{"meta":{"query_hash":"5d9e2b4a2aff","filters":{"topic":"Power System Reliability and Maintenance"},"cohort_total":594,"direct_labels_cover":0,"predictions_cover":594,"exported":594,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/5d9e2b4a2aff","api":"https://metacan.xera.ac/api/v1/cohort?topic=Power+System+Reliability+and+Maintenance"},"results":[{"id":"W139086410","doi":"10.1007/978-81-322-0757-3_37","title":"Probabilistic Risk Analysis in Wind-Integrated Electric Power System Operation","year":2012,"lang":"en","type":"book-chapter","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Probabilistic logic; Electric power system; Wind power; Computer science; Reliability engineering; Environmental science; Power (physics); Electrical engineering; Engineering; Physics; Artificial intelligence","score_opus":0.005383464512945084,"score_gpt":0.17463198693959656,"score_spread":0.16924852242665148,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W139086410","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002430452,0.0040730876,0.028364267,0.000011354172,0.0009947651,0.0014493414,0.00011363877,0.0011104909,0.9614526],"genre_scores_gemma":[0.939241,0.00017612493,0.0001086117,0.0000076167953,0.00006301031,0.0000322464,0.00008271809,0.00007653226,0.06021213],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99808675,0.000052583116,0.00076056505,0.00041198076,0.000256538,0.00043159717],"domain_scores_gemma":[0.998947,0.000077211494,0.00011864882,0.00061705627,0.00012238961,0.00011768895],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005867192,0.00047031758,0.00086692214,0.0006972782,0.000038492588,0.000053771386,0.00021609737,0.00054354407,0.00050895166],"category_scores_gemma":[0.000044631102,0.00039475638,0.0002863259,0.00034067605,0.000021984264,0.00014061919,0.000022892944,0.0006103057,0.0004817085],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011050718,0.00017341734,0.002683033,0.004099159,0.007486436,0.00010818505,0.0013638254,0.4447242,0.00031724697,0.52807987,0.005658968,0.0051951567],"study_design_scores_gemma":[0.0012853454,0.0002341291,0.0033401547,0.001858735,0.0052476735,0.00006306873,0.00021838678,0.8095672,0.00020550491,0.0014322612,0.17250554,0.004042017],"about_ca_topic_score_codex":0.0002320091,"about_ca_topic_score_gemma":0.00062972633,"teacher_disagreement_score":0.93681055,"about_ca_system_score_codex":0.001059816,"about_ca_system_score_gemma":0.00005567122,"threshold_uncertainty_score":0.99985045},"labels":[],"label_agreement":null},{"id":"W1495235813","doi":"10.1109/tdc.2006.1668500","title":"Stray Voltage at Farm Site Utilities Practice and Review","year":2006,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Stray voltage; Engineering; Computer science; Voltage; Operations research; Telecommunications; Electrical engineering","score_opus":0.005320543826605702,"score_gpt":0.20488432181820043,"score_spread":0.19956377799159472,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1495235813","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029302612,0.20396978,0.011137393,0.0009883136,0.0005399168,0.00064190733,0.000043109772,0.00082198606,0.75255495],"genre_scores_gemma":[0.965299,0.011595017,0.00060815085,0.0007437537,0.00006801581,0.000024745656,0.000010568245,0.000021441345,0.021629306],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99943507,0.000016543732,0.00018175265,0.00012017241,0.00008478568,0.00016166427],"domain_scores_gemma":[0.99963254,0.00009671085,0.00001907412,0.00018375996,0.000033019383,0.000034870183],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023335748,0.000095881944,0.00014877884,0.000012910118,0.000030207639,0.000017403705,0.00004456579,0.000035061687,0.00010541042],"category_scores_gemma":[0.00006989278,0.000079632315,0.000028907714,0.000053395965,0.00002795576,0.00013254698,0.0000253005,0.00006346864,0.0000934397],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006484531,0.00024864444,0.0051661255,0.05601453,0.0002789183,0.00017927476,0.0014851663,0.0013056364,0.017156217,0.111389354,0.7694148,0.037296485],"study_design_scores_gemma":[0.00008776159,0.000010949027,0.00077477697,0.00035513495,0.000023727185,0.00004430091,0.000049206614,0.00053784536,0.00042742654,0.00010922407,0.9974518,0.00012789303],"about_ca_topic_score_codex":0.00025654794,"about_ca_topic_score_gemma":0.00035487578,"teacher_disagreement_score":0.9359964,"about_ca_system_score_codex":0.000050367555,"about_ca_system_score_gemma":0.00000486516,"threshold_uncertainty_score":0.32473117},"labels":[],"label_agreement":null},{"id":"W1503143551","doi":"10.1109/ccece.2000.849566","title":"Adequacy evaluation of interconnected systems with an AC/DC link using an equivalent approach","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Link (geometry); Computer science; Transmission system; Transmission line; Reliability engineering; Electronic engineering; Control theory (sociology); Engineering; Transmission (telecommunications); Telecommunications; Power (physics); Physics; Computer network","score_opus":0.10328794429392567,"score_gpt":0.2695121384568509,"score_spread":0.16622419416292522,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1503143551","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7695027,0.00051127956,0.2163031,0.000009369972,0.00034201072,0.0006846502,0.000006230454,0.00030254433,0.012338113],"genre_scores_gemma":[0.99709624,0.000006425904,0.0026706243,0.0000052560295,0.00008383286,0.000035006156,0.000010637634,0.000029436289,0.00006254697],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998616,0.00017670097,0.00035064502,0.00023716422,0.00038586563,0.0002336277],"domain_scores_gemma":[0.99907154,0.00002381091,0.00006195088,0.00048724297,0.00025761485,0.00009784269],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008506229,0.0001576777,0.00026240086,0.0000856105,0.000029891196,0.00003844124,0.00017196394,0.000092369024,0.00008244912],"category_scores_gemma":[0.000039612853,0.00012410694,0.000034405424,0.00019187853,0.000033450287,0.00045268124,0.000016313474,0.00010430802,0.000007027957],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025158604,0.00028527598,0.00022330064,0.00097122137,0.000117717755,0.0000015950328,0.0029602365,0.97939545,0.009500052,0.0016831924,0.000065209424,0.0047715893],"study_design_scores_gemma":[0.00049187226,0.00017941179,0.00013466449,0.00016603933,0.000058284302,0.000024769586,0.00094047154,0.99654335,0.0011774295,0.000020988438,0.00008585132,0.00017685989],"about_ca_topic_score_codex":0.00016266886,"about_ca_topic_score_gemma":0.00003332486,"teacher_disagreement_score":0.22759353,"about_ca_system_score_codex":0.00016482458,"about_ca_system_score_gemma":0.00001658546,"threshold_uncertainty_score":0.50609344},"labels":[],"label_agreement":null},{"id":"W1506342128","doi":"10.2172/834270","title":"Understanding the cost of power interruptions to U.S. electricity consumers","year":2004,"lang":"en","type":"report","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":181,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Blackout; Electricity; Reliability (semiconductor); Electric power industry; Quality (philosophy); Reliability engineering; Electricity market; Environmental economics; Electric power system; Power (physics); Business; Computer science; Engineering; Economics; Electrical engineering","score_opus":0.09768550781516999,"score_gpt":0.2871544068848088,"score_spread":0.18946889906963882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1506342128","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00023656017,0.00063403015,0.5346152,0.00022057687,0.0025257447,0.0008771086,0.000080421225,0.0002338797,0.46057647],"genre_scores_gemma":[0.99703705,0.00048031786,0.00011724147,0.000049910304,0.00003098568,0.00005067512,0.000009057129,0.000041598192,0.0021831365],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99852324,0.000023562814,0.0004970677,0.00021304253,0.00041220308,0.00033091215],"domain_scores_gemma":[0.9990374,0.0001222064,0.0000832065,0.0004855741,0.00017888114,0.00009273612],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00060050486,0.000238872,0.0004243044,0.00016315219,0.000054864406,0.000025947973,0.00030003875,0.00021348214,0.00014806587],"category_scores_gemma":[0.00023403503,0.00016890152,0.00018256222,0.00035294468,0.00008296109,0.000042313866,0.000051145544,0.00040118783,0.000049325936],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006592029,0.00024152362,0.0008473376,0.0048099537,0.0025485777,0.00004712881,0.004483648,0.07514519,0.0016468209,0.044723775,0.8625019,0.0029382112],"study_design_scores_gemma":[0.00051951053,0.0001792783,0.0008639062,0.0025665623,0.00023863353,0.00019657867,0.001915385,0.000734373,0.0015217869,0.0018719621,0.9881522,0.001239819],"about_ca_topic_score_codex":0.0004205902,"about_ca_topic_score_gemma":0.0006747955,"teacher_disagreement_score":0.99680054,"about_ca_system_score_codex":0.0023828645,"about_ca_system_score_gemma":0.00043296936,"threshold_uncertainty_score":0.6887604},"labels":[],"label_agreement":null},{"id":"W1514229852","doi":"10.1109/tdc.2006.1668593","title":"Reliability Analysis of the Isolation and Restoration Procedures of Distribution Feeders","year":2006,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Blackout; Islanding; Reliability engineering; Reliability (semiconductor); Grid; Point (geometry); Computer science; Isolation (microbiology); Engineering; Maintenance engineering; Electric power system; Power (physics); Electrical engineering; Distributed generation; Renewable energy","score_opus":0.0031034729359782623,"score_gpt":0.18092111270610775,"score_spread":0.1778176397701295,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1514229852","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93619466,0.000064786545,0.06233209,0.000041863186,0.00005140184,0.00011517491,0.000020715122,0.00002841553,0.0011509041],"genre_scores_gemma":[0.99984056,0.000005360716,0.00009145835,0.0000017146332,0.000004421987,0.0000034633247,0.000017562568,0.0000018832347,0.00003357606],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9995927,0.000018890069,0.00020592753,0.000056443114,0.00007763306,0.000048378977],"domain_scores_gemma":[0.9997018,0.000027446504,0.000048003556,0.0001457894,0.00006966173,0.0000073167926],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016519034,0.00004081581,0.00010579728,0.000026790081,0.000018621806,0.000004069966,0.000035261342,0.000035581415,0.0000025280692],"category_scores_gemma":[0.00008332196,0.00002779947,0.00004620719,0.0003672216,0.00004574277,0.00007104036,0.000007544129,0.000024305216,1.10883725e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037250655,0.00009841221,0.2994131,0.0010719822,0.00021494928,4.361108e-8,0.0006304308,0.6143536,0.05548188,0.024868205,0.0035479532,0.00028221632],"study_design_scores_gemma":[0.00006864699,0.000010138059,0.8795273,0.000019804038,0.00011773138,1.7437291e-7,0.00011547153,0.111069806,0.008300745,0.0005699697,0.00015392143,0.00004630165],"about_ca_topic_score_codex":0.00038938035,"about_ca_topic_score_gemma":0.0006180382,"teacher_disagreement_score":0.5801142,"about_ca_system_score_codex":0.000040029932,"about_ca_system_score_gemma":0.000008896034,"threshold_uncertainty_score":0.11336295},"labels":[],"label_agreement":null},{"id":"W1524693415","doi":"10.1109/rams.2015.7105167","title":"Maintenance resource planning for utility poles in a power distribution network","year":2015,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Weibull distribution; Reliability engineering; Interval (graph theory); Preventive maintenance; Resource (disambiguation); Distribution (mathematics); Computer science; Mathematical optimization; Operations research; Engineering; Mathematics; Statistics","score_opus":0.021570534736361405,"score_gpt":0.23448758873281023,"score_spread":0.21291705399644884,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1524693415","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09194036,0.0012220335,0.86301476,0.00038225495,0.00097033125,0.0007413081,0.00008887955,0.00060821883,0.041031867],"genre_scores_gemma":[0.9987291,0.0000020352725,0.0007337127,0.000063274965,0.0000639216,0.000052083895,0.000030261823,0.000013708936,0.00031191658],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990219,0.000026708065,0.00025371913,0.0001790824,0.000093259245,0.00042531785],"domain_scores_gemma":[0.9995285,0.0000768957,0.000021877313,0.00022453886,0.00004831236,0.00009981959],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007573649,0.00011898626,0.00018408382,0.00001796883,0.00002609081,0.000019652318,0.00012219718,0.00008500134,0.000006029469],"category_scores_gemma":[0.00019672578,0.000105851585,0.000047652222,0.00015829717,0.000030449939,0.000094981704,0.000025942178,0.00010811499,0.000010035565],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003485218,0.00007776033,0.027597867,0.00027955414,0.000037135665,0.000017488237,0.0017083975,0.19079469,0.000053861306,0.022164188,0.75473535,0.0021851643],"study_design_scores_gemma":[0.0010797464,0.000069675705,0.015296302,0.00030187564,0.0000051761617,0.000010191445,0.0010213568,0.1295642,0.00014664563,0.004583995,0.84758544,0.0003354179],"about_ca_topic_score_codex":0.000031185555,"about_ca_topic_score_gemma":0.000053761112,"teacher_disagreement_score":0.9067887,"about_ca_system_score_codex":0.00015930217,"about_ca_system_score_gemma":0.000019914292,"threshold_uncertainty_score":0.43165022},"labels":[],"label_agreement":null},{"id":"W1532820469","doi":"10.1109/apt.1993.673917","title":"A Canadian Cost Of Interruption Study","year":2005,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Computer science","score_opus":0.013650331795433695,"score_gpt":0.23469328608563603,"score_spread":0.22104295429020232,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1532820469","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8780933,0.00006780193,0.0077634114,0.00020592504,0.00036674328,0.00047797436,0.0000072605744,0.00014509256,0.1128725],"genre_scores_gemma":[0.9993222,0.0000019693668,0.00010603239,0.000022873965,0.000018290622,0.00001070779,5.18099e-7,0.0000043414266,0.0005130929],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997152,0.000005962291,0.00010429826,0.000044381268,0.000035682184,0.00009444603],"domain_scores_gemma":[0.99981004,0.0000053304334,0.000005102426,0.00010817217,0.000016630493,0.000054694985],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008813721,0.000036258552,0.00006278487,0.000042404503,0.000007058605,0.0000037696616,0.000053810872,0.000017209957,0.00011721951],"category_scores_gemma":[0.0000074949526,0.00003239483,0.000014205493,0.000048883485,0.000004669972,0.000047534864,0.0000041464687,0.00003078114,0.00006796341],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009489072,0.0014220232,0.15963529,0.00096627156,0.00069810665,0.00004479892,0.047595117,0.23485087,0.009153248,0.016593972,0.1330239,0.3959215],"study_design_scores_gemma":[0.0019381172,0.000529648,0.077727996,0.00018220556,0.000041399453,0.000023337281,0.008061618,0.18562134,0.00815565,0.000109559645,0.7168358,0.00077331864],"about_ca_topic_score_codex":0.035293404,"about_ca_topic_score_gemma":0.6387823,"teacher_disagreement_score":0.6034889,"about_ca_system_score_codex":0.00013633657,"about_ca_system_score_gemma":0.000013541162,"threshold_uncertainty_score":0.97113067},"labels":[],"label_agreement":null},{"id":"W1536430162","doi":"10.1109/pes.2004.1372834","title":"Assessment of high voltage auto-transformer spare requirements in bulk transmission systems","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Spare part; Autotransformer; Reliability engineering; Unavailability; Computer science; Electricity; Engineering; Voltage; Operations management; Transformer; Electrical engineering","score_opus":0.007341018452248082,"score_gpt":0.225669800912643,"score_spread":0.21832878246039492,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1536430162","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5596336,0.0020713385,0.43294543,0.00004516406,0.0030940282,0.00065248634,0.00004492591,0.0005104406,0.0010025928],"genre_scores_gemma":[0.9901314,0.00022128675,0.009167382,0.000023909539,0.000119504526,0.00008174373,0.000014050939,0.00009633091,0.00014440529],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974711,0.000024167126,0.0008594366,0.00040717068,0.0005038901,0.00073426],"domain_scores_gemma":[0.9992285,0.00003345842,0.00008955548,0.0003994023,0.00007849822,0.00017060028],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007181494,0.00043212858,0.00059608987,0.0001004297,0.000049178503,0.000037886464,0.00030776073,0.0002820234,0.000017284101],"category_scores_gemma":[0.0000155008,0.00043939363,0.00028740757,0.00039036406,0.000040607352,0.00022397129,0.0000128342635,0.00040455846,0.0000065311433],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000026635914,0.00007197641,0.00016070128,0.00084183994,0.00007698562,0.0000073926,0.0009240609,0.8357216,0.16130307,0.00039011094,0.00044099655,0.000058612157],"study_design_scores_gemma":[0.0072658556,0.00042172804,0.0113957925,0.007862923,0.00014264374,0.000052972224,0.0006032691,0.778917,0.16216005,0.0001349519,0.028119013,0.0029237901],"about_ca_topic_score_codex":0.0004680407,"about_ca_topic_score_gemma":0.000011227174,"teacher_disagreement_score":0.4304978,"about_ca_system_score_codex":0.0007267703,"about_ca_system_score_gemma":0.0000790786,"threshold_uncertainty_score":0.9998058},"labels":[],"label_agreement":null},{"id":"W1537246775","doi":"10.1109/pes.2003.1270402","title":"Risk assessment of power systems SCADA","year":2004,"lang":"en","type":"article","venue":"2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"SCADA; Reliability engineering; Reliability (semiconductor); Electric power system; Computer science; Engineering; Risk analysis (engineering); Power (physics); Business; Electrical engineering","score_opus":0.004558632617385556,"score_gpt":0.20604147724159358,"score_spread":0.201482844624208,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1537246775","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.81004816,0.0012151608,0.16339673,0.00004729731,0.019365907,0.0009600231,0.00018433687,0.0013198443,0.003462555],"genre_scores_gemma":[0.9450758,0.00051702844,0.05297745,0.00007645564,0.0004446485,0.00015352626,0.000017833954,0.00025349445,0.00048373675],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99557954,0.00010168529,0.0013334875,0.00078361284,0.0008408196,0.0013608391],"domain_scores_gemma":[0.99733776,0.0001502119,0.00031892763,0.0010878915,0.0007087378,0.00039647036],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0016068999,0.00086696283,0.0010637739,0.00013988507,0.00018894796,0.00013547095,0.0006871608,0.00052694185,0.000023151364],"category_scores_gemma":[0.00028110985,0.0008988639,0.00060626294,0.0009241897,0.0001209199,0.00035931493,0.00006654747,0.0008103767,0.000081303566],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004314735,0.000082568826,0.00055965025,0.0006625222,0.00036108357,0.000012166237,0.00078733225,0.8601288,0.12724198,0.00039363917,0.009749692,0.00001621918],"study_design_scores_gemma":[0.0028094894,0.0003297721,0.0027145906,0.0021252756,0.0002345339,0.000113942915,0.000486811,0.9271712,0.038109917,0.000042695323,0.023115898,0.0027459157],"about_ca_topic_score_codex":0.00040979774,"about_ca_topic_score_gemma":0.0000074096074,"teacher_disagreement_score":0.13502768,"about_ca_system_score_codex":0.0011504873,"about_ca_system_score_gemma":0.00024522713,"threshold_uncertainty_score":0.9993462},"labels":[],"label_agreement":null},{"id":"W1537693240","doi":"10.1002/9780470061596.risk0604","title":"Quantitative Reliability Assessment of Electricity Supply","year":2008,"lang":"en","type":"other","venue":"Encyclopedia of Quantitative Risk Analysis and Assessment","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Mains electricity; Computer science; Electricity; Electric power system; Power (physics); Engineering; Electrical engineering","score_opus":0.010126823246302942,"score_gpt":0.2934130815124276,"score_spread":0.2832862582661247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1537693240","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03532912,0.010764528,0.28315347,0.00004173682,0.0005401662,0.0012397778,0.0022468714,0.00025437545,0.66642994],"genre_scores_gemma":[0.49534932,0.2712075,0.21092223,0.000010430587,0.00008389537,0.00018367458,0.00032159372,0.00043190323,0.02148947],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99649096,0.00049926725,0.0012454765,0.0006842386,0.000674952,0.00040510937],"domain_scores_gemma":[0.99705935,0.0007304024,0.0010733678,0.0007193073,0.00027188062,0.00014566799],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010061621,0.0005798808,0.0021772194,0.0009914023,0.00006206106,0.000015167341,0.00030999474,0.00030091,0.00030640612],"category_scores_gemma":[0.00018259791,0.00050638546,0.0006156704,0.0015162177,0.00039593232,0.00011196689,0.000080487305,0.0006027792,0.00000398941],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011344531,0.0021267934,0.73192906,0.005964864,0.030006401,0.000041191153,0.0027357717,0.021751348,0.00046858029,0.053041406,0.14439596,0.00742515],"study_design_scores_gemma":[0.0016072667,0.0019507963,0.6389583,0.0010402695,0.008129927,0.000003327179,0.0016430533,0.14390488,0.0002497758,0.0012176053,0.19907188,0.0022229552],"about_ca_topic_score_codex":0.0025898772,"about_ca_topic_score_gemma":0.0010947277,"teacher_disagreement_score":0.6449405,"about_ca_system_score_codex":0.00016473926,"about_ca_system_score_gemma":0.00022901953,"threshold_uncertainty_score":0.99973875},"labels":[],"label_agreement":null},{"id":"W1542126636","doi":"10.1002/gas.21774","title":"NERC's Reliability Assurance Initiative: What Registered Entities Can Do","year":2014,"lang":"en","type":"article","venue":"Natural Gas & Electricity","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Jurisdiction; Commission; Power grid; Business; Power (physics); Reliability engineering; Engineering; Telecommunications; Political science; Law; Finance; Physics","score_opus":0.007980412692778889,"score_gpt":0.20985885456539136,"score_spread":0.20187844187261247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1542126636","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9692647,0.008683068,0.0046268785,0.0012656845,0.0041000433,0.00067769265,0.000020419586,0.001126869,0.010234672],"genre_scores_gemma":[0.9978222,0.0008824596,0.00026181721,0.00034049925,0.00019696631,0.000038175265,0.000011507653,0.00003323983,0.00041313274],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9978394,0.00021615416,0.00044145313,0.00046329648,0.00036474768,0.0006749437],"domain_scores_gemma":[0.9985225,0.00035122712,0.00009983596,0.00066833815,0.00023051102,0.00012755395],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007427144,0.00032271823,0.00046077414,0.00009788347,0.00013240885,0.00021484082,0.00040066536,0.0001976562,0.000023546934],"category_scores_gemma":[0.0009506235,0.00028966577,0.00016090242,0.00051043485,0.000111346104,0.00074145466,0.000044596494,0.0007088891,0.00003407504],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001561286,0.001067021,0.03225744,0.010011528,0.001116425,0.00013865645,0.015087695,0.020009838,0.06318044,0.036959212,0.2140202,0.60459024],"study_design_scores_gemma":[0.006116905,0.0014411962,0.12552285,0.0028481858,0.00028339526,0.00027509846,0.0010436164,0.15935174,0.1318045,0.046579648,0.518215,0.0065178685],"about_ca_topic_score_codex":0.00012271751,"about_ca_topic_score_gemma":0.0002873041,"teacher_disagreement_score":0.5980724,"about_ca_system_score_codex":0.00038919324,"about_ca_system_score_gemma":0.00004835288,"threshold_uncertainty_score":0.99995553},"labels":[],"label_agreement":null},{"id":"W1547312877","doi":"10.1109/ias.1992.244270","title":"Utility network reliability costing methodology","year":2003,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Activity-based costing; Reliability (semiconductor); Reliability engineering; Computer science; Downtown; Point (geometry); Service (business); Set (abstract data type); Operations research; Power (physics); Engineering; Mathematics; Geography; Business","score_opus":0.04012146262465197,"score_gpt":0.25007215283113204,"score_spread":0.20995069020648008,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1547312877","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046313412,0.00049920165,0.6150068,0.000057555422,0.002127582,0.00026579553,0.0000026122443,0.0008513531,0.3348757],"genre_scores_gemma":[0.9469771,0.0000173537,0.05234682,0.00009737919,0.000053506526,0.000014651504,0.000001046765,0.000015661813,0.000476489],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.998544,0.0003568469,0.00032610766,0.00024573776,0.000086490516,0.0004408526],"domain_scores_gemma":[0.9987519,0.000598921,0.000021976386,0.00047946724,0.000053837473,0.00009390507],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023421699,0.00014004592,0.00026448464,0.000015836713,0.0000623464,0.000012616494,0.00012249907,0.00011939619,0.00035524697],"category_scores_gemma":[0.0012870907,0.00012402583,0.000076017626,0.00019814633,0.000060523438,0.00008058926,0.000019877509,0.00019643518,0.00008420426],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000075222706,0.0002156577,0.16677159,0.0015847078,0.0002330558,0.000031658856,0.0010335309,0.24598972,0.002234621,0.40983567,0.14488682,0.027107734],"study_design_scores_gemma":[0.00060466665,0.00005702487,0.020802215,0.00007135795,0.000031426498,0.000063942156,0.00024503784,0.047513045,0.007211776,0.052803393,0.8698187,0.00077741186],"about_ca_topic_score_codex":0.00003035724,"about_ca_topic_score_gemma":0.000053489905,"teacher_disagreement_score":0.9006637,"about_ca_system_score_codex":0.000046050325,"about_ca_system_score_gemma":0.000020448175,"threshold_uncertainty_score":0.50576264},"labels":[],"label_agreement":null},{"id":"W1551858500","doi":"10.1109/pes.2004.1372878","title":"A study on the optimal reliability criteria decision for a transmission system expansion planning","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Computer science; Electric power system; Electricity market; Transmission (telecommunications); Constraint (computer-aided design); Grid; Total cost; Transmission system; Business system planning; Operations research; Mathematical optimization; Electricity; Engineering; Power (physics); Economics; Mathematics; Telecommunications","score_opus":0.013582685038198428,"score_gpt":0.25049578306023706,"score_spread":0.23691309802203864,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1551858500","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6051689,0.00036810746,0.39063546,0.00008092308,0.0018214836,0.0010750872,0.000016499092,0.00072623126,0.00010733283],"genre_scores_gemma":[0.9735509,0.000009778017,0.025537455,0.00006379702,0.0002799746,0.0003964311,0.0000044197322,0.000121254845,0.000035994464],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99743277,0.00005872069,0.0006843107,0.00060956186,0.00047404226,0.00074062473],"domain_scores_gemma":[0.99856967,0.0003408383,0.00007618718,0.0007080935,0.00012123701,0.00018397333],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0017171737,0.00051625504,0.000485376,0.00005873313,0.00028394465,0.00010974086,0.0004332731,0.0002448067,0.0000052658233],"category_scores_gemma":[0.00014869176,0.00039350847,0.00045689373,0.00028982834,0.00003682219,0.00015346303,0.00003164022,0.00043080826,0.000013564405],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051810282,0.00012290462,0.00003024486,0.00027786545,0.000071500566,0.000008702512,0.005864701,0.96452695,0.024710786,0.000113025286,0.004108948,0.00011258527],"study_design_scores_gemma":[0.0057936963,0.0016510012,0.0014755094,0.005785399,0.00018389293,0.00007878003,0.007476882,0.89270395,0.06383478,0.000118942226,0.018651452,0.0022457102],"about_ca_topic_score_codex":0.00002542585,"about_ca_topic_score_gemma":8.0694736e-7,"teacher_disagreement_score":0.36838204,"about_ca_system_score_codex":0.00062190497,"about_ca_system_score_gemma":0.000046325713,"threshold_uncertainty_score":0.9998517},"labels":[],"label_agreement":null},{"id":"W1554891489","doi":"","title":"Modélisation de l’historique d’opération de groupes turbine-alternateur","year":2012,"lang":"fr","type":"article","venue":"Espace École de technologie supérieure (École de technologie supérieure)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Mitacs; Hydro-Québec","keywords":"Humanities; Physics; Political science; Art","score_opus":0.013305728710247936,"score_gpt":0.24253426496424743,"score_spread":0.2292285362539995,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1554891489","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37358177,0.025583329,0.56071526,0.016808394,0.004032434,0.0026122255,0.0002553179,0.013831444,0.0025798173],"genre_scores_gemma":[0.96060306,0.0033555266,0.024242004,0.00073413685,0.0010387284,0.0014044581,0.00007906093,0.00044063336,0.008102419],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9890593,0.0005157046,0.0016571704,0.0017020435,0.0008785827,0.0061871912],"domain_scores_gemma":[0.99396485,0.0006446531,0.00070849224,0.0033427845,0.00045762054,0.000881592],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["metaepi_narrow","research_integrity"],"category_scores_codex":[0.0041841925,0.0018860493,0.0016407659,0.0013412125,0.00068203773,0.0003778397,0.003210674,0.006037795,0.00014140902],"category_scores_gemma":[0.006105618,0.002176187,0.00070570514,0.0028006262,0.0013064594,0.0021304442,0.0010806194,0.004874885,0.00045175524],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005630276,0.0025882283,0.13670884,0.0040974505,0.00095585047,0.0015428858,0.010672481,0.48193723,0.13149957,0.14145112,0.0623535,0.025629815],"study_design_scores_gemma":[0.0036409416,0.0015579673,0.016561331,0.0018853672,0.00074577454,0.0029860928,0.014281848,0.30705285,0.20974617,0.023424458,0.41264015,0.0054770703],"about_ca_topic_score_codex":0.0019416568,"about_ca_topic_score_gemma":0.0017035283,"teacher_disagreement_score":0.58702123,"about_ca_system_score_codex":0.007794717,"about_ca_system_score_gemma":0.0010396644,"threshold_uncertainty_score":0.99938834},"labels":[],"label_agreement":null},{"id":"W1562627805","doi":"10.1002/047134608x.w8187","title":"Operation Reliability of Power Systems","year":2012,"lang":"en","type":"other","venue":"Wiley Encyclopedia of Electrical and Electronics Engineering","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Probabilistic logic; Randomness; Electric power system; Computer science; Transient (computer programming); Fuzzy logic; Power (physics); Engineering; Statistics; Mathematics","score_opus":0.0025091728965292116,"score_gpt":0.17102157441254676,"score_spread":0.16851240151601754,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1562627805","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011488295,0.33889365,0.103010654,0.000026759919,0.002605879,0.0014598268,0.00006859577,0.0012895092,0.5411568],"genre_scores_gemma":[0.9702036,0.021619545,0.0007292336,0.000002853053,0.00013745597,0.00004441387,0.000008864528,0.00027196787,0.0069821114],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986925,0.00002072998,0.00043526196,0.00020066669,0.00017666911,0.00047414552],"domain_scores_gemma":[0.9994268,0.0000651528,0.000079016645,0.0002791763,0.000035740883,0.00011411758],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00022809098,0.0002622087,0.00051115354,0.0001861495,0.0000111834115,0.000007684568,0.00014015047,0.00026860472,0.000044652494],"category_scores_gemma":[0.000070967144,0.00024743314,0.00007318926,0.00025853358,0.00003127596,0.00007925055,0.000021772132,0.00028286705,0.0000043787277],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021596017,0.0014437091,0.008980075,0.029588295,0.002195893,0.0000195827,0.0019916033,0.24534017,0.04421009,0.3563487,0.2739044,0.035761524],"study_design_scores_gemma":[0.00038107764,0.00024698031,0.0003571339,0.00051364535,0.00008550808,0.00002377827,0.000006811173,0.050632663,0.0010324805,0.00006528585,0.9459924,0.0006622415],"about_ca_topic_score_codex":0.000039108323,"about_ca_topic_score_gemma":0.000002980505,"teacher_disagreement_score":0.95871526,"about_ca_system_score_codex":0.00007970066,"about_ca_system_score_gemma":0.00003655457,"threshold_uncertainty_score":0.9999978},"labels":[],"label_agreement":null},{"id":"W1565293882","doi":"10.1109/pes.2005.1489099","title":"New performance measures for transmission stations","year":2005,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2005","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Unavailability; Transmission (telecommunications); Computer science; Ranking (information retrieval); Reliability engineering; Asset management; Reliability (semiconductor); Transfer (computing); Overhead (engineering); Engineering; Telecommunications; Business; Finance","score_opus":0.007024797996865646,"score_gpt":0.20515620276727384,"score_spread":0.1981314047704082,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1565293882","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050837073,0.0021883915,0.9429053,0.00035857596,0.0014433698,0.00042172658,0.0000238077,0.000951163,0.00087058154],"genre_scores_gemma":[0.6961246,0.00071300426,0.29795066,0.00017305808,0.0012292487,0.00013328726,0.000015833435,0.00015266954,0.0035076535],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983562,0.000010879683,0.000405109,0.000289168,0.00025006878,0.00068855623],"domain_scores_gemma":[0.99930894,0.00006153902,0.000039645132,0.00026835935,0.000070763475,0.00025074938],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000446009,0.00031584228,0.00027008314,0.00004587587,0.00011392189,0.000050698203,0.0002319599,0.0001732829,0.00004024664],"category_scores_gemma":[0.000026212469,0.00032369373,0.00029345328,0.00015049601,0.000016848036,0.00025647774,0.0000094703155,0.00022601792,0.000029706076],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000053140284,0.000014321227,0.000018227911,0.00017250473,0.00006593598,1.8190501e-7,0.0010747885,0.8496736,0.042286903,0.0000813582,0.096537285,0.010069531],"study_design_scores_gemma":[0.00038503937,0.000023710383,0.000074655676,0.000108082204,0.000018328317,0.0000040892646,0.000019006002,0.43736008,0.03084031,0.000005772452,0.5308446,0.0003163244],"about_ca_topic_score_codex":0.000012651255,"about_ca_topic_score_gemma":0.000008430052,"teacher_disagreement_score":0.6452875,"about_ca_system_score_codex":0.00022890292,"about_ca_system_score_gemma":0.00005740722,"threshold_uncertainty_score":0.9999215},"labels":[],"label_agreement":null},{"id":"W1584860337","doi":"","title":"A reliability based model for electricity pricing","year":2008,"lang":"en","type":"article","venue":"eSpace (Curtin University)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Reliability (semiconductor); Computer science; Electricity; Reliability engineering; Electric power industry; Electricity market; Mains electricity; Order (exchange); Electric power system; Operations research; Engineering; Power (physics); Economics; Finance","score_opus":0.01146046792361888,"score_gpt":0.17361461525646119,"score_spread":0.1621541473328423,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1584860337","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2496347,0.000028901875,0.744854,0.000104746876,0.00012333515,0.0003576903,0.000015452595,0.00045808576,0.0044231466],"genre_scores_gemma":[0.98870367,0.000019916955,0.0072712805,0.000036925056,0.000022567152,0.0000032409105,0.0000030831793,0.000020778289,0.003918563],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99907744,0.00003209287,0.00013220255,0.00026848525,0.00011759842,0.00037219957],"domain_scores_gemma":[0.99927783,0.00012921564,0.000040578376,0.00033300853,0.000110822926,0.00010853652],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001882374,0.00015645578,0.00021396653,0.00015377163,0.00016788153,0.000007399346,0.00021951146,0.00010516802,0.0000063112516],"category_scores_gemma":[0.00012080804,0.00017674114,0.00013380384,0.00046007495,0.000060440845,0.00017712727,0.000026029122,0.00015403607,0.000010714897],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019658724,0.00009986604,0.0015785029,0.0003236,0.00003269752,0.000027073467,0.0010116162,0.9828443,0.004654957,0.003260648,0.0058002085,0.00016996912],"study_design_scores_gemma":[0.00061952806,0.000040142546,0.000467427,0.00002587218,0.000017512693,0.0000027451106,0.000059373757,0.96927416,0.002625748,0.00006901537,0.026572237,0.00022625613],"about_ca_topic_score_codex":0.000024109375,"about_ca_topic_score_gemma":0.000079966296,"teacher_disagreement_score":0.7390689,"about_ca_system_score_codex":0.0003389834,"about_ca_system_score_gemma":0.0000970224,"threshold_uncertainty_score":0.7207295},"labels":[],"label_agreement":null},{"id":"W1587761432","doi":"","title":"Power system reinforcement planning considering wind power and load forecast uncertainty using the well-being analysis framework","year":2010,"lang":"en","type":"article","venue":"International Universities Power Engineering Conference","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Electric power system; Probabilistic logic; Computer science; Wind power; Power (physics); Engineering","score_opus":0.006569272193489268,"score_gpt":0.2065951882002314,"score_spread":0.20002591600674213,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1587761432","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7125983,0.00008311288,0.26145664,0.00008826423,0.002569025,0.00016314603,0.000019010107,0.00029907934,0.022723414],"genre_scores_gemma":[0.99821097,0.0000074168224,0.0014673629,0.000035647838,0.000054834094,0.0000034383017,0.0000051736597,0.000028542096,0.00018662775],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985158,0.00001754008,0.00034322034,0.0003124591,0.0004116856,0.00039930927],"domain_scores_gemma":[0.99890155,0.00024590947,0.00008634081,0.0003809861,0.0002591285,0.00012605998],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00029996526,0.0003149102,0.00031672636,0.00028960616,0.000155936,0.00022301183,0.00045654248,0.00016492701,0.0002666046],"category_scores_gemma":[0.00005896303,0.00029405148,0.00014126141,0.00028527936,0.00012332629,0.0003772127,0.00017289279,0.0005781581,0.000007699333],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019642479,0.0000046872597,0.0011461175,0.00006254127,0.0008171007,0.000054692577,0.005493906,0.90907097,0.0018541538,0.08142574,0.00004023922,0.000010203467],"study_design_scores_gemma":[0.00029941468,0.000026101825,0.0016255346,0.00050996116,0.00013891733,0.000086018605,0.010915262,0.97281635,0.0003660514,0.00009454146,0.012608358,0.0005135077],"about_ca_topic_score_codex":0.00009922152,"about_ca_topic_score_gemma":0.0000137403795,"teacher_disagreement_score":0.28561264,"about_ca_system_score_codex":0.0005090962,"about_ca_system_score_gemma":0.000093288836,"threshold_uncertainty_score":0.9999512},"labels":[],"label_agreement":null},{"id":"W1592194218","doi":"","title":"Estimating the value of reliability for residential customers","year":2005,"lang":"en","type":"article","venue":"Probabilistic Methods Applied to Power Systems, 2004 International Conference on","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Valuation (finance); Cost estimate; Regression analysis; Total cost; Activity-based costing; Econometrics; Computer science; Statistics; Environmental economics; Actuarial science; Operations research; Business; Power (physics); Economics; Engineering; Mathematics; Microeconomics; Marketing; Finance","score_opus":0.03366964788112392,"score_gpt":0.33385068646519583,"score_spread":0.3001810385840719,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1592194218","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004340803,0.00008445168,0.94371104,0.00075765705,0.0040040105,0.0023588964,0.00011494165,0.0001830298,0.044445176],"genre_scores_gemma":[0.79872864,0.0000023125629,0.19990459,0.00007331865,0.00019764104,0.00080106826,0.000010190592,0.000034798308,0.00024743297],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973691,0.00020754746,0.0010383066,0.0005026693,0.0005005043,0.00038185713],"domain_scores_gemma":[0.9975856,0.0008970991,0.0002219812,0.00068341725,0.00048400494,0.00012787867],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003591429,0.0003011877,0.0004968823,0.00013275188,0.00009321992,0.00010242138,0.0007986439,0.00013390768,0.000073516814],"category_scores_gemma":[0.0014417007,0.00023339246,0.00013130659,0.00018346522,0.00012397881,0.00009303596,0.000081097416,0.000239905,0.000055756744],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000116472,0.00005715988,0.000007805884,0.00038042243,0.000073726755,2.7100785e-7,0.0005525457,0.60110825,0.0030988993,0.38890254,0.0017359009,0.0039659836],"study_design_scores_gemma":[0.0007057733,0.00016595425,0.00011741298,0.0004990566,0.000059157694,0.000011186529,0.0003670605,0.93853635,0.0032469446,0.014640291,0.041126803,0.00052401697],"about_ca_topic_score_codex":0.00007033169,"about_ca_topic_score_gemma":0.00001093602,"teacher_disagreement_score":0.7943878,"about_ca_system_score_codex":0.0004191635,"about_ca_system_score_gemma":0.000105672945,"threshold_uncertainty_score":0.9517468},"labels":[],"label_agreement":null},{"id":"W1599689703","doi":"","title":"A Joint Deterministic - Probabilistic Approach To Bulk System Reliability Assessment","year":2008,"lang":"en","type":"article","venue":"Proceedings of the 10th International Conference on Probablistic Methods Applied to Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Probabilistic logic; Reliability (semiconductor); Component (thermodynamics); Reliability engineering; Electric power system; Computer science; Mathematical optimization; Power (physics); Engineering; Mathematics; Artificial intelligence","score_opus":0.05413246594253355,"score_gpt":0.2966268591254283,"score_spread":0.24249439318289476,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1599689703","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024132086,0.00002317026,0.39497104,0.00031569623,0.005144603,0.0057360013,0.00013652789,0.00058860646,0.56895226],"genre_scores_gemma":[0.9238879,0.0000028109328,0.07326193,0.00007733554,0.00009521653,0.0019102598,0.00000399255,0.000066371846,0.00069416064],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9956462,0.00009234726,0.0015149341,0.00095931813,0.0011672407,0.000619988],"domain_scores_gemma":[0.99711776,0.00019746608,0.00041704,0.0007021079,0.0011816943,0.00038393508],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0029258092,0.00057030434,0.0009944743,0.00032173583,0.00019987785,0.00020551431,0.0017153232,0.00020294474,0.000018431583],"category_scores_gemma":[0.0011260611,0.00042933036,0.00019561825,0.00064980914,0.00018520532,0.0001337984,0.00038495497,0.00048358896,0.000053475782],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013467832,0.00026739467,0.00010371858,0.0029661069,0.00014329104,0.0000018756615,0.0013693859,0.027523352,0.016111052,0.9483269,0.0028413392,0.00021093934],"study_design_scores_gemma":[0.003596293,0.0018567955,0.008414514,0.009947309,0.00042192568,0.0011744789,0.0069036586,0.8907982,0.0148942415,0.020688316,0.03609527,0.0052090078],"about_ca_topic_score_codex":0.000041511867,"about_ca_topic_score_gemma":7.177741e-7,"teacher_disagreement_score":0.92763853,"about_ca_system_score_codex":0.0010447,"about_ca_system_score_gemma":0.0001772728,"threshold_uncertainty_score":0.9998158},"labels":[],"label_agreement":null},{"id":"W1599853693","doi":"10.1109/wescan.1993.270566","title":"Comparison of methods for building a capacity model in generation capacity adequacy studies","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Capital Power (Canada)","funders":"","keywords":"Rounding; Computer science; Convergence (economics); Function (biology); Unit (ring theory); Mathematical optimization; Algorithm; Rate of convergence; Mathematics; Key (lock)","score_opus":0.30356601814058376,"score_gpt":0.41580936894650034,"score_spread":0.11224335080591658,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1599853693","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29867297,0.0009363084,0.6993993,0.00003191953,0.00018569911,0.0002169745,0.0000048395345,0.00006129406,0.0004906952],"genre_scores_gemma":[0.70863,0.000040573268,0.2912066,0.000009138298,0.000018765433,0.00005125496,4.0385436e-7,0.000007417062,0.000035819172],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99917346,0.0000508119,0.0003971789,0.00014081284,0.000054797474,0.0001829399],"domain_scores_gemma":[0.9995494,0.00014328094,0.00004060787,0.00016243497,0.000076744975,0.000027533344],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00056718127,0.0001075406,0.00036236396,0.00006487664,0.000029032379,0.00000670313,0.00007943752,0.00006652034,0.0000052281503],"category_scores_gemma":[0.00023699134,0.00009761005,0.000060342863,0.0001112951,0.00003619699,0.00012991225,0.000014314516,0.000088338325,9.422806e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004183169,0.00008810942,0.0005279818,0.0007328367,0.000060885086,5.950845e-8,0.0063873674,0.8399427,0.12956797,0.01369746,0.002544975,0.0064454614],"study_design_scores_gemma":[0.00019009241,0.000018858946,0.000024868765,0.000036711426,0.00000761809,4.1144708e-7,0.00015807712,0.9189038,0.07917825,0.0010110275,0.00037257024,0.0000976628],"about_ca_topic_score_codex":0.000040095892,"about_ca_topic_score_gemma":0.00014733845,"teacher_disagreement_score":0.40995705,"about_ca_system_score_codex":0.00011709051,"about_ca_system_score_gemma":0.000002788501,"threshold_uncertainty_score":0.39804223},"labels":[],"label_agreement":null},{"id":"W1621895939","doi":"10.1109/pesgm.2015.7285676","title":"Assessment of spare breaker requirements for high voltage transmission stations","year":2015,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Spare part; Circuit breaker; Reliability engineering; Probabilistic logic; Computer science; Transformer; Electric power system; Maintenance engineering; Reliability (semiconductor); Failure rate; Engineering; Voltage; Power (physics); Electrical engineering; Operations management","score_opus":0.03300768112245108,"score_gpt":0.29054721141643003,"score_spread":0.25753953029397897,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1621895939","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011368009,0.00004219055,0.97417414,0.0000676675,0.00034541386,0.00032765398,0.00004871996,0.0000991534,0.013527068],"genre_scores_gemma":[0.9849278,0.0000065295717,0.014066654,0.000014496522,0.00001508017,0.000045880548,0.000022023707,0.0000110658975,0.00089052576],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99945956,0.0000072795206,0.0002026592,0.00008527444,0.00012449127,0.000120722434],"domain_scores_gemma":[0.9996481,0.000025822404,0.000019686799,0.0001412128,0.00009399955,0.0000711834],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019531276,0.0000659532,0.0001185572,0.000025294235,0.000013989706,0.0000062876006,0.000063714186,0.000033148564,0.000039816823],"category_scores_gemma":[0.000013322846,0.000054726323,0.00003101147,0.000053814758,0.000010673629,0.000097326774,0.0000059078884,0.000027979268,0.0000032079304],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013805335,0.0008100134,0.00989685,0.0065450394,0.0006179942,0.000009835695,0.0055282046,0.22005545,0.11496272,0.33313873,0.25104216,0.057254963],"study_design_scores_gemma":[0.0076586762,0.00090856553,0.038426816,0.0007599545,0.00015344373,0.0000070130404,0.0024469905,0.35045257,0.06699096,0.025282824,0.50576264,0.0011495393],"about_ca_topic_score_codex":0.000049981405,"about_ca_topic_score_gemma":0.000022183624,"teacher_disagreement_score":0.97355974,"about_ca_system_score_codex":0.00006747417,"about_ca_system_score_gemma":0.000040282823,"threshold_uncertainty_score":0.22316746},"labels":[],"label_agreement":null},{"id":"W1623767150","doi":"10.1109/pesgm.2015.7286040","title":"Practical experience in evaluating adequacy of generating capacity in the Western interconnection","year":2015,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Reliability engineering; Probabilistic logic; Reliability (semiconductor); Interconnection; Index (typography); Margin (machine learning); Electricity; Transmission (telecommunications); Electricity generation; Computer science; Variable (mathematics); Operations research; Transmission system; Engineering; Risk analysis (engineering); Telecommunications; Electrical engineering; Business","score_opus":0.2293412946927809,"score_gpt":0.36578462651291005,"score_spread":0.13644333182012916,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1623767150","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9625179,0.00002647972,0.03466137,0.00013442275,0.00023048562,0.00014763822,3.0809784e-7,0.000029921188,0.0022514453],"genre_scores_gemma":[0.99675196,0.0000015538445,0.0031152354,0.00004908329,0.000026075073,0.00003893003,2.809871e-7,0.000004705991,0.000012199949],"study_design_codex":"qualitative","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991632,0.00014898197,0.00029682842,0.00010090803,0.00015353695,0.0001365542],"domain_scores_gemma":[0.9995961,0.00015835275,0.000028761191,0.00015570836,0.000037563153,0.000023505332],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014158367,0.00006415542,0.000114077906,0.000039627746,0.000008968205,0.000015764062,0.00009263864,0.000040719457,0.0000047012054],"category_scores_gemma":[0.0008614432,0.00004604303,0.000016586124,0.00015595656,0.000025047766,0.00024683255,0.000018523055,0.0001535302,0.000004679822],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000112298694,0.0005002138,0.19316779,0.00074801,0.000031101536,0.000044728167,0.43671152,0.27348703,0.07264251,0.008683965,0.0016237017,0.012247132],"study_design_scores_gemma":[0.0007785435,0.00015127336,0.0066285245,0.00024871164,0.0000039236347,0.00006540183,0.026155272,0.9533709,0.011651972,0.00027086335,0.00045775055,0.00021682905],"about_ca_topic_score_codex":0.0005617992,"about_ca_topic_score_gemma":0.0013445672,"teacher_disagreement_score":0.6798839,"about_ca_system_score_codex":0.00008808961,"about_ca_system_score_gemma":0.000019848212,"threshold_uncertainty_score":0.18775803},"labels":[],"label_agreement":null},{"id":"W165960967","doi":"10.1007/978-0-85729-088-5_4","title":"Adequacy Assessment of Wind-Integrated Composite Generation and Transmission Systems","year":2011,"lang":"en","type":"book-chapter","venue":"Springer series in reliability engineering","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Electric power system; Wind power; Reliability engineering; Reliability (semiconductor); Transmission system; Electricity generation; Monte Carlo method; Transmission (telecommunications); Engineering; Electric power; Computer science; Power (physics); Electrical engineering","score_opus":0.011757515945643202,"score_gpt":0.20042960396272258,"score_spread":0.18867208801707938,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W165960967","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17956421,0.038948983,0.4267245,0.00015672648,0.01648098,0.008622116,0.000576291,0.0038749268,0.32505128],"genre_scores_gemma":[0.984622,0.0025105535,0.0068578036,0.0000035395462,0.00014639016,0.000058416714,0.000059133858,0.0002020732,0.00554006],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99771065,0.00002794822,0.0010841766,0.0005282356,0.00028462242,0.0003643511],"domain_scores_gemma":[0.99888146,0.000067645175,0.00012878647,0.0006618084,0.00012682726,0.00013347194],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005863278,0.0005855748,0.00095750386,0.0002753975,0.000032757467,0.00004023002,0.00023802549,0.0005444731,0.000036389076],"category_scores_gemma":[0.000028882157,0.0005969792,0.00013858508,0.00008750794,0.00010759097,0.0002814083,0.00007171313,0.00073859055,0.0000028358384],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006593606,0.000087137916,0.001186635,0.017488034,0.00031879812,0.00004860709,0.0013260575,0.8455678,0.03394293,0.0955657,0.00015049288,0.004251865],"study_design_scores_gemma":[0.0011740979,0.0004356554,0.0049168826,0.009675069,0.00021427871,0.00008175076,0.00006279653,0.7574843,0.0057538897,0.0009788838,0.2164219,0.0028004416],"about_ca_topic_score_codex":0.00009452293,"about_ca_topic_score_gemma":0.000013881036,"teacher_disagreement_score":0.8050578,"about_ca_system_score_codex":0.0003901178,"about_ca_system_score_gemma":0.000057628684,"threshold_uncertainty_score":0.99964815},"labels":[],"label_agreement":null},{"id":"W1677027312","doi":"10.1109/wescan.1993.270565","title":"An energy based approach for spinning reserve assessment in interconnected generation systems","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Spinning; Probabilistic logic; Salient; Reliability (semiconductor); Energy (signal processing); Computer science; Reliability engineering; Process (computing); Engineering; Artificial intelligence; Mathematics; Mechanical engineering; Statistics; Physics","score_opus":0.035896568250346136,"score_gpt":0.24341198662786037,"score_spread":0.20751541837751425,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1677027312","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0223535,0.00017849974,0.9694227,0.00003232023,0.0003955103,0.00031194979,0.000005669027,0.00023785829,0.0070619946],"genre_scores_gemma":[0.98635435,0.000005234859,0.012888546,0.000037607304,0.00010138416,0.00035605088,0.00005625932,0.000022012739,0.00017858234],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991114,0.00006520376,0.00029684108,0.00021215764,0.00009208246,0.00022231584],"domain_scores_gemma":[0.99956775,0.000032911124,0.000023057635,0.0002728091,0.00005111807,0.000052379077],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003345693,0.00011601955,0.00017513162,0.00010215549,0.000028724204,0.000063933156,0.00012421542,0.00008487138,0.000021087077],"category_scores_gemma":[0.000020969848,0.00010742309,0.000036100704,0.00014329102,0.000008101219,0.00019472765,0.0000069522034,0.0000745908,0.0000011826496],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000044300145,0.00011013489,0.00028451387,0.0003120659,0.000014820662,0.0000016432084,0.00013533895,0.967268,0.01776456,0.010293105,0.003081615,0.00072980847],"study_design_scores_gemma":[0.0004027884,0.000064777036,0.00007907137,0.00004135355,0.000002709102,0.0000014218356,0.00013675792,0.99526507,0.0016556691,0.000008098749,0.0022022682,0.00014001044],"about_ca_topic_score_codex":0.00032346536,"about_ca_topic_score_gemma":0.00023708948,"teacher_disagreement_score":0.9640008,"about_ca_system_score_codex":0.00017603514,"about_ca_system_score_gemma":0.000008099833,"threshold_uncertainty_score":0.43805867},"labels":[],"label_agreement":null},{"id":"W1704324944","doi":"10.1109/wescan.1991.160560","title":"Basic data and evaluation of distribution system reliability worth","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Contingency; Computer science; Point (geometry); Contingency table; Distribution (mathematics); Operations research; Engineering; Mathematics; Machine learning","score_opus":0.03723186800198351,"score_gpt":0.2347878965664993,"score_spread":0.19755602856451576,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1704324944","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94057614,0.0015125085,0.038287964,0.000085991196,0.00052253896,0.0005589638,0.00031102035,0.0003168181,0.017828075],"genre_scores_gemma":[0.9997237,0.00003358473,0.00011575161,0.0000018921363,0.000016972537,0.000010196314,0.000056594356,0.0000050272374,0.000036332876],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99918944,0.000059815426,0.00023338383,0.00017410105,0.00024030881,0.00010297089],"domain_scores_gemma":[0.99913585,0.000040841303,0.00002660273,0.0006566118,0.00010440816,0.000035664412],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014022547,0.00006792842,0.00012781195,0.000013080037,0.00001953744,0.000010024696,0.00013833154,0.000044507207,0.000051464714],"category_scores_gemma":[0.00014498146,0.000058301423,0.000014239023,0.00009688342,0.000030767314,0.00017021026,0.000049440285,0.000046079673,0.000013717787],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009451159,0.0009657957,0.12081229,0.026965676,0.00058455777,0.000009752603,0.0033630005,0.113364615,0.00437401,0.046557844,0.24417073,0.43873724],"study_design_scores_gemma":[0.00021003246,0.00001029359,0.007724652,0.000076119264,0.000034123692,0.000004444978,0.00009841764,0.98775834,0.00024835367,0.00004415331,0.0037193468,0.00007173232],"about_ca_topic_score_codex":0.000027617865,"about_ca_topic_score_gemma":0.000021453992,"teacher_disagreement_score":0.8743937,"about_ca_system_score_codex":0.00010446453,"about_ca_system_score_gemma":0.0000055787004,"threshold_uncertainty_score":0.2377463},"labels":[],"label_agreement":null},{"id":"W1715558832","doi":"","title":"Aleatory and Epistemic Uncertainty Considerations in Power System Reliability Evaluation","year":2008,"lang":"en","type":"article","venue":"Proceedings of the 10th International Conference on Probablistic Methods Applied to Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Uncertainty quantification; Reliability engineering; Electric power system; Uncertainty analysis; Monte Carlo method; Computer science; Measurement uncertainty; Range (aeronautics); Risk analysis (engineering); Power (physics); Engineering; Mathematics; Statistics; Simulation; Machine learning","score_opus":0.04749444276834666,"score_gpt":0.2990044524882542,"score_spread":0.25151000971990756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1715558832","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4769838,0.0004158063,0.03194449,0.0014493781,0.007578457,0.008116416,0.0001638119,0.0005057942,0.47284204],"genre_scores_gemma":[0.99382687,0.0000096409985,0.0052072057,0.000053347016,0.000028724178,0.0006901816,0.0000023689256,0.000027728165,0.00015391601],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972732,0.00011911496,0.0010110117,0.00054475915,0.00074164313,0.0003102675],"domain_scores_gemma":[0.9979426,0.000306078,0.0002796236,0.0003246974,0.0010140418,0.0001329405],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00377056,0.0003069813,0.0005412049,0.00025590675,0.00012129712,0.000098668286,0.0004780753,0.00016453241,0.00004304263],"category_scores_gemma":[0.0013097196,0.00024458976,0.00007230719,0.0003151407,0.00018445191,0.00015897318,0.00012795029,0.00032160597,0.000012937181],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009168816,0.0000758271,0.0014324116,0.0008011275,0.00007788186,0.0000013921402,0.0022391125,0.018256782,0.014344033,0.96103215,0.0014892748,0.00015833077],"study_design_scores_gemma":[0.0074162157,0.0008307119,0.0412705,0.011563133,0.00031251227,0.0011200599,0.018143719,0.78090215,0.016992254,0.10651023,0.010954092,0.0039844164],"about_ca_topic_score_codex":0.000072855364,"about_ca_topic_score_gemma":0.000006993933,"teacher_disagreement_score":0.85452193,"about_ca_system_score_codex":0.0007218165,"about_ca_system_score_gemma":0.00013916292,"threshold_uncertainty_score":0.9974081},"labels":[],"label_agreement":null},{"id":"W1739183808","doi":"10.1109/pes.2004.1372770","title":"Reliability evaluation of the IEEE-RTS incorporating station related outages","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Transmission system; Computer science; Engineering; Transmission (telecommunications); Telecommunications","score_opus":0.00870969827875118,"score_gpt":0.22043031899110127,"score_spread":0.2117206207123501,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1739183808","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97016484,0.0007247384,0.022974836,0.000102181795,0.004292148,0.00062493555,0.000026445754,0.00046089932,0.00062897697],"genre_scores_gemma":[0.9936789,0.000022343764,0.0059475815,0.000032928012,0.00011779762,0.000062257524,0.000007979967,0.00006786029,0.00006233229],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997557,0.000108201806,0.000771696,0.00036463692,0.0007660376,0.00043243295],"domain_scores_gemma":[0.9986214,0.0000745742,0.00021673736,0.0006135637,0.00038335376,0.000090376954],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0026466884,0.00032804487,0.00033552558,0.0000349215,0.000114425675,0.000034702156,0.0003084471,0.00025155445,0.000010385056],"category_scores_gemma":[0.00040695127,0.0002849514,0.00033386206,0.0005065609,0.00008961654,0.00023968598,0.000030066629,0.00041398383,0.000009820423],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000018386976,0.000026547346,0.0002778784,0.00018296124,0.00005769773,3.6515098e-7,0.0016507165,0.9191573,0.07754871,0.00015147922,0.0008345548,0.00010994482],"study_design_scores_gemma":[0.0016649446,0.00006719414,0.006683772,0.000860257,0.00015849904,0.000015148265,0.00029164925,0.8216003,0.16559012,0.0015474788,0.0007380074,0.0007825901],"about_ca_topic_score_codex":0.00012464127,"about_ca_topic_score_gemma":0.000017609467,"teacher_disagreement_score":0.09755696,"about_ca_system_score_codex":0.00075377687,"about_ca_system_score_gemma":0.00013437627,"threshold_uncertainty_score":0.99996024},"labels":[],"label_agreement":null},{"id":"W1739725004","doi":"","title":"Well-being reliability worth indices due to different customer outage cost functions","year":2007,"lang":"en","type":"article","venue":"International Power Engineering Conference","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Probabilistic logic; Electric power system; Marginal cost; Service (business); Computer science; Risk analysis (engineering); Engineering; Operations research; Power (physics); Economics; Business; Microeconomics","score_opus":0.00577672769299829,"score_gpt":0.2155617737974345,"score_spread":0.2097850461044362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1739725004","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4834725,0.000030295143,0.46896428,0.00025049545,0.0059232344,0.0003767403,0.000036578174,0.0006786758,0.0402672],"genre_scores_gemma":[0.9980261,0.000008366722,0.00060010474,0.00009677458,0.0001721997,0.00006482524,0.000022394674,0.00004502937,0.0009642462],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99811757,0.000012255858,0.0005240961,0.00039712244,0.0004248291,0.0005241113],"domain_scores_gemma":[0.99886996,0.0001831021,0.000047434616,0.0004083062,0.00020963915,0.00028158218],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00043215638,0.00032348622,0.00029507617,0.00031482035,0.000053546086,0.00011633414,0.0005044869,0.00012879186,0.00041251435],"category_scores_gemma":[0.00020642894,0.0003201973,0.000111150395,0.00024898804,0.000035942325,0.00026692712,0.00011048088,0.0003968215,0.0005263558],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027002575,0.00059536775,0.048329122,0.0007071176,0.0009133079,0.00042452046,0.007390745,0.834342,0.029778779,0.052612863,0.012014639,0.012621539],"study_design_scores_gemma":[0.0010374876,0.00012146622,0.23855405,0.00081533694,0.000048158185,0.00012040643,0.0004752632,0.11114583,0.010942091,0.0003395451,0.6345465,0.0018538388],"about_ca_topic_score_codex":0.000029888482,"about_ca_topic_score_gemma":0.00007589831,"teacher_disagreement_score":0.72319615,"about_ca_system_score_codex":0.00036007914,"about_ca_system_score_gemma":0.00002202694,"threshold_uncertainty_score":0.999925},"labels":[],"label_agreement":null},{"id":"W17807767","doi":"10.1126/science.120.3111.259","title":"Enforcing Transmission Reliability: An International Problem","year":2016,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Blackout; Geography","score_opus":0.006479322342997149,"score_gpt":0.20779212219806203,"score_spread":0.2013127998550649,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W17807767","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07698691,0.000030330153,0.78039575,0.0009132566,0.00081443647,0.00023163193,0.000007045553,0.0009670109,0.13965362],"genre_scores_gemma":[0.99071205,0.000056138295,0.007282544,0.00003325842,0.000057886657,0.000017183102,0.0000016247899,0.000014397082,0.0018248998],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99934334,0.00001387584,0.0001938825,0.00016039122,0.00012005092,0.00016846477],"domain_scores_gemma":[0.9996019,0.000032845615,0.000010589502,0.00022897299,0.000039680992,0.00008602248],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023338081,0.000087272,0.00008824115,0.000033683253,0.000021023416,0.000017010007,0.00017613282,0.00005487438,0.0003826025],"category_scores_gemma":[0.000018682485,0.000051625215,0.000039449886,0.000043809534,0.000020592299,0.00048336785,0.000011590921,0.000045042263,0.00007254077],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006391048,0.00012603166,0.005274279,0.00034577982,0.00006067679,0.000008937142,0.00124184,0.0053525595,0.18505003,0.03001823,0.004853721,0.767604],"study_design_scores_gemma":[0.0007917613,0.00008543618,0.0020621277,0.0003411486,0.0000069186704,0.000018482651,0.00006575816,0.027046831,0.0289663,0.0054490496,0.93476945,0.00039676242],"about_ca_topic_score_codex":0.000015591475,"about_ca_topic_score_gemma":0.0000054191246,"teacher_disagreement_score":0.9299157,"about_ca_system_score_codex":0.00008530879,"about_ca_system_score_gemma":0.000009952964,"threshold_uncertainty_score":0.41892293},"labels":[],"label_agreement":null},{"id":"W1789455423","doi":"10.1109/eeic.1995.482518","title":"Quality assurance testing for large air-cooled generator stator winding insulation","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Stator; Reliability engineering; Electromagnetic coil; Reliability (semiconductor); Generator (circuit theory); Computer science; Automotive engineering; Quality assurance; Quality (philosophy); Electric generator; Engineering; Power (physics); Mechanical engineering; Electrical engineering","score_opus":0.03436705509193098,"score_gpt":0.25231367529529664,"score_spread":0.21794662020336567,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1789455423","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5446384,0.00030570614,0.44670758,0.000083854575,0.00073278404,0.00047431703,0.00007755641,0.00072334375,0.0062564644],"genre_scores_gemma":[0.98703325,0.000004355866,0.012182294,0.000093132876,0.00013163478,0.00006583744,0.0000060487073,0.000026548925,0.0004569263],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989425,0.000031746084,0.00035663543,0.0001980822,0.0001239407,0.00034711257],"domain_scores_gemma":[0.99929804,0.0002615396,0.000048055208,0.00022070431,0.0001007367,0.00007091249],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005096244,0.00013548262,0.00019997287,0.00003613124,0.00010249408,0.000027232514,0.00009364219,0.000075127195,0.00004992493],"category_scores_gemma":[0.00052894745,0.00012987728,0.00005568716,0.00017911264,0.000007956017,0.00022450113,0.000013255061,0.000076431315,0.000044214485],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000095751246,0.0007391162,0.29187453,0.008075916,0.00050928956,0.000017239803,0.0056875646,0.14383872,0.36012393,0.07919814,0.079173066,0.030666746],"study_design_scores_gemma":[0.0015338332,0.000060838665,0.047887523,0.00012698941,0.000013223914,0.00000446675,0.00013659288,0.8878597,0.009309481,0.00034833304,0.052113365,0.0006056688],"about_ca_topic_score_codex":0.000011647123,"about_ca_topic_score_gemma":0.000034771034,"teacher_disagreement_score":0.744021,"about_ca_system_score_codex":0.00010101358,"about_ca_system_score_gemma":0.000008009899,"threshold_uncertainty_score":0.5296242},"labels":[],"label_agreement":null},{"id":"W1803807889","doi":"10.1109/ccece.2002.1015169","title":"Adequacy evaluation of generation systems including wind energy","year":2003,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind speed; Wind power; Reliability (semiconductor); Monte Carlo method; Computer science; Autoregressive–moving-average model; Reliability engineering; Engineering; Autoregressive model; Marine engineering; Meteorology; Mathematics; Power (physics); Statistics","score_opus":0.05946663215145631,"score_gpt":0.257818611157767,"score_spread":0.19835197900631069,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1803807889","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29095846,0.004006133,0.37731913,0.000017004879,0.0030855055,0.00039248733,0.000004111479,0.00022060679,0.32399657],"genre_scores_gemma":[0.9993334,0.000022141763,0.00019309238,0.0000059449517,0.00005101198,0.000016467617,0.00000385146,0.000009414428,0.00036468348],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999212,0.00010514777,0.0002396164,0.00009215793,0.00024437538,0.00010668977],"domain_scores_gemma":[0.9996138,0.000022973883,0.000030634477,0.00016356779,0.00014214759,0.000026875681],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009478502,0.000068974645,0.00011951666,0.000046062214,0.00002334085,0.000012662469,0.000044014836,0.000052907693,0.000045445016],"category_scores_gemma":[0.00010585012,0.00006314378,0.000027288343,0.00010616685,0.000008659684,0.00011523226,0.0000049465248,0.00002754932,0.000006590092],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001213799,0.000020314252,0.00014465231,0.0001461444,0.000043069416,3.0472248e-7,0.00019816919,0.7962383,0.07492708,0.122400455,0.0021562986,0.0037239883],"study_design_scores_gemma":[0.00031943893,0.000015967398,0.000067760906,0.000050350554,0.000025908083,0.0000059347226,0.00013190256,0.9054336,0.073246144,0.00019094997,0.02038179,0.00013026028],"about_ca_topic_score_codex":0.000051915926,"about_ca_topic_score_gemma":0.000029478548,"teacher_disagreement_score":0.7083749,"about_ca_system_score_codex":0.000110725894,"about_ca_system_score_gemma":0.000027459926,"threshold_uncertainty_score":0.25749284},"labels":[],"label_agreement":null},{"id":"W1821888196","doi":"","title":"Reliability Cost/Worth Associated With Wind Energy and Energy Storage Utilization in Electric Power Systems","year":2008,"lang":"en","type":"article","venue":"Proceedings of the 10th International Conference on Probablistic Methods Applied to Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan; Manitoba Hydro","funders":"","keywords":"Reliability engineering; Wind power; Reliability (semiconductor); Energy storage; Intermittent energy source; Electric power system; Energy (signal processing); Computer science; Renewable energy; Power (physics); Engineering; Distributed generation; Electrical engineering","score_opus":0.03542443618227134,"score_gpt":0.26429280534750477,"score_spread":0.22886836916523343,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1821888196","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27211598,0.0007734044,0.46010688,0.00031229432,0.005615282,0.003677515,0.00016739932,0.00062266755,0.2566086],"genre_scores_gemma":[0.99759537,0.000051941493,0.0008366173,0.000052994263,0.000023535478,0.00037040687,0.0000073345914,0.00004971961,0.001012075],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99718773,0.00010627668,0.0009032717,0.0006218187,0.0007340196,0.00044687223],"domain_scores_gemma":[0.99802864,0.00024108546,0.00041724797,0.0002932583,0.0008560184,0.00016374578],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0016096081,0.00040215853,0.00068260735,0.00037032366,0.0001014855,0.0001426378,0.0006853814,0.00021834958,0.000013697005],"category_scores_gemma":[0.00072421686,0.00030126012,0.00005884796,0.0008447999,0.00012403088,0.00020291512,0.00011728971,0.00026315017,0.0000016530042],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044154038,0.00029885457,0.002256897,0.00048134718,0.0002577331,0.0000056024924,0.0013177102,0.03802076,0.014487831,0.9401049,0.0018540717,0.00047276917],"study_design_scores_gemma":[0.006556944,0.0019423445,0.034394886,0.008915689,0.00022942595,0.00044928826,0.0030738602,0.84441227,0.014758045,0.012430229,0.068497784,0.0043392293],"about_ca_topic_score_codex":0.00018368367,"about_ca_topic_score_gemma":0.00001981346,"teacher_disagreement_score":0.92767465,"about_ca_system_score_codex":0.0005174111,"about_ca_system_score_gemma":0.000106966,"threshold_uncertainty_score":0.999944},"labels":[],"label_agreement":null},{"id":"W1822002551","doi":"10.1109/pes.2004.1373278","title":"Tie line equivalent constrained assisting generator model (TEAG) considering forced outage rates of transmission systems-II","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Tie line; Transmission line; Electric power transmission; Electric power system; Generator (circuit theory); Computer science; Reliability engineering; Transmission (telecommunications); Transmission system; Line (geometry); Power (physics); Point (geometry); Power transmission; Simple (philosophy); Control theory (sociology); Engineering; Electrical engineering; Mathematics; Telecommunications; Control (management)","score_opus":0.015912362765103025,"score_gpt":0.23147299432303925,"score_spread":0.21556063155793623,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1822002551","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41164187,0.0034866184,0.58147275,0.0000908866,0.0016921463,0.00047639298,0.00006975639,0.0007729945,0.0002965639],"genre_scores_gemma":[0.9500965,0.0001327068,0.04894264,0.00006896316,0.00027195038,0.000072235634,0.000016116534,0.00015954553,0.00023934816],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9967634,0.000037778507,0.0011923234,0.00055730034,0.00048175568,0.0009674562],"domain_scores_gemma":[0.9986686,0.00009449075,0.00020240499,0.00051165005,0.00020555276,0.00031729412],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008837701,0.0006519368,0.00085099204,0.00010107028,0.00019562063,0.00007153869,0.00034266248,0.00037896464,0.000009898813],"category_scores_gemma":[0.00011511111,0.00066413876,0.0006153751,0.00030947514,0.00010572445,0.00022207557,0.00005853365,0.0004809532,0.000004896246],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000057745306,0.000033038945,0.000015192478,0.00072972546,0.00014965222,0.0000060384036,0.001039621,0.6709915,0.32604253,0.00021544202,0.00072045607,0.000051067247],"study_design_scores_gemma":[0.0011738065,0.00008679841,0.0000072495113,0.0011100805,0.00006392603,0.000029484858,0.00013764911,0.822292,0.1726674,0.000027785565,0.0017489239,0.0006549269],"about_ca_topic_score_codex":0.00006963773,"about_ca_topic_score_gemma":0.000003081585,"teacher_disagreement_score":0.53845465,"about_ca_system_score_codex":0.00043232442,"about_ca_system_score_gemma":0.0001298528,"threshold_uncertainty_score":0.999581},"labels":[],"label_agreement":null},{"id":"W1825203518","doi":"","title":"Combined Adequacy and Static Security Considerations in Transmission System Reinforcement","year":2008,"lang":"en","type":"article","venue":"Proceedings of the 10th International Conference on Probablistic Methods Applied to Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan; TransCanada (Canada)","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Probabilistic logic; Computer science; Electric power system; Probabilistic risk assessment; Monte Carlo method; Transmission system; Stress testing (software); Process (computing); Risk analysis (engineering); Transmission (telecommunications); Engineering; Power (physics); Statistics; Mathematics; Artificial intelligence","score_opus":0.034230712308749855,"score_gpt":0.2790834298018567,"score_spread":0.24485271749310683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1825203518","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14668633,0.0002447865,0.38557747,0.0019157903,0.00493931,0.008247255,0.00011416354,0.00060714723,0.45166776],"genre_scores_gemma":[0.99109346,0.000017396316,0.008271243,0.000053588734,0.000016932896,0.00033711054,0.0000019959643,0.000021163067,0.000187133],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980745,0.000042078118,0.00083805557,0.00033414422,0.00045130585,0.00025997165],"domain_scores_gemma":[0.9990081,0.0001761065,0.00019408997,0.00017493717,0.0003166145,0.00013012445],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011285091,0.00024749376,0.00045302615,0.00021248913,0.000097277094,0.00009104639,0.00037441385,0.000098895776,0.000024743817],"category_scores_gemma":[0.0002403093,0.00019150687,0.000050167193,0.00023636274,0.00009335557,0.0001257514,0.00008212085,0.00024211725,0.000006019825],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008373804,0.000044321667,0.0001424694,0.0010234944,0.000053301348,0.0000016220249,0.0030284817,0.004557586,0.009093033,0.98100847,0.00086367666,0.000099821365],"study_design_scores_gemma":[0.0063029197,0.0009289137,0.0029640184,0.010806046,0.00013246173,0.00037976273,0.010592427,0.8515946,0.035266194,0.067936614,0.010844522,0.002251516],"about_ca_topic_score_codex":0.000047510577,"about_ca_topic_score_gemma":0.0000017179942,"teacher_disagreement_score":0.9130718,"about_ca_system_score_codex":0.00023574536,"about_ca_system_score_gemma":0.000059367143,"threshold_uncertainty_score":0.7809424},"labels":[],"label_agreement":null},{"id":"W1831691180","doi":"10.5539/emr.v4n2p70","title":"An Empirical Model for Industrial Generator’s Capacity Requirement Determination","year":2015,"lang":"en","type":"article","venue":"Engineering Management Research","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Generator (circuit theory); Nameplate capacity; Computation; Selection (genetic algorithm); Productivity; Production (economics); Capacity utilization; Electrical load; Computer science; Engineering; Power (physics); Reliability engineering; Industrial engineering; Operations research; Electricity generation; Economics; Electrical engineering; Microeconomics; Algorithm","score_opus":0.2742452556986902,"score_gpt":0.37528731152055383,"score_spread":0.10104205582186365,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1831691180","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12766142,0.000067599554,0.8683564,0.00013688834,0.0006698736,0.0011046624,0.0000109162775,0.0004633748,0.001528845],"genre_scores_gemma":[0.9803566,0.0000133616795,0.018361943,0.000014666312,0.00028865703,0.00050913106,0.000017221184,0.0000463657,0.00039208523],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982624,0.00004923324,0.00025841422,0.0002882844,0.00056888745,0.0005727746],"domain_scores_gemma":[0.99908876,0.000045380035,0.000012575775,0.00043477502,0.00016808878,0.00025042935],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024837696,0.00015541891,0.00015861467,0.00027117404,0.000064535474,0.000098787634,0.00032854523,0.000113205795,0.0000035573735],"category_scores_gemma":[0.00011489678,0.00016096972,0.000045383196,0.00028724733,0.000026404376,0.00027233045,0.000065159016,0.0002039516,0.000016479587],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022018683,0.0000605597,0.00008559055,0.00031974693,0.000037327012,0.000005972568,0.0005281858,0.96941304,0.0010940146,0.0031981152,0.021210037,0.0040253713],"study_design_scores_gemma":[0.00055820023,0.00008643433,0.000040401646,0.000039075996,0.0000070252327,8.8915544e-7,0.00006516169,0.96824914,0.0012075988,0.0003398021,0.029233634,0.00017263663],"about_ca_topic_score_codex":0.0000072993125,"about_ca_topic_score_gemma":0.0000073581487,"teacher_disagreement_score":0.85269517,"about_ca_system_score_codex":0.00056524697,"about_ca_system_score_gemma":0.000029068344,"threshold_uncertainty_score":0.65641546},"labels":[],"label_agreement":null},{"id":"W1838147031","doi":"10.1109/tdcllm.2000.882854","title":"Reliability centered maintenance implementation in Hydro-Quebec transmission system","year":2000,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Task (project management); Reliability engineering; Reliability (semiconductor); Computer science; Preventive maintenance; Interval (graph theory); Order (exchange); Maintenance engineering; Risk analysis (engineering); Selection (genetic algorithm); Operations research; Engineering; Systems engineering; Business; Artificial intelligence","score_opus":0.005116891227210587,"score_gpt":0.2149029743189509,"score_spread":0.2097860830917403,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1838147031","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92089057,0.00018864845,0.02133836,0.00021612774,0.00041697113,0.00090086355,0.000021509724,0.0009411744,0.05508575],"genre_scores_gemma":[0.99788743,0.000065924665,0.0004961135,0.000033863485,0.000022234019,0.000056982535,0.000012688811,0.000020981797,0.0014037786],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985907,0.0000645346,0.00051906443,0.0002797735,0.00015143126,0.00039451313],"domain_scores_gemma":[0.9995065,0.000027652095,0.000019828181,0.00032931525,0.00002510384,0.00009160712],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037394968,0.00017231039,0.00023631737,0.000055193945,0.00003329385,0.000024469298,0.00015616245,0.000084302446,0.000775488],"category_scores_gemma":[0.0000047462813,0.00014792563,0.00007484114,0.00020577965,0.000024804465,0.00025228248,0.0000070330075,0.00012969448,0.00014065512],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048393014,0.00043813765,0.012753051,0.006507923,0.000092545306,0.00013456006,0.0069497637,0.106208034,0.019443646,0.008684271,0.027701758,0.81060237],"study_design_scores_gemma":[0.006926114,0.00017819802,0.12608577,0.0020539209,0.00003706955,0.00008699929,0.0046411236,0.38372535,0.020040927,0.00066759856,0.45379218,0.0017647734],"about_ca_topic_score_codex":0.004284547,"about_ca_topic_score_gemma":0.004008547,"teacher_disagreement_score":0.8088376,"about_ca_system_score_codex":0.0005315702,"about_ca_system_score_gemma":0.00002186237,"threshold_uncertainty_score":0.84910494},"labels":[],"label_agreement":null},{"id":"W1860056538","doi":"10.1109/wescan.1993.270584","title":"Power system harmonic guidelines and how to evaluate the impact of customer generated harmonics","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SaskTel (Canada)","funders":"","keywords":"Harmonics; Total harmonic distortion; Pipeline (software); Harmonic; Limit (mathematics); Distortion (music); Electrical engineering; Gas compressor; Computer science; Harmonic analysis; Telecommunications; Engineering; Electronic engineering; Mechanical engineering; Physics; Mathematics; Operating system; Voltage; Acoustics","score_opus":0.04016469522962285,"score_gpt":0.2686605617056613,"score_spread":0.22849586647603848,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1860056538","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97017515,0.0055729924,0.008857755,0.0020639987,0.000693345,0.0007582074,0.00003783619,0.00042277022,0.011417946],"genre_scores_gemma":[0.99799573,0.00013762107,0.00028776043,0.000051854386,0.000033407072,0.000024287227,6.9480956e-7,0.000024638292,0.0014439959],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990573,0.000050337036,0.00027734516,0.00017020229,0.00017251623,0.0002723015],"domain_scores_gemma":[0.99915445,0.000040939125,0.000027744109,0.00039918895,0.0002712316,0.0001064641],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048590373,0.00018052477,0.00025948836,0.000057305482,0.00004251347,0.000047659923,0.00017820767,0.00006554201,0.00012030386],"category_scores_gemma":[0.00009452943,0.00010094584,0.00009807538,0.00025097345,0.000029083149,0.000087931214,0.00004147607,0.000088512024,0.00009443649],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002259391,0.00003854566,0.0005225189,0.00037429848,0.0004616059,0.000009677285,0.001493241,0.07579675,0.059472848,0.00091797335,0.8588093,0.0020806286],"study_design_scores_gemma":[0.0006422496,0.00015106518,0.0017161348,0.00020795257,0.00004994057,0.00007752501,0.00061139517,0.9622106,0.011130273,0.000009739968,0.022766193,0.0004269564],"about_ca_topic_score_codex":0.000063487096,"about_ca_topic_score_gemma":0.000009058987,"teacher_disagreement_score":0.8864138,"about_ca_system_score_codex":0.00011373894,"about_ca_system_score_gemma":0.000012153556,"threshold_uncertainty_score":0.4116452},"labels":[],"label_agreement":null},{"id":"W1863172992","doi":"10.1109/ccece.2001.933531","title":"Composite systems operating reserve assessment using a reliability framework","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Contingency; Composite number; Computer science; Transmission system; Power system simulation; Transmission (telecommunications); Unit (ring theory); Electric power system; Engineering; Telecommunications; Algorithm; Mathematics","score_opus":0.02653263547453447,"score_gpt":0.2615014226013724,"score_spread":0.2349687871268379,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1863172992","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.586458,0.0011916389,0.35695615,0.00015528123,0.0022437477,0.0006777281,0.000013558356,0.0009895231,0.05131435],"genre_scores_gemma":[0.9704405,0.000026671336,0.028990192,0.000040875202,0.00011407258,0.00003133245,0.0000014656803,0.000030373372,0.00032452628],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984965,0.00010831026,0.00047496226,0.00028533922,0.00024676116,0.00038814088],"domain_scores_gemma":[0.99897164,0.00016566417,0.00003627353,0.00061706797,0.00009188853,0.00011749175],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055674603,0.00019457363,0.00031130412,0.000044534976,0.00013313355,0.00014836657,0.0002186106,0.00014900767,0.00015653812],"category_scores_gemma":[0.00009093024,0.00017124553,0.000078011464,0.0002281725,0.000037941045,0.0002366097,0.0000620753,0.0003463085,0.00006098618],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000028155332,0.0001482845,0.02269881,0.0014119023,0.00009697947,0.000027620157,0.0009048207,0.9475511,0.010201892,0.0121209035,0.0045114057,0.00032350488],"study_design_scores_gemma":[0.00013297122,0.000018783503,0.00085627456,0.000353577,0.00000970839,0.000019450621,0.00016560576,0.99471945,0.00020487313,0.00012642678,0.003154076,0.00023878453],"about_ca_topic_score_codex":0.0002898242,"about_ca_topic_score_gemma":0.0000070742667,"teacher_disagreement_score":0.38398248,"about_ca_system_score_codex":0.00032940853,"about_ca_system_score_gemma":0.000009262676,"threshold_uncertainty_score":0.69831896},"labels":[],"label_agreement":null},{"id":"W1873158791","doi":"","title":"Probabilistic Reliability Planning at British Columbia Transmission Corporation: Method and Project Case","year":2008,"lang":"en","type":"article","venue":"Proceedings of the 10th International Conference on Probablistic Methods Applied to Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"TransCanada (Canada)","funders":"","keywords":"Probabilistic logic; Reliability (semiconductor); Plan (archaeology); Transmission (telecommunications); Computer science; Reliability engineering; Business system planning; Operations research; Service (business); Engineering; Geography; Business; Artificial intelligence; Telecommunications; Process management","score_opus":0.04560159232388095,"score_gpt":0.30194290937641727,"score_spread":0.2563413170525363,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1873158791","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28447855,0.0002963633,0.53387016,0.00033487295,0.0051944195,0.008333273,0.00027319958,0.0006712755,0.16654791],"genre_scores_gemma":[0.93632346,0.000015897343,0.06101299,0.00004162814,0.00005689677,0.0005718047,0.0000045673864,0.000043173084,0.0019295882],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99735516,0.000091525304,0.0009374197,0.0006869739,0.0005753873,0.00035351582],"domain_scores_gemma":[0.9980041,0.00027319213,0.00032947573,0.00027878673,0.0009341431,0.00018031675],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0021946747,0.00029251637,0.0006010882,0.00010805031,0.0003112856,0.000352112,0.00056764076,0.00018603788,0.00006124312],"category_scores_gemma":[0.0008959517,0.00029612915,0.00009383866,0.0003877034,0.0001919066,0.00018522228,0.00018908094,0.00032697394,0.000004395375],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0025538697,0.0016346825,0.01202289,0.023893781,0.0016109132,0.0005579027,0.034888465,0.07827153,0.13637228,0.4920108,0.18437529,0.031807598],"study_design_scores_gemma":[0.007200891,0.0021355145,0.00963085,0.0135246515,0.00057519827,0.0375473,0.0056125815,0.64803004,0.0136516,0.07243174,0.18347308,0.00618657],"about_ca_topic_score_codex":0.00089738803,"about_ca_topic_score_gemma":0.00005926591,"teacher_disagreement_score":0.6518449,"about_ca_system_score_codex":0.00032079493,"about_ca_system_score_gemma":0.000090271555,"threshold_uncertainty_score":0.9999491},"labels":[],"label_agreement":null},{"id":"W1878882886","doi":"10.1109/ccece.2002.1015180","title":"Reliability assessment of transmission and distribution systems considering repair in adverse weather conditions","year":2003,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Adverse weather; Reliability (semiconductor); Reliability engineering; Computer science; Transmission (telecommunications); Environmental science; Meteorology; Engineering; Telecommunications; Physics","score_opus":0.007109370577998389,"score_gpt":0.23126676259506646,"score_spread":0.22415739201706808,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1878882886","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.842726,0.00042507777,0.14243294,0.00002748368,0.0003386876,0.0006181013,0.00009362353,0.0002965873,0.013041511],"genre_scores_gemma":[0.9988953,0.000056059336,0.00092565484,0.0000031719385,0.0000027078395,0.000030071129,0.0000072437665,0.000006879935,0.000072921255],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99923706,0.00007442043,0.00032838908,0.00014293216,0.00008211779,0.00013509941],"domain_scores_gemma":[0.99963176,0.0000780271,0.000023403049,0.00018136698,0.000034678586,0.000050739327],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048011204,0.00008788764,0.00018787476,0.000028326118,0.000021704644,0.000003372967,0.000024967632,0.00006615968,0.000031767227],"category_scores_gemma":[0.00005221351,0.00007756157,0.00004283625,0.00009749076,0.00004669383,0.00010221738,0.0000047611106,0.00008516254,0.0000010106825],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036840825,0.00071830204,0.22474933,0.00978274,0.00018338877,0.000044986693,0.0016649296,0.44844386,0.046325594,0.2618139,0.005743343,0.0004927785],"study_design_scores_gemma":[0.002906727,0.00016747336,0.2987944,0.0017264306,0.000065714434,0.00008546029,0.0028110014,0.5886281,0.0065238075,0.0021761884,0.09526481,0.0008498993],"about_ca_topic_score_codex":0.000079696605,"about_ca_topic_score_gemma":0.000015855736,"teacher_disagreement_score":0.2596377,"about_ca_system_score_codex":0.00011354258,"about_ca_system_score_gemma":0.00002427716,"threshold_uncertainty_score":0.3162869},"labels":[],"label_agreement":null},{"id":"W1881546447","doi":"10.1109/empd.1995.500718","title":"Application of reliability concepts to the Nepal Power System","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Computer science; Electric power system; Power (physics); Engineering","score_opus":0.005479681395731964,"score_gpt":0.19899839615538556,"score_spread":0.1935187147596536,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1881546447","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16769716,0.00057156873,0.52264947,0.0013869323,0.0014891211,0.0018749412,0.000033302495,0.00104929,0.3032482],"genre_scores_gemma":[0.9991733,0.000002979445,0.0003441731,0.000052214637,0.000026732881,0.000068222,5.032629e-7,0.000008912298,0.00032296075],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99932784,0.000025629968,0.00024665348,0.00013326526,0.00012152016,0.00014510112],"domain_scores_gemma":[0.9992767,0.00005475229,0.000021668093,0.0005343234,0.000061899445,0.00005068014],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026289397,0.00007994302,0.00013620147,0.000016439282,0.000025746009,0.000007469511,0.00019310384,0.00004646864,0.00006393284],"category_scores_gemma":[0.0000377863,0.000052410873,0.000048592028,0.00016115463,0.000030508114,0.00004429111,0.000016846883,0.0000602196,0.00032469028],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007863698,0.00045075107,0.011549007,0.004719147,0.00023742761,0.000006139768,0.017777398,0.2638994,0.025512949,0.26622498,0.3630003,0.04654389],"study_design_scores_gemma":[0.00040010005,0.00011241114,0.0069218,0.00013239714,0.000019989579,0.000017193102,0.0016351118,0.3869225,0.008692402,0.00009411405,0.59464735,0.00040465035],"about_ca_topic_score_codex":0.000048075457,"about_ca_topic_score_gemma":0.000016571295,"teacher_disagreement_score":0.83147615,"about_ca_system_score_codex":0.00007307555,"about_ca_system_score_gemma":0.0000022783875,"threshold_uncertainty_score":0.4173345},"labels":[],"label_agreement":null},{"id":"W1897996733","doi":"10.1109/pess.2001.970078","title":"A reliability based approach to transmission maintenance planning and its application in BC Hydro system","year":2001,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"BC Hydro","keywords":"Reliability (semiconductor); Reliability engineering; Schedule; Computer science; Monte Carlo method; Transmission system; Transmission (telecommunications); Maintenance engineering; Electric power transmission; Linear programming; Engineering; Power (physics); Telecommunications; Electrical engineering","score_opus":0.0094812282500339,"score_gpt":0.2086124084932358,"score_spread":0.19913118024320192,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1897996733","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19428115,0.00026080053,0.7744174,0.00008678661,0.00006785621,0.00084916176,0.0000027020474,0.00042106188,0.029613074],"genre_scores_gemma":[0.9961911,0.000009065257,0.0033237648,0.00005019972,0.000017223378,0.00023747742,0.0000039297347,0.000019635709,0.00014758993],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99881905,0.000040032442,0.00032903074,0.00036685192,0.00013132508,0.00031372253],"domain_scores_gemma":[0.99947196,0.000046839865,0.000020300242,0.00028078078,0.000035241585,0.00014488195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000534245,0.00016309129,0.000240063,0.000092176626,0.00003623017,0.000017358243,0.00013267797,0.00010496862,0.0000024782355],"category_scores_gemma":[0.00002338293,0.0001401472,0.000032605018,0.00033868724,0.000012474791,0.0001195995,0.00001407751,0.00013489604,0.000018260867],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022500678,0.00022153325,0.0072025177,0.0046881796,0.000014525604,0.000020075127,0.0017307601,0.94958407,0.019683355,0.0059252908,0.00080086046,0.009903799],"study_design_scores_gemma":[0.0004098964,0.000020232901,0.0034460744,0.00033513544,0.0000035781086,0.000015875103,0.00022142976,0.982465,0.001159518,0.00003080342,0.011687911,0.00020453065],"about_ca_topic_score_codex":0.00009235217,"about_ca_topic_score_gemma":0.00000941764,"teacher_disagreement_score":0.80191,"about_ca_system_score_codex":0.00020003087,"about_ca_system_score_gemma":0.000012658159,"threshold_uncertainty_score":0.5715037},"labels":[],"label_agreement":null},{"id":"W1902692898","doi":"10.1109/apt.1993.673902","title":"A Practical Approach To Evaluating The Marginal Outage Costs In Generating Systems","year":2005,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Computer science; Reliability engineering; Marginal cost; Engineering; Economics; Microeconomics","score_opus":0.04731053224627568,"score_gpt":0.3140736161853366,"score_spread":0.2667630839390609,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1902692898","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3042074,0.00039078968,0.56372654,0.000974451,0.00072141015,0.0014325114,0.0000041934745,0.00036024424,0.12818244],"genre_scores_gemma":[0.95979714,0.0000023906248,0.038968723,0.00016571715,0.00021106515,0.00017723686,0.000001180287,0.000017426253,0.00065913843],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988287,0.00011665467,0.0003185867,0.00018949236,0.00022611809,0.00032043882],"domain_scores_gemma":[0.9994583,0.00014840027,0.000021440408,0.00026607295,0.00003456179,0.00007119784],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015194603,0.00012065764,0.00016107233,0.00004144863,0.000051675994,0.000091081936,0.00013514732,0.0000555112,0.000010534892],"category_scores_gemma":[0.0002590528,0.00008205418,0.000029615527,0.00017571758,0.000013054179,0.00014087492,0.00003887054,0.00021579332,0.00009829832],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013830695,0.000063505766,0.00037414368,0.0001606939,0.000019206906,0.000004060099,0.0011439627,0.9703799,0.0034172928,0.012840145,0.0054566883,0.006126606],"study_design_scores_gemma":[0.00015672558,0.000024472258,0.00017944629,0.000052719166,0.00000390704,0.00004462533,0.00073604344,0.9911143,0.00007738101,0.0000022016577,0.007487799,0.00012035504],"about_ca_topic_score_codex":0.0001316894,"about_ca_topic_score_gemma":0.00014807262,"teacher_disagreement_score":0.6555897,"about_ca_system_score_codex":0.00026477312,"about_ca_system_score_gemma":0.000026119526,"threshold_uncertainty_score":0.33460727},"labels":[],"label_agreement":null},{"id":"W1905635524","doi":"10.1109/empd.1998.702760","title":"A new approach to adequacy assessment of small isolated power generating systems","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Probabilistic logic; Electric power system; Computer science; Reliability engineering; Power (physics); Power system simulation; Index (typography); Engineering; Artificial intelligence","score_opus":0.023052768961961352,"score_gpt":0.22057561977139015,"score_spread":0.1975228508094288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1905635524","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010397336,0.00029372034,0.80951965,0.000028201468,0.000458687,0.00035004638,0.0000030958095,0.00022737434,0.17872186],"genre_scores_gemma":[0.9484727,0.000007119425,0.04655074,0.0000351324,0.00004712714,0.00002720278,0.0000014769364,0.000023065199,0.00483545],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990001,0.000030006417,0.00038347917,0.00019640796,0.00013377822,0.00025625873],"domain_scores_gemma":[0.9994047,0.000027191452,0.000033048957,0.00034200842,0.00004927891,0.00014376144],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019901345,0.00014114994,0.00026353434,0.00006352632,0.000022483737,0.00003740718,0.00016886959,0.00007620649,0.00014551212],"category_scores_gemma":[0.00002076393,0.00012274791,0.000055989065,0.0002166603,0.000005950022,0.000066452245,0.000030509955,0.00010249471,0.000061886625],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000045636793,0.00016250246,0.00039217703,0.0008883941,0.0001726245,0.000004466804,0.0021594404,0.896345,0.02131326,0.01681737,0.059351366,0.0023888191],"study_design_scores_gemma":[0.00020220454,0.00004636314,0.00010894452,0.00007641294,0.0000071162867,0.000010842001,0.00016819412,0.9902138,0.00019946405,0.0000037918935,0.008788201,0.00017464497],"about_ca_topic_score_codex":0.00016503927,"about_ca_topic_score_gemma":0.000007960242,"teacher_disagreement_score":0.93807536,"about_ca_system_score_codex":0.00008032032,"about_ca_system_score_gemma":0.000013014577,"threshold_uncertainty_score":0.50055146},"labels":[],"label_agreement":null},{"id":"W1905901472","doi":"10.1109/ptc.2001.964881","title":"Effects of selected operating considerations in health analysis of interconnected systems","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Derating; Probabilistic logic; Reliability engineering; Computer science; Power system simulation; Unit (ring theory); Electric power system; Engineering; Voltage; Electrical engineering; Power (physics); Mathematics","score_opus":0.008422298684106154,"score_gpt":0.20520521796858956,"score_spread":0.1967829192844834,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1905901472","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9708152,0.002358715,0.023960724,0.000065734406,0.00022963417,0.00053807563,0.000011598039,0.0001603587,0.0018599652],"genre_scores_gemma":[0.9994208,0.00003497079,0.00044636475,0.000013424678,0.0000039877755,0.000019226676,0.0000027113913,0.0000067196147,0.000051790605],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989756,0.00010916813,0.0005940162,0.00010191864,0.00007438595,0.00014493002],"domain_scores_gemma":[0.99930423,0.00035258758,0.000062135245,0.00014485532,0.000101303536,0.00003486804],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020013412,0.00007873816,0.00045914037,0.00029016624,0.000014421359,0.000008714762,0.000045880548,0.000041485244,0.000053404627],"category_scores_gemma":[0.0003292311,0.000072088085,0.000048267368,0.0011537749,0.00001656748,0.000059604943,0.000008198003,0.000069125934,0.0000018995387],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000028912973,0.00026260663,0.012062169,0.0067177825,0.0015658272,0.0000079945985,0.0077127847,0.89396,0.062123865,0.013344562,0.0019930461,0.000246449],"study_design_scores_gemma":[0.0002809383,0.00004737808,0.008606929,0.00031155942,0.000048100686,0.0000020387504,0.00017968871,0.9833685,0.0070384433,0.000005923639,0.000024393454,0.00008606441],"about_ca_topic_score_codex":0.00088967785,"about_ca_topic_score_gemma":0.0008781933,"teacher_disagreement_score":0.08940852,"about_ca_system_score_codex":0.00006434036,"about_ca_system_score_gemma":0.000012615129,"threshold_uncertainty_score":0.29396668},"labels":[],"label_agreement":null},{"id":"W1914149702","doi":"10.1109/ccece.2002.1015177","title":"A sequential simulation method for the generating capacity adequacy evaluation of small stand-alone wind energy conversion systems","year":2003,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Wind speed; Turbine; Reliability (semiconductor); Small wind turbine; State of charge; Energy storage; Generator (circuit theory); Electricity generation; Monte Carlo method; Computer science; Automotive engineering; Battery (electricity); Power (physics); Marine engineering; Simulation; Engineering; Meteorology; Electrical engineering; Aerospace engineering","score_opus":0.06660229651746502,"score_gpt":0.2860324615552816,"score_spread":0.2194301650378166,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1914149702","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03949777,0.00076362526,0.957263,0.000009581614,0.0008717545,0.000588988,0.000013912448,0.000056195542,0.00093518023],"genre_scores_gemma":[0.98932636,0.00000977213,0.010421121,0.000010411088,0.000063976186,0.00004500925,0.0000057623765,0.000014532861,0.00010307571],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99876934,0.00031236472,0.0003443847,0.00014802165,0.00026148767,0.00016440687],"domain_scores_gemma":[0.9988085,0.0005006003,0.000084197134,0.00021870979,0.00035594087,0.000032020394],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029018929,0.00011063915,0.00019179349,0.00003620334,0.000084686726,0.000025893843,0.00007397618,0.000085836065,0.000022400769],"category_scores_gemma":[0.0003243941,0.00008154157,0.00007481636,0.00010238041,0.000018556055,0.00009670083,0.000007393372,0.00005105232,9.128166e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008544,0.000008085036,0.000012113058,0.0001829115,0.000047251462,4.81492e-8,0.0002111752,0.9810423,0.011989987,0.005552034,0.000062312145,0.0008831904],"study_design_scores_gemma":[0.0006647257,0.000025826726,0.000011639755,0.00004413558,0.000084367784,0.000002099411,0.00022476565,0.9676198,0.026756447,0.00013401012,0.004337465,0.00009475939],"about_ca_topic_score_codex":0.0003363377,"about_ca_topic_score_gemma":0.00006154584,"teacher_disagreement_score":0.94982857,"about_ca_system_score_codex":0.0001647279,"about_ca_system_score_gemma":0.00005318891,"threshold_uncertainty_score":0.33251688},"labels":[],"label_agreement":null},{"id":"W1918498505","doi":"10.1109/wescan.1995.493963","title":"Composite system reliability concepts in the evaluation of nonutility generation","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Cogeneration; Reliability (semiconductor); Electricity generation; Electric power system; Environmental economics; Reliability engineering; Energy market; Computer science; Business; Engineering; Risk analysis (engineering); Power (physics); Electricity; Economics; Electrical engineering","score_opus":0.049231812297560046,"score_gpt":0.2695894497757545,"score_spread":0.22035763747819445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1918498505","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95719767,0.0004238078,0.0055463817,0.00008281952,0.00037594305,0.00064184115,0.000006417777,0.0000899912,0.035635147],"genre_scores_gemma":[0.9997145,0.000007205989,0.00015305686,0.000016001512,0.000030649404,0.0000539116,0.0000041258177,0.0000044037247,0.000016162308],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998725,0.00032275487,0.00035605067,0.00013279401,0.0003449927,0.00011841006],"domain_scores_gemma":[0.99934036,0.00007296659,0.00003242287,0.00039192123,0.00014504818,0.000017274202],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025462483,0.00007935598,0.00014587627,0.000025892874,0.000024477347,0.0000113724345,0.00013055088,0.000056278954,0.00006271693],"category_scores_gemma":[0.00007278518,0.00005543104,0.00004162931,0.00016545979,0.000039608072,0.00010172653,0.000008294253,0.00008021831,0.000020955964],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003181074,0.00072168605,0.031123215,0.0033296433,0.00008305032,0.0000048878014,0.018781437,0.8385467,0.040562794,0.017635314,0.016496308,0.032683164],"study_design_scores_gemma":[0.00028484396,0.000012867034,0.014857688,0.00003683143,0.000013256301,0.0000031820277,0.0003024043,0.981587,0.0024388295,0.000037729045,0.0003616265,0.00006374315],"about_ca_topic_score_codex":0.00007880944,"about_ca_topic_score_gemma":0.000110419816,"teacher_disagreement_score":0.14304031,"about_ca_system_score_codex":0.00019044035,"about_ca_system_score_gemma":0.0000065486547,"threshold_uncertainty_score":0.22604121},"labels":[],"label_agreement":null},{"id":"W1919443814","doi":"10.1109/pes.2004.1373277","title":"Deterministic/probabilistic contingency evaluation in composite generation and transmission systems","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Probabilistic logic; Computer science; Transmission system; Electric power system; Business system planning; Component (thermodynamics); Contingency; Transmission (telecommunications); Point (geometry); Mathematical optimization; Power (physics); Engineering; Artificial intelligence; Mathematics; Systems engineering","score_opus":0.010499859089040454,"score_gpt":0.2168362416346241,"score_spread":0.20633638254558365,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1919443814","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88812953,0.005577584,0.10278793,0.000044240216,0.0021032854,0.0007031891,0.000010250341,0.0003491667,0.00029482995],"genre_scores_gemma":[0.9924825,0.00015081126,0.006886122,0.000023500706,0.00022455175,0.00012626266,0.000015367481,0.000060089682,0.000030781815],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99818075,0.00005278395,0.00056798384,0.00039011685,0.0003407918,0.00046759946],"domain_scores_gemma":[0.99941266,0.00004579783,0.000060998707,0.0002399076,0.0001039181,0.00013669358],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010241298,0.0003235148,0.0003456544,0.00007114182,0.00007952406,0.000091739865,0.00012898177,0.00021086796,0.000004512298],"category_scores_gemma":[0.00006564828,0.00034217632,0.00011205264,0.00022268295,0.00003713477,0.00016863421,0.000012968138,0.0002522337,0.000005988198],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000024476037,0.000022432861,0.00008127016,0.00028365778,0.000023369399,0.0000035051407,0.0012862774,0.87530094,0.12223386,0.00014380568,0.00020700332,0.00041142575],"study_design_scores_gemma":[0.000998397,0.000045301764,0.0007644464,0.000484183,0.000038556034,0.000027807571,0.00005070377,0.99042135,0.005629422,0.00004915451,0.0010525131,0.00043817906],"about_ca_topic_score_codex":0.000107624306,"about_ca_topic_score_gemma":0.000016967439,"teacher_disagreement_score":0.11660444,"about_ca_system_score_codex":0.00047944952,"about_ca_system_score_gemma":0.000048290876,"threshold_uncertainty_score":0.999903},"labels":[],"label_agreement":null},{"id":"W1921838467","doi":"10.1109/ccece.2000.849565","title":"Predicting bulk electricity system performance indices","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Electricity; Electric power system; Computer science; System testing; Test (biology); Engineering; Power (physics); Electrical engineering","score_opus":0.007186836843932556,"score_gpt":0.1591816494139309,"score_spread":0.15199481256999833,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1921838467","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.801503,0.0006198127,0.0032878171,0.000015647256,0.0005254062,0.00014106312,0.0000020978114,0.0013352289,0.19256991],"genre_scores_gemma":[0.99875385,0.00007278802,0.00013578782,0.000015839783,0.00008556202,0.000019299867,4.8976773e-7,0.000014490158,0.00090189994],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992293,0.000011777577,0.00020759845,0.00013022499,0.00013298787,0.00028809943],"domain_scores_gemma":[0.9996755,0.000031060812,0.000023250654,0.00018748526,0.000023126107,0.000059564147],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016486894,0.000108280634,0.00013918332,0.00005081937,0.00006724011,0.000025245401,0.00014160365,0.00006459748,0.00007283773],"category_scores_gemma":[0.000016171976,0.000092974486,0.000033550477,0.00019515601,0.000013305519,0.00017894372,0.000014885685,0.00013200025,0.00027528554],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056081913,0.0004651173,0.5475328,0.029001664,0.00086541544,0.00012400986,0.011917226,0.18479702,0.013205292,0.019522168,0.07675196,0.11576127],"study_design_scores_gemma":[0.00014878063,0.000037014,0.0029768662,0.00013323543,0.000007234318,0.000039459916,0.00009047303,0.98486996,0.0044178334,0.0000021715384,0.00710544,0.00017154116],"about_ca_topic_score_codex":0.00002578008,"about_ca_topic_score_gemma":0.000008667228,"teacher_disagreement_score":0.8000729,"about_ca_system_score_codex":0.00010799397,"about_ca_system_score_gemma":0.000002581538,"threshold_uncertainty_score":0.37913898},"labels":[],"label_agreement":null},{"id":"W1933776184","doi":"10.1109/ccece.2001.933530","title":"Predictive reliability assessment of distribution systems including extreme adverse weather","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Adverse weather; Reliability (semiconductor); Extreme weather; Weather forecasting; Computer science; Weather prediction; Meteorology; Severe weather; Environmental science; Numerical weather prediction; Model output statistics; Reliability engineering; Engineering; Storm; Climate change; Geography","score_opus":0.02578103158183836,"score_gpt":0.2318336088440813,"score_spread":0.20605257726224294,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1933776184","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2142112,0.0005806682,0.65753865,0.00007179492,0.0017962495,0.00093301793,0.00022624795,0.00075218437,0.12388996],"genre_scores_gemma":[0.99899024,0.00005405175,0.0002786138,0.000003080734,0.000038741317,0.000046954145,0.00001002382,0.000013133521,0.0005651664],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99892634,0.000055091336,0.00039615706,0.00019049602,0.00021427174,0.00021765224],"domain_scores_gemma":[0.99934644,0.00007120369,0.000055112967,0.00036167796,0.0001005298,0.000065068416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040976744,0.00013413088,0.0002450595,0.000027331535,0.000037898182,0.000008201062,0.00011852026,0.00008918708,0.00014439186],"category_scores_gemma":[0.00006349341,0.000114915645,0.0000784392,0.00015156665,0.00004990412,0.00017719768,0.00003789759,0.00011953347,0.000020037123],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052274558,0.0012068067,0.099740654,0.0055524753,0.00056867447,0.0000303077,0.0027294157,0.7733995,0.011366932,0.04631854,0.056310486,0.0027239793],"study_design_scores_gemma":[0.00034526023,0.0000736694,0.01295921,0.00020061072,0.000023743856,0.0000069864136,0.0003701482,0.972485,0.0004345047,0.0000816645,0.012824346,0.00019483922],"about_ca_topic_score_codex":0.000069077985,"about_ca_topic_score_gemma":0.0000050430967,"teacher_disagreement_score":0.784779,"about_ca_system_score_codex":0.00037059002,"about_ca_system_score_gemma":0.0000080102955,"threshold_uncertainty_score":0.4686124},"labels":[],"label_agreement":null},{"id":"W1946797405","doi":"10.1109/pes.2004.1372740","title":"Considerations of relevant factors in setting distribution system reliability standards","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Reliability (semiconductor); Metric (unit); Reliability engineering; Duration (music); Index (typography); Computer science; Operations research; Engineering; Operations management","score_opus":0.0044532881495786,"score_gpt":0.20301819505124782,"score_spread":0.19856490690166922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1946797405","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88663334,0.00062916894,0.10897403,0.00007586821,0.0018567265,0.00040978775,0.000415199,0.0006838439,0.0003220221],"genre_scores_gemma":[0.9933984,0.00002979002,0.0063494653,0.000011191673,0.00007999448,0.000036168327,0.000028261566,0.000054626806,0.000012059748],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99767166,0.000046252357,0.0008580966,0.000366642,0.00047543494,0.000581912],"domain_scores_gemma":[0.99896336,0.00014463038,0.00011194093,0.00042831743,0.0002239817,0.00012775333],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0014200684,0.00034806895,0.00049108185,0.000052609397,0.0000827696,0.000041112144,0.00016346277,0.0002451379,0.0000065950258],"category_scores_gemma":[0.00046323866,0.00035609488,0.0002840856,0.00033758723,0.000066321576,0.00018602425,0.000028564993,0.00039500004,0.0000030615777],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000032017078,0.000032165575,0.0009275564,0.00070253684,0.000042281234,0.000004802877,0.0018340459,0.9707633,0.023004938,0.0010672092,0.0016107635,0.000007149404],"study_design_scores_gemma":[0.005304446,0.00032133865,0.015167393,0.006858794,0.0001625666,0.000108894885,0.004242147,0.4659814,0.48759863,0.0007517363,0.010148248,0.003354407],"about_ca_topic_score_codex":0.00022733115,"about_ca_topic_score_gemma":0.000025048847,"teacher_disagreement_score":0.50478196,"about_ca_system_score_codex":0.0018587664,"about_ca_system_score_gemma":0.0001447454,"threshold_uncertainty_score":0.9998891},"labels":[],"label_agreement":null},{"id":"W1951587790","doi":"10.1109/ccece.2001.933553","title":"Implementation of nonuniform reliability in a deregulated power market","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Computer science; Power (physics); Engineering; Physics","score_opus":0.005428844867762916,"score_gpt":0.20174836595278153,"score_spread":0.19631952108501863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1951587790","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9057153,0.00008975261,0.0016699149,0.000091644986,0.00017107629,0.0002811074,0.000008615846,0.00012842155,0.091844186],"genre_scores_gemma":[0.99916726,0.000019814306,0.0004133098,0.0000147964565,0.0000032471241,0.000012387814,0.000001359019,0.00000820273,0.00035961912],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9992939,0.000018827202,0.0003241778,0.000104999475,0.00008816983,0.00016989825],"domain_scores_gemma":[0.9996629,0.000030848078,0.000021746951,0.00022194508,0.000032467608,0.000030110548],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00024695828,0.00007798151,0.00013887284,0.00005818853,0.000007388865,0.000004499466,0.00007474993,0.00004940789,0.003358162],"category_scores_gemma":[0.000017531238,0.00007077833,0.00002974332,0.00018803368,0.000019764226,0.00011843811,0.000013048713,0.000056352786,0.000021354064],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001884177,0.0013616387,0.571553,0.005321285,0.00032606412,0.000051312116,0.021708043,0.025272278,0.029369358,0.013771939,0.25291878,0.07815791],"study_design_scores_gemma":[0.0031946702,0.00024979078,0.7548408,0.0002175477,0.000018033004,0.000018142557,0.0030948096,0.18188076,0.028912235,0.0014964527,0.025299674,0.0007771064],"about_ca_topic_score_codex":0.00020560576,"about_ca_topic_score_gemma":0.00047739854,"teacher_disagreement_score":0.22761911,"about_ca_system_score_codex":0.00008078808,"about_ca_system_score_gemma":0.000003864568,"threshold_uncertainty_score":0.99755293},"labels":[],"label_agreement":null},{"id":"W1964045365","doi":"10.1109/pesgm.2014.6939937","title":"Risk based methods for short term wind power commitment","year":2014,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Probabilistic logic; Power system simulation; Reliability engineering; Reliability (semiconductor); Electric power system; Term (time); Computer science; Unit (ring theory); Wind speed; Operations research; Power (physics); Engineering; Risk analysis (engineering); Business; Electrical engineering; Meteorology; Mathematics","score_opus":0.011785723902606656,"score_gpt":0.28121801424895015,"score_spread":0.2694322903463435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1964045365","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0063756267,0.000055588906,0.9640004,0.00006595556,0.0007379233,0.00037441586,0.000010993756,0.00026325954,0.028115833],"genre_scores_gemma":[0.8701854,0.0000038131818,0.12921058,0.0001254945,0.000036458336,0.000052993928,0.000004035498,0.000022063183,0.0003592012],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99931467,0.000069269925,0.00018571499,0.00014904303,0.0000573285,0.00022400384],"domain_scores_gemma":[0.9992318,0.00029422896,0.000012728699,0.00035707347,0.0000312484,0.00007291269],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009326527,0.00011884963,0.00018231281,0.000029339379,0.000040578838,0.000018816849,0.00012652106,0.00006449505,0.00008810163],"category_scores_gemma":[0.000098053024,0.00009568661,0.000094619936,0.00004297784,0.000018742126,0.00004371933,0.000013455358,0.000073187395,0.000020313135],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023041961,0.0007051977,0.040034946,0.0024523435,0.00095804175,0.000004125627,0.0017593349,0.06720161,0.034996137,0.048248615,0.18065393,0.6227553],"study_design_scores_gemma":[0.0005621185,0.00014167924,0.006692997,0.000039351824,0.00003517481,0.0000014275123,0.000029308783,0.325937,0.01803991,0.00078207307,0.6474159,0.0003230504],"about_ca_topic_score_codex":0.000008110568,"about_ca_topic_score_gemma":0.000009495255,"teacher_disagreement_score":0.86380976,"about_ca_system_score_codex":0.00005051089,"about_ca_system_score_gemma":0.000006146068,"threshold_uncertainty_score":0.39019868},"labels":[],"label_agreement":null},{"id":"W1967547949","doi":"10.1109/pesmg.2013.6672283","title":"Evaluating substation reliability using a combined state enumeration and linear programming method","year":2013,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Enumeration; Linear programming; Electric power system; State (computer science); Computer science; Terminal (telecommunication); Transmission system; Power (physics); Engineering; Transmission (telecommunications); Mathematics; Algorithm","score_opus":0.031843835346467016,"score_gpt":0.3205199069307021,"score_spread":0.2886760715842351,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1967547949","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5638144,0.000039634997,0.43515295,0.00004160548,0.000119400145,0.0005103135,9.748132e-7,0.00020068284,0.0001200201],"genre_scores_gemma":[0.67894065,0.0000050349463,0.32088986,0.000015402418,0.000015494616,0.000056843022,0.0000044372778,0.0000144299165,0.000057813177],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989708,0.000116611314,0.00033441637,0.0002084949,0.00014531189,0.00022437982],"domain_scores_gemma":[0.99940425,0.00013246178,0.000043670065,0.00018294291,0.00016806409,0.000068603964],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001013162,0.00012451633,0.0001631842,0.000041041258,0.00007771156,0.000078827696,0.000046207413,0.000051299823,0.000031955202],"category_scores_gemma":[0.00019803809,0.000112053734,0.000027397788,0.00013923318,0.000023444873,0.00041911504,0.000019306059,0.00010351409,0.00001556927],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004107329,0.000103961785,0.006798775,0.0014886386,0.00008829035,0.0000019000183,0.006314631,0.46297207,0.13478535,0.0010600542,0.00015494286,0.38619033],"study_design_scores_gemma":[0.0002756923,0.000054455104,0.0016658275,0.000036468056,0.000010332795,0.0000037233858,0.0001369479,0.99165773,0.004579208,0.0012834491,0.00015663134,0.00013955287],"about_ca_topic_score_codex":0.000533322,"about_ca_topic_score_gemma":0.00004338017,"teacher_disagreement_score":0.5286856,"about_ca_system_score_codex":0.00008350701,"about_ca_system_score_gemma":0.000018214907,"threshold_uncertainty_score":0.45694184},"labels":[],"label_agreement":null},{"id":"W1968830689","doi":"10.1109/tdc.2014.6863414","title":"Risk-based asset management optimization","year":2014,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Asset (computer security); Risk analysis (engineering); IT asset management; Asset management; Scope (computer science); Business; Risk management; Order (exchange); Investment (military); Present value; Service (business); Finance; Actuarial science; Computer science; Computer security","score_opus":0.0024237112256221883,"score_gpt":0.16253071243480544,"score_spread":0.16010700120918325,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1968830689","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000976508,0.000009500665,0.8721886,0.00003337754,0.00024370916,0.00008270412,0.0000015609635,0.0003315812,0.12613246],"genre_scores_gemma":[0.9633806,0.000013833262,0.036003977,0.00006911502,0.000019457557,0.000016389758,0.0000059004797,0.000010132673,0.00048059135],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99965096,0.000017938804,0.00008968937,0.00007778704,0.000060650724,0.000102999606],"domain_scores_gemma":[0.9997499,0.00001972505,0.000010691882,0.0001798423,0.000011832485,0.000028035774],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017236406,0.000055368564,0.000058768193,0.000026784921,0.000019325767,0.000014130267,0.000062856496,0.000024951853,0.00008419402],"category_scores_gemma":[0.000013164105,0.000048571717,0.000022087801,0.000059559046,0.000006116141,0.00003806834,0.000006990719,0.000033862656,0.00008616671],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[8.805993e-7,0.0000054804004,0.0002485328,0.00005588698,0.000007377919,2.40914e-7,0.0000042585016,0.9919166,0.0000042469337,0.0019694495,0.004097868,0.0016891538],"study_design_scores_gemma":[0.00015751173,0.000008054461,0.00068485056,0.000012457898,0.0000062249433,2.0190683e-7,0.0000056886697,0.95952505,0.00022816147,0.00008835647,0.039213117,0.0000703386],"about_ca_topic_score_codex":0.0000065611907,"about_ca_topic_score_gemma":0.0000055306214,"teacher_disagreement_score":0.9624041,"about_ca_system_score_codex":0.000024638526,"about_ca_system_score_gemma":0.0000011140133,"threshold_uncertainty_score":0.1980697},"labels":[],"label_agreement":null},{"id":"W1968983472","doi":"10.1109/tpwrs.2013.2264904","title":"Utilization of the Area Risk Concept for Operational Reliability Evaluation of a Wind-Integrated Power System","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Reliability engineering; Reliability (semiconductor); Electric power system; Turbine; Wind speed; Engineering; Power (physics); Electrical engineering; Meteorology; Aerospace engineering","score_opus":0.02116232363307804,"score_gpt":0.2333632218346043,"score_spread":0.21220089820152627,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1968983472","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14589804,0.00022546436,0.8439972,0.000027122025,0.004532635,0.0033943052,0.0006185445,0.0001397625,0.0011669645],"genre_scores_gemma":[0.9992306,0.0000053415574,0.000115419694,0.0000059280205,0.000007740899,0.00045424202,0.000009030571,0.00003221754,0.00013948217],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997569,0.0003834361,0.0009010564,0.00028875662,0.0006352886,0.00022242974],"domain_scores_gemma":[0.9972552,0.00023142346,0.00024211426,0.00069706154,0.001511819,0.00006236688],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001290662,0.00023084758,0.00041501288,0.00010077805,0.000119739765,0.000034092165,0.00024311987,0.0001950056,0.00010266068],"category_scores_gemma":[0.000087666784,0.00016689571,0.0002459067,0.00036480685,0.00010879609,0.00024905254,0.0000012969302,0.00018275101,0.000015073933],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033457676,0.00013480827,0.00015595039,0.00045297312,0.0001504058,4.7150888e-8,0.0011588122,0.99339724,0.0024808897,0.0004641236,0.0012896226,0.00028165232],"study_design_scores_gemma":[0.0011569199,0.00017257793,0.0013612933,0.0007538914,0.00017768632,0.000008415662,0.0021872642,0.9631618,0.029658534,0.000038665217,0.0010759741,0.00024692476],"about_ca_topic_score_codex":0.00044331205,"about_ca_topic_score_gemma":0.00003083893,"teacher_disagreement_score":0.8533325,"about_ca_system_score_codex":0.00039959597,"about_ca_system_score_gemma":0.00014799128,"threshold_uncertainty_score":0.680581},"labels":[],"label_agreement":null},{"id":"W1969321285","doi":"10.3390/app3010107","title":"An Appropriate Wind Model for Wind Integrated Power Systems Reliability Evaluation Considering Wind Speed Correlations","year":2013,"lang":"en","type":"article","venue":"Applied Sciences","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":44,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Wind speed; Environmental science; Renewable energy; Electric power system; Meteorology; Engineering; Power (physics); Electrical engineering; Geography","score_opus":0.030798160118756072,"score_gpt":0.25720816919655387,"score_spread":0.2264100090777978,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1969321285","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86634845,0.00010646977,0.121070236,0.00008385029,0.0013108421,0.0030736555,0.000029089393,0.00032418896,0.007653215],"genre_scores_gemma":[0.9965857,0.0000023476614,0.0031333687,0.00003028279,0.00003554532,0.000074715615,0.000018294102,0.000022739949,0.00009699803],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979058,0.000060946706,0.00052977423,0.0005515401,0.00047979926,0.00047212295],"domain_scores_gemma":[0.9987651,0.00019177717,0.000107326065,0.00046891804,0.00031690326,0.00014994715],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022819596,0.00024122346,0.00030686558,0.00011545857,0.00033271336,0.00028252485,0.0003613614,0.0001559975,0.000047165595],"category_scores_gemma":[0.00018248105,0.00020160696,0.00005947198,0.00041417874,0.00032019423,0.000681569,0.000026935468,0.00017392947,0.00007117866],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000055785495,0.000028832545,0.00023038205,0.00005404347,0.000011505988,6.9124894e-8,0.0010170691,0.98401093,0.011312612,0.0026583918,0.00043923824,0.00023135621],"study_design_scores_gemma":[0.00035245932,0.000044599066,0.0007081807,0.00004703034,0.000022390093,0.000002267926,0.0016145221,0.9897825,0.0004143181,0.0065061236,0.00023502925,0.00027059246],"about_ca_topic_score_codex":0.00011453698,"about_ca_topic_score_gemma":0.00001827867,"teacher_disagreement_score":0.13023725,"about_ca_system_score_codex":0.00018252063,"about_ca_system_score_gemma":0.00018041032,"threshold_uncertainty_score":0.82212937},"labels":[],"label_agreement":null},{"id":"W1969557628","doi":"10.1109/pmaps.2010.5528975","title":"Wind power planning and operating capacity credit assessment","year":2010,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Context (archaeology); Wind speed; Capacity planning; Electric power system; Nameplate capacity; Computer science; Reliability engineering; Environmental science; Automotive engineering; Power (physics); Engineering; Meteorology; Electrical engineering; Electricity generation; Operations management; Geography; Physics","score_opus":0.009859776586768954,"score_gpt":0.23226897029195212,"score_spread":0.22240919370518317,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1969557628","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90021306,0.000028790653,0.011579301,0.000077950775,0.0008833725,0.000098581666,0.0000039543684,0.00020385646,0.08691116],"genre_scores_gemma":[0.9928652,8.537153e-7,0.0067790747,0.000055147393,0.000056564804,0.0000044124663,7.484585e-7,0.000010878678,0.00022708753],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99948406,0.000008815886,0.00012967567,0.00012327106,0.00008015281,0.00017403695],"domain_scores_gemma":[0.9997047,0.000035281726,0.0000097764505,0.00015626747,0.000022145276,0.00007183048],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002423827,0.00009211058,0.000113697264,0.000020228033,0.00005848296,0.000056847766,0.000064745145,0.000066864064,0.00013942123],"category_scores_gemma":[0.000030472695,0.000077053955,0.000015922911,0.00003469854,0.00003081812,0.00014325377,0.000025442958,0.0002644063,0.000009184175],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008673496,0.00013823215,0.13010536,0.00083616964,0.00027577468,0.00007081144,0.009809336,0.020901976,0.7406149,0.06486001,0.03027437,0.002104369],"study_design_scores_gemma":[0.0021666384,0.0002768755,0.47943574,0.00025332486,0.00008701697,0.0003647434,0.0029028552,0.28745154,0.03997859,0.0015320062,0.18322046,0.002330222],"about_ca_topic_score_codex":0.000023368644,"about_ca_topic_score_gemma":0.000020316607,"teacher_disagreement_score":0.7006363,"about_ca_system_score_codex":0.000016378539,"about_ca_system_score_gemma":0.000008785763,"threshold_uncertainty_score":0.3142169},"labels":[],"label_agreement":null},{"id":"W1969750156","doi":"10.1016/j.epsr.2005.02.008","title":"Reliability optimization using ant colony algorithm under performance and cost constraints","year":2005,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":61,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Reliability (semiconductor); Ant colony optimization algorithms; Maximization; Reliability engineering; Computer science; Electric power system; Network topology; Algorithm; Electrical network; Power (physics); Mathematical optimization; Engineering; Mathematics; Electrical engineering","score_opus":0.02812735513222942,"score_gpt":0.28931352871432486,"score_spread":0.26118617358209545,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1969750156","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3476517,0.0056094173,0.63070285,0.00013020531,0.0012884347,0.002759431,0.000035606146,0.000493922,0.011328448],"genre_scores_gemma":[0.9967272,0.00048707126,0.002083819,0.000014279668,0.0001107061,0.00009566971,0.0000047143826,0.000043258522,0.0004332558],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9970676,0.0003244906,0.00051872694,0.00045070532,0.00067277794,0.0009657181],"domain_scores_gemma":[0.99852884,0.00026982403,0.000050756105,0.00047073493,0.00044364756,0.00023621318],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002956252,0.00022843947,0.00035706343,0.00033011285,0.00028058141,0.0001587174,0.00025316665,0.00021723453,0.000044460914],"category_scores_gemma":[0.00018035447,0.00021639475,0.000042611064,0.0009574316,0.00023277447,0.00039838516,0.00006778682,0.0006138575,0.00005022884],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036407146,0.0001148173,0.00061605294,0.0005484008,0.00007698755,0.000013224497,0.0004561451,0.97446084,0.0031145962,0.000357427,0.004374221,0.015830904],"study_design_scores_gemma":[0.00041384535,0.00010260974,0.000662514,0.0001456405,0.0000059126655,0.00015008403,0.00013348926,0.98441553,0.00048369745,0.000008288633,0.013233991,0.00024441222],"about_ca_topic_score_codex":0.00011464035,"about_ca_topic_score_gemma":0.000005896178,"teacher_disagreement_score":0.6490755,"about_ca_system_score_codex":0.0010331561,"about_ca_system_score_gemma":0.00019077811,"threshold_uncertainty_score":0.8824322},"labels":[],"label_agreement":null},{"id":"W1970562755","doi":"10.1109/pmaps.2014.6960588","title":"Operating risk considerations in wind integrated power systems","year":2014,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Power system simulation; Electric power system; Reliability engineering; Reliability (semiconductor); Wind power forecasting; Economic dispatch; Renewable energy; Computer science; Resource (disambiguation); Engineering; Power (physics); Automotive engineering; Electrical engineering","score_opus":0.005472333152899368,"score_gpt":0.1855667940530698,"score_spread":0.18009446090017045,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1970562755","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.66501755,0.0004431589,0.17106548,0.00012186199,0.0020931668,0.0005758121,0.000020163743,0.00075707,0.15990572],"genre_scores_gemma":[0.9989453,0.000006270946,0.0006607665,0.000041638126,0.000016798978,0.000015366175,0.0000023285065,0.00001433098,0.00029720817],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992001,0.00009339424,0.00030644774,0.000136797,0.000070101174,0.00019317899],"domain_scores_gemma":[0.99951434,0.00015765845,0.000019138703,0.0002111831,0.000049212937,0.000048473838],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048242585,0.00010848688,0.00017874294,0.000059889033,0.00004708722,0.000077322184,0.000056356614,0.00007059207,0.00009020419],"category_scores_gemma":[0.00036334593,0.00008930642,0.000024675533,0.00011712636,0.00001965702,0.00012133917,0.000011228696,0.00017802317,0.00010101604],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002180524,0.000065099586,0.03406473,0.00021132336,0.000067119756,0.000013194969,0.002417543,0.86119694,0.0042522643,0.080643244,0.016740076,0.00032631386],"study_design_scores_gemma":[0.0006699731,0.000052134925,0.008137424,0.00027042048,0.0000081577355,0.000031589007,0.0012752248,0.9619236,0.00085002923,0.0005653999,0.02579385,0.00042218473],"about_ca_topic_score_codex":0.00046161492,"about_ca_topic_score_gemma":0.00028526507,"teacher_disagreement_score":0.33392772,"about_ca_system_score_codex":0.00006398612,"about_ca_system_score_gemma":0.000015752274,"threshold_uncertainty_score":0.364181},"labels":[],"label_agreement":null},{"id":"W1979027747","doi":"10.1016/j.ijepes.2005.08.010","title":"Utilization of time varying event-based customer interruption cost load shedding schemes","year":2005,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Load Shedding; Customer satisfaction; Reliability engineering; Duration (music); Computer science; Total cost; Operations research; Power (physics); Electric power system; Engineering; Business; Economics; Microeconomics","score_opus":0.014301589930475343,"score_gpt":0.2654046873680593,"score_spread":0.2511030974375839,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1979027747","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.045655783,0.0054382645,0.93528533,0.0003097338,0.0052064974,0.00021247845,0.000019524101,0.00013853048,0.0077338824],"genre_scores_gemma":[0.998927,0.000104167746,0.0002080837,0.00006105495,0.00041876428,0.000007949135,0.0000073113474,0.000028222157,0.00023745782],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976242,0.0000885705,0.0010739907,0.00014371691,0.00082613685,0.00024339119],"domain_scores_gemma":[0.9982322,0.00013935339,0.0004237881,0.00013962129,0.00095583574,0.00010921649],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005664245,0.00018350888,0.00037035844,0.00038244782,0.000024736295,0.00005762055,0.00042355072,0.00012773965,0.00007724883],"category_scores_gemma":[0.0001959517,0.00016527015,0.00020927774,0.00027318578,0.00003185758,0.00040532285,0.000022388895,0.0002106141,0.000028326507],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033937296,0.00033374937,0.00044217205,0.00006922034,0.00062244904,0.0000387412,0.00021651232,0.900887,0.06507007,0.0061644423,0.0072568497,0.018559424],"study_design_scores_gemma":[0.0012564556,0.00016113986,0.000075950615,0.00079041306,0.000038204027,0.00021389351,0.000023753464,0.7579087,0.035351347,0.000038343318,0.20385493,0.0002868503],"about_ca_topic_score_codex":0.000034586647,"about_ca_topic_score_gemma":0.0000040998493,"teacher_disagreement_score":0.9532712,"about_ca_system_score_codex":0.00089580246,"about_ca_system_score_gemma":0.00012581082,"threshold_uncertainty_score":0.6739521},"labels":[],"label_agreement":null},{"id":"W1980141074","doi":"10.1109/ccece.2013.6567702","title":"Reliability evaluation incorporating the load following capability of wind generation","year":2013,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Reliability engineering; Reliability (semiconductor); Wind speed; Environmental science; Electric power system; Computer science; Meteorology; Engineering; Power (physics); Electrical engineering","score_opus":0.016992914027738802,"score_gpt":0.2287702651361056,"score_spread":0.2117773511083668,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1980141074","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9776733,0.00013795227,0.010181426,0.0001550057,0.00067246315,0.0009478035,0.0000015896412,0.00010973387,0.01012073],"genre_scores_gemma":[0.9986756,0.0000017252239,0.0010863413,0.000025870844,0.00006258038,0.0000803686,0.0000044302833,0.000009850195,0.000053266922],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99864465,0.00015486093,0.0004544291,0.00018375459,0.0004078855,0.00015442174],"domain_scores_gemma":[0.99889576,0.00011900106,0.0000639171,0.00052677,0.0003577615,0.000036801815],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026934706,0.000112678,0.00016749246,0.000017236713,0.000071968614,0.000031452877,0.00014290388,0.00007215197,0.00012797845],"category_scores_gemma":[0.0006780829,0.00007489566,0.00009729803,0.000164594,0.000056182664,0.00035342755,0.000026128937,0.00010803367,0.000038120612],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008711868,0.00017191203,0.029138815,0.000655229,0.00015546347,5.344015e-7,0.004031733,0.47727677,0.4398208,0.0030518011,0.010016072,0.03567217],"study_design_scores_gemma":[0.00028492248,0.00002876062,0.031887043,0.000034186647,0.000032693923,0.0000011937524,0.00032789126,0.94555306,0.017153265,0.0041982196,0.0003233313,0.0001754084],"about_ca_topic_score_codex":0.0006785128,"about_ca_topic_score_gemma":0.00018892442,"teacher_disagreement_score":0.46827632,"about_ca_system_score_codex":0.00026177464,"about_ca_system_score_gemma":0.000073909054,"threshold_uncertainty_score":0.30541563},"labels":[],"label_agreement":null},{"id":"W1980372699","doi":"10.1109/tpwrs.2002.800871","title":"Determination of the optimum routine test and self-checking intervals in protective relaying using a reliability model","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":72,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Dependability; Relay; Reliability (semiconductor); Protective relay; Computer science; Markov model; Markov chain; Markov process; Engineering; Power (physics); Statistics; Mathematics","score_opus":0.017129943996203705,"score_gpt":0.21773575595789255,"score_spread":0.20060581196168883,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1980372699","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2817175,0.00013537693,0.716116,0.000023812247,0.00066117075,0.00081806193,0.000020179465,0.00011921157,0.00038864109],"genre_scores_gemma":[0.998798,0.000016690406,0.0009858023,0.0000058986884,0.0000044164817,0.00010405016,7.414083e-8,0.00002890773,0.000056163],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99863595,0.000116141324,0.0005544048,0.00026473793,0.00019547097,0.00023332104],"domain_scores_gemma":[0.99921644,0.00014857567,0.000103815066,0.00040263392,0.00008420421,0.000044342094],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005558044,0.0001906095,0.0003018502,0.0001319179,0.00009238119,0.00003073337,0.00014579223,0.00014295023,0.0000036427334],"category_scores_gemma":[0.00004262645,0.00015773962,0.00009292953,0.0003199328,0.00005444416,0.0002464361,0.0000031252648,0.00032685007,0.0000020965317],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008230009,0.0002209112,0.0003794544,0.0006065204,0.000020643776,0.0000017007445,0.005348154,0.9879848,0.0051573184,0.000015840387,0.0000058474975,0.00025059542],"study_design_scores_gemma":[0.00032696276,0.000048138747,0.00018219757,0.00079649256,0.000020761921,0.000029339231,0.00026673917,0.99352527,0.00460637,0.00002407002,0.00001751602,0.00015614562],"about_ca_topic_score_codex":0.00012892095,"about_ca_topic_score_gemma":0.00003567976,"teacher_disagreement_score":0.7170805,"about_ca_system_score_codex":0.00036851424,"about_ca_system_score_gemma":0.000014003144,"threshold_uncertainty_score":0.6432435},"labels":[],"label_agreement":null},{"id":"W1980723399","doi":"10.1109/pmaps.2010.5528425","title":"Reliability evaluation of integrated wind/diesel/storage systems for remote locations","year":2010,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Manitoba Hydro","funders":"","keywords":"Wind power; Energy storage; Environmental science; Renewable energy; Diesel fuel; Automotive engineering; Reliability (semiconductor); Wind hybrid power systems; Wind speed; Intermittent energy source; Pumped-storage hydroelectricity; Computer science; Distributed generation; Engineering; Power (physics); Meteorology; Electrical engineering","score_opus":0.01793255329082574,"score_gpt":0.25594747215321595,"score_spread":0.2380149188623902,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1980723399","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.61683464,0.00035145538,0.36274216,0.000086932145,0.004197953,0.002146897,0.00009314696,0.0004244106,0.013122402],"genre_scores_gemma":[0.99760455,0.000009883531,0.0018840213,0.000005258374,0.000054885968,0.000053089174,0.000027031952,0.00001795619,0.00034334016],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989291,0.000055902936,0.0004147223,0.00018233804,0.00024175133,0.00017620172],"domain_scores_gemma":[0.9982648,0.00013841326,0.0000563939,0.00055028195,0.0009347811,0.000055369834],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002323048,0.0001191769,0.00021566037,0.000060891194,0.000040828552,0.00001720805,0.00015231168,0.00013304187,0.00005038197],"category_scores_gemma":[0.00097543636,0.00010000868,0.000070326634,0.00017526615,0.000059584494,0.00012999776,0.000011330881,0.00015272263,0.000014346871],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006073536,0.00020081081,0.0005932833,0.003159519,0.00017814028,3.8987204e-7,0.0012456332,0.8186177,0.12218388,0.018593013,0.021961836,0.013205059],"study_design_scores_gemma":[0.00035212724,0.000026728925,0.0011501816,0.000066681474,0.000043488504,0.0000027286856,0.00022020587,0.9710736,0.0032724645,0.0009124382,0.02274623,0.00013308662],"about_ca_topic_score_codex":0.00036003525,"about_ca_topic_score_gemma":0.00020929589,"teacher_disagreement_score":0.3807699,"about_ca_system_score_codex":0.00013887123,"about_ca_system_score_gemma":0.000102280115,"threshold_uncertainty_score":0.40782356},"labels":[],"label_agreement":null},{"id":"W1981779951","doi":"10.1007/s00202-004-0262-2","title":"Reliability evaluation of electrical power systems including multi-state considerations","year":2004,"lang":"en","type":"article","venue":"Electrical Engineering","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Electric power system; State (computer science); Moment (physics); Ranging; Computer science; Power (physics); Function (biology); Work (physics); Electrical network; Engineering; Electrical engineering; Algorithm","score_opus":0.024668895196226694,"score_gpt":0.25522192044732733,"score_spread":0.23055302525110064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1981779951","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.441172,0.0032638544,0.55204743,0.00004505947,0.0009931282,0.0009872848,0.000012499261,0.00078973826,0.00068901636],"genre_scores_gemma":[0.99714607,0.000030973573,0.0026304044,0.000008629707,0.000028181243,0.000100609526,0.0000033400256,0.00004130613,0.000010460771],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979586,0.0000656874,0.0006516859,0.00028979083,0.00054031314,0.00049389363],"domain_scores_gemma":[0.9988855,0.00023132308,0.000058682905,0.0003463354,0.00033698234,0.0001411494],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011753275,0.0002381895,0.00039325553,0.0002047947,0.000060911978,0.000036175992,0.0001284436,0.00014109274,0.000012787097],"category_scores_gemma":[0.0016621851,0.00024016872,0.00011022423,0.0006465162,0.000026967404,0.0001993083,0.00002526433,0.0003807242,0.00001783686],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000038356657,0.000059948386,0.00004755906,0.00006510556,0.00003769983,0.000003204911,0.00016989616,0.96672744,0.027801974,0.0048779454,0.00006155576,0.00014386674],"study_design_scores_gemma":[0.0009889556,0.00007471178,0.002018865,0.000098379,0.000041572257,0.000036244066,0.0000074360782,0.98058313,0.014830254,0.0006172979,0.00039176428,0.00031137498],"about_ca_topic_score_codex":0.000047180612,"about_ca_topic_score_gemma":0.0000049286505,"teacher_disagreement_score":0.55597407,"about_ca_system_score_codex":0.0009064043,"about_ca_system_score_gemma":0.0001396356,"threshold_uncertainty_score":0.97937965},"labels":[],"label_agreement":null},{"id":"W1983098309","doi":"10.1109/cjece.2005.1541750","title":"Reliability-performance-index probability distribution analysis of bulk electricity systems","year":2005,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Monte Carlo method; Probability distribution; Computer science; Electric power system; Index (typography); Probability density function; Random variable; Power (physics); Statistics; Mathematics; Engineering","score_opus":0.003882484964186648,"score_gpt":0.1573425614822216,"score_spread":0.15346007651803495,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1983098309","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7235048,0.0013621358,0.2746683,0.00002249133,0.00027508006,0.00009656936,0.000012759208,0.000027564505,0.000030334404],"genre_scores_gemma":[0.9992972,0.000065401706,0.00044633873,0.0000069366915,0.00016146335,0.0000030242693,0.0000040262416,0.000009986222,0.0000056161134],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99866307,0.000025981826,0.0006326081,0.00013975032,0.00015560404,0.00038301587],"domain_scores_gemma":[0.9990219,0.00011503208,0.00009002697,0.00017142258,0.0002117522,0.0003898674],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045615967,0.00016134778,0.0005093718,0.00038769483,0.000041419236,0.000037705253,0.00018077917,0.00010409692,0.0000038266476],"category_scores_gemma":[0.00008619062,0.00014531758,0.00014717708,0.0011113189,0.00003082698,0.00018762374,0.000008306138,0.00031261586,5.9429874e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000070076167,0.000014445835,0.008639826,0.00015047706,0.00024352635,0.0000041016583,0.000057869376,0.9846319,0.00008902006,0.0003533971,0.00017436183,0.0056340755],"study_design_scores_gemma":[0.00014694892,0.000112767324,0.059630617,0.000056067576,0.00011970522,0.00004584934,0.0000011419104,0.9356774,0.00022090318,0.00001373124,0.00383311,0.00014175102],"about_ca_topic_score_codex":0.00026406176,"about_ca_topic_score_gemma":0.00015488877,"teacher_disagreement_score":0.27579245,"about_ca_system_score_codex":0.00042609108,"about_ca_system_score_gemma":0.00012630163,"threshold_uncertainty_score":0.5925879},"labels":[],"label_agreement":null},{"id":"W1983466952","doi":"10.1243/1748006xjrr266","title":"Wind power modelling and the determination of capacity credit in an electric power system","year":2009,"lang":"en","type":"article","venue":"Proceedings of the Institution of Mechanical Engineers Part O Journal of Risk and Reliability","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Electric power system; Wind speed; Reliability (semiconductor); Reliability engineering; Environmental science; Electric power; Power (physics); Computer science; Meteorology; Automotive engineering; Engineering; Electrical engineering; Geography","score_opus":0.0067246090579162554,"score_gpt":0.19060570902267307,"score_spread":0.18388109996475682,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1983466952","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9744327,0.00045845404,0.024309615,0.00007621627,0.00036319633,0.0002384757,0.000006254585,0.000013362117,0.00010174737],"genre_scores_gemma":[0.99843806,0.0003255146,0.0011996725,0.0000034222687,0.00002608995,0.0000012424432,8.300367e-8,0.0000052082933,6.8383036e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998502,0.000040128278,0.00087265583,0.00012668419,0.00030964508,0.00014888677],"domain_scores_gemma":[0.9988279,0.00012764751,0.00042933237,0.00012122674,0.00042261678,0.000071320406],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027341358,0.00013823174,0.00047371862,0.00010897953,0.000047657082,0.000011508884,0.0002250551,0.00014284955,6.40637e-7],"category_scores_gemma":[0.0006290568,0.0000816732,0.0001285744,0.0002598043,0.00017831386,0.00033056084,0.000022145563,0.0004003543,4.040389e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0024572022,0.00078100996,0.0038227015,0.0035092058,0.00013945409,0.000002609892,0.008590272,0.7884769,0.041061383,0.14776215,0.00007611662,0.0033210423],"study_design_scores_gemma":[0.0036922523,0.00093126163,0.005981596,0.0020130465,0.00023169404,0.00015109943,0.0012909923,0.9121958,0.0583931,0.014596399,0.00018235951,0.00034042887],"about_ca_topic_score_codex":0.0000142594445,"about_ca_topic_score_gemma":8.266195e-7,"teacher_disagreement_score":0.13316575,"about_ca_system_score_codex":0.000087195265,"about_ca_system_score_gemma":0.000027867307,"threshold_uncertainty_score":0.33305362},"labels":[],"label_agreement":null},{"id":"W1984278330","doi":"10.1109/pes.2006.1708934","title":"Research and technology shaping the future of electric power systems","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Powertech Labs (Canada)","funders":"","keywords":"Reliability (semiconductor); Electricity; Electric power industry; Presentation (obstetrics); Electric power; Mains electricity; Electric power quality; Risk analysis (engineering); Quality (philosophy); Environmentally friendly; Power (physics); Emerging technologies; Computer science; Business; Engineering; Electrical engineering","score_opus":0.007594937809834022,"score_gpt":0.21825573799764883,"score_spread":0.2106608001878148,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1984278330","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94281554,0.041195795,0.010371682,0.00035605466,0.002332531,0.000500319,0.000014260708,0.00065948855,0.001754343],"genre_scores_gemma":[0.99781317,0.00025769148,0.0012306097,0.000010207252,0.00035571173,0.00006113132,0.0000019000462,0.000067888155,0.00020168752],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980058,0.000046004305,0.00048336948,0.000313092,0.00037100233,0.0007807242],"domain_scores_gemma":[0.9990725,0.00016489132,0.00006216035,0.00040572308,0.00023681515,0.000057910012],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014180102,0.0002663152,0.0003432836,0.00016665508,0.00017255565,0.00006929418,0.00033281188,0.0003034776,0.0000026906666],"category_scores_gemma":[0.00003464904,0.00022138936,0.00011065851,0.001204955,0.00010413911,0.000100334335,0.00006247107,0.0006754161,0.000004841085],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004472629,0.000040534414,0.00089808204,0.000743418,0.00014487522,0.000006382881,0.00059312326,0.4843164,0.47831064,0.01046738,0.024315815,0.0001588803],"study_design_scores_gemma":[0.0008601531,0.00021966145,0.0014690744,0.0010185799,0.000046522415,0.00017116286,0.0026223196,0.8266364,0.07816246,0.00047310416,0.087034695,0.001285887],"about_ca_topic_score_codex":0.000097487915,"about_ca_topic_score_gemma":0.000005012305,"teacher_disagreement_score":0.40014818,"about_ca_system_score_codex":0.00015520942,"about_ca_system_score_gemma":0.000026664831,"threshold_uncertainty_score":0.9027996},"labels":[],"label_agreement":null},{"id":"W1985172729","doi":"10.1016/j.strusafe.2005.08.006","title":"Estimation of life expectancy of wood poles in electrical distribution networks","year":2005,"lang":"en","type":"article","venue":"Structural Safety","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Probabilistic logic; Asset (computer security); Reliability engineering; Life expectancy; Engineering; Cost estimate; Statistical model; Asset management; Computer science; Operations research; Business; Systems engineering","score_opus":0.0030336059507574263,"score_gpt":0.19616413781414307,"score_spread":0.19313053186338563,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1985172729","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93845254,0.0010471452,0.05975409,0.00005667974,0.000170211,0.00013618417,0.000031752028,0.00005109861,0.00030032085],"genre_scores_gemma":[0.99930704,0.000036143,0.0005649377,0.0000034414436,0.00004571028,0.0000029501728,0.000031163476,0.000005498496,0.0000030908136],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99927086,0.000021888494,0.00037388926,0.00008292485,0.00008982498,0.00016060253],"domain_scores_gemma":[0.9997401,0.00003544532,0.00005309839,0.00011414373,0.000022315086,0.00003484795],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007971118,0.00008083849,0.00019494031,0.000026115418,0.000012816949,0.0000024596966,0.000075078686,0.00007135435,0.000015293608],"category_scores_gemma":[0.000070364025,0.000071925315,0.000043599895,0.00020063129,0.000026859308,0.0000970369,0.000010610139,0.00009860422,8.833267e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000081637394,0.000009766187,0.002726638,0.00010655502,0.000017170982,3.4260864e-7,0.00021336286,0.9300844,0.0008009838,0.0063329684,0.00009617681,0.059530016],"study_design_scores_gemma":[0.00037808227,0.000026193798,0.12945496,0.00006600029,0.0000050588646,0.0000028058166,0.000021128913,0.86657995,0.00281983,0.00040610932,0.00013042214,0.00010947771],"about_ca_topic_score_codex":0.000029918543,"about_ca_topic_score_gemma":0.00004459712,"teacher_disagreement_score":0.12672831,"about_ca_system_score_codex":0.00011650156,"about_ca_system_score_gemma":0.000012990513,"threshold_uncertainty_score":0.29330292},"labels":[],"label_agreement":null},{"id":"W1988554358","doi":"10.1109/tdc.2010.5484574","title":"The impact of a volt &amp;#x00026;var control system (VVC) on PQ and customer's equipment","year":2010,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Volt; AC power; Voltage; Capacitor; Shunt (medical); Electrical engineering; Automotive engineering; Computer science; Business; Engineering","score_opus":0.004826740498977193,"score_gpt":0.21812135396290555,"score_spread":0.21329461346392836,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1988554358","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91242576,0.00042497125,0.012358768,0.00015802935,0.001618075,0.00088062853,0.000053606276,0.00043081984,0.071649365],"genre_scores_gemma":[0.9993203,0.000014803434,0.00009868322,0.00001090274,0.00005104466,0.000029812649,6.6973047e-7,0.000016502003,0.00045726405],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.99916345,0.000027806802,0.00026442934,0.00013266994,0.00014041744,0.00027123207],"domain_scores_gemma":[0.99920505,0.0001869441,0.000041306183,0.00041652526,0.00005107888,0.00009910602],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046585064,0.00014911506,0.00023760367,0.00003537843,0.000061813014,0.00003344343,0.00015204425,0.00008072628,0.000026441921],"category_scores_gemma":[0.00005284391,0.00008223207,0.000096680706,0.00006646347,0.000065345965,0.00005032838,0.000020396154,0.0001813346,0.000081766644],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009873833,0.000553731,0.014086463,0.004169692,0.0029810152,0.000028437358,0.004267019,0.04805949,0.46415013,0.34175357,0.09313311,0.025829967],"study_design_scores_gemma":[0.014340915,0.002185079,0.08502533,0.0020612879,0.0003388876,0.00048902037,0.002477013,0.3441924,0.022627186,0.0014554333,0.5214117,0.003395733],"about_ca_topic_score_codex":0.00027373887,"about_ca_topic_score_gemma":0.00014352075,"teacher_disagreement_score":0.44152296,"about_ca_system_score_codex":0.00007905789,"about_ca_system_score_gemma":0.000019083282,"threshold_uncertainty_score":0.33533263},"labels":[],"label_agreement":null},{"id":"W1989805140","doi":"10.1260/0309-524x.36.1.35","title":"Preliminary Impacts of Wind Power Integration in the Hydro-Quebec System","year":2012,"lang":"en","type":"article","venue":"Wind Engineering","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Desjardins; Hydro-Québec","funders":"","keywords":"Wind power; Environmental science; Time horizon; Meteorology; Electric power system; Reliability (semiconductor); Electricity generation; Wind speed; Reliability engineering; Power (physics); Engineering; Electrical engineering; Geography; Mathematics","score_opus":0.005258119319427839,"score_gpt":0.1838826331179976,"score_spread":0.17862451379856975,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1989805140","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98778516,0.0012995383,0.006680881,0.000025164918,0.0009505333,0.00027032773,0.0000055779797,0.00017231039,0.002810513],"genre_scores_gemma":[0.9996813,0.000006441292,0.0001552536,0.000006998408,0.00009452255,0.000010568511,0.0000034486116,0.000026178868,0.000015310894],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99904823,0.000025440304,0.00031517562,0.00009215831,0.00015700623,0.0003619791],"domain_scores_gemma":[0.9995055,0.00008479288,0.000030875348,0.00029806237,0.000017955625,0.000062798514],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00053217344,0.00016454064,0.00020562096,0.00010966995,0.000015597554,0.00001650479,0.00018258978,0.000098484255,0.0000056129684],"category_scores_gemma":[0.000056100238,0.00012501664,0.00006153492,0.00023967354,0.0000141035125,0.00031934332,0.000018425531,0.00020423376,0.000017142862],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006576848,0.00022634536,0.0140421465,0.0044335783,0.00015040471,0.000036889756,0.048555553,0.83561325,0.077087596,0.015341505,0.0017982429,0.002648689],"study_design_scores_gemma":[0.001397885,0.0002517043,0.58786815,0.0051398384,0.00009283403,0.00035651212,0.0094584115,0.34197095,0.03907694,0.000020467078,0.012944275,0.0014220362],"about_ca_topic_score_codex":0.00019678497,"about_ca_topic_score_gemma":0.00003608157,"teacher_disagreement_score":0.573826,"about_ca_system_score_codex":0.00017222283,"about_ca_system_score_gemma":0.000009625383,"threshold_uncertainty_score":0.50980306},"labels":[],"label_agreement":null},{"id":"W1990951116","doi":"10.5539/jmr.v1n2p130","title":"A Reliability Simulation of Warm-fund and Redundancy Repairable System","year":2009,"lang":"en","type":"article","venue":"Journal of Mathematics Research","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Redundancy (engineering); Monte Carlo method; Mathematics; Reliability engineering; Reliability (semiconductor); Diagram; Statistics; Engineering","score_opus":0.062441824843928954,"score_gpt":0.34935899187455016,"score_spread":0.2869171670306212,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1990951116","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95932806,0.0012919736,0.031435482,0.00012437513,0.00020747223,0.00034622537,0.000004110817,0.000053935328,0.007208388],"genre_scores_gemma":[0.99381965,0.00009966418,0.0059170555,0.0000015975036,0.00004994736,0.000001386931,1.3617633e-7,0.000010632109,0.00009992077],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981288,0.00011700191,0.0008001269,0.000089718196,0.0006324233,0.0002319657],"domain_scores_gemma":[0.9981286,0.00058929727,0.00016334561,0.00031750882,0.00069590105,0.00010534256],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0053219367,0.00008726604,0.00036819917,0.00019446302,0.000050686307,0.00003115341,0.0001838068,0.000084778454,0.000006285029],"category_scores_gemma":[0.0009379146,0.000068173424,0.00008157857,0.00024633046,0.00006940374,0.00018714413,0.00002421364,0.00035449595,0.000004008288],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004136011,0.00189885,0.00093707343,0.047031574,0.00039268847,0.000189767,0.019920746,0.7944562,0.07963344,0.03280093,0.008859408,0.013465709],"study_design_scores_gemma":[0.0008912789,0.00085912773,0.0014407804,0.003767692,0.00003686268,0.0002687011,0.0027948518,0.95966417,0.0061543644,0.021007562,0.00290044,0.0002141771],"about_ca_topic_score_codex":0.0000040078708,"about_ca_topic_score_gemma":9.3101323e-7,"teacher_disagreement_score":0.16520795,"about_ca_system_score_codex":0.00017957985,"about_ca_system_score_gemma":0.00005368968,"threshold_uncertainty_score":0.27800316},"labels":[],"label_agreement":null},{"id":"W1991106683","doi":"10.1109/upec.2006.367760","title":"Distribution System Reliability Assessment Incorporating Weather Effects","year":2006,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Redundancy (engineering); Computer science; Extreme weather; Environmental science; Power (physics); Engineering","score_opus":0.0023697141902573058,"score_gpt":0.18681151311325506,"score_spread":0.18444179892299775,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1991106683","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23896904,0.00010176002,0.661928,0.000059506605,0.0011255526,0.0005377333,0.000023435567,0.0016312808,0.0956237],"genre_scores_gemma":[0.99768835,7.732336e-7,0.0018213554,0.0000065343497,0.000097847085,0.000071338334,0.000036710873,0.000016910404,0.00026015704],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990298,0.000058685033,0.000308745,0.000196732,0.00017521453,0.00023078774],"domain_scores_gemma":[0.99945647,0.00008503272,0.000037463557,0.00032341285,0.00005186578,0.000045742778],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049447874,0.00014665704,0.00019763311,0.000016652988,0.000062580286,0.000041539875,0.000106248066,0.00008534772,0.0000072458565],"category_scores_gemma":[0.0000221692,0.00012241802,0.00006488226,0.00013673067,0.000027355214,0.000124364,0.000025522066,0.00011736624,0.000052632025],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021971013,0.00037693256,0.08149985,0.011624823,0.000101060665,0.00007034302,0.00009429486,0.1371011,0.022964772,0.6944309,0.047386784,0.0043271943],"study_design_scores_gemma":[0.0018179482,0.00019905723,0.23953255,0.0012216005,0.00008547028,0.00005952808,0.00034593613,0.6845529,0.027625054,0.0060578086,0.036975536,0.0015266369],"about_ca_topic_score_codex":0.00021597707,"about_ca_topic_score_gemma":0.0000317029,"teacher_disagreement_score":0.7587193,"about_ca_system_score_codex":0.0005434018,"about_ca_system_score_gemma":0.000016485565,"threshold_uncertainty_score":0.49920622},"labels":[],"label_agreement":null},{"id":"W1993037483","doi":"10.1049/ip-gtd:20030401","title":"Short-term generating unit maintenance scheduling in a deregulated power system using a probabilistic approach","year":2003,"lang":"en","type":"article","venue":"IEE Proceedings - Generation Transmission and Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Preventive maintenance; Scheduling (production processes); Probabilistic logic; Economic shortage; Electric power system; Planned maintenance; Operations research; Computer science; Engineering; Operations management; Risk analysis (engineering); Power (physics); Business","score_opus":0.0220945105376296,"score_gpt":0.22372172597614864,"score_spread":0.20162721543851905,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1993037483","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.61132824,0.0004843223,0.38700187,0.000008929206,0.00014111336,0.00040448757,0.000012482901,0.00017677623,0.00044175147],"genre_scores_gemma":[0.9911311,0.000032547465,0.00856702,0.000008991746,0.00004719983,0.00007029037,0.00009677698,0.000029734316,0.000016294665],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982955,0.000038614115,0.0005959162,0.0004384608,0.00022129393,0.00041023034],"domain_scores_gemma":[0.999465,0.000011093544,0.00005926181,0.00010179751,0.00019641341,0.00016642617],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006030552,0.0002831368,0.00029383486,0.000091627786,0.00022381816,0.00016217686,0.00007832056,0.00021655574,0.000005064811],"category_scores_gemma":[0.000069373134,0.000265343,0.000055922217,0.00042848344,0.000046905447,0.00034986655,0.000008252842,0.00021588497,0.0000011875505],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005888761,0.00019875877,0.0037321718,0.0034827972,0.000047596677,0.000010650955,0.0018326606,0.23651312,0.7019094,0.0484399,0.0001677303,0.003606295],"study_design_scores_gemma":[0.00058761553,0.000024896382,0.00073555595,0.0005043269,0.00002393125,0.00012345826,0.0005769549,0.98147434,0.015075035,0.00005455373,0.0004676202,0.00035169633],"about_ca_topic_score_codex":0.0000062090785,"about_ca_topic_score_gemma":0.000002010437,"teacher_disagreement_score":0.74496126,"about_ca_system_score_codex":0.00030096865,"about_ca_system_score_gemma":0.000044256147,"threshold_uncertainty_score":0.99997985},"labels":[],"label_agreement":null},{"id":"W1993389070","doi":"10.1109/epec.2011.6070212","title":"Evaluation of wind power commitment risk in system operation","year":2011,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba; University of Saskatchewan","funders":"","keywords":"Wind power; Wind power forecasting; Electric power system; Wind speed; Reliability engineering; Renewable energy; Base load power plant; Power system simulation; Electricity generation; Environmental science; Computer science; Engineering; Power (physics); Meteorology; Automotive engineering; Distributed generation; Electrical engineering","score_opus":0.027939191619364204,"score_gpt":0.2240146455545976,"score_spread":0.1960754539352334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1993389070","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82760966,0.00019872077,0.008000683,0.0000031541872,0.00043724908,0.00045315194,0.0000044760463,0.00007717656,0.16321571],"genre_scores_gemma":[0.9996323,0.000005507059,0.00030694634,0.000002072561,0.0000047241965,0.000018459228,9.986055e-7,0.0000054625375,0.00002354219],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99933076,0.000099987796,0.0002209941,0.000071605995,0.00019760763,0.000079025645],"domain_scores_gemma":[0.9996884,0.0000105252075,0.000023616542,0.00017128812,0.00008881985,0.000017351404],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001560756,0.000054060205,0.00009930402,0.00004112169,0.0000088615525,0.000003261948,0.000052562926,0.000038793994,0.000111800786],"category_scores_gemma":[0.000027035283,0.000045715584,0.000019467543,0.00005767471,0.000008272798,0.00008202333,0.0000074804293,0.000042038537,0.00003290847],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013755573,0.0010627881,0.12814365,0.002318097,0.00065981166,0.000011646088,0.058355737,0.65601224,0.011599106,0.10344965,0.0046227206,0.03362698],"study_design_scores_gemma":[0.0018295114,0.00013653385,0.1723725,0.00032933266,0.0000992763,0.000005091455,0.003206462,0.7946513,0.02607954,0.00038782178,0.0006143795,0.00028819204],"about_ca_topic_score_codex":0.0002693532,"about_ca_topic_score_gemma":0.00021473039,"teacher_disagreement_score":0.17202261,"about_ca_system_score_codex":0.00018180397,"about_ca_system_score_gemma":0.000014750815,"threshold_uncertainty_score":0.18642274},"labels":[],"label_agreement":null},{"id":"W1993550956","doi":"10.5539/mas.v8n5p45","title":"Reliability Worth Assessment in Composite Power System Planning and Operation","year":2014,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Profit (economics); Computer science; Electric power system; Operational costs; Operations research; Term (time); Cost reduction; Unit (ring theory); Power (physics); Operations management; Engineering; Business; Economics; Mathematics","score_opus":0.005509534686725744,"score_gpt":0.21738041332570976,"score_spread":0.21187087863898402,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1993550956","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6825844,0.000029433828,0.28446168,0.000012569037,0.00016707534,0.00021113492,7.322175e-7,0.00014204899,0.032390937],"genre_scores_gemma":[0.99778056,7.8616836e-7,0.0021304279,0.000020783304,0.000009470112,0.000039142593,7.8452075e-7,0.000008320776,0.000009727718],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99887884,0.000019367768,0.00023002639,0.00034789694,0.00024652405,0.00027734647],"domain_scores_gemma":[0.9995342,0.000034773562,0.00002362091,0.0002978998,0.00002592567,0.000083571365],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013666782,0.000112462076,0.00016946749,0.00007835421,0.00011831369,0.00010069497,0.00019503715,0.000041850803,0.0000013318801],"category_scores_gemma":[0.00001235132,0.00010219463,0.000011429337,0.00020255263,0.00011869941,0.0001979421,0.000048956623,0.00015220178,0.000006315439],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019904304,0.00003774207,0.015317043,0.0003545302,0.0000036438896,0.0000027120407,0.0032276942,0.31359082,0.6402675,0.024040971,0.000013572262,0.003123889],"study_design_scores_gemma":[0.00018551717,0.000010863915,0.106285125,0.00007099606,0.0000013971478,0.0000031178909,0.00014466133,0.8905823,0.0021006875,0.00038838323,0.000094578296,0.00013234807],"about_ca_topic_score_codex":0.000007176466,"about_ca_topic_score_gemma":0.000010680255,"teacher_disagreement_score":0.6381668,"about_ca_system_score_codex":0.00023960773,"about_ca_system_score_gemma":0.000030093015,"threshold_uncertainty_score":0.41673762},"labels":[],"label_agreement":null},{"id":"W1993759852","doi":"10.1049/iet-gtd.2014.0361","title":"Identifying critical components for reliability centred maintenance management of deregulated power systems","year":2015,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Computer science; Risk analysis (engineering); Power (physics); Engineering; Business; Physics","score_opus":0.05030035214190985,"score_gpt":0.26378251419984805,"score_spread":0.21348216205793819,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1993759852","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050928444,0.0008329579,0.9449053,0.00020534628,0.0016115874,0.00079581304,0.0003355393,0.00019041912,0.00019460428],"genre_scores_gemma":[0.99653053,0.000055887474,0.0021207356,0.000006282707,0.000032356857,0.00009771217,0.001035326,0.000019685502,0.000101465914],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983094,0.0000876999,0.0006443703,0.00030315883,0.00033747248,0.0003179324],"domain_scores_gemma":[0.9989737,0.000036710095,0.00006491636,0.00029903578,0.00043061073,0.00019500991],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004917349,0.00018629328,0.00027295682,0.000032181848,0.00008961296,0.000049886978,0.00013477825,0.00014075708,0.000011202215],"category_scores_gemma":[0.00005347372,0.00017566624,0.00011471733,0.00017216803,0.000058203193,0.0002196909,0.000012395278,0.00008184597,0.0000076110923],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001108235,0.0013340326,0.0004221849,0.013068476,0.00046212145,0.00002786155,0.0024707643,0.45970693,0.24463841,0.08628788,0.18295336,0.0075197336],"study_design_scores_gemma":[0.0030239248,0.00014042412,0.0017172709,0.0011528578,0.00012795751,0.000014510039,0.00081487326,0.87951994,0.04385843,0.0013409768,0.067738526,0.0005502819],"about_ca_topic_score_codex":0.000015143063,"about_ca_topic_score_gemma":8.590606e-7,"teacher_disagreement_score":0.9456021,"about_ca_system_score_codex":0.00028171792,"about_ca_system_score_gemma":0.000024209632,"threshold_uncertainty_score":0.71634614},"labels":[],"label_agreement":null},{"id":"W1993788402","doi":"10.1109/pes.2006.1709289","title":"Assessment of asset safety risk for transmission stations","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Risk analysis (engineering); Asset (computer security); Risk assessment; Safety standards; Context (archaeology); Electricity; Hazardous waste; Business; Electric utility; Electric power industry; Operations management; Engineering; Computer science; Computer security; Reliability engineering","score_opus":0.0039776836728090854,"score_gpt":0.21719554366304777,"score_spread":0.21321785999023868,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1993788402","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12177263,0.0004704673,0.8744289,0.000032051736,0.00087328407,0.000385608,0.00029596582,0.00037192416,0.0013691599],"genre_scores_gemma":[0.81415516,0.00009930749,0.1852124,0.00001068293,0.00017821335,0.00006997248,0.000051231767,0.00006688928,0.00015612424],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99842393,0.000027557979,0.00060900435,0.00025127328,0.00022837946,0.0004598247],"domain_scores_gemma":[0.9992694,0.00020683587,0.00009863549,0.00024058987,0.0001103372,0.000074181145],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00077099504,0.0002575585,0.000338061,0.000045740653,0.00011057991,0.000025908135,0.00015365373,0.00014925282,0.000009097073],"category_scores_gemma":[0.00002943175,0.00026670587,0.00035619765,0.00021634037,0.00002394636,0.00012016292,0.000010602664,0.00021802775,0.000001264073],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000021996188,0.000027769245,0.0005548942,0.00033421954,0.000060825798,2.8443054e-7,0.00015013089,0.89998025,0.09281977,0.00057329936,0.0052740145,0.00022234218],"study_design_scores_gemma":[0.00060620497,0.00004030895,0.0062687756,0.00018992844,0.000050613777,0.000002158357,0.000053320346,0.94575137,0.017409297,0.00008487403,0.029161045,0.00038209461],"about_ca_topic_score_codex":0.0001053394,"about_ca_topic_score_gemma":0.000007528572,"teacher_disagreement_score":0.6923825,"about_ca_system_score_codex":0.00018714236,"about_ca_system_score_gemma":0.00003525939,"threshold_uncertainty_score":0.99997854},"labels":[],"label_agreement":null},{"id":"W1995636377","doi":"10.1260/0309524001495747","title":"Reliability/Cost Implications of Utilizing Wind Energy in Small Isolated Power Systems","year":2000,"lang":"en","type":"article","venue":"Wind Engineering","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Reliability engineering; Automotive engineering; Reliability (semiconductor); Electric power system; Diesel fuel; Engineering; Environmental science; Power (physics); Marine engineering; Computer science; Electrical engineering","score_opus":0.0076759459319574105,"score_gpt":0.1841802064499463,"score_spread":0.17650426051798887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1995636377","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9595119,0.0016504149,0.02481108,0.00004142383,0.0007725461,0.00044210182,0.00003591273,0.0005682361,0.01216638],"genre_scores_gemma":[0.9994126,0.000093982,0.00021949671,0.000008580749,0.000028290015,0.00003132161,0.0000075090456,0.000053038628,0.00014520559],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99856365,0.000022533704,0.0005977481,0.0002709665,0.00009051335,0.00045460195],"domain_scores_gemma":[0.999185,0.00008906783,0.00003204949,0.00053966267,0.000047930047,0.00010626709],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002559276,0.0002344748,0.00036989382,0.0001708685,0.000024334411,0.000024344816,0.00024050944,0.00016932802,0.000063196756],"category_scores_gemma":[0.000043744538,0.0002536187,0.000083948114,0.00051501155,0.000023901655,0.00015356956,0.000020623836,0.00021280076,0.000018126444],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000795779,0.000030538453,0.00059932016,0.00025302157,0.000024335452,0.0000038239396,0.0003043073,0.98690444,0.009742395,0.0011494511,0.00007283082,0.0009075889],"study_design_scores_gemma":[0.0010267243,0.00009324256,0.046146423,0.0012566029,0.000031034,0.00008058751,0.0002210576,0.8527604,0.002616494,0.00013358124,0.09456866,0.0010652401],"about_ca_topic_score_codex":0.00023778598,"about_ca_topic_score_gemma":0.000031417894,"teacher_disagreement_score":0.13414408,"about_ca_system_score_codex":0.00017944575,"about_ca_system_score_gemma":0.000019776588,"threshold_uncertainty_score":0.9999916},"labels":[],"label_agreement":null},{"id":"W1996330381","doi":"10.1243/1748006xjrr90","title":"Impacts of repair state residence time distributions in an electric power generating capacity adequacy assessment","year":2007,"lang":"en","type":"article","venue":"Proceedings of the Institution of Mechanical Engineers Part O Journal of Risk and Reliability","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Weibull distribution; Electric power system; Computer science; State (computer science); Power system simulation; Power (physics); Engineering; Mathematics; Statistics; Algorithm","score_opus":0.006789851987170005,"score_gpt":0.22911412539359136,"score_spread":0.22232427340642136,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1996330381","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9751936,0.00026184623,0.023932489,0.00003275938,0.00028539356,0.00019633364,0.000029792662,0.000025390433,0.000042361782],"genre_scores_gemma":[0.9949252,0.0002912214,0.0047437735,0.0000022856375,0.000027082151,0.0000015747398,4.4746614e-7,0.0000072061143,0.0000011785008],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99792254,0.000036832887,0.0012503257,0.00015188572,0.00038757644,0.0002508252],"domain_scores_gemma":[0.99835914,0.00017768535,0.0005557875,0.00015378714,0.0006103458,0.00014326474],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00464096,0.00015458271,0.00046511716,0.00013233359,0.000056865792,0.000009208688,0.00023843038,0.00012719436,0.0000029187186],"category_scores_gemma":[0.0019637959,0.000110493034,0.00018509051,0.00045734525,0.00014903121,0.00041066503,0.000043729324,0.0005319473,1.2252217e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006486808,0.0010831873,0.050836794,0.0022527757,0.00018728219,0.00000518938,0.00226093,0.22133914,0.7040925,0.015605616,0.0003029011,0.0013850185],"study_design_scores_gemma":[0.0023582238,0.0016337853,0.13734443,0.0028521833,0.00024197347,0.00012869186,0.00063832046,0.18237197,0.6626784,0.008787947,0.00033564193,0.00062841916],"about_ca_topic_score_codex":0.000048126723,"about_ca_topic_score_gemma":0.000009118351,"teacher_disagreement_score":0.08650764,"about_ca_system_score_codex":0.00021913339,"about_ca_system_score_gemma":0.00009331555,"threshold_uncertainty_score":0.4505775},"labels":[],"label_agreement":null},{"id":"W1998868978","doi":"10.1109/tpwrs.2011.2166411","title":"Criticality Assessment of Distribution Feeder Sections","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Criticality; Reliability engineering; Ranking (information retrieval); Probabilistic logic; Section (typography); Reliability (semiconductor); Distribution (mathematics); Asset (computer security); Investment (military); Failure mode, effects, and criticality analysis; Asset management; Computer science; Engineering; Operations research; Mathematics; Economics; Power (physics)","score_opus":0.019932311676943256,"score_gpt":0.23667284384180012,"score_spread":0.21674053216485686,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1998868978","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01444294,0.00005995248,0.9637531,0.000014937491,0.0051709297,0.00032604425,0.00032668278,0.000314678,0.015590701],"genre_scores_gemma":[0.9994864,0.000014352854,0.00015228482,0.000007281828,0.000008619854,0.00011751313,0.0000042690535,0.000022125778,0.00018719424],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987644,0.000081503866,0.00047288233,0.00020254399,0.00022051639,0.00025814128],"domain_scores_gemma":[0.99923176,0.000058918315,0.00004038111,0.00042779432,0.00013362631,0.00010751716],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002951646,0.0001689295,0.00027591965,0.00007085213,0.0000919086,0.000019202082,0.00012737696,0.0001334911,0.0001035663],"category_scores_gemma":[0.0000046869327,0.00016272296,0.00014578823,0.00022458077,0.000074951604,0.00015224623,6.874463e-7,0.00023008583,0.000036488993],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045119366,0.012170742,0.0029392063,0.0125475805,0.0045107985,0.00011335562,0.01545499,0.7056472,0.043779995,0.16846955,0.0314492,0.0024662258],"study_design_scores_gemma":[0.0073864306,0.00411483,0.07579664,0.0047221547,0.0012966552,0.0007944737,0.011457768,0.4507955,0.32677546,0.0017117718,0.10871676,0.006431549],"about_ca_topic_score_codex":0.00023942869,"about_ca_topic_score_gemma":0.000031613123,"teacher_disagreement_score":0.9850434,"about_ca_system_score_codex":0.0001928457,"about_ca_system_score_gemma":0.00003129361,"threshold_uncertainty_score":0.66356504},"labels":[],"label_agreement":null},{"id":"W1999912552","doi":"10.1109/tpwrs.2011.2120633","title":"Incorporating Wind Power in Generating Capacity Reliability Evaluation Using Different Models","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":85,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind speed; Wind power; Reliability (semiconductor); Autoregressive–moving-average model; Autoregressive model; Monte Carlo method; Electric power system; Markov chain; Time series; Series (stratigraphy); Moving average; Computer science; Reliability engineering; Meteorology; Power (physics); Engineering; Statistics; Mathematics","score_opus":0.061479420387323756,"score_gpt":0.23399217724949523,"score_spread":0.17251275686217146,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1999912552","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49676317,0.00008067834,0.49808893,0.0000024657502,0.0026995346,0.0006528689,0.00002376458,0.00016037622,0.0015282016],"genre_scores_gemma":[0.99861187,0.0000044124263,0.0011374592,0.000012858407,0.000016072878,0.00013135144,0.0000016911633,0.000058654696,0.000025651429],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9971756,0.00037322412,0.0009460818,0.00050982524,0.00052903173,0.00046624654],"domain_scores_gemma":[0.9987628,0.0000793332,0.00013621288,0.00068248564,0.00019907196,0.00014010837],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0014559715,0.00037874596,0.00048872863,0.0002464476,0.00016189572,0.000063353895,0.0002112916,0.0002555353,0.000055803615],"category_scores_gemma":[0.000018819312,0.00036035222,0.00014754107,0.00034708294,0.000067979425,0.0005688987,0.0000023846783,0.00048811652,0.00001825099],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021888323,0.00016705,0.00019448926,0.00014721935,0.00003740857,0.000003467304,0.003396311,0.9901988,0.005588723,0.00012253331,0.0000129604505,0.00010913105],"study_design_scores_gemma":[0.0005275244,0.00008088652,0.00033508748,0.00038821253,0.000033884786,0.000021524122,0.000589552,0.99245507,0.0049129543,0.0002369759,0.000015157238,0.00040317167],"about_ca_topic_score_codex":0.0008339686,"about_ca_topic_score_gemma":0.00026822646,"teacher_disagreement_score":0.5018487,"about_ca_system_score_codex":0.00091439835,"about_ca_system_score_gemma":0.00006204808,"threshold_uncertainty_score":0.99988484},"labels":[],"label_agreement":null},{"id":"W2000152137","doi":"10.1243/095440804774134244","title":"Mathematical methods of combining deterministic/probabilistic criteria in short-term generating reserve scheduling","year":2004,"lang":"en","type":"article","venue":"Proceedings of the Institution of Mechanical Engineers Part E Journal of Process Mechanical Engineering","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Probabilistic logic; Scheduling (production processes); Computer science; Term (time); Electric power system; Reliability engineering; Operator (biology); Mathematical optimization; Process (computing); Operations research; Risk analysis (engineering); Power (physics); Engineering; Mathematics; Artificial intelligence","score_opus":0.024418192573031884,"score_gpt":0.2935015320625268,"score_spread":0.2690833394894949,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2000152137","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6282271,0.0002566955,0.37006113,0.00005377617,0.0009525288,0.00031612293,0.0000070014185,0.000056941542,0.00006869543],"genre_scores_gemma":[0.9130977,0.000040756848,0.08670352,0.0000054109164,0.000090534,0.000019173156,5.0046293e-7,0.00004150569,9.1768703e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99628645,0.000023793491,0.00238272,0.00024230081,0.0006363721,0.0004283333],"domain_scores_gemma":[0.9983147,0.00024040423,0.00041380877,0.00020903682,0.0006355965,0.00018647825],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0025878993,0.0003494357,0.0011540708,0.0002962484,0.00004024479,0.000024465513,0.0008337718,0.0002822821,0.000007669418],"category_scores_gemma":[0.004258777,0.00028653082,0.00033514158,0.00070959906,0.00010413738,0.00043456207,0.00013648096,0.0007750364,3.6932474e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050110742,0.00013350582,0.000008445684,0.003820599,0.00007582248,0.000003703382,0.00033144862,0.5715946,0.37349367,0.050290138,0.000002216434,0.00019575923],"study_design_scores_gemma":[0.00086251745,0.00023366003,0.000014334833,0.00559736,0.00010492401,0.00012928597,0.00023891256,0.48862317,0.49812606,0.0057898294,0.000015388274,0.0002645608],"about_ca_topic_score_codex":0.00000248645,"about_ca_topic_score_gemma":9.1339825e-7,"teacher_disagreement_score":0.2848706,"about_ca_system_score_codex":0.00023322164,"about_ca_system_score_gemma":0.00013585063,"threshold_uncertainty_score":0.9999587},"labels":[],"label_agreement":null},{"id":"W2000545388","doi":"10.1109/epec.2014.29","title":"Inclusion of Wind Generation Modeling into the Conventional Generation Adequacy Evaluation","year":2014,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Wind power; Reliability engineering; Reliability (semiconductor); Electric power system; Electricity generation; Computer science; Variety (cybernetics); Systems engineering; Risk analysis (engineering); Engineering; Power (physics); Electrical engineering","score_opus":0.029687800469418137,"score_gpt":0.25088105720440124,"score_spread":0.2211932567349831,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2000545388","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38327038,0.00017593444,0.61389005,0.00016838656,0.0004355219,0.00018544002,5.4981405e-7,0.00003613899,0.0018375813],"genre_scores_gemma":[0.9982069,0.000013459292,0.0013193813,0.00004784156,0.00028419157,0.0000185831,0.00004774199,0.000008285132,0.00005358634],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999105,0.00010621996,0.00027936997,0.00011051291,0.00031708428,0.00008181635],"domain_scores_gemma":[0.99954283,0.000027099439,0.000035529745,0.00018473565,0.00018978478,0.00002001047],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015018481,0.0000724055,0.00008922639,0.00003550174,0.00015388212,0.000015710277,0.00008758273,0.000054651613,0.00006630074],"category_scores_gemma":[0.00010652862,0.00005244474,0.00004234003,0.000075610136,0.000016317303,0.00015918277,0.00005202433,0.000054327542,0.000011048785],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000015047412,0.0000080485,0.000014654094,0.000023749615,0.000008123125,1.099279e-8,0.0007384007,0.8781191,0.10505507,0.00848198,0.00034452093,0.0072048474],"study_design_scores_gemma":[0.00019908526,0.00001532316,0.000031372278,0.000015016347,0.000013141881,6.0049763e-7,0.000029578261,0.98121893,0.015898705,0.0014723033,0.0010440586,0.00006187095],"about_ca_topic_score_codex":0.00006525837,"about_ca_topic_score_gemma":0.000110948255,"teacher_disagreement_score":0.61493653,"about_ca_system_score_codex":0.00007792856,"about_ca_system_score_gemma":0.000021883066,"threshold_uncertainty_score":0.21386343},"labels":[],"label_agreement":null},{"id":"W2000928690","doi":"10.1016/j.ijepes.2009.07.002","title":"Sensitivity of system operating considerations in generating capacity adequacy evaluation","year":2009,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Electric power system; Representation (politics); Sensitivity (control systems); Computer science; Unit (ring theory); Power system simulation; Power (physics); Mathematical optimization; Engineering; Mathematics; Electronic engineering","score_opus":0.015345358212832593,"score_gpt":0.24374558345244643,"score_spread":0.22840022523961384,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2000928690","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.74752784,0.0034165669,0.2379517,0.00023265019,0.005494965,0.00032967934,0.000021827442,0.00009313999,0.004931638],"genre_scores_gemma":[0.9989036,0.000017542154,0.0006710878,0.0000494745,0.0003255473,0.0000065795975,0.0000034747497,0.000012854766,0.000009836795],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9968423,0.0005333197,0.001362281,0.00015592718,0.0008716179,0.00023453866],"domain_scores_gemma":[0.99768263,0.00038568192,0.000398347,0.0001469825,0.0012979958,0.00008837831],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025894046,0.0001725793,0.00048094348,0.0003605592,0.00003905571,0.00008355226,0.00017129342,0.00012214908,0.0000063640277],"category_scores_gemma":[0.0007594568,0.00015856829,0.00014132017,0.00024442538,0.000024284307,0.0003608057,0.000012192372,0.000273523,0.0000013934086],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023758319,0.00013497437,0.0006095159,0.000037947084,0.00017902048,0.00013206739,0.00045175722,0.8382698,0.11114186,0.04651031,0.00044714258,0.0020618006],"study_design_scores_gemma":[0.0009313995,0.00017363411,0.0014868344,0.00076314574,0.000028357352,0.0011640128,0.00017174208,0.98596776,0.008495886,0.0002271966,0.00036604115,0.00022398127],"about_ca_topic_score_codex":0.00027676823,"about_ca_topic_score_gemma":0.000060976647,"teacher_disagreement_score":0.25137576,"about_ca_system_score_codex":0.00079674623,"about_ca_system_score_gemma":0.00015352805,"threshold_uncertainty_score":0.6466227},"labels":[],"label_agreement":null},{"id":"W2002651923","doi":"10.1260/030952407783123060","title":"Quantification of Condition Monitoring Benefit for Offshore Wind Turbines","year":2007,"lang":"en","type":"article","venue":"Wind Engineering","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":148,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Royal College of Physicians and Surgeons of Canada","funders":"","keywords":"Offshore wind power; Flexibility (engineering); Turbine; Wind power; Probabilistic logic; Reliability engineering; Baseline (sea); Condition monitoring; Submarine pipeline; Markov chain; Marine engineering; Variety (cybernetics); Engineering; Risk analysis (engineering); Computer science; Operations research; Environmental science; Business","score_opus":0.011866763125865997,"score_gpt":0.2296276090420428,"score_spread":0.2177608459161768,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2002651923","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7734633,0.00049697707,0.22374065,0.000011616022,0.0015246378,0.00025327617,0.00002211745,0.00022885729,0.0002585661],"genre_scores_gemma":[0.9973104,0.000016152544,0.002313525,0.0000013315337,0.00025545259,0.000008746002,0.000017181794,0.00003438165,0.000042802018],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991586,0.0000017026374,0.00033091748,0.00013639133,0.0001075027,0.00026488397],"domain_scores_gemma":[0.99953854,0.00009404909,0.00003717768,0.00019860647,0.000075047494,0.000056582798],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031210238,0.00013610948,0.00018545632,0.000113902504,0.000025708503,0.000012355737,0.000102773134,0.00009694655,0.000003481803],"category_scores_gemma":[0.000055168108,0.00014836187,0.00007001916,0.00015092334,0.000012430199,0.00014278376,0.000008487893,0.000082669845,0.000004064568],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018925562,0.000020715577,0.0027905917,0.0012371322,0.00006279529,0.0000016243632,0.00043525925,0.71166414,0.2778302,0.0028199756,0.000117388765,0.0030012534],"study_design_scores_gemma":[0.00074081746,0.00007586809,0.13503237,0.0007475767,0.000047400445,0.000014486588,0.00030029714,0.12656698,0.72213596,0.0002292648,0.013516966,0.00059202826],"about_ca_topic_score_codex":0.000005825658,"about_ca_topic_score_gemma":0.0000024929334,"teacher_disagreement_score":0.58509713,"about_ca_system_score_codex":0.000069684844,"about_ca_system_score_gemma":0.000004624748,"threshold_uncertainty_score":0.60500216},"labels":[],"label_agreement":null},{"id":"W2002847944","doi":"10.1109/tste.2012.2190999","title":"A Simplified Risk-Based Method for Short-Term Wind Power Commitment","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":65,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Electric power system; Wind power forecasting; Reliability engineering; Wind speed; Power system simulation; Renewable energy; Probabilistic logic; Computer science; Engineering; Power (physics); Meteorology; Electrical engineering","score_opus":0.010805948250849882,"score_gpt":0.24738771967049944,"score_spread":0.23658177141964956,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2002847944","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005083701,0.00023183668,0.9904716,0.000058351627,0.0011269565,0.00044804098,0.00006729106,0.00035783037,0.0021543675],"genre_scores_gemma":[0.9930213,0.000026955266,0.00364831,0.00012482738,0.00006708237,0.0004621047,0.000006446975,0.000069598565,0.0025733616],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99830574,0.000087726396,0.0003179867,0.0002464186,0.00017304531,0.0008690956],"domain_scores_gemma":[0.9988024,0.00031486616,0.00003618342,0.0004984197,0.0001243493,0.00022373469],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00053473335,0.00027928475,0.00030563292,0.00017987446,0.00025338514,0.000039096813,0.00017266115,0.00016970222,0.000092189344],"category_scores_gemma":[0.000011799608,0.00027185635,0.00023384302,0.00024050089,0.00003329043,0.00023067229,0.0000012731507,0.00019721198,0.000008415722],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021290957,0.0005629884,0.00004816899,0.00044212866,0.00026799235,0.000009481013,0.0005387763,0.9763543,0.00120305,0.0047599003,0.0030740644,0.012526269],"study_design_scores_gemma":[0.0026467755,0.0006024564,0.00029058036,0.00010333339,0.0003298143,0.000020980484,0.0024894148,0.09929492,0.19193307,0.00093531015,0.69997084,0.001382501],"about_ca_topic_score_codex":0.00018083709,"about_ca_topic_score_gemma":0.000041490533,"teacher_disagreement_score":0.9879376,"about_ca_system_score_codex":0.00045726178,"about_ca_system_score_gemma":0.00005267364,"threshold_uncertainty_score":0.99997336},"labels":[],"label_agreement":null},{"id":"W2003372102","doi":"10.1109/ccece.2007.425","title":"Impact of Wind Power Growth on Capacity Credit","year":2007,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Electric power system; Reliability (semiconductor); Reliability engineering; Environmental economics; Wind speed; Computer science; Environmental science; Engineering; Power (physics); Economics; Meteorology; Electrical engineering; Geography","score_opus":0.009233553743506547,"score_gpt":0.22296481998256962,"score_spread":0.21373126623906308,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2003372102","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8292496,0.000016161133,0.008072211,0.000008364892,0.00036668236,0.000073482515,0.00000932214,0.00011285542,0.16209131],"genre_scores_gemma":[0.9995957,0.000002582747,0.0001764753,0.0000146327275,0.000037076454,4.875788e-7,6.2274734e-7,0.0000106828975,0.00016174033],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993863,0.000006446102,0.00018207748,0.000089883,0.000114924616,0.00022037528],"domain_scores_gemma":[0.9996001,0.0000606074,0.000017544742,0.00019877403,0.000048008034,0.00007497486],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028649397,0.00009583637,0.00014274314,0.00005304835,0.000010883005,0.0000046286464,0.00008914961,0.00006635948,0.00018724658],"category_scores_gemma":[0.00005795609,0.000071494906,0.00010026971,0.00010453008,0.000029778259,0.000064409905,0.000008143692,0.00009486345,0.00005541799],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008027773,0.0017610303,0.2906015,0.0018672805,0.001666561,0.00013318787,0.008765355,0.036860954,0.2343224,0.14688283,0.27200854,0.004327623],"study_design_scores_gemma":[0.00074576796,0.00070077943,0.9324277,0.000136541,0.000012356762,0.00002161846,0.00010034366,0.00097265997,0.05935045,0.0010796287,0.0039842553,0.00046789547],"about_ca_topic_score_codex":0.00014857936,"about_ca_topic_score_gemma":0.000021045427,"teacher_disagreement_score":0.6418262,"about_ca_system_score_codex":0.00009719188,"about_ca_system_score_gemma":0.000008282089,"threshold_uncertainty_score":0.29154775},"labels":[],"label_agreement":null},{"id":"W2006323425","doi":"10.1109/pesgm.2012.6345744","title":"Reliability-based appraisal of Smart Grid challenges and realization","year":2012,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Interdependence; Scope (computer science); Computer science; Reliability engineering; Risk analysis (engineering); Vision; Realization (probability); Smart grid; Systems engineering; Power (physics); Engineering","score_opus":0.015029972915462705,"score_gpt":0.22971768176171747,"score_spread":0.21468770884625477,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2006323425","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5961745,0.021794988,0.17161043,0.00046151425,0.005887892,0.0008923951,0.000040412364,0.0014369888,0.20170088],"genre_scores_gemma":[0.9987375,0.00027242152,0.00086610916,0.000012116927,0.000057618523,0.000011116396,0.0000033823596,0.000010534849,0.000029176279],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994858,0.000026695247,0.00016845898,0.00008486268,0.000078032266,0.00015615883],"domain_scores_gemma":[0.99958384,0.00010328216,0.00001868725,0.00019827079,0.00003406547,0.000061880666],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003534313,0.00007605382,0.00013253951,0.00002916271,0.0000107427995,0.0000028275049,0.000043186086,0.000059473816,0.000019104118],"category_scores_gemma":[0.00007988758,0.00006460993,0.000023854107,0.00004456631,0.000037567657,0.00012777645,0.000010841074,0.000041291725,0.0000058355067],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037473458,0.0017729932,0.108375266,0.034176808,0.00034704228,0.000004064597,0.019861974,0.032372247,0.03634245,0.59770036,0.048568048,0.12010399],"study_design_scores_gemma":[0.0022771521,0.00042522035,0.29038805,0.00056785904,0.0000942113,0.000024337975,0.0012910445,0.08576669,0.06845428,0.001635973,0.5477318,0.0013433958],"about_ca_topic_score_codex":0.000016199923,"about_ca_topic_score_gemma":0.000021390166,"teacher_disagreement_score":0.5960644,"about_ca_system_score_codex":0.0000147490955,"about_ca_system_score_gemma":0.0000054115117,"threshold_uncertainty_score":0.26347163},"labels":[],"label_agreement":null},{"id":"W2007654216","doi":"10.1109/pmaps.2006.360250","title":"Life Cycle Management ¿ Distributed Web-based Software Development with Evolutionary Programming and Stochastic Optimization","year":2006,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kinectrics (Canada)","funders":"","keywords":"Computer science; Genetic programming; Monte Carlo method; Software development; Software; Software maintenance; Software development process; Software engineering; Distributed computing; Mathematical optimization; Programming language; Artificial intelligence; Mathematics","score_opus":0.0029932114748857015,"score_gpt":0.16003207514367085,"score_spread":0.15703886366878514,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2007654216","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0071723275,0.00015452468,0.99119335,0.00005011546,0.000056547142,0.00037138056,0.0000074455647,0.00057437056,0.0004199579],"genre_scores_gemma":[0.7995126,0.000001333102,0.20018317,0.000017940396,0.000010797641,0.000107570166,0.00009081512,0.000014327994,0.000061405924],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993321,0.000007779162,0.00016991196,0.00015857749,0.0001296433,0.00020201565],"domain_scores_gemma":[0.9997384,0.000018425782,0.000019631954,0.00010901015,0.00003855297,0.00007598621],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006625816,0.000119968936,0.00009983201,0.00004501615,0.00007398264,0.000029237754,0.00004869335,0.000034117278,0.0000136895815],"category_scores_gemma":[0.000010002807,0.00010167399,0.00001198262,0.00013979734,0.000027380574,0.00007612862,0.0000179527,0.000041075575,0.0000047680505],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009419833,0.00003001856,0.0005171719,0.00019003428,0.000018549435,0.0000032038408,0.000010516003,0.99742895,0.0000013709525,0.00020455653,0.00046575002,0.0011204281],"study_design_scores_gemma":[0.0007838272,0.000024066303,0.0074179443,0.00015516189,0.00001859495,0.0000045540332,0.000059045007,0.9862663,0.00002117753,0.000021614283,0.0049815406,0.0002461317],"about_ca_topic_score_codex":0.000010677138,"about_ca_topic_score_gemma":0.000021517517,"teacher_disagreement_score":0.79234034,"about_ca_system_score_codex":0.0001119857,"about_ca_system_score_gemma":0.000038864953,"threshold_uncertainty_score":0.4146145},"labels":[],"label_agreement":null},{"id":"W2013563784","doi":"10.1109/pmaps.2006.360431","title":"Basic Concepts in Generating Capacity Adequacy Evaluation","year":2006,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Computer science; Reliability engineering; Range (aeronautics); Interpretation (philosophy); Engineering","score_opus":0.01772588098450498,"score_gpt":0.2405747472070912,"score_spread":0.22284886622258623,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2013563784","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90827143,0.00023574202,0.037864808,0.000029188159,0.00036522408,0.00022698488,0.0000019909776,0.00016143432,0.052843213],"genre_scores_gemma":[0.998136,0.000001475451,0.0015389371,0.000026295906,0.00007884679,0.000035573386,0.000004614084,0.000007631569,0.00017061649],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993568,0.000044340817,0.00019982283,0.00010787073,0.00013194456,0.000159199],"domain_scores_gemma":[0.99977845,0.00003177233,0.0000128110005,0.00012325121,0.000035930534,0.000017808065],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049007375,0.000070994894,0.00009747197,0.000032750475,0.000018170342,0.00001552878,0.000049655162,0.0000452141,0.000109436],"category_scores_gemma":[0.000047946294,0.00006719748,0.000022986937,0.000104793675,0.000014224065,0.000115029725,0.00000606535,0.00007012602,0.000039892897],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000031977431,0.000052274616,0.00912738,0.00017020332,0.0000104109795,0.0000036693991,0.00064849306,0.8949867,0.060336582,0.0138313845,0.006400037,0.014429699],"study_design_scores_gemma":[0.00043237818,0.000007840047,0.010356738,0.000039996452,0.000003994622,0.0000027244093,0.000063427164,0.9757317,0.009621727,0.000674151,0.0029106122,0.00015473882],"about_ca_topic_score_codex":0.00049791136,"about_ca_topic_score_gemma":0.0010281996,"teacher_disagreement_score":0.0898646,"about_ca_system_score_codex":0.00014305353,"about_ca_system_score_gemma":0.0000127299845,"threshold_uncertainty_score":0.27402335},"labels":[],"label_agreement":null},{"id":"W2015626420","doi":"10.1049/ip-gtd:20041222","title":"Incorporating station-related outages in composite system reliability analysis","year":2005,"lang":"en","type":"article","venue":"IEE Proceedings - Generation Transmission and Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Circuit breaker; Reliability (semiconductor); Composite number; Reliability engineering; Engineering; Computer science; Automotive engineering; Electrical engineering; Physics","score_opus":0.00647671378107685,"score_gpt":0.20645560797300072,"score_spread":0.19997889419192388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2015626420","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7916047,0.0003638973,0.20634457,0.0003536002,0.0001074007,0.0002980899,0.00006645905,0.00032111892,0.000540173],"genre_scores_gemma":[0.9980048,0.000059280785,0.0013536442,0.000013601421,0.00005040562,0.000038958373,0.00043533513,0.00001071398,0.000033238703],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99867165,0.00002604829,0.00060604437,0.0003083056,0.00019110537,0.00019683332],"domain_scores_gemma":[0.9995459,0.000018373252,0.000085639265,0.00007914416,0.00015288554,0.00011807965],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000575748,0.00017524743,0.00026350896,0.0001356714,0.00014391022,0.000103224986,0.00006270649,0.00014974848,0.000010735729],"category_scores_gemma":[0.000025815914,0.00016580937,0.00006975689,0.0007046235,0.000034895398,0.00045268217,0.0000071450577,0.00015438549,0.0000056986837],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000129424,0.00031378775,0.054312885,0.0023750723,0.00029014776,0.000005001937,0.0050420994,0.59826857,0.26621032,0.023789935,0.0023425715,0.04692018],"study_design_scores_gemma":[0.0005326903,0.000021582679,0.014510579,0.000099966164,0.000088674686,0.0000051624907,0.00025508742,0.9664694,0.01589644,0.00008276288,0.0018100095,0.00022760815],"about_ca_topic_score_codex":0.000033278226,"about_ca_topic_score_gemma":0.000020770272,"teacher_disagreement_score":0.36820087,"about_ca_system_score_codex":0.00028556897,"about_ca_system_score_gemma":0.000016141537,"threshold_uncertainty_score":0.676151},"labels":[],"label_agreement":null},{"id":"W2016351089","doi":"10.1109/mia.2003.1176457","title":"Reliability Methodologies Applied to the IEEE Gold Book Standard Network","year":2003,"lang":"en","type":"article","venue":"IEEE Industry Applications Magazine","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Key (lock); Component (thermodynamics); Computer science; Point (geometry); Engineering; Set (abstract data type); Power (physics)","score_opus":0.02590480368659128,"score_gpt":0.2678846342680723,"score_spread":0.241979830581481,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2016351089","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006470778,0.00071036816,0.88041836,0.0027028995,0.0016497634,0.0034879942,0.00012273624,0.0012507723,0.10318634],"genre_scores_gemma":[0.93053496,0.00015140693,0.048920795,0.0034957328,0.0014259223,0.008423065,0.000018237237,0.00015035112,0.0068795327],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99807996,0.0001446376,0.00051277364,0.0004556165,0.00024070803,0.00056628085],"domain_scores_gemma":[0.99771875,0.00042261765,0.00007061394,0.0014550658,0.00015659523,0.00017634874],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016368999,0.00029049077,0.00036113526,0.00004657239,0.00017525586,0.000058826583,0.0005521847,0.00040462622,0.000091124275],"category_scores_gemma":[0.00017769281,0.0002285534,0.00007820168,0.00097616616,0.00011362577,0.00009744722,0.00003313039,0.00088526413,0.0007753822],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022046663,0.000027927359,0.000052409785,0.00008225612,0.00004003562,8.2485377e-7,0.000111604095,0.45441577,0.0036250236,0.0064690597,0.5308668,0.004286233],"study_design_scores_gemma":[0.00017391596,0.000020782021,0.0002798739,0.000023098697,0.000026196982,0.000010003053,0.00007137942,0.00028690745,0.006006223,0.0030000603,0.9898175,0.00028404006],"about_ca_topic_score_codex":0.0000048622064,"about_ca_topic_score_gemma":0.00002340787,"teacher_disagreement_score":0.92406416,"about_ca_system_score_codex":0.00022110439,"about_ca_system_score_gemma":0.000076760785,"threshold_uncertainty_score":0.9966228},"labels":[],"label_agreement":null},{"id":"W2018479097","doi":"10.1109/ccece.2006.277661","title":"Peaking Unit Considerations in Generating Capacity Adequacy Assessment","year":2006,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Unavailability; Reliability engineering; Reliability (semiconductor); Computer science; Electric power system; Task (project management); Representation (politics); Power system simulation; Monte Carlo method; Unit (ring theory); Power (physics); Engineering; Statistics; Mathematics","score_opus":0.020957234349341693,"score_gpt":0.2355604185621664,"score_spread":0.2146031842128247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2018479097","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.72117406,0.00009857733,0.17067854,0.0001414578,0.0003676318,0.0002036561,0.0000054255875,0.00034551384,0.10698511],"genre_scores_gemma":[0.980768,0.0000016283966,0.018914334,0.00005418285,0.00006221334,0.000024171013,0.0000037306886,0.00001013102,0.00016157112],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993029,0.00003376859,0.00026898747,0.000114304996,0.00008314651,0.00019684993],"domain_scores_gemma":[0.9997061,0.00007734124,0.000016510408,0.00014655878,0.000029151075,0.000024334047],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022168977,0.0000895785,0.00011853885,0.000053425734,0.000058334397,0.000047860478,0.000040673087,0.000044191835,0.000101323465],"category_scores_gemma":[0.000029336665,0.000087483946,0.000025482823,0.00010155488,0.000017076507,0.00013522738,0.000012165331,0.00013338476,0.000013375585],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[5.1892664e-7,0.00006862562,0.027616289,0.00014517528,0.000015244434,0.000023316865,0.00037106904,0.7178983,0.02887962,0.2210628,0.0034798465,0.00043919368],"study_design_scores_gemma":[0.0006236025,0.000017663122,0.055374056,0.0001272689,0.00000785701,0.000032510496,0.0003239552,0.92576826,0.0048791603,0.00576603,0.0066051395,0.0004744895],"about_ca_topic_score_codex":0.00086067803,"about_ca_topic_score_gemma":0.0042189346,"teacher_disagreement_score":0.25959396,"about_ca_system_score_codex":0.0001003234,"about_ca_system_score_gemma":0.0000232765,"threshold_uncertainty_score":0.35674918},"labels":[],"label_agreement":null},{"id":"W2018776063","doi":"10.1049/ip-gtd:20050427","title":"Weather-based distribution system reliability evaluation","year":2006,"lang":"en","type":"article","venue":"IEE Proceedings - Generation Transmission and Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":58,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Overhead (engineering); Reliability engineering; Adverse weather; Extreme weather; Environmental science; Computer science; Storm; Sensitivity (control systems); Meteorology; Engineering; Geography; Climate change","score_opus":0.009526437495190661,"score_gpt":0.2066454420140325,"score_spread":0.19711900451884184,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2018776063","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4175998,0.0006288703,0.5782334,0.0003381449,0.0004139851,0.0007465729,0.00022692195,0.00064656907,0.0011657272],"genre_scores_gemma":[0.99691814,0.000028529386,0.00030453346,0.000013283669,0.00022139549,0.00016739889,0.0022908116,0.000018931862,0.000036946385],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982842,0.000039974613,0.0005109741,0.00040086915,0.0004771949,0.00028678525],"domain_scores_gemma":[0.9991997,0.000017889588,0.00008164327,0.00012640687,0.0004479377,0.0001264274],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010598027,0.0002462782,0.00021716976,0.000039836028,0.00028097612,0.00015854725,0.00008442522,0.0002199069,0.000023490487],"category_scores_gemma":[0.000044765424,0.00022717624,0.00008323335,0.00026945595,0.00005598094,0.0003487805,0.0000063100656,0.00013840669,0.0000106371945],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003918565,0.00078848447,0.005912044,0.006134744,0.00007096858,0.0000045283305,0.00050075015,0.12512672,0.58208036,0.07477542,0.11931849,0.084895596],"study_design_scores_gemma":[0.000961865,0.00005406256,0.004066641,0.00015592518,0.00006654218,0.000009812951,0.000068148125,0.888507,0.071838155,0.00032767316,0.033634506,0.0003096831],"about_ca_topic_score_codex":0.000040579234,"about_ca_topic_score_gemma":0.0000043823006,"teacher_disagreement_score":0.7633803,"about_ca_system_score_codex":0.00056399446,"about_ca_system_score_gemma":0.000049808805,"threshold_uncertainty_score":0.9263978},"labels":[],"label_agreement":null},{"id":"W2019535375","doi":"10.1080/15325000490441354","title":"Adequacy Assessment of Composite Power Systems with FACTS Devices Using a DC Load Flow Method","year":2004,"lang":"en","type":"article","venue":"Electric Power Components and Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Power flow; Transmission system; Electric power system; Power transmission; Computer science; Composite number; Transmission (telecommunications); Flexible AC transmission system; Power (physics); Engineering; Electrical engineering","score_opus":0.0155039007397673,"score_gpt":0.25412515903017036,"score_spread":0.23862125829040307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2019535375","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.65078247,0.0072418354,0.33795094,0.000015611258,0.0011566157,0.000890982,0.00002945129,0.00018815119,0.0017439218],"genre_scores_gemma":[0.9964583,0.00004815159,0.0033080152,0.000015044661,0.000031434058,0.000037358102,0.000005851382,0.00005779401,0.000038036484],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99718827,0.0001990555,0.00081703113,0.00045363966,0.00070583954,0.0006361856],"domain_scores_gemma":[0.9986876,0.00012179157,0.0002605524,0.0004734519,0.00023230421,0.00022428224],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00080542173,0.00043451504,0.00094730494,0.00022122492,0.00013179296,0.0001609226,0.00027416606,0.00016149985,0.000003916727],"category_scores_gemma":[0.000012706772,0.0003434236,0.000095654555,0.0004866,0.000042657004,0.00028474687,0.000046531364,0.00028898168,0.00000525383],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012495226,0.00030734428,0.005279798,0.002730403,0.0010436814,0.00010988287,0.0016545433,0.8059893,0.18049172,0.0019943418,0.000106063075,0.00016792344],"study_design_scores_gemma":[0.0044257985,0.0007887351,0.020150987,0.0037446667,0.00020704142,0.0011007816,0.0005581569,0.958102,0.0025829442,0.000043775024,0.0068733795,0.0014217476],"about_ca_topic_score_codex":0.0010483641,"about_ca_topic_score_gemma":0.00001255462,"teacher_disagreement_score":0.34567583,"about_ca_system_score_codex":0.0005595599,"about_ca_system_score_gemma":0.0001516645,"threshold_uncertainty_score":0.9999018},"labels":[],"label_agreement":null},{"id":"W2024401476","doi":"10.1049/ip-gtd:20020702","title":"Quantitative reliability considerations in the determination of performance-based rates and customer service disruption payments","year":2002,"lang":"en","type":"article","venue":"IEE Proceedings - Generation Transmission and Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Payment; Index (typography); Service (business); Customer service; Computer science; Probability distribution; Power (physics); Operations research; Business; Statistics; Engineering; Mathematics; Marketing","score_opus":0.029700926509315054,"score_gpt":0.24763822307775166,"score_spread":0.2179372965684366,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2024401476","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94525933,0.00032181712,0.052727614,0.0009233494,0.00006649914,0.00039536893,0.000033335837,0.00004210017,0.0002305654],"genre_scores_gemma":[0.99888283,0.00027415925,0.0006302647,0.00006139049,0.000013954992,0.00005977244,0.00006661805,0.0000053378126,0.000005655682],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99923515,0.00003050207,0.00030942637,0.00016423973,0.00014741626,0.00011328594],"domain_scores_gemma":[0.99962497,0.000052107072,0.000054593664,0.000053738095,0.0001750091,0.000039563638],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003891547,0.00011266263,0.00012104369,0.00004892546,0.00013559783,0.000055421493,0.00003350645,0.00007807217,0.000018346154],"category_scores_gemma":[0.000052835418,0.00008576519,0.000019169429,0.00020854044,0.000051166546,0.00036912918,0.0000033523017,0.000089997244,0.0000020876864],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003591973,0.0014658645,0.050450694,0.00992753,0.00005246586,0.000003942455,0.03929586,0.018522881,0.7284406,0.034719605,0.006304275,0.110457085],"study_design_scores_gemma":[0.0006255253,0.00008384032,0.01257368,0.00011934423,0.000019313196,0.0000066369744,0.0003167313,0.95444196,0.03017702,0.00019917673,0.0012998597,0.00013690242],"about_ca_topic_score_codex":0.000009300127,"about_ca_topic_score_gemma":0.000009220886,"teacher_disagreement_score":0.9359191,"about_ca_system_score_codex":0.000043480715,"about_ca_system_score_gemma":0.000007666018,"threshold_uncertainty_score":0.3497403},"labels":[],"label_agreement":null},{"id":"W2024825567","doi":"10.1109/tpwrs.2012.2205022","title":"Adequacy Assessment Considerations in Wind Integrated Power Systems","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":113,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada); Manitoba Hydro; University of Saskatchewan","funders":"","keywords":"Wind power; Electric power system; Reliability engineering; Electricity generation; Wind speed; Engineering; Electric power transmission; Range (aeronautics); Computer science; Power (physics); Electrical engineering; Meteorology; Aerospace engineering","score_opus":0.01429391360885355,"score_gpt":0.23757517683005044,"score_spread":0.2232812632211969,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2024825567","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.036886323,0.0018783815,0.92097515,0.000088790504,0.022524422,0.0015515574,0.00021489151,0.000745806,0.015134683],"genre_scores_gemma":[0.9986518,0.000029004206,0.000110369845,0.00004143178,0.000022702612,0.00031728097,0.0000059611134,0.000078479105,0.0007429671],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.997193,0.00028387125,0.00096944877,0.00035589503,0.000410976,0.00078681717],"domain_scores_gemma":[0.99852645,0.0002746509,0.0000926674,0.0006866875,0.00013303137,0.00028650215],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008365539,0.00042869328,0.00059897633,0.00040005572,0.00015667504,0.00017810805,0.00018144654,0.00030199523,0.00018018829],"category_scores_gemma":[0.000015185121,0.00040212835,0.00015742493,0.000484887,0.000066403925,0.00064346805,0.0000016164673,0.0006774895,0.00032520478],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004693296,0.00138009,0.0016495944,0.0009069294,0.00059838034,0.00006782656,0.0068176086,0.95889026,0.0052911933,0.0115411915,0.012729308,0.00008068798],"study_design_scores_gemma":[0.013683467,0.0019532016,0.017636318,0.011144077,0.0006290909,0.0029224716,0.04518885,0.3951565,0.01148738,0.00022035342,0.48968226,0.010296022],"about_ca_topic_score_codex":0.00041926274,"about_ca_topic_score_gemma":0.00008080346,"teacher_disagreement_score":0.96176547,"about_ca_system_score_codex":0.0007592238,"about_ca_system_score_gemma":0.00010657584,"threshold_uncertainty_score":0.99984306},"labels":[],"label_agreement":null},{"id":"W2026103137","doi":"10.1109/irep.2010.5563301","title":"Probabilistic wind energy modeling for electric generation system reliability assessment","year":2010,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Wind power; Reliability engineering; Probabilistic logic; Reliability (semiconductor); Electric power system; Intermittency; Computer science; Grid; Renewable energy; Engineering; Power (physics); Electrical engineering; Meteorology","score_opus":0.010499065721192429,"score_gpt":0.21775269854814738,"score_spread":0.20725363282695494,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2026103137","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24738646,0.000036575686,0.74386126,0.00004554717,0.0016002519,0.000507926,0.000007054137,0.00053922774,0.0060157096],"genre_scores_gemma":[0.9920096,0.0000044373264,0.007241507,0.000017891125,0.00029983115,0.00023051791,0.000016983244,0.000030687403,0.00014856148],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987712,0.00002750014,0.00040597765,0.00031420408,0.00015243456,0.00032871668],"domain_scores_gemma":[0.99917173,0.00007087474,0.000030190162,0.00045528688,0.00018240772,0.00008953234],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00062886666,0.0001728638,0.00022536983,0.00005690345,0.00009406326,0.000054659624,0.00014910364,0.00014782301,0.000012722469],"category_scores_gemma":[0.00008957108,0.00015059374,0.00008886818,0.0001406731,0.00001260574,0.00014592594,0.00001510779,0.00016580719,0.000004936824],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007634563,0.00005220752,0.00005755492,0.0007713632,0.000025417703,6.670859e-7,0.000039651182,0.77279955,0.09017433,0.13353981,0.0009943617,0.001537418],"study_design_scores_gemma":[0.00019491011,0.000035426365,0.000024965397,0.0000171541,0.000015833935,0.000007122675,0.000021630281,0.9940635,0.0023432092,0.0008485521,0.0022399344,0.0001877554],"about_ca_topic_score_codex":0.00007831331,"about_ca_topic_score_gemma":0.00014566658,"teacher_disagreement_score":0.7446231,"about_ca_system_score_codex":0.00025101475,"about_ca_system_score_gemma":0.00006786871,"threshold_uncertainty_score":0.61410344},"labels":[],"label_agreement":null},{"id":"W2028195561","doi":"10.1109/eit.2005.1626966","title":"A Monte Carlo Simulation Model for Reliability Evaluation of Transmission Systems","year":2006,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Monte Carlo method; Reliability (semiconductor); Reliability engineering; Probabilistic logic; Electric power system; Computer science; Grid; Transmission system; Power system simulation; Transmission (telecommunications); Operations research; Power (physics); Engineering; Telecommunications; Statistics; Mathematics; Artificial intelligence","score_opus":0.025376446825851495,"score_gpt":0.2602470063507424,"score_spread":0.2348705595248909,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2028195561","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22115335,0.00037577926,0.7754462,0.000013472929,0.000174033,0.00097254774,0.000017461942,0.00013162826,0.0017155764],"genre_scores_gemma":[0.9979978,0.0000030622427,0.0015512259,0.0000015942215,0.000026472324,0.00011992872,0.000004014747,0.000013742317,0.00028213277],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990343,0.00003762308,0.00038514056,0.00014351257,0.00026709522,0.00013236245],"domain_scores_gemma":[0.99927205,0.00008262244,0.00003823721,0.00022012983,0.00036127013,0.000025713207],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010785634,0.00009250508,0.00017333677,0.000035649453,0.000023261953,0.000008708821,0.000058204423,0.00008525812,0.0000038097937],"category_scores_gemma":[0.00004875042,0.00007942383,0.00007733358,0.00007062785,0.000012813161,0.00012393283,0.0000031601508,0.00003402687,0.0000010127305],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013529567,0.000020218067,0.000044270448,0.00040965635,0.0000044546855,1.3558238e-8,0.00009358984,0.99710196,0.00083704526,0.00027517646,0.0002791814,0.00092090847],"study_design_scores_gemma":[0.00046413532,0.000015075142,0.00019635235,0.00006064128,0.00003462034,2.0389597e-7,0.000020705667,0.9972351,0.00053374784,0.0007590514,0.0005921751,0.00008818184],"about_ca_topic_score_codex":0.00021076585,"about_ca_topic_score_gemma":0.000028353383,"teacher_disagreement_score":0.7768445,"about_ca_system_score_codex":0.00013645655,"about_ca_system_score_gemma":0.000028975504,"threshold_uncertainty_score":0.32388097},"labels":[],"label_agreement":null},{"id":"W2029500005","doi":"10.1243/1748006xjrr11","title":"Failure Bunching Phenomena in Electric Power Transmission Systems","year":2006,"lang":"en","type":"article","venue":"Proceedings of the Institution of Mechanical Engineers Part O Journal of Risk and Reliability","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Electric power transmission; Reliability (semiconductor); Overhead (engineering); Reliability engineering; Tower; Power transmission; Failure mode and effects analysis; Electric power system; Transmission line; Transmission (telecommunications); Computer science; Component (thermodynamics); Transmission system; Power (physics); Electric power; Electrical engineering; Engineering; Telecommunications; Structural engineering; Physics","score_opus":0.002822704829870875,"score_gpt":0.16985058816909218,"score_spread":0.1670278833392213,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2029500005","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97529554,0.0020844368,0.021032589,0.00012354365,0.00076890906,0.0002683152,0.000007637496,0.000028553108,0.00039046598],"genre_scores_gemma":[0.9987978,0.00047315095,0.000628574,0.0000017935198,0.0000803072,0.0000030322938,1.8610328e-7,0.000009614404,0.0000055898045],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99829847,0.000024192675,0.0009974733,0.00013641479,0.0003397207,0.000203751],"domain_scores_gemma":[0.9991282,0.00009098381,0.00034144556,0.000097141965,0.00026650217,0.00007570584],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017242245,0.00016216509,0.000468254,0.00014088278,0.000046051708,0.000014354852,0.00024106,0.00015758022,0.0000021348806],"category_scores_gemma":[0.0003573712,0.000105942694,0.00016924522,0.0003815604,0.000077241995,0.0002530498,0.000023952774,0.0004974811,1.9244887e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034571017,0.00050397706,0.0046058376,0.003099141,0.0000926564,0.0000025287188,0.00097196776,0.87833655,0.07856137,0.03018576,0.0011631246,0.0021313552],"study_design_scores_gemma":[0.010788336,0.0018934454,0.020568473,0.012567449,0.00073131936,0.0006229478,0.0030485943,0.5660419,0.2519366,0.033723425,0.09597603,0.0021014719],"about_ca_topic_score_codex":0.00004666123,"about_ca_topic_score_gemma":0.0000015192803,"teacher_disagreement_score":0.3122947,"about_ca_system_score_codex":0.00012835844,"about_ca_system_score_gemma":0.00003795588,"threshold_uncertainty_score":0.43202177},"labels":[],"label_agreement":null},{"id":"W2029841071","doi":"10.1109/isgteurope.2010.5638935","title":"Integration of new generation and load technology in the computation of risk over the operations planning time-horizon","year":2010,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Time horizon; Computer science; Electricity generation; Plan (archaeology); Computation; Electric power system; Wind power; Horizon; Operations research; Reliability engineering; Industrial engineering; Power (physics); Mathematical optimization; Engineering; Electrical engineering","score_opus":0.00853365783804953,"score_gpt":0.23097656166961578,"score_spread":0.22244290383156626,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2029841071","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.873121,0.00009441887,0.12592034,0.00017626643,0.000113125185,0.00014726215,0.0000022818622,0.000023269195,0.0004020209],"genre_scores_gemma":[0.9981019,0.000011613852,0.0018244194,0.0000072205216,0.000027201668,0.000006377199,0.0000036859144,0.0000032336172,0.000014364477],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996271,0.000024115687,0.0001751675,0.000057682966,0.00006659604,0.000049321065],"domain_scores_gemma":[0.99976295,0.000050603343,0.000026176902,0.00011287266,0.00004078492,0.000006621082],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030741649,0.000046524397,0.00007267429,0.00004849059,0.000028234148,0.00001190758,0.000065860804,0.000061599036,0.0000056189506],"category_scores_gemma":[0.0001062494,0.000026602662,0.000011191759,0.00015222338,0.000037794845,0.00007781979,0.000008233239,0.00014082839,0.0000012906927],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000081949065,0.000032817785,0.0028028213,0.000035060413,0.00001945517,3.1782903e-7,0.009246389,0.21229501,0.7159192,0.028222743,0.0020121832,0.029405808],"study_design_scores_gemma":[0.00023896665,0.000053214244,0.01591302,0.000034286248,0.0000105590225,0.0000047468097,0.0006796746,0.9563558,0.024761658,0.0016013389,0.00028462522,0.000062111794],"about_ca_topic_score_codex":0.00029428524,"about_ca_topic_score_gemma":0.0012635865,"teacher_disagreement_score":0.74406075,"about_ca_system_score_codex":0.000010420794,"about_ca_system_score_gemma":0.000016553891,"threshold_uncertainty_score":0.10848251},"labels":[],"label_agreement":null},{"id":"W2031709606","doi":"","title":"BC hydro strategy for replacement of equipment","year":2009,"lang":"en","type":"article","venue":"Electricity Distribution - Part 2, 2009. CIRED 2009. The 20th International Conference and Exhibition on","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Business; Asset (computer security); Due diligence; Investment (military); Audit; Asset management; Finance; Capital investment; Capital expenditure; Actuarial science; Risk analysis (engineering); Computer science; Accounting; Computer security","score_opus":0.028720288608997308,"score_gpt":0.26586206752940367,"score_spread":0.23714177892040636,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2031709606","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.63421124,0.0012808706,0.3122414,0.009409406,0.0022130578,0.0031270413,0.009363382,0.0006023532,0.02755121],"genre_scores_gemma":[0.99766976,0.0003978578,0.000020524392,0.00022113415,0.00012602138,0.00008042513,0.0009667623,0.000007795203,0.00050972326],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985452,0.000047821613,0.0004956582,0.00027004594,0.0003285286,0.00031273204],"domain_scores_gemma":[0.999248,0.00006773191,0.00014724981,0.00021333917,0.00024840166,0.00007523216],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003791679,0.00020108346,0.00023185335,0.00006687065,0.00012792854,0.00006323264,0.00019683191,0.00010117138,0.00010366821],"category_scores_gemma":[0.000082796585,0.00016916807,0.00009565786,0.0001623493,0.00004915282,0.00016253744,0.00001372255,0.00016707835,0.000013021194],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019502576,0.0018584051,0.00041201993,0.00030205832,0.00048437258,0.000008221627,0.00050799706,0.025292514,0.030954342,0.53994185,0.3246599,0.073628016],"study_design_scores_gemma":[0.007109317,0.005466891,0.015658101,0.0013298105,0.00020038216,0.00007278587,0.00061459426,0.3575401,0.18823788,0.05005115,0.37182167,0.001897315],"about_ca_topic_score_codex":0.000030642124,"about_ca_topic_score_gemma":0.000016276039,"teacher_disagreement_score":0.48989072,"about_ca_system_score_codex":0.00023980661,"about_ca_system_score_gemma":0.000050125018,"threshold_uncertainty_score":0.68984735},"labels":[],"label_agreement":null},{"id":"W2033205122","doi":"10.1109/tpwrs.2011.2164425","title":"Effects of Load Sector Demand Side Management Applications in Generating Capacity Adequacy Assessment","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":88,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Load management; Reliability engineering; Demand side; Reliability (semiconductor); Electric power system; Environmental economics; Investment (military); Load shifting; Electric power; Risk analysis (engineering); Electric power industry; Energy management; Computer science; Business; Engineering; Power (physics); Economics; Electricity; Energy (signal processing); Electrical engineering","score_opus":0.012901990610136877,"score_gpt":0.20824593145311168,"score_spread":0.1953439408429748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2033205122","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08410209,0.00024558746,0.9064895,0.0000020099465,0.0013640432,0.0012595225,0.00002165723,0.0001633289,0.0063522873],"genre_scores_gemma":[0.99726176,0.000037183894,0.001615844,0.000007091914,0.000008631457,0.00089942565,7.268645e-7,0.00003059513,0.00013870982],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99858266,0.00009392815,0.0005267936,0.00026639862,0.00025028098,0.00027992594],"domain_scores_gemma":[0.99929035,0.00009749251,0.000072598436,0.00040142922,0.000056269902,0.00008188369],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003208128,0.00021324246,0.00033059652,0.00016080249,0.000064456486,0.00001848888,0.00017574262,0.00010457178,0.0000144590895],"category_scores_gemma":[0.0000019307436,0.00020621359,0.00010115788,0.0002771545,0.000035103134,0.0001288422,0.0000014532596,0.00021055124,0.000018820725],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010225432,0.003243919,0.0010674491,0.023235325,0.0016048179,0.00009283892,0.019211575,0.836679,0.10275847,0.008518777,0.00055642094,0.0029291552],"study_design_scores_gemma":[0.009688556,0.0012714494,0.02816099,0.0077553205,0.0008129622,0.00011091854,0.006311196,0.3490522,0.5790126,0.00043348715,0.013077698,0.004312646],"about_ca_topic_score_codex":0.0003339725,"about_ca_topic_score_gemma":0.00014138041,"teacher_disagreement_score":0.9131597,"about_ca_system_score_codex":0.00034475577,"about_ca_system_score_gemma":0.000023156017,"threshold_uncertainty_score":0.84091467},"labels":[],"label_agreement":null},{"id":"W2034258068","doi":"10.1080/00401706.2000.10485995","title":"Progressively Censored Reliability Sampling Plans for the Weibull Distribution","year":2000,"lang":"en","type":"article","venue":"Technometrics","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":118,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Weibull distribution; Censoring (clinical trials); Estimator; Statistics; Monte Carlo method; Sampling (signal processing); Acceptance sampling; Mathematics; Importance sampling; Sample size determination; Reliability (semiconductor); Maximum likelihood; Sample (material); Log-logistic distribution; Computer science; Exponential distribution; Distribution fitting","score_opus":0.014945378741686735,"score_gpt":0.23382910986283367,"score_spread":0.21888373112114695,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2034258068","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19797644,0.003160849,0.7885824,0.0008198839,0.0008523512,0.0024661275,0.0016255012,0.0025385343,0.0019779378],"genre_scores_gemma":[0.9965533,0.00023978959,0.0026017965,0.000015864041,0.00006629968,0.00024818364,0.00006088318,0.000023261087,0.00019064025],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989718,0.000008503762,0.00028300236,0.0002156368,0.00016820298,0.00035281727],"domain_scores_gemma":[0.9989576,0.00038560043,0.00003419265,0.0004918353,0.00007962099,0.00005116076],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00051745237,0.00014647443,0.00017283109,0.000084546526,0.00015405421,0.000042983207,0.0003314552,0.00013583736,0.00003933174],"category_scores_gemma":[0.0005612995,0.00010699919,0.000094219664,0.0012923919,0.00008181219,0.00008085201,0.000019306253,0.00018947264,0.000038706625],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014988137,0.0002840974,0.004686356,0.0011739361,0.00012966062,0.000004156029,0.00028927685,0.05731455,0.00032365523,0.009980449,0.02645637,0.8992076],"study_design_scores_gemma":[0.00042420207,0.0000794616,0.008310899,0.00006163919,0.000038474267,0.000007634726,0.00006552019,0.047796093,0.0015966201,0.0019621977,0.93933654,0.00032074662],"about_ca_topic_score_codex":0.0000094071465,"about_ca_topic_score_gemma":0.0000028483557,"teacher_disagreement_score":0.9128801,"about_ca_system_score_codex":0.00018606533,"about_ca_system_score_gemma":0.000012491589,"threshold_uncertainty_score":0.43633005},"labels":[],"label_agreement":null},{"id":"W2035334421","doi":"10.1109/tdc.2010.5484326","title":"Collection, access, and use of customer level interruption data as pertaining to BChydro distribution reliability","year":2010,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Reliability (semiconductor); Computer science; Data collection; Focus (optics); Voice of the customer; Reliability engineering; Customer retention; Business; Marketing; Engineering; Service quality; Statistics","score_opus":0.07798091408816094,"score_gpt":0.31211947342750324,"score_spread":0.2341385593393423,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2035334421","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9137818,0.000008938314,0.08299849,0.0002553467,0.0008377154,0.00031279586,0.00022147434,0.00016773051,0.0014156996],"genre_scores_gemma":[0.9982729,0.000015543257,0.0011177199,0.00003491958,0.00003070449,0.000014826378,0.00012675529,0.000010790143,0.00037587396],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991582,0.0000222067,0.00027970498,0.00026828022,0.00011223917,0.00015935952],"domain_scores_gemma":[0.9990143,0.00009203237,0.000031259435,0.0006474036,0.0001247571,0.00009020442],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043379146,0.000107528,0.00016244793,0.000046532292,0.0000529675,0.00006893851,0.00024370337,0.0000924746,0.0000873581],"category_scores_gemma":[0.0009475543,0.00009650667,0.000020609334,0.0002335413,0.00005345531,0.0007720793,0.00021556002,0.0001654893,0.00003316544],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007071454,0.00067404297,0.18984467,0.0027694046,0.000345191,0.000009303763,0.0048921104,0.024550889,0.18084727,0.016850198,0.52334666,0.05516309],"study_design_scores_gemma":[0.0007750004,0.00015339718,0.13006982,0.00023048611,0.00006274956,0.0000605696,0.00025738674,0.24685544,0.02563293,0.0006597371,0.5944479,0.0007945764],"about_ca_topic_score_codex":0.0010702668,"about_ca_topic_score_gemma":0.0011440382,"teacher_disagreement_score":0.22230455,"about_ca_system_score_codex":0.000053434793,"about_ca_system_score_gemma":0.00002558577,"threshold_uncertainty_score":0.39354277},"labels":[],"label_agreement":null},{"id":"W2035347801","doi":"10.1109/pmaps.2010.5528714","title":"Reliability evaluation of bulk power systems incorporating UPFC","year":2010,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Unified power flow controller; Reliability (semiconductor); Electric power system; Control theory (sociology); Reliability engineering; Computer science; Voltage; Electric power transmission; Flexible AC transmission system; AC power; Engineering; Power (physics); Power flow; Control (management); Electrical engineering","score_opus":0.011824843321816597,"score_gpt":0.2329601698870885,"score_spread":0.2211353265652719,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2035347801","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9069282,0.000105348314,0.009578116,0.000021818058,0.0031000266,0.0005012621,0.000007494428,0.00025498413,0.07950275],"genre_scores_gemma":[0.9989986,0.0000011894512,0.00078562106,0.0000048824218,0.000031219242,0.000041656614,0.0000027827891,0.000014402965,0.00011964832],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99880016,0.00006303008,0.00042619553,0.00016590387,0.00038879595,0.00015592182],"domain_scores_gemma":[0.99884623,0.000077544144,0.00007018435,0.00051418116,0.00043497182,0.00005686855],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028342875,0.00011052637,0.00019964746,0.00004319432,0.000026968353,0.000018229302,0.00013997253,0.00011752023,0.00012043828],"category_scores_gemma":[0.0005014353,0.00009313121,0.00005150306,0.00014148276,0.000055084365,0.00015937207,0.000022867198,0.00018891819,0.000037881993],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030256355,0.00026248704,0.01253547,0.0020833046,0.0001289823,0.0000024691374,0.0016542728,0.39856496,0.51110387,0.061796963,0.00782354,0.004013416],"study_design_scores_gemma":[0.000710656,0.00006664741,0.0123491725,0.00014085582,0.000050388822,0.000017162885,0.0004287769,0.9592517,0.017810747,0.0037611898,0.004991547,0.00042114945],"about_ca_topic_score_codex":0.00010964812,"about_ca_topic_score_gemma":0.000053767584,"teacher_disagreement_score":0.56068677,"about_ca_system_score_codex":0.00006131246,"about_ca_system_score_gemma":0.00004892005,"threshold_uncertainty_score":0.37977806},"labels":[],"label_agreement":null},{"id":"W2036205453","doi":"10.1109/pesmg.2013.6672726","title":"Quantifying operational flexibility of VSC-HVDC lines and SVCs","year":2013,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Flexibility (engineering); Electric power system; Reliability engineering; Reliability (semiconductor); Economic dispatch; Monte Carlo method; Computer science; Markov chain; Power flow; Power (physics); Control theory (sociology); Control engineering; Engineering; Control (management); Mathematics","score_opus":0.028024507757782587,"score_gpt":0.2453370874700859,"score_spread":0.2173125797123033,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2036205453","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97870964,0.00034764135,0.012600148,0.00017966515,0.0002395734,0.0001825329,0.000003766214,0.0001196664,0.0076173875],"genre_scores_gemma":[0.9968466,0.00002590073,0.0027177841,0.000031965144,0.000025312374,0.00001347353,0.0000017717762,0.0000057020757,0.0003314516],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995325,0.000010816927,0.00019391922,0.000098555145,0.00006643301,0.0000977744],"domain_scores_gemma":[0.9996884,0.00004868508,0.00001104404,0.00014380699,0.00007129647,0.00003676053],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001394349,0.000064891174,0.000118247044,0.000019090427,0.000019339112,0.00001860524,0.000052143874,0.00003974553,0.00022512228],"category_scores_gemma":[0.000055664503,0.000051289637,0.00002181268,0.000047586236,0.000038290742,0.00016515472,0.000020234424,0.000043597796,0.00002983331],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048907837,0.00043604375,0.21735689,0.0081163775,0.00038256205,0.0000047685107,0.0052315095,0.07904029,0.41005096,0.17310926,0.068386704,0.03783572],"study_design_scores_gemma":[0.00085865567,0.00010162483,0.15867709,0.00023648547,0.000018712619,0.000024013469,0.00068145135,0.7410458,0.07758289,0.002688477,0.017423615,0.00066122145],"about_ca_topic_score_codex":0.00017577354,"about_ca_topic_score_gemma":0.000063290674,"teacher_disagreement_score":0.6620055,"about_ca_system_score_codex":0.000011094198,"about_ca_system_score_gemma":0.000008126825,"threshold_uncertainty_score":0.24649312},"labels":[],"label_agreement":null},{"id":"W2037066364","doi":"10.1109/tpwrd.2005.861237","title":"Predicting Bulk Electricity System Reliability Performance Indices Using Sequential Monte Carlo Simulation","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":56,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Monte Carlo method; Reliability (semiconductor); Reliability engineering; Electric power system; Probability distribution; Computer science; Power (physics); Engineering; Statistics; Mathematics","score_opus":0.009371369543174048,"score_gpt":0.20071841935571666,"score_spread":0.1913470498125426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2037066364","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.69755507,0.000106232146,0.2991888,0.0000036061347,0.0015744198,0.000320334,0.00005107466,0.0006637058,0.000536749],"genre_scores_gemma":[0.9994672,0.000018771401,0.00025994595,0.000011184645,0.000085704676,0.00003111337,0.000001806385,0.000048099406,0.00007619337],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980649,0.00008283524,0.0005974357,0.00040007656,0.00037663485,0.0004781413],"domain_scores_gemma":[0.9991106,0.00012945247,0.00009875692,0.00041727893,0.00015848882,0.0000854448],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00037386204,0.00030170532,0.0003132153,0.00021114915,0.00032034467,0.00006407367,0.0001769348,0.00022103486,0.000018548566],"category_scores_gemma":[0.0000052380155,0.00031681624,0.00017649951,0.00041530526,0.00005820771,0.000591985,0.000001932419,0.0004249895,0.000030461122],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056619756,0.00006147408,0.00074431364,0.0002823873,0.000037573507,0.0000050706117,0.0001535244,0.9964277,0.0018936382,0.0000031416057,0.000018169727,0.00031636722],"study_design_scores_gemma":[0.00036012204,0.00008142504,0.0009974788,0.00022397198,0.000068617206,0.000020987816,0.000068047404,0.9821834,0.015475343,0.0000026588407,0.00020851937,0.000309432],"about_ca_topic_score_codex":0.001054139,"about_ca_topic_score_gemma":0.00010341692,"teacher_disagreement_score":0.3019121,"about_ca_system_score_codex":0.00085014175,"about_ca_system_score_gemma":0.000053594435,"threshold_uncertainty_score":0.9999284},"labels":[],"label_agreement":null},{"id":"W2037391976","doi":"10.1109/epec.2014.51","title":"Quantifying System Adequacy Benefit of Wind Power Diversity","year":2014,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Renewable energy; Electric power system; Electricity generation; Diversification (marketing strategy); Environmental science; Electric power; Reliability (semiconductor); Distributed generation; Environmental economics; Wind speed; Automotive engineering; Reliability engineering; Power (physics); Engineering; Meteorology; Electrical engineering; Business; Geography; Economics; Physics","score_opus":0.014247531226614985,"score_gpt":0.19566676498208452,"score_spread":0.18141923375546953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2037391976","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8416125,0.00013400018,0.04820856,0.00002273624,0.00096063886,0.00014265467,0.000007820511,0.00044558544,0.10846551],"genre_scores_gemma":[0.999451,0.0000029399719,0.00030672413,0.000010801456,0.000018946695,8.8172214e-7,7.5234817e-7,0.000010129169,0.00019783613],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993452,0.000014854347,0.00020193707,0.00012200849,0.00013489413,0.00018109813],"domain_scores_gemma":[0.9995321,0.000054675307,0.000029859606,0.0002807877,0.00004614212,0.000056415345],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002776202,0.00009605903,0.00020903886,0.0000417183,0.00005601497,0.000008496645,0.00017450766,0.000063730324,0.00004132026],"category_scores_gemma":[0.000024320816,0.000085277934,0.00006920969,0.0000870479,0.000021723763,0.00010191684,0.00010162957,0.0000649046,0.0000712997],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006650156,0.00014717494,0.12314673,0.00882219,0.00040151016,0.000014674534,0.005520855,0.060250614,0.0146427965,0.77592164,0.0064683314,0.0045969915],"study_design_scores_gemma":[0.006013945,0.0007823931,0.29677206,0.0047872006,0.00029908365,0.00012416067,0.010401103,0.46508837,0.07595165,0.0016649992,0.13416591,0.0039491197],"about_ca_topic_score_codex":0.0001143628,"about_ca_topic_score_gemma":0.000034302753,"teacher_disagreement_score":0.77425665,"about_ca_system_score_codex":0.000052380066,"about_ca_system_score_gemma":0.0000031354843,"threshold_uncertainty_score":0.34775332},"labels":[],"label_agreement":null},{"id":"W2037947702","doi":"10.1590/s0103-17592003000300005","title":"Avaliação da confiabilidade em sistemas de ditribuição considerando falhas de geração e transmissão","year":2003,"lang":"pt","type":"article","venue":"Sba Controle & Automação Sociedade Brasileira de Automatica","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Physics; Humanities; Philosophy","score_opus":0.015696711864414375,"score_gpt":0.2512320988155801,"score_spread":0.23553538695116574,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2037947702","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6032563,0.014070581,0.34593844,0.0021898767,0.0035445786,0.006848535,0.0010243311,0.006757184,0.01637019],"genre_scores_gemma":[0.9861108,0.000178827,0.0065225014,0.0022886603,0.0003373524,0.000871419,0.000049030048,0.00053870486,0.0031027074],"study_design_codex":"qualitative","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.98448557,0.003208445,0.0035554487,0.0019761042,0.001497798,0.0052766358],"domain_scores_gemma":[0.9902519,0.003738152,0.00089213706,0.0025371527,0.000484766,0.002095908],"candidate_categories":["metaepi_narrow","scholarly_communication","research_integrity","insufficient_payload"],"consensus_categories":["metaepi_narrow","research_integrity"],"category_scores_codex":[0.0066679935,0.0023114788,0.0038496328,0.0004484533,0.0010350455,0.0014068187,0.0015982499,0.0022687132,0.0015607581],"category_scores_gemma":[0.0037609593,0.002524216,0.0022198549,0.0010931573,0.0007996583,0.00073594676,0.00013830689,0.0025639532,0.0007295627],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017513994,0.007942187,0.03252744,0.042301804,0.018990476,0.004167199,0.2687492,0.05929966,0.23139466,0.2164431,0.09458379,0.021849055],"study_design_scores_gemma":[0.032609228,0.0010309885,0.028620606,0.0053590224,0.0041489443,0.0026976431,0.02165804,0.83425987,0.01802001,0.00995755,0.033961866,0.0076762163],"about_ca_topic_score_codex":0.00019647015,"about_ca_topic_score_gemma":0.00012512307,"teacher_disagreement_score":0.7749602,"about_ca_system_score_codex":0.0032918334,"about_ca_system_score_gemma":0.003319281,"threshold_uncertainty_score":0.99973714},"labels":[],"label_agreement":null},{"id":"W2037982552","doi":"10.1109/59.852155","title":"State extension for adequacy evaluation of composite power systems-applications","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Electric power system; Extension (predicate logic); State (computer science); Reliability (semiconductor); Reliability engineering; Computation; Computer science; Transmission system; Extension method; Mathematical optimization; Power (physics); Algorithm; Mathematics; Transmission (telecommunications); Engineering; Telecommunications","score_opus":0.018070665832006234,"score_gpt":0.25071264130582105,"score_spread":0.23264197547381482,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2037982552","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035161156,0.0014352856,0.952416,0.00002277487,0.0029627085,0.0035039976,0.0004632527,0.00037184483,0.003662995],"genre_scores_gemma":[0.99672335,0.000073294665,0.00013221879,0.0000121697385,0.000013011737,0.0017343597,0.000012217279,0.00006658211,0.0012328012],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975961,0.00017699065,0.0008566791,0.00039776144,0.0005992906,0.00037320715],"domain_scores_gemma":[0.9982684,0.00017768922,0.00011907438,0.00077691744,0.0005292293,0.00012866607],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010965886,0.0002909317,0.00049839704,0.00019665377,0.00015636535,0.00006468188,0.00022376541,0.00015987059,0.00010994454],"category_scores_gemma":[0.0000052168616,0.00028596303,0.00021428066,0.00033110252,0.000055489603,0.00023783663,7.057909e-7,0.00017799356,0.00015916409],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010461311,0.0001942092,0.0000028117565,0.00058581337,0.0001683376,6.8206134e-7,0.0005529032,0.9868235,0.008213749,0.0001759104,0.0009833347,0.0021941492],"study_design_scores_gemma":[0.004486827,0.0006964015,0.00040753454,0.001983725,0.00060960505,0.00012495813,0.0009339733,0.7712117,0.024815539,0.00015415279,0.1930971,0.0014785243],"about_ca_topic_score_codex":0.000087561355,"about_ca_topic_score_gemma":0.000013480545,"teacher_disagreement_score":0.9615622,"about_ca_system_score_codex":0.0002615192,"about_ca_system_score_gemma":0.000059250477,"threshold_uncertainty_score":0.99995923},"labels":[],"label_agreement":null},{"id":"W2038409208","doi":"10.1049/ip-gtd:20045058","title":"Application of adverse and extreme adverse weather: modelling in transmission and distribution system reliability evaluation","year":2006,"lang":"en","type":"article","venue":"IEE Proceedings - Generation Transmission and Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":142,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Adverse weather; Reliability (semiconductor); Reliability engineering; Extreme weather; Transmission (telecommunications); Computer science; Environmental science; Transmission system; Meteorology; Engineering; Telecommunications; Climate change; Geography; Ecology","score_opus":0.012896359021244622,"score_gpt":0.2059004522262654,"score_spread":0.1930040932050208,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2038409208","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49565953,0.0009044148,0.5024742,0.00007092561,0.00004700893,0.0005980276,0.000062252155,0.000088453155,0.00009519132],"genre_scores_gemma":[0.9979553,0.00042649152,0.00079349667,0.0000031664167,0.000053551867,0.00011441769,0.000628467,0.000015437272,0.000009644041],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982569,0.00004396228,0.0006880168,0.00044896468,0.00034062762,0.00022153309],"domain_scores_gemma":[0.99937075,0.000022322409,0.00012611396,0.00010204657,0.00026181436,0.000116927906],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011086839,0.0002359811,0.00028005117,0.00007276669,0.0001506234,0.000027135678,0.0000534384,0.00023366133,0.0000036708361],"category_scores_gemma":[0.000018875995,0.00022500768,0.000048275066,0.0002581181,0.00007654208,0.0004669504,0.000009298394,0.00013886217,6.351414e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005879446,0.00047123487,0.016819691,0.007731353,0.00003815741,0.0000019255706,0.0022089516,0.2564847,0.56164277,0.024965566,0.00063614215,0.12841155],"study_design_scores_gemma":[0.0011417771,0.000044035743,0.0074307444,0.00028436436,0.00005813263,0.000010917297,0.00023783444,0.9702159,0.017567707,0.0004972405,0.0022854228,0.00022591883],"about_ca_topic_score_codex":0.00014247035,"about_ca_topic_score_gemma":0.000008705127,"teacher_disagreement_score":0.7137312,"about_ca_system_score_codex":0.00025587928,"about_ca_system_score_gemma":0.00002707842,"threshold_uncertainty_score":0.9175547},"labels":[],"label_agreement":null},{"id":"W2040107681","doi":"10.1109/pmaps.2010.5528651","title":"Reliability assessment of a wind integrated hydro-thermal power system","year":2010,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Electric power system; Reliability engineering; Renewable energy; Monte Carlo method; Wind speed; Thermal power station; Reliability (semiconductor); Power system simulation; Environmental science; Automotive engineering; Computer science; Engineering; Marine engineering; Power (physics); Electrical engineering; Meteorology","score_opus":0.003546670121336418,"score_gpt":0.20782949523410302,"score_spread":0.2042828251127666,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2040107681","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8631453,0.000013968059,0.0074230796,0.0000220957,0.0014384659,0.00027108975,0.000016955733,0.00044498636,0.12722406],"genre_scores_gemma":[0.99703807,8.7960393e-7,0.0026048252,0.000009827789,0.000025110867,0.000013906496,0.0000032168748,0.00002229415,0.0002818883],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99885505,0.000040483676,0.00044679744,0.00020991579,0.00019173161,0.00025599104],"domain_scores_gemma":[0.99902797,0.00006682905,0.00004801565,0.0006263193,0.00013488097,0.00009599768],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00062977,0.00016937572,0.0003122237,0.000052015337,0.000025560596,0.000016842427,0.00022729518,0.00015172482,0.0002672723],"category_scores_gemma":[0.000056413366,0.0001300729,0.00010140323,0.00017150422,0.00007884032,0.00012680849,0.000032728927,0.00035978723,0.000034681765],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033308068,0.00031095257,0.018500416,0.002134965,0.00017963996,0.00001916691,0.00067997153,0.018955097,0.9106512,0.044384938,0.0031041417,0.0010461813],"study_design_scores_gemma":[0.0023936518,0.0004099488,0.26910356,0.0007828461,0.000096690535,0.00010986633,0.0020347496,0.5487668,0.090579726,0.00022373036,0.08381554,0.0016828794],"about_ca_topic_score_codex":0.00011749223,"about_ca_topic_score_gemma":0.000046664096,"teacher_disagreement_score":0.8200715,"about_ca_system_score_codex":0.00010353137,"about_ca_system_score_gemma":0.000055204677,"threshold_uncertainty_score":0.5304219},"labels":[],"label_agreement":null},{"id":"W2044417996","doi":"10.1109/pmaps.2010.5528891","title":"Coordinating wind and hydro generation to increase the effective load carrying capability","year":2010,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Hydroelectricity; Reliability (semiconductor); Reliability engineering; Energy storage; Electricity generation; Computer science; Small hydro; Power (physics); Renewable energy; Engineering; Electrical engineering","score_opus":0.004497817490432769,"score_gpt":0.20130912344833596,"score_spread":0.1968113059579032,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2044417996","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98487467,0.000044842036,0.0055922694,0.00019504601,0.00050479575,0.00050338457,0.0000034850368,0.00012358621,0.008157919],"genre_scores_gemma":[0.99920505,9.76297e-7,0.00043814778,0.00008731471,0.00012639162,0.00004332852,8.0172197e-7,0.0000097352795,0.000088279594],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993997,0.000044118457,0.00013086174,0.0001684042,0.00009614813,0.00016073315],"domain_scores_gemma":[0.9994347,0.00016295139,0.000012320354,0.00024596235,0.00006247469,0.000081565224],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007560733,0.000099208846,0.00010901326,0.000016873011,0.000110912966,0.000046792444,0.00007723326,0.0000545393,0.000016112335],"category_scores_gemma":[0.00047425117,0.000068429705,0.000023187706,0.000087994085,0.00003919048,0.000102283004,0.000038022863,0.00018459244,0.000013690035],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021406202,0.00004171009,0.012959157,0.0003309069,0.00006920179,0.00000526829,0.006775773,0.015324831,0.90304834,0.0034246729,0.0037794744,0.05421929],"study_design_scores_gemma":[0.0013719251,0.00019824164,0.08245137,0.00012589496,0.00007224465,0.00010220624,0.0010076398,0.6861216,0.18244143,0.0009663784,0.043930728,0.0012103793],"about_ca_topic_score_codex":0.0009920094,"about_ca_topic_score_gemma":0.0015945908,"teacher_disagreement_score":0.72060686,"about_ca_system_score_codex":0.00006782568,"about_ca_system_score_gemma":0.000013026186,"threshold_uncertainty_score":0.27904823},"labels":[],"label_agreement":null},{"id":"W2044730803","doi":"10.1109/csudet.2013.6670982","title":"On the selection of wind turbine generator based on ARMA time series","year":2013,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Renewable energy; Wind speed; Turbine; Automotive engineering; Kyoto Protocol; Environmental science; Steam turbine; Electricity; Computer science; Electricity generation; Environmental economics; Greenhouse gas; Power (physics); Engineering; Meteorology; Electrical engineering; Economics; Mechanical engineering","score_opus":0.0038224189967452716,"score_gpt":0.1596188706723373,"score_spread":0.15579645167559203,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2044730803","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9476493,0.000017306975,0.0033646359,0.001103924,0.00035300836,0.000421579,0.000006018481,0.00025423072,0.046829995],"genre_scores_gemma":[0.997392,0.0000014054484,0.00018439231,0.00022360151,0.000035439534,0.000016746328,0.0000012686876,0.000010241703,0.0021349206],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99960315,0.000021878424,0.00011104977,0.00007419095,0.00008516137,0.00010459296],"domain_scores_gemma":[0.99970436,0.00006200342,0.0000141349965,0.00015685208,0.00003936154,0.0000233084],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00009505295,0.000076795346,0.00008780477,0.000023849892,0.000023822742,0.000012785452,0.000062035,0.000035635272,0.0012227645],"category_scores_gemma":[0.00003121253,0.000045710753,0.00003025856,0.00008705373,0.000016809752,0.000060533792,0.000004143436,0.000065176035,0.00037669652],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007443011,0.00016207743,0.0004364188,0.00028595293,0.000087878645,0.0000011188955,0.00020786576,0.28883415,0.35061848,0.013206835,0.34492058,0.0011641775],"study_design_scores_gemma":[0.00026061237,0.00028280914,0.0024414517,0.00007864889,0.0000065906897,0.0000022488462,0.000024138186,0.5786573,0.40605974,0.00028749148,0.011715501,0.00018341144],"about_ca_topic_score_codex":0.000024728739,"about_ca_topic_score_gemma":0.000005154601,"teacher_disagreement_score":0.33320507,"about_ca_system_score_codex":0.000028599652,"about_ca_system_score_gemma":0.000007759076,"threshold_uncertainty_score":0.99969023},"labels":[],"label_agreement":null},{"id":"W2046869866","doi":"10.1049/iet-gtd.2008.0639","title":"Reliability evaluation of generating systems containing wind power and energy storage","year":2009,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":247,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Energy storage; Pumped-storage hydroelectricity; Electric power system; Reliability engineering; Intermittent energy source; Wind speed; Reliability (semiconductor); Distributed generation; Environmental science; Automotive engineering; Engineering; Computer science; Renewable energy; Power (physics); Electrical engineering; Meteorology","score_opus":0.014689602726404087,"score_gpt":0.2337976380686591,"score_spread":0.219108035342255,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2046869866","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.50775623,0.0022561913,0.4887681,0.00007340265,0.00042844468,0.00021866133,0.00006592279,0.00010958879,0.00032345232],"genre_scores_gemma":[0.9990169,0.00011269843,0.0002785335,0.000020460477,0.00009987417,0.000020044237,0.0004161243,0.000011615699,0.000023775687],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99816376,0.00025120325,0.0005965537,0.000295139,0.00048032985,0.00021301738],"domain_scores_gemma":[0.9990829,0.000031663818,0.00010404148,0.0002469552,0.00042295436,0.00011146206],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014903747,0.00019093863,0.00026634027,0.000045475255,0.00013956553,0.000058278754,0.00006996868,0.00017226783,0.000024747356],"category_scores_gemma":[0.00008713146,0.00018074385,0.000065805325,0.00017159752,0.000034276538,0.00029238223,0.000004813458,0.000105853316,9.94148e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003321128,0.00006504684,0.000052951906,0.00009558338,0.000020111638,8.817683e-7,0.00043513914,0.57675,0.38525936,0.0029699726,0.0014305849,0.03288718],"study_design_scores_gemma":[0.0006740256,0.00015169548,0.0020614592,0.000116437324,0.000051971354,0.000008210318,0.00009860835,0.96725404,0.022604136,0.00013701901,0.0066248337,0.00021755707],"about_ca_topic_score_codex":0.000029512836,"about_ca_topic_score_gemma":0.0000037149703,"teacher_disagreement_score":0.49126065,"about_ca_system_score_codex":0.00022563049,"about_ca_system_score_gemma":0.00006336564,"threshold_uncertainty_score":0.7370521},"labels":[],"label_agreement":null},{"id":"W2048205884","doi":"10.1109/eic.2013.6554291","title":"Development of a generator prognostic tool","year":2013,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Reliability engineering; Identification (biology); Root cause; Computer science; Condition-based maintenance; Condition monitoring; Prognostics; Context (archaeology); Generator (circuit theory); Root cause analysis; Maintenance engineering; Stator; Engineering; Power (physics); Mechanical engineering","score_opus":0.007263742950724285,"score_gpt":0.17400795297251134,"score_spread":0.16674421002178705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2048205884","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9459212,0.000069224996,0.044775385,0.000012800012,0.00017374095,0.00022860257,5.1026956e-7,0.00013715115,0.008681416],"genre_scores_gemma":[0.96736467,0.0000014519785,0.032208458,0.000013832993,0.000010527615,0.00007480758,6.0175125e-7,0.000005990843,0.0003196352],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9996202,0.0000030367505,0.00016613085,0.0000525219,0.000054641132,0.000103469014],"domain_scores_gemma":[0.99982786,0.000010913259,0.0000081845365,0.00009526807,0.000033117496,0.000024675386],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000520554,0.000049292903,0.00007533529,0.000014835656,0.000009128253,0.000006860103,0.00005411298,0.000022454442,0.00019534418],"category_scores_gemma":[0.000017601142,0.000038480215,0.000014427582,0.0000443609,0.0000074144596,0.000052538246,0.000011242137,0.00002197995,0.0002466477],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000066182433,0.00027526944,0.018860891,0.003282417,0.00035249713,0.000005162714,0.0068574524,0.0038019451,0.70474696,0.013813071,0.08193331,0.16606443],"study_design_scores_gemma":[0.00067467155,0.00004661824,0.072831795,0.00027268007,0.000014861352,0.000011184905,0.0004522246,0.05613891,0.6627118,0.00045651261,0.2055537,0.0008350751],"about_ca_topic_score_codex":0.000005123031,"about_ca_topic_score_gemma":0.000006855389,"teacher_disagreement_score":0.16522935,"about_ca_system_score_codex":0.000013958236,"about_ca_system_score_gemma":0.00001717222,"threshold_uncertainty_score":0.31702393},"labels":[],"label_agreement":null},{"id":"W2050403393","doi":"10.1109/pcicon.2007.4365768","title":"An Update on the Spreadsheet Electrical Reliability Model","year":2007,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Reliability (semiconductor); Computer science; Reliability engineering; Software engineering; Engineering","score_opus":0.008118063546765579,"score_gpt":0.221364799623591,"score_spread":0.21324673607682543,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2050403393","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45431826,0.000035321504,0.44423804,0.00059422664,0.0002997556,0.00031235238,0.000005983249,0.00075240096,0.099443674],"genre_scores_gemma":[0.9980984,0.000010346626,0.001056029,0.0005199432,0.00004724215,0.000009607506,0.0000019316124,0.000016555638,0.00023996014],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990474,0.000027488955,0.00021799441,0.00019471876,0.0001606802,0.00035170946],"domain_scores_gemma":[0.9990784,0.00013104395,0.000011691208,0.00064243557,0.00003481298,0.000101641686],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010832521,0.00012365782,0.00012033581,0.000029248578,0.000051911422,0.00002225133,0.00025708953,0.00008241709,0.000059640734],"category_scores_gemma":[0.000078278,0.00007534754,0.00005281662,0.00015128605,0.000035803703,0.00009808261,0.000012641778,0.0002171109,0.00015198493],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015567511,0.00038835424,0.0009782073,0.000081193524,0.000041463805,0.00001295033,0.00051718164,0.55191004,0.007853188,0.36705446,0.061907295,0.009099965],"study_design_scores_gemma":[0.000103869315,0.000065063636,0.0011547823,0.00000891618,0.0000045331717,0.0000033198714,0.000022129556,0.9725864,0.009596982,0.0057241437,0.010551178,0.00017871003],"about_ca_topic_score_codex":0.000016553933,"about_ca_topic_score_gemma":0.000034545476,"teacher_disagreement_score":0.54378015,"about_ca_system_score_codex":0.00009615469,"about_ca_system_score_gemma":0.000012124839,"threshold_uncertainty_score":0.30725837},"labels":[],"label_agreement":null},{"id":"W2050836254","doi":"10.1002/etep.313","title":"A novel hybrid active filter compensator for stabilization of wind‐utility grid interface scheme","year":2008,"lang":"en","type":"article","venue":"European Transactions on Electrical Power","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Control theory (sociology); AC power; Compensation (psychology); Active filter; Controller (irrigation); Harmonic; Wind power; Voltage; Computer science; Filter (signal processing); Grid; Active power filter; Electronic engineering; Engineering; Electrical engineering; Control (management); Physics; Mathematics; Acoustics","score_opus":0.017847370299465534,"score_gpt":0.2147676832838959,"score_spread":0.19692031298443036,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2050836254","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09502042,0.00006450246,0.8992598,0.000044323315,0.00048562564,0.00047954102,0.00026517847,0.00022347974,0.004157104],"genre_scores_gemma":[0.99834675,0.000021087004,0.0012807308,0.000046344114,0.000031631364,0.000013235279,0.0000107927945,0.00005224329,0.00019721345],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99873453,0.00007700148,0.0004099846,0.00029286012,0.00017507108,0.0003105528],"domain_scores_gemma":[0.99920595,0.0001625744,0.000056702404,0.00032978345,0.00014379314,0.00010117878],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019659221,0.00020252125,0.00028449105,0.0001049791,0.000101576596,0.0000086866585,0.00018203446,0.000044673197,0.000117805095],"category_scores_gemma":[0.000061586106,0.00019568582,0.00018283019,0.00026826846,0.00009012896,0.00014251897,0.0000032220564,0.00028483756,0.000046477737],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.006543896,0.011208504,0.0005081722,0.0017157992,0.0020947407,0.000073958494,0.009426161,0.2017417,0.6911858,0.0017141864,0.04251543,0.0312717],"study_design_scores_gemma":[0.0064033368,0.0026103442,0.018096259,0.0003416089,0.00014044932,0.00022884016,0.00016415222,0.18834692,0.6248689,0.000091184374,0.15687816,0.0018298336],"about_ca_topic_score_codex":0.0000051802244,"about_ca_topic_score_gemma":0.0000025993838,"teacher_disagreement_score":0.90332633,"about_ca_system_score_codex":0.00012073706,"about_ca_system_score_gemma":0.000029336608,"threshold_uncertainty_score":0.7979836},"labels":[],"label_agreement":null},{"id":"W2051847040","doi":"10.1016/j.epsr.2010.06.002","title":"Review of reduction techniques in the determination of composite system adequacy equivalents","year":2010,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Electric power system; Reduction (mathematics); Computer science; Composite number; Power (physics); Engineering; Mathematics; Algorithm; Physics","score_opus":0.02438967923008481,"score_gpt":0.32432015697429817,"score_spread":0.29993047774421333,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2051847040","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.57390594,0.26001188,0.034967963,0.0005510533,0.007438254,0.018277537,0.000071507944,0.0010479846,0.1037279],"genre_scores_gemma":[0.9974846,0.002064374,0.000086436885,0.0000032451123,0.00004459282,0.00024296506,0.0000031440538,0.000019042867,0.000051590792],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9972096,0.0006497934,0.00078177074,0.00019976261,0.00076096656,0.00039809223],"domain_scores_gemma":[0.9984598,0.0002453795,0.00013129035,0.00063797366,0.00048256037,0.000042994117],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006928228,0.00012861782,0.00039419415,0.00046908192,0.000046604677,0.000022113429,0.0005797696,0.00013673343,0.000004116954],"category_scores_gemma":[0.00027367263,0.00009637463,0.00007732972,0.0015081828,0.00006911367,0.00014498891,0.00003578626,0.0006681335,0.000009567935],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005068562,0.0002499683,0.00036789288,0.10868024,0.000049023914,0.000018498564,0.0014811389,0.000023729508,0.86191124,0.0061659236,0.009391169,0.0116105145],"study_design_scores_gemma":[0.0016787411,0.0019212236,0.0040395255,0.15272215,0.00010334793,0.0020905552,0.0028195335,0.042803213,0.67114776,0.00033439862,0.11881955,0.0015199798],"about_ca_topic_score_codex":0.00026527353,"about_ca_topic_score_gemma":0.000008730019,"teacher_disagreement_score":0.42357868,"about_ca_system_score_codex":0.00018578692,"about_ca_system_score_gemma":0.000065621614,"threshold_uncertainty_score":0.39300433},"labels":[],"label_agreement":null},{"id":"W2052424019","doi":"10.1109/upec.2006.367726","title":"Reliability Evaluation of a Wind Power Delivery System Using an Approximate Wind Model","year":2006,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind speed; Wind power; Reliability (semiconductor); Turbine; Wind profile power law; Power optimizer; Marine engineering; Power (physics); Computer science; Meteorology; Environmental science; Engineering; Maximum power point tracking; Electrical engineering; Aerospace engineering; Voltage","score_opus":0.02347375388394627,"score_gpt":0.23535976725324756,"score_spread":0.2118860133693013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2052424019","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8993194,0.00014131334,0.083542146,0.0000028797149,0.00024747738,0.00049782475,0.000020063639,0.00025662384,0.015972236],"genre_scores_gemma":[0.9959213,0.0000010075328,0.003960951,0.000004152674,0.00002880335,0.0000067177866,0.000007397363,0.000026706846,0.000042969306],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99834675,0.00010690404,0.00052483653,0.0002789784,0.00047332753,0.0002692204],"domain_scores_gemma":[0.99887246,0.00002467075,0.00007235111,0.0005748693,0.00039657374,0.000059066],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017177807,0.00017672766,0.00028710056,0.00007250731,0.00004458177,0.000022048544,0.00014599477,0.00012958168,0.000021034217],"category_scores_gemma":[0.00002984014,0.00016084175,0.000082171675,0.00015730773,0.000047986836,0.00039598913,0.000025765421,0.000089519424,0.0000062027448],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009189045,0.00006233767,0.00019065515,0.00034099186,0.000010697811,4.576671e-7,0.00014515125,0.9837483,0.014213706,0.0011429628,0.000059505972,0.00007601977],"study_design_scores_gemma":[0.00034464704,0.00001985505,0.0010674692,0.00011112753,0.00005256526,0.0000074500317,0.00023109365,0.9936932,0.0036846807,0.000586811,0.000022097904,0.00017903063],"about_ca_topic_score_codex":0.00035904397,"about_ca_topic_score_gemma":0.00003449361,"teacher_disagreement_score":0.09660185,"about_ca_system_score_codex":0.00042669944,"about_ca_system_score_gemma":0.000077268545,"threshold_uncertainty_score":0.6558936},"labels":[],"label_agreement":null},{"id":"W2053598626","doi":"10.1109/tpwrd.2011.2171060","title":"Optimized Sectionalizing Switch Placement Strategy in Distribution Systems","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":187,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Automation; Reliability (semiconductor); Integer programming; Linear programming; Reliability engineering; Process automation system; Engineering; Computer science; Process (computing); Mathematical optimization; Power (physics)","score_opus":0.02011447678765636,"score_gpt":0.20223235140593349,"score_spread":0.18211787461827714,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2053598626","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.113917686,0.00024112508,0.8770252,0.000006818665,0.0025631648,0.0004038372,0.00012177425,0.00033017492,0.0053902436],"genre_scores_gemma":[0.9993104,0.00012127788,0.00011417833,0.000013554883,0.00001445215,0.0001410654,0.00000889222,0.000025733594,0.00025045424],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987697,0.000057414687,0.00040270554,0.00025183673,0.00019290642,0.00032545035],"domain_scores_gemma":[0.99951327,0.00004732591,0.000034381213,0.00025719454,0.00006180597,0.000086013715],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024388496,0.00020478592,0.00023029259,0.00012892454,0.000075795586,0.00002996066,0.00011966566,0.00013763578,0.00018308779],"category_scores_gemma":[0.0000020120724,0.00021217542,0.00010106393,0.00024563767,0.00002956563,0.00024695156,8.646358e-7,0.00028739267,0.00010277405],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016072411,0.00019971318,0.000019855213,0.000095434196,0.00007974389,0.000019390869,0.00048001006,0.9971846,0.0007518131,0.00017340975,0.0005770891,0.00025822385],"study_design_scores_gemma":[0.0115749175,0.0015378059,0.005378585,0.0023435703,0.0002801814,0.00035234113,0.008120369,0.8782645,0.075291425,0.0003065629,0.012691308,0.003858446],"about_ca_topic_score_codex":0.00032428675,"about_ca_topic_score_gemma":0.00005962968,"teacher_disagreement_score":0.8853927,"about_ca_system_score_codex":0.00041275186,"about_ca_system_score_gemma":0.00003279537,"threshold_uncertainty_score":0.86522627},"labels":[],"label_agreement":null},{"id":"W2054027023","doi":"10.1080/15325008.2013.846439","title":"Evaluation of the Generating Capacity Adequacy of the Saudi Arabian Central Operating Area","year":2013,"lang":"en","type":"article","venue":"Electric Power Components and Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Probabilistic logic; Monte Carlo method; Variety (cybernetics); Computer science; Capacity planning; Engineering; Statistics; Mathematics; Power (physics)","score_opus":0.027080342892774844,"score_gpt":0.20295954642752326,"score_spread":0.17587920353474842,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2054027023","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9938901,0.0017268928,0.0010200462,0.000040604107,0.0012577296,0.0009079671,0.000005859402,0.000023803825,0.0011270003],"genre_scores_gemma":[0.999823,0.000011297363,0.000022091068,0.000011605924,0.000039416558,0.000044880897,7.8253197e-7,0.000012025126,0.000034926547],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998141,0.00036476535,0.0004991272,0.000150502,0.00056443055,0.00028019078],"domain_scores_gemma":[0.9991197,0.00005782818,0.00016680406,0.0003559904,0.00025229485,0.000047359226],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010287439,0.0001408735,0.00026161328,0.00003260965,0.00012915887,0.000044380555,0.00023927604,0.00006546544,0.0000112654],"category_scores_gemma":[0.00016855597,0.00008134675,0.00008053297,0.00023380601,0.00004102798,0.00011153294,0.000040738363,0.00015943004,0.0000014149256],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003052092,0.000066982546,0.023246504,0.0004021009,0.00019738362,1.781936e-7,0.002636854,0.080525234,0.88920224,0.0006604319,0.0010098576,0.0020491742],"study_design_scores_gemma":[0.00039537877,0.000023222787,0.09610101,0.0003483865,0.000043892825,0.000015345755,0.00012746044,0.8933133,0.009236231,0.000060662573,0.00019568953,0.00013942314],"about_ca_topic_score_codex":0.00073360873,"about_ca_topic_score_gemma":0.000020161015,"teacher_disagreement_score":0.879966,"about_ca_system_score_codex":0.0001227649,"about_ca_system_score_gemma":0.000042592037,"threshold_uncertainty_score":0.33172244},"labels":[],"label_agreement":null},{"id":"W2058880062","doi":"10.1080/15325000701735421","title":"Identification of Major Outage Years in Utility Reliability Performance","year":2008,"lang":"en","type":"article","venue":"Electric Power Components and Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Identification (biology); Incentive; Reliability engineering; Task (project management); Computer science; Operations research; Risk analysis (engineering); Engineering; Power (physics); Business; Economics; Systems engineering; Microeconomics","score_opus":0.01091315317676308,"score_gpt":0.19259391573621654,"score_spread":0.18168076255945345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2058880062","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9956364,0.0014972248,0.0011511461,0.0000069073894,0.0006406311,0.0003771041,0.000010249818,0.00007741804,0.0006029403],"genre_scores_gemma":[0.99959064,0.00022260044,0.000009090694,0.0000028981628,0.000013523252,0.000025566957,0.000003094904,0.000012603207,0.00011997503],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9985512,0.00007804974,0.00065705413,0.00023484808,0.0002160933,0.00026279408],"domain_scores_gemma":[0.9993976,0.00004828709,0.0000890949,0.0003542476,0.000050743332,0.00006004282],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00069315976,0.00013185803,0.00033311362,0.0001319188,0.00004053163,0.000012658303,0.0001496196,0.000086191605,0.000004223545],"category_scores_gemma":[0.00004074669,0.00012883375,0.00004234978,0.0003067371,0.0000513603,0.00015240014,0.000021118476,0.00015212456,0.000011961703],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028783886,0.0006737171,0.7052876,0.0040088813,0.00015798605,0.00006800634,0.0063075954,0.007534948,0.27012902,0.0006382576,0.0017621011,0.003144054],"study_design_scores_gemma":[0.00049485295,0.000046242043,0.8740888,0.000090357076,0.0000051450556,0.00004276019,0.00003421713,0.12163289,0.0016550962,0.000022856697,0.0016987739,0.00018797361],"about_ca_topic_score_codex":0.00015226271,"about_ca_topic_score_gemma":0.0000029171279,"teacher_disagreement_score":0.26847392,"about_ca_system_score_codex":0.00008412485,"about_ca_system_score_gemma":0.000017030769,"threshold_uncertainty_score":0.5253688},"labels":[],"label_agreement":null},{"id":"W2059411722","doi":"10.1049/iet-rpg.2009.0070","title":"Reliability assessment of a wind-power system with integrated energy storage","year":2010,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":85,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Wind power; Electric power system; MATLAB; Computer science; Battery (electricity); Energy storage; Power (physics); Automotive engineering; Engineering; Electrical engineering","score_opus":0.0051437265944635985,"score_gpt":0.20045608944487106,"score_spread":0.19531236285040746,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2059411722","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6324372,0.00009704755,0.3458713,0.000033444787,0.0026541497,0.00032471202,0.000047707854,0.00040563158,0.018128747],"genre_scores_gemma":[0.99462456,0.000008863351,0.004615403,0.000020406924,0.00009056819,0.000060079674,0.000057474525,0.00004642336,0.00047619976],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99830145,0.00008974701,0.0005377503,0.00038758028,0.00035701634,0.00032646483],"domain_scores_gemma":[0.99853027,0.000038671402,0.00012794649,0.00081953657,0.00036062833,0.0001229232],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00060956157,0.0002813109,0.00039551043,0.000108095475,0.00007780642,0.0000610691,0.00021095882,0.00022281878,0.000096790835],"category_scores_gemma":[0.000038225884,0.00022526033,0.00008324407,0.00033806887,0.00008340429,0.00028828546,0.000027081538,0.00024404054,0.0000047520407],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000308746,0.00012547623,0.0010025962,0.00021552469,0.00008485697,0.0000094991165,0.0003043828,0.40263233,0.5826803,0.007841069,0.0049478905,0.00012523026],"study_design_scores_gemma":[0.0016625805,0.00067857804,0.0047139768,0.00036993728,0.000079632846,0.000082829545,0.00064124854,0.67900395,0.1969361,0.00007462985,0.11461487,0.0011416803],"about_ca_topic_score_codex":0.0009250983,"about_ca_topic_score_gemma":0.0019803122,"teacher_disagreement_score":0.38574418,"about_ca_system_score_codex":0.0001949257,"about_ca_system_score_gemma":0.0001776841,"threshold_uncertainty_score":0.91858494},"labels":[],"label_agreement":null},{"id":"W2059497226","doi":"10.1049/ip-gtd:20045098","title":"Impact of utilising sequential and nonsequential simulation techniques in bulk-electric-system reliability assessment","year":2005,"lang":"en","type":"article","venue":"IEE Proceedings - Generation Transmission and Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Monte Carlo method; Reliability engineering; Electric power system; Computer science; Sampling (signal processing); State (computer science); Power (physics); Index (typography); Statistics; Mathematics; Algorithm; Engineering; Physics; Telecommunications; Thermodynamics","score_opus":0.012524700307054212,"score_gpt":0.2781744752300711,"score_spread":0.2656497749230169,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2059497226","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7448636,0.00018610913,0.2541586,0.000056662375,0.000052323627,0.00033899522,0.000027490794,0.00014007825,0.00017612838],"genre_scores_gemma":[0.9983238,0.00011945798,0.0013469233,0.0000032380267,0.00009152303,0.000026699097,0.000072739,0.000011299734,0.0000042990982],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99884045,0.000025312656,0.00049548683,0.00026247159,0.00018010495,0.0001961583],"domain_scores_gemma":[0.999574,0.000018786557,0.00008028791,0.00006681224,0.00016675662,0.00009337819],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005377699,0.0001708357,0.00022607554,0.000094451854,0.000088639674,0.000067114786,0.000043375185,0.00016370228,0.0000074582176],"category_scores_gemma":[0.00002643013,0.00015426053,0.00006123402,0.00021885427,0.000035066067,0.0004430062,0.000008602537,0.00013912158,3.2258887e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001102044,0.00011995013,0.00501658,0.00073590124,0.000021137668,7.462324e-7,0.00049387064,0.038633883,0.8973073,0.0012880587,0.00019954609,0.056072842],"study_design_scores_gemma":[0.00046066396,0.00010411743,0.010051403,0.00014593954,0.000018820238,0.000011275258,0.000030621904,0.867464,0.12077387,0.000045744884,0.00072854967,0.00016499044],"about_ca_topic_score_codex":0.000053453095,"about_ca_topic_score_gemma":0.0000045603856,"teacher_disagreement_score":0.8288301,"about_ca_system_score_codex":0.0005159407,"about_ca_system_score_gemma":0.00005114052,"threshold_uncertainty_score":0.6290562},"labels":[],"label_agreement":null},{"id":"W2060698547","doi":"10.1080/15325000601139682","title":"Distribution System Reliability Risk Assessment Using Historical Utility Data","year":2007,"lang":"en","type":"article","venue":"Electric Power Components and Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Engineering; Reliability engineering; Risk analysis (engineering); Operations research; Computer science; Actuarial science; Power (physics); Economics; Business","score_opus":0.027824481128745443,"score_gpt":0.25126246514391287,"score_spread":0.22343798401516743,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2060698547","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.59306884,0.0031058476,0.39812842,0.000012191014,0.0034099722,0.00057193707,0.00019209302,0.0004128644,0.0010978407],"genre_scores_gemma":[0.9994034,0.000065189684,0.00022171163,0.0000035017822,0.00013311642,0.000009677649,0.00009998522,0.000028114991,0.000035289842],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9969442,0.00025753566,0.00093348103,0.00064741937,0.00053549634,0.0006818506],"domain_scores_gemma":[0.9979415,0.00021287562,0.0001874503,0.0012568171,0.00013412951,0.00026726304],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.004474719,0.00031136116,0.0005832476,0.00009043873,0.00025735097,0.00011162356,0.00048134255,0.00019963969,0.000003056675],"category_scores_gemma":[0.00012269343,0.0002791314,0.000072585324,0.0003903601,0.00003515789,0.0003105818,0.00015525207,0.00043460954,0.0000073553992],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015414441,0.0032570579,0.7132614,0.02018276,0.0028321433,0.00077340484,0.0019810204,0.016958032,0.099460796,0.01815883,0.0933884,0.028204696],"study_design_scores_gemma":[0.00061721477,0.00007185695,0.11350372,0.00019668005,0.00007858962,0.00014521934,0.000104265135,0.80840516,0.0000549267,0.000027795179,0.07630683,0.0004877524],"about_ca_topic_score_codex":0.0015812811,"about_ca_topic_score_gemma":0.000010843113,"teacher_disagreement_score":0.7914471,"about_ca_system_score_codex":0.0025190446,"about_ca_system_score_gemma":0.00004705076,"threshold_uncertainty_score":0.9999661},"labels":[],"label_agreement":null},{"id":"W2061448762","doi":"10.1109/pedg.2014.6878664","title":"Energy cost estimation of small wind power systems - An integrated approach","year":2014,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Wind power; Electric power system; Reliability engineering; Reliability (semiconductor); Monte Carlo method; Turbine; Benchmark (surveying); Computer science; Wind speed; Power (physics); Grid; Automotive engineering; Engineering; Electrical engineering; Meteorology; Aerospace engineering","score_opus":0.009465872889102112,"score_gpt":0.18704429119002286,"score_spread":0.17757841830092075,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2061448762","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022336511,0.000059799568,0.9296618,0.0000042199017,0.0004090912,0.0001367823,0.0000057349785,0.00022813401,0.04715789],"genre_scores_gemma":[0.99598575,0.0000026275027,0.003509645,0.000011915939,0.000013090399,0.000016127316,0.000030207662,0.000017762928,0.00041289],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99929273,0.000055772773,0.0002678221,0.00013762206,0.000089143614,0.00015692659],"domain_scores_gemma":[0.9994938,0.000031921336,0.000035463087,0.00030461466,0.00006646719,0.0000677338],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029273223,0.00011496639,0.00020800889,0.00005419621,0.000015412492,0.000023643108,0.00013248586,0.00009162032,0.000013498064],"category_scores_gemma":[0.000030863168,0.000092413924,0.000031288117,0.00011975822,0.00002644006,0.00011474913,0.000010247903,0.000059591217,0.000008660225],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009320125,0.00006959767,0.0000700639,0.0003159765,0.000031511336,3.2913454e-7,0.00026463758,0.9474589,0.0010130188,0.044916566,0.00087486015,0.0049751992],"study_design_scores_gemma":[0.00015232735,0.00004627768,0.000130814,0.000051829473,0.0000054277125,0.0000061399264,0.00015836394,0.98461,0.0009840183,0.00004831281,0.013689388,0.00011709609],"about_ca_topic_score_codex":0.00041131917,"about_ca_topic_score_gemma":0.00003071422,"teacher_disagreement_score":0.9736492,"about_ca_system_score_codex":0.000043724012,"about_ca_system_score_gemma":0.000009927568,"threshold_uncertainty_score":0.37685305},"labels":[],"label_agreement":null},{"id":"W2061859107","doi":"10.1007/s11071-005-6761-5","title":"Optimal Design and Reliability Evaluation of Multi-State Series-Parallel Power Systems","year":2005,"lang":"en","type":"article","venue":"Nonlinear Dynamics","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Series (stratigraphy); Electric power system; State (computer science); Ranging; Computer science; Selection (genetic algorithm); Power (physics); Mean time between failures; Mathematical optimization; Engineering; Failure rate; Algorithm; Mathematics","score_opus":0.017684371302469398,"score_gpt":0.25044820957588243,"score_spread":0.23276383827341304,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2061859107","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.450096,0.0006325265,0.5475596,0.00005387293,0.00039515537,0.0007197853,0.00006506367,0.00014427051,0.00033366965],"genre_scores_gemma":[0.86546916,0.00009924743,0.13415293,0.0000053804,0.000022996119,0.000035137706,0.000017663728,0.000029838167,0.0001676627],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986815,0.00013491836,0.0004316608,0.00022350806,0.00029680293,0.00023165357],"domain_scores_gemma":[0.9991366,0.0000639328,0.000069923706,0.0003587709,0.00029564823,0.00007509503],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016314863,0.0001698687,0.00026922813,0.000049659648,0.00003295859,0.000023841278,0.000118462376,0.000111864254,0.000008238049],"category_scores_gemma":[0.0001382158,0.00016342736,0.000047631696,0.00010859468,0.0000784904,0.00023071603,0.0000307838,0.00014442646,0.000012484115],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029287348,0.00004717284,0.00020160103,0.0001395042,0.000019407078,5.819511e-7,0.00027451833,0.9979857,0.00015322558,0.00006739543,0.000039282593,0.00104228],"study_design_scores_gemma":[0.00057236874,0.00005488153,0.00079723744,0.000053054173,0.000027465496,0.000014714536,0.00009857268,0.9970315,0.00011489801,0.000019943303,0.0010522793,0.00016306594],"about_ca_topic_score_codex":0.000025482863,"about_ca_topic_score_gemma":0.000048330203,"teacher_disagreement_score":0.41537312,"about_ca_system_score_codex":0.0002767606,"about_ca_system_score_gemma":0.00005817915,"threshold_uncertainty_score":0.66643745},"labels":[],"label_agreement":null},{"id":"W2061948033","doi":"10.1109/tpwrs.2012.2214447","title":"Probabilistic Power Flow by Monte Carlo Simulation With Latin Supercube Sampling","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":205,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Latin hypercube sampling; Monte Carlo method; Slice sampling; Bin; Sampling (signal processing); Probabilistic logic; Computer science; Histogram; Rejection sampling; Simple random sample; Monte Carlo integration; Importance sampling; Random variable; Algorithm; Mathematical optimization; Mathematics; Hybrid Monte Carlo; Statistics; Markov chain Monte Carlo; Artificial intelligence; Detector","score_opus":0.010757602155902733,"score_gpt":0.1990213242482729,"score_spread":0.18826372209237016,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2061948033","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16864547,0.00023571817,0.8251684,0.00004048373,0.0023880394,0.0013908851,0.00012709813,0.0006728775,0.0013310349],"genre_scores_gemma":[0.9982679,0.0000072861844,0.0002479136,0.000029268795,0.0000149113785,0.0004377665,0.0000034209913,0.00009095048,0.00090060144],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980987,0.00007666525,0.00054057344,0.0004174426,0.00037066857,0.00049595116],"domain_scores_gemma":[0.99876493,0.00020343022,0.00005218235,0.0005958945,0.00019568331,0.00018786565],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019792013,0.00037418102,0.0004109881,0.0001226085,0.00015264002,0.0001639036,0.00018827584,0.00019895808,0.00015124562],"category_scores_gemma":[0.0000100598245,0.00031637514,0.000113352595,0.0002859828,0.000058713686,0.00044545872,9.941808e-7,0.00033923646,0.0003028498],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018382278,0.000069202324,0.000024564197,0.00017858569,0.000080750186,0.0000019061724,0.0007644628,0.9970159,0.0007569756,0.000015095656,0.00096886995,0.00010531382],"study_design_scores_gemma":[0.00065420294,0.00026346176,0.00019135588,0.00047182324,0.000045258508,0.000024516024,0.0005520788,0.987504,0.0004985889,0.000009597872,0.009150083,0.00063502917],"about_ca_topic_score_codex":0.0003760878,"about_ca_topic_score_gemma":0.00007194793,"teacher_disagreement_score":0.8296224,"about_ca_system_score_codex":0.00027636462,"about_ca_system_score_gemma":0.000028569686,"threshold_uncertainty_score":0.99992883},"labels":[],"label_agreement":null},{"id":"W2062341738","doi":"10.1049/ip-gtd:20010406","title":"Time-sequential simulation technique for rural distribution system reliability cost/worth evaluation including wind generation as alternative supply","year":2001,"lang":"en","type":"article","venue":"IEE Proceedings - Generation Transmission and Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":82,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Turbine; Computer science; Wind speed; Engineering; Power (physics); Meteorology; Mechanical engineering","score_opus":0.029551510574752752,"score_gpt":0.28420246925243103,"score_spread":0.2546509586776783,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2062341738","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36825737,0.00016421154,0.6276455,0.00016867512,0.0004052547,0.0026484537,0.00028120275,0.00028445027,0.00014488144],"genre_scores_gemma":[0.99107903,0.00013042238,0.0004690391,0.000019302868,0.000529666,0.00073631475,0.00694707,0.000033874458,0.000055299144],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99766695,0.00007963577,0.0007548773,0.00053165597,0.0005745867,0.0003922728],"domain_scores_gemma":[0.99840146,0.000048518283,0.00019394356,0.00014670056,0.0010092513,0.00020011734],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0017494633,0.0003558511,0.0003222394,0.00008520098,0.0005796642,0.00024060167,0.000119831246,0.00033116672,0.00003981427],"category_scores_gemma":[0.00020894143,0.00035174706,0.00012418415,0.0003294781,0.00007306483,0.0009628211,0.000018938585,0.00018611523,0.000011212758],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003481748,0.00013171727,0.00037419389,0.0006452245,0.000056756806,0.00000128925,0.00065503904,0.2946909,0.67223465,0.00337017,0.003640946,0.023850935],"study_design_scores_gemma":[0.0011083672,0.00012763214,0.00030747458,0.00019445417,0.00009834589,0.000029842291,0.00012785013,0.87254864,0.115859225,0.00028524478,0.008961933,0.00035097965],"about_ca_topic_score_codex":0.00002891913,"about_ca_topic_score_gemma":0.0000037894845,"teacher_disagreement_score":0.62717646,"about_ca_system_score_codex":0.0011133811,"about_ca_system_score_gemma":0.00007831905,"threshold_uncertainty_score":0.9998934},"labels":[],"label_agreement":null},{"id":"W2063624295","doi":"10.1109/pmaps.2006.360220","title":"Utilizing Bulk Electric System Reliability Performance Index Probability Distributions in a Performance Based Regulation Framework","year":2006,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Monte Carlo method; Index (typography); Incentive; Probability distribution; Computer science; Electric power industry; Power (physics); Engineering; Statistics; Electricity; Mathematics; Electrical engineering; Economics","score_opus":0.006021948229836808,"score_gpt":0.18308528089261772,"score_spread":0.1770633326627809,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2063624295","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85477275,0.00009844093,0.13564846,0.00006096602,0.0003314936,0.00076089427,0.000011547178,0.0008605468,0.007454927],"genre_scores_gemma":[0.9974756,0.000008404101,0.0021109022,0.000008316708,0.00006926446,0.0002187199,0.0000284141,0.000026701684,0.000053649615],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976567,0.000089940884,0.00081650226,0.00047109625,0.00031700067,0.0006487602],"domain_scores_gemma":[0.99875027,0.00016793361,0.00008001495,0.0007771133,0.00014495826,0.00007971437],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010939587,0.00029400244,0.0003727023,0.00015800403,0.00015230276,0.000049016304,0.0002456692,0.0002844563,0.000028919614],"category_scores_gemma":[0.00013741975,0.00027949482,0.00009655106,0.0012346831,0.00006755683,0.0004063823,0.000030157997,0.00047778984,0.000037868263],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007867544,0.00020328932,0.38686126,0.0036133982,0.000008585069,0.0000019086915,0.000062711006,0.595927,0.0007087116,0.010811024,0.00023958072,0.001483825],"study_design_scores_gemma":[0.0002267724,0.000030431951,0.35499048,0.00034852847,0.000005552497,0.0000044143917,0.000014394047,0.64036304,0.0028114256,0.00047385495,0.0004985378,0.00023257107],"about_ca_topic_score_codex":0.0002242453,"about_ca_topic_score_gemma":0.00009533994,"teacher_disagreement_score":0.14270289,"about_ca_system_score_codex":0.0016124595,"about_ca_system_score_gemma":0.00009959897,"threshold_uncertainty_score":0.9999657},"labels":[],"label_agreement":null},{"id":"W2064323657","doi":"10.1080/15325008.2011.639129","title":"Operating Risk Analysis of Wind-integrated Power Systems","year":2012,"lang":"en","type":"article","venue":"Electric Power Components and Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Electric power system; Reliability engineering; Renewable energy; Power optimizer; Wind power forecasting; Automotive engineering; Engineering; Power (physics); Computer science; Maximum power point tracking; Electrical engineering; Voltage","score_opus":0.009378938027429078,"score_gpt":0.2017980785994694,"score_spread":0.19241914057204032,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2064323657","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9576816,0.020255417,0.0153555935,0.0000037160603,0.002380258,0.00048209456,0.00007976316,0.00020428386,0.0035572667],"genre_scores_gemma":[0.9994827,0.0001636836,0.000026541677,0.000006096825,0.000042239757,0.000023986395,0.000020709871,0.000036012207,0.00019801545],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975708,0.00026705716,0.0008540275,0.0002777494,0.00036568855,0.00066464674],"domain_scores_gemma":[0.99880075,0.0001581766,0.00021363545,0.00045354333,0.00014097922,0.00023290163],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0011546889,0.00031859937,0.0009407632,0.00048733945,0.000115795316,0.000097477896,0.00021239476,0.00016679478,0.000018631687],"category_scores_gemma":[0.000072682735,0.00025829216,0.00017136165,0.0012962921,0.00003194465,0.00024808958,0.000033437915,0.00027344975,0.000017471335],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009394012,0.00073804666,0.56706226,0.0017418294,0.017622296,0.000029200664,0.009732483,0.21180545,0.17556864,0.008640475,0.0063989037,0.0005664961],"study_design_scores_gemma":[0.00094121444,0.00018592789,0.1457367,0.0003974686,0.0010494012,0.00007493193,0.001061415,0.8198565,0.0006328885,0.000004138244,0.029090783,0.00096858403],"about_ca_topic_score_codex":0.00096911745,"about_ca_topic_score_gemma":0.000003303061,"teacher_disagreement_score":0.6080511,"about_ca_system_score_codex":0.00013937894,"about_ca_system_score_gemma":0.000017441433,"threshold_uncertainty_score":0.99998695},"labels":[],"label_agreement":null},{"id":"W2064377997","doi":"10.1016/j.ijepes.2014.05.016","title":"End-of-life assessment of electric power equipment allowing for non-constant hazard rate – Application to circuit breakers","year":2014,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Circuit breaker; Electrical engineering; Constant (computer programming); Hazard; Power (physics); Engineering; Distribution board; Electric power system; Reliability engineering; Computer science; Physics","score_opus":0.007274758629366666,"score_gpt":0.24689512559006369,"score_spread":0.23962036696069702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2064377997","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04602506,0.00042829986,0.9467657,0.00019558684,0.002657174,0.00032241782,0.000017052354,0.000029267188,0.0035593943],"genre_scores_gemma":[0.9990006,0.000041558706,0.00047314054,0.00012122936,0.00021176318,0.000060665716,0.000005368788,0.000035957728,0.000049685375],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9969795,0.000109523884,0.0015270271,0.00022915931,0.0007877541,0.00036703257],"domain_scores_gemma":[0.99745923,0.00045726923,0.0006130761,0.0002426193,0.0009991382,0.00022865304],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001449482,0.00023075216,0.0006735821,0.00049261074,0.000027623792,0.00004530009,0.00063803256,0.00012321038,0.000009413767],"category_scores_gemma":[0.0002867912,0.00020740068,0.00031463677,0.00035065832,0.000026383788,0.00016663839,0.000033097695,0.00018300985,0.0000021715603],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005265213,0.00057804765,0.0016831394,0.00025439684,0.002415242,0.000017999746,0.00035666834,0.24061665,0.5538649,0.18409652,0.00653334,0.009056561],"study_design_scores_gemma":[0.0069504753,0.004215899,0.006618785,0.0018428366,0.00025300024,0.00036119565,0.00021010094,0.66187,0.069232084,0.0027082304,0.24416192,0.001575488],"about_ca_topic_score_codex":0.00006534406,"about_ca_topic_score_gemma":0.0000058992955,"teacher_disagreement_score":0.9529756,"about_ca_system_score_codex":0.00058339135,"about_ca_system_score_gemma":0.00024967984,"threshold_uncertainty_score":0.84575546},"labels":[],"label_agreement":null},{"id":"W2066787887","doi":"10.1049/ip-gtd:20030797","title":"Reliability evaluation algorithm for complex medium voltage electrical distribution networks based on the shortest path","year":2003,"lang":"en","type":"article","venue":"IEE Proceedings - Generation Transmission and Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":63,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"National Science Foundation","keywords":"Shortest path problem; Node (physics); Reliability (semiconductor); Algorithm; Computer science; Path (computing); Circuit breaker; Complex network; Topology (electrical circuits); Graph theory; Graph; Dijkstra's algorithm; Voltage; Mathematics; Theoretical computer science; Engineering; Power (physics); Computer network; Structural engineering","score_opus":0.02054915439409869,"score_gpt":0.23600567771396885,"score_spread":0.21545652331987017,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2066787887","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011006329,0.00020894849,0.98592675,0.00045792066,0.0003428522,0.0014333647,0.00023470832,0.00018800625,0.00020110753],"genre_scores_gemma":[0.99584574,0.00008035725,0.001068871,0.00011957481,0.00016814106,0.000455133,0.0022274314,0.00001994405,0.000014819656],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982746,0.00006777128,0.00045045308,0.00041915075,0.0004294252,0.00035856123],"domain_scores_gemma":[0.9989817,0.00012777725,0.00007740465,0.00014360678,0.00050588226,0.00016363153],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019718937,0.00026037556,0.0002182332,0.000029178713,0.00045538697,0.00013733497,0.00009464825,0.00022012193,0.00004333323],"category_scores_gemma":[0.0003897093,0.00019433134,0.000102999154,0.00031501474,0.00006589807,0.00018958512,0.0000039389206,0.00022089848,0.0000019781544],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042320648,0.0012991206,0.0011009435,0.0006576936,0.00011717674,0.0000018249724,0.00050440285,0.17969924,0.15182856,0.05938257,0.22720067,0.37778458],"study_design_scores_gemma":[0.0007334049,0.0001434816,0.0014579473,0.000045605473,0.00005333725,0.0000035805867,0.000026532542,0.94931513,0.010574159,0.0004904145,0.036929354,0.00022707912],"about_ca_topic_score_codex":0.0000032110117,"about_ca_topic_score_gemma":0.0000010413603,"teacher_disagreement_score":0.9848579,"about_ca_system_score_codex":0.0003213348,"about_ca_system_score_gemma":0.00006708129,"threshold_uncertainty_score":0.7924602},"labels":[],"label_agreement":null},{"id":"W2069197775","doi":"10.1016/j.renene.2010.12.011","title":"Energy and reliability benefits of wind energy conversion systems","year":2011,"lang":"en","type":"article","venue":"Renewable Energy","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Wind speed; Reliability (semiconductor); Turbine; Reliability engineering; Renewable energy; Electric potential energy; Engineering; Energy (signal processing); Power (physics); Environmental science; Meteorology; Statistics; Electrical engineering; Mathematics; Mechanical engineering; Physics","score_opus":0.00953827965995236,"score_gpt":0.16516805353783653,"score_spread":0.15562977387788418,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2069197775","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41487876,0.048242696,0.2550956,0.00005070013,0.008524442,0.00033053133,0.0001525956,0.0015132125,0.27121148],"genre_scores_gemma":[0.99540335,0.0020445932,0.00019504964,0.00002748191,0.00008259856,0.000018101393,0.000011642875,0.000041083003,0.0021760808],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984506,0.000079386875,0.0004936591,0.00036876707,0.00021517806,0.00039243457],"domain_scores_gemma":[0.99892616,0.00008019186,0.00010208839,0.00058777374,0.00012253493,0.00018125885],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00023924699,0.00026122024,0.0004680643,0.00011873695,0.00005548435,0.00001609054,0.00022673345,0.00023186915,0.000045171437],"category_scores_gemma":[0.000024979552,0.00024788262,0.000085758125,0.0002307682,0.00011112889,0.00019614794,0.000087777764,0.000048172195,0.0000014041459],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013660164,0.0002625832,0.0019310217,0.0012467977,0.00018506587,0.000016757458,0.0005324028,0.91654193,0.0075999754,0.05886951,0.008759446,0.0039179106],"study_design_scores_gemma":[0.0016062895,0.000541961,0.0013486752,0.00085632043,0.00011177176,0.00009475065,0.00040500233,0.16740009,0.35287958,0.003222388,0.47018644,0.0013467221],"about_ca_topic_score_codex":0.050021593,"about_ca_topic_score_gemma":0.00074145064,"teacher_disagreement_score":0.7491418,"about_ca_system_score_codex":0.000087618115,"about_ca_system_score_gemma":0.00003396788,"threshold_uncertainty_score":0.9999973},"labels":[],"label_agreement":null},{"id":"W2070925175","doi":"10.1109/tpwrs.2011.2166090","title":"Workforce Planning for Power Restoration: An Integrated Simulation-Optimization Approach","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Crew; Workforce; Duration (music); Electricity; Work (physics); Operations research; Electric power system; Operations management; Mains electricity; Workforce planning; Computer science; Power (physics); Reliability engineering; Engineering; Economics; Electrical engineering; Voltage; Aeronautics","score_opus":0.04503219538216347,"score_gpt":0.2498172247838406,"score_spread":0.20478502940167714,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2070925175","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014392547,0.00011364305,0.9852216,0.0000039990205,0.0037929064,0.001006455,0.00006740703,0.00074356893,0.007611118],"genre_scores_gemma":[0.9896601,0.000003809614,0.009265665,0.000020615109,0.000022134001,0.00036056363,0.000026990385,0.00007385406,0.00056629704],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985146,0.00008401175,0.0005206762,0.00035095497,0.00020337806,0.00032639125],"domain_scores_gemma":[0.99898946,0.00008986723,0.00008158073,0.00049343024,0.00020848885,0.00013715975],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00034111334,0.0002770972,0.00029327214,0.00019533694,0.00019106435,0.00008570487,0.00019327887,0.00023624531,0.0000472652],"category_scores_gemma":[0.000009827827,0.0002674587,0.00011022215,0.00033591694,0.000037411908,0.0005700004,5.358514e-7,0.00021363545,0.000016395195],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000091084854,0.00010508634,0.0000072625476,0.00008036144,0.000048455116,0.0000010962967,0.0030660953,0.99600154,0.000045696976,0.000202992,0.00026024878,0.00009006086],"study_design_scores_gemma":[0.00041975672,0.00021794582,0.000011673478,0.00015809314,0.00002643312,0.0000098256305,0.0012698979,0.99154806,0.0003243593,0.000007752401,0.0056807613,0.000325469],"about_ca_topic_score_codex":0.00003142809,"about_ca_topic_score_gemma":0.0000050958065,"teacher_disagreement_score":0.9882208,"about_ca_system_score_codex":0.00017699895,"about_ca_system_score_gemma":0.00003340506,"threshold_uncertainty_score":0.99997777},"labels":[],"label_agreement":null},{"id":"W2073632261","doi":"10.1016/j.apenergy.2012.02.076","title":"Forecasting the reliability of wind-energy systems: A new approach using the RL technique","year":2012,"lang":"en","type":"article","venue":"Applied Energy","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Wind power; Greenhouse gas; Renewable energy; Reliability (semiconductor); Environmental economics; Electricity; Energy security; Electricity generation; Reliability engineering; Environmental science; Computer science; Engineering; Economics; Power (physics); Electrical engineering","score_opus":0.023008359203970926,"score_gpt":0.20370900666779684,"score_spread":0.18070064746382591,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2073632261","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009261083,0.001404321,0.9386771,0.000030140127,0.0006263998,0.00038357178,0.00000539752,0.00023296589,0.049379025],"genre_scores_gemma":[0.99698365,0.000020634185,0.0021917138,0.000040994426,0.00036330722,0.00015395449,0.0000037348536,0.00004482344,0.00019719236],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99852216,0.00010054877,0.00045603653,0.00020889507,0.00022673498,0.00048562375],"domain_scores_gemma":[0.9986569,0.00023289063,0.00011808733,0.0008566225,0.000039820894,0.00009563939],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011610561,0.00022587422,0.0003111998,0.000040806317,0.00012321935,0.000026491422,0.00043978362,0.0001554246,0.0000055790024],"category_scores_gemma":[0.00004878635,0.00013398977,0.00009946937,0.000352643,0.000118740936,0.00010544788,0.000104182065,0.00017739367,0.0000014563427],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025286148,0.00009140179,0.00011237644,0.00047038385,0.00010305748,5.1353356e-7,0.0016008004,0.82404256,0.014649601,0.15147842,0.0032914458,0.0041341702],"study_design_scores_gemma":[0.00048341078,0.000028214756,0.00005759617,0.00023793982,0.00013539147,0.00015518247,0.0026071079,0.7433348,0.048664793,0.0026996047,0.20078419,0.00081181707],"about_ca_topic_score_codex":0.0018761044,"about_ca_topic_score_gemma":0.000017196588,"teacher_disagreement_score":0.9877226,"about_ca_system_score_codex":0.00012667484,"about_ca_system_score_gemma":0.00004286123,"threshold_uncertainty_score":0.5463944},"labels":[],"label_agreement":null},{"id":"W2073639793","doi":"10.1016/j.epsr.2006.11.010","title":"Reliability assessment of restructured power systems using reliability network equivalent and pseudo-sequential simulation techniques","year":2007,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":42,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Electric power system; Reliability engineering; Computer science; Monte Carlo method; Markov process; Markov chain; Power system simulation; Markov model; Transmission system; Power (physics); Transmission (telecommunications); Engineering; Mathematics","score_opus":0.03536785874771406,"score_gpt":0.36049681593517935,"score_spread":0.32512895718746526,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2073639793","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7156747,0.003986741,0.26921317,0.000016656119,0.0025541156,0.0033239485,0.000026150574,0.0004911525,0.004713392],"genre_scores_gemma":[0.9981358,0.00010665203,0.0012747113,0.0000037255822,0.00018252157,0.00008725139,0.000006857786,0.00008584741,0.00011661879],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9924398,0.0012432014,0.0018375148,0.0009182047,0.001846036,0.0017152238],"domain_scores_gemma":[0.99528366,0.0013055522,0.00028147138,0.0014383706,0.0013285879,0.00036232846],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.017878376,0.0004617036,0.0009665304,0.00059822574,0.00031618876,0.00018637322,0.00054473337,0.0005781616,0.000016244869],"category_scores_gemma":[0.0008320832,0.00042439872,0.00016644338,0.0018960878,0.0002818257,0.0003898418,0.00021882995,0.0011863592,0.0000039979946],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037465943,0.00031581157,0.020503726,0.005398866,0.0002999856,0.00007731448,0.0007937858,0.8443729,0.1181024,0.0067216703,0.0024770766,0.0005618014],"study_design_scores_gemma":[0.00087434496,0.00083391473,0.031317975,0.0013457689,0.000055822165,0.00013768196,0.00040133455,0.94591475,0.004622523,0.0007634789,0.01270416,0.0010282788],"about_ca_topic_score_codex":0.0009301113,"about_ca_topic_score_gemma":0.000013624589,"teacher_disagreement_score":0.28246114,"about_ca_system_score_codex":0.0018820363,"about_ca_system_score_gemma":0.00031671656,"threshold_uncertainty_score":0.99982077},"labels":[],"label_agreement":null},{"id":"W2075286451","doi":"10.1049/ip-gid:20030068","title":"Reliability evaluation of small stand-alone wind energy conversion systems using a time series simulation model","year":2003,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":85,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Reliability (semiconductor); Turbine; Reliability engineering; Wind speed; Battery (electricity); Series (stratigraphy); Small wind turbine; Margin (machine learning); Electric power system; Electricity; Automotive engineering; Engineering; Power (physics); Environmental science; Marine engineering; Computer science; Meteorology; Electrical engineering; Aerospace engineering","score_opus":0.028509200026225232,"score_gpt":0.23431240244716264,"score_spread":0.20580320242093741,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2075286451","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.52642065,0.00040154246,0.46737355,0.0000030714336,0.0003066115,0.0003224948,0.000011875938,0.00011970398,0.00504048],"genre_scores_gemma":[0.9977788,0.000011533188,0.0018058537,0.000003251336,0.000011771039,0.0000058231626,0.0000056130757,0.000017444507,0.00035991872],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99872345,0.00017395479,0.00040184622,0.00019117707,0.00033289022,0.00017671344],"domain_scores_gemma":[0.9990435,0.000067661305,0.000072271585,0.00032098425,0.00044435827,0.00005120559],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013762221,0.00013743504,0.00025650565,0.00005851034,0.000041010822,0.00001650171,0.000062591935,0.00011776595,0.00003950718],"category_scores_gemma":[0.00017437433,0.00012854805,0.000053942716,0.00014702459,0.000036925238,0.00027091877,0.000011749112,0.000050443592,0.000005238263],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016617172,0.000018917877,0.00005980001,0.00024126894,0.000014982586,1.423334e-7,0.00011534109,0.9911791,0.00742826,0.00085135887,0.000033868884,0.000040312545],"study_design_scores_gemma":[0.00041377105,0.000023966628,0.00003510811,0.000093997856,0.000045545836,0.0000025079016,0.00008284504,0.9915849,0.006646859,0.00047878778,0.00045338515,0.00013835034],"about_ca_topic_score_codex":0.00010718694,"about_ca_topic_score_gemma":0.0000073031692,"teacher_disagreement_score":0.47135812,"about_ca_system_score_codex":0.0003291683,"about_ca_system_score_gemma":0.00009958443,"threshold_uncertainty_score":0.5242037},"labels":[],"label_agreement":null},{"id":"W2076136622","doi":"10.1109/pes.2004.1373160","title":"Data management issues associated with the August 14, 2003 blackout investigation","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Pacific Northwest National Laboratory; Natural Environment Research Council","keywords":"Blackout; Electricity; Work (physics); Engineering; Interim; Task (project management); Scope (computer science); Task force; Aeronautics; Electric power industry; Electric power; Operations research; Operations management; Computer security; Computer science; Electric power system; Power (physics); Systems engineering; Political science; Electrical engineering; Public administration","score_opus":0.011615438946576644,"score_gpt":0.20838106419261895,"score_spread":0.1967656252460423,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2076136622","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.71439487,0.009779591,0.24682334,0.0030229143,0.008453778,0.0028077047,0.00043032478,0.0055844886,0.008703014],"genre_scores_gemma":[0.9714454,0.00035378084,0.022465467,0.0005981904,0.0004971018,0.00014130957,0.00019652407,0.00023375887,0.004068478],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99798936,0.00003668281,0.00036680588,0.00047872125,0.00045791978,0.00067049876],"domain_scores_gemma":[0.9986046,0.00003901283,0.00008650504,0.0009858693,0.00014218732,0.00014185769],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00091645477,0.00040883126,0.00030275367,0.00003950477,0.00014701541,0.000121882746,0.00075377105,0.00017801425,0.000014361246],"category_scores_gemma":[0.00009395517,0.00032355826,0.00009747955,0.000665481,0.00010299034,0.00030046795,0.0000939795,0.00039847012,0.000039286817],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000028020665,0.000025610296,0.00007740619,0.00014754084,0.0003811007,0.000009610664,0.0011090987,0.8112014,0.0023044914,0.00040322993,0.18429846,0.000039252805],"study_design_scores_gemma":[0.0052939286,0.00028549996,0.0050716125,0.0034512011,0.0005880514,0.00006163554,0.0014581158,0.42389625,0.026375601,0.00029649038,0.5290996,0.004122026],"about_ca_topic_score_codex":0.000071216775,"about_ca_topic_score_gemma":0.000054785884,"teacher_disagreement_score":0.38730514,"about_ca_system_score_codex":0.0003829827,"about_ca_system_score_gemma":0.00004499574,"threshold_uncertainty_score":0.9999216},"labels":[],"label_agreement":null},{"id":"W2078059550","doi":"10.1080/15325000902954029","title":"Utilization of Multi-state Generating Unit Models in Unit Commitment Risk Analysis of Wind-integrated Power Systems","year":2009,"lang":"en","type":"article","venue":"Electric Power Components and Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Power system simulation; Reliability engineering; Reliability (semiconductor); Unit (ring theory); Derating; Wind power; Electric power system; Engineering; Electricity; State (computer science); Power (physics); Computer science; Electrical engineering; Mathematics; Voltage","score_opus":0.036638353368773045,"score_gpt":0.24590571946610335,"score_spread":0.2092673660973303,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2078059550","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88836384,0.00683793,0.103215806,0.0000032993407,0.00036889326,0.00063776376,0.00009469391,0.00008042084,0.0003973524],"genre_scores_gemma":[0.99939317,0.00035934846,0.000072056006,0.0000052232485,0.000005277861,0.000012943747,0.00004580781,0.000021196944,0.000085003005],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974199,0.00035665024,0.0011915589,0.00030399518,0.0003372984,0.00039058705],"domain_scores_gemma":[0.99881583,0.000097183874,0.00035362618,0.00040483588,0.00022597722,0.00010255171],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008737984,0.00029245557,0.00097535085,0.0008090099,0.000058079804,0.00004801661,0.00020220617,0.00013228777,0.000003153145],"category_scores_gemma":[0.000034219447,0.00025697149,0.00011717561,0.0018301011,0.00002593686,0.00016601938,0.000018607932,0.00021882784,0.0000010869878],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000362131,0.00016803978,0.010055633,0.000158965,0.0005807339,0.0000058625265,0.0012984985,0.9727736,0.014055028,0.0005536926,0.000029132603,0.00028459815],"study_design_scores_gemma":[0.00073928473,0.00012640395,0.0211803,0.00026900962,0.00013514925,0.000004619197,0.0002784826,0.9763782,0.00039212022,0.000014528596,0.00025016116,0.00023172867],"about_ca_topic_score_codex":0.0019112489,"about_ca_topic_score_gemma":0.000068341775,"teacher_disagreement_score":0.111029305,"about_ca_system_score_codex":0.00011820063,"about_ca_system_score_gemma":0.000027998156,"threshold_uncertainty_score":0.99998826},"labels":[],"label_agreement":null},{"id":"W2078265696","doi":"10.1016/j.ijepes.2014.07.034","title":"Consequence-based framework for electric power providers using Bayesian belief network","year":2014,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Bayesian network; Performance indicator; Reliability (semiconductor); Electric power; Key (lock); Computer science; Reliability engineering; Sensitivity (control systems); Electric power system; Reputation; Risk analysis (engineering); Power (physics); Business; Engineering; Computer security; Machine learning","score_opus":0.008476577734217972,"score_gpt":0.2330948977470135,"score_spread":0.22461832001279552,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2078265696","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0053012096,0.0024880222,0.9836937,0.00032310828,0.0070163924,0.0002005154,0.0000066675084,0.00009399006,0.00087637594],"genre_scores_gemma":[0.99254525,0.000033503187,0.00566261,0.00044763784,0.0011727404,0.000024509829,0.000003241518,0.0000633141,0.000047184327],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99704957,0.00017881734,0.0011415516,0.00025823902,0.0007416215,0.0006301991],"domain_scores_gemma":[0.99724525,0.0009108568,0.00048742932,0.00024760712,0.00086824666,0.00024058274],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009379451,0.0003055874,0.0005780704,0.00035501315,0.00008066172,0.00018102382,0.0007184871,0.00027338485,0.000016919023],"category_scores_gemma":[0.000752625,0.00027132698,0.00035569526,0.00043113448,0.000050325194,0.00024792075,0.000018908499,0.00041187974,0.0000033942874],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044083688,0.0001695263,0.00036192063,0.000068653564,0.0007890557,0.00011196029,0.000075840275,0.8316247,0.0058383793,0.14797157,0.010547695,0.0019998932],"study_design_scores_gemma":[0.0014978646,0.0009404781,0.00006954861,0.0009560061,0.000078170604,0.00090499315,0.000024064531,0.8061493,0.0021136664,0.013624916,0.17298172,0.0006592839],"about_ca_topic_score_codex":0.00005797652,"about_ca_topic_score_gemma":0.0000042038087,"teacher_disagreement_score":0.98724407,"about_ca_system_score_codex":0.0006576219,"about_ca_system_score_gemma":0.0002514921,"threshold_uncertainty_score":0.9999739},"labels":[],"label_agreement":null},{"id":"W2078302367","doi":"10.2202/1553-779x.1504","title":"A Test on Probabilistic Reliability Evaluation of the Korea Power System","year":2007,"lang":"en","type":"article","venue":"International Journal of Emerging Electric Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Blackout; Reliability engineering; Reliability (semiconductor); Probabilistic logic; Electric power system; Transmission system; Electric power transmission; Computer science; Electricity; Transmission (telecommunications); Power transmission; Grid; Electricity market; Sensitivity (control systems); Engineering; Power (physics); Telecommunications; Electrical engineering; Electronic engineering","score_opus":0.010309612817407653,"score_gpt":0.2512283558482052,"score_spread":0.24091874303079752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2078302367","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93884146,0.0018324837,0.016365757,0.0002192817,0.021314533,0.0009444299,0.00002490069,0.000113100235,0.020344026],"genre_scores_gemma":[0.9996699,0.000010390511,0.000028832581,0.000016059523,0.00018043017,0.000011921107,7.8947056e-7,0.000028266399,0.000053425098],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99571633,0.00020169196,0.0014611952,0.00019386373,0.0021016186,0.00032527818],"domain_scores_gemma":[0.9957944,0.0005585229,0.0007265178,0.0004290878,0.0023963,0.00009514584],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006865777,0.00021887555,0.0003935985,0.00035671305,0.000050370763,0.000045520468,0.0008306073,0.00011797852,0.000013158808],"category_scores_gemma":[0.0021466494,0.00015238744,0.0002685211,0.0005006537,0.000045848086,0.00017846911,0.000035597168,0.0003853462,0.000009168935],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00094932615,0.0018177939,0.024974646,0.0018221617,0.0023934832,0.00017201462,0.0056712786,0.852865,0.055169746,0.027931634,0.020123338,0.006109574],"study_design_scores_gemma":[0.0127695715,0.0034782153,0.15730152,0.020025838,0.001266807,0.006121914,0.0054433695,0.67545784,0.046251945,0.0023804128,0.06654526,0.0029572917],"about_ca_topic_score_codex":0.000038647908,"about_ca_topic_score_gemma":0.000006708769,"teacher_disagreement_score":0.17740715,"about_ca_system_score_codex":0.0015774745,"about_ca_system_score_gemma":0.00020157357,"threshold_uncertainty_score":0.62141794},"labels":[],"label_agreement":null},{"id":"W2079996559","doi":"10.1049/iet-gtd.2010.0725","title":"Adequacy equivalent development of composite generation and transmission systems using network screening","year":2011,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Electric power system; Electric power transmission; Computer science; Transmission (telecommunications); Power network; Power (physics); Engineering; Telecommunications; Electrical engineering","score_opus":0.06878835774933588,"score_gpt":0.2374204542111022,"score_spread":0.1686320964617663,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2079996559","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2412083,0.0022218395,0.7556556,0.000012079124,0.0003754814,0.0003341236,0.000026867106,0.000107630185,0.000058091537],"genre_scores_gemma":[0.9666709,0.00020721441,0.03232265,0.000006430395,0.00017660382,0.0000270221,0.0005489878,0.000024529145,0.000015666277],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99821126,0.00011733494,0.0007829384,0.00029572364,0.0002899613,0.00030280126],"domain_scores_gemma":[0.99939007,0.000013693833,0.000117792784,0.00017485808,0.00013657467,0.00016703932],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005348548,0.00024067116,0.00029253244,0.000052103245,0.0002887898,0.00004382794,0.00009175284,0.0001793557,0.000027240936],"category_scores_gemma":[0.0000047765157,0.00022791063,0.00007015339,0.0001991037,0.00003814336,0.00028701342,0.000011600547,0.00012355746,0.0000018636202],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058937338,0.00007650122,0.00023747695,0.00050752785,0.0000645746,0.0000020860368,0.0017614652,0.20222549,0.73637694,0.0006376432,0.00061995105,0.05743139],"study_design_scores_gemma":[0.00045366294,0.00004146123,0.0009163265,0.00037334883,0.000046010467,0.00001244721,0.000047194328,0.7922294,0.197336,0.000016897031,0.008259287,0.00026793074],"about_ca_topic_score_codex":0.000029788918,"about_ca_topic_score_gemma":0.0000036878646,"teacher_disagreement_score":0.7254626,"about_ca_system_score_codex":0.00011660953,"about_ca_system_score_gemma":0.000050009006,"threshold_uncertainty_score":0.9293926},"labels":[],"label_agreement":null},{"id":"W2081098056","doi":"10.1109/tpwrs.2013.2244077","title":"2.5 Beta Methodology—Impact of “Zero SAIDI” Days","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Reliability (semiconductor); Zero (linguistics); Statistics; Reliability engineering; Mathematics; Event (particle physics); Econometrics; Computer science; Power (physics); Engineering","score_opus":0.028105860817638936,"score_gpt":0.2574582377716995,"score_spread":0.22935237695406058,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2081098056","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.057478994,0.00044020667,0.9301956,0.000023375656,0.004530475,0.0006826288,0.000098402015,0.00035443643,0.006195846],"genre_scores_gemma":[0.9984234,0.000038247428,0.00049880537,0.000011205261,0.0000117905265,0.00017732289,0.0000014946936,0.000050631777,0.00078708766],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9982722,0.00020820554,0.0006093514,0.00026950735,0.0002266237,0.0004141249],"domain_scores_gemma":[0.9986441,0.0002861965,0.00008335126,0.00068957405,0.00013456334,0.00016218955],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047284976,0.00028513902,0.00057083124,0.00020149007,0.00006165487,0.000037365728,0.00027096175,0.0001863025,0.00032930932],"category_scores_gemma":[0.000009655909,0.00023815267,0.00034788085,0.00028087993,0.000077594,0.00026390355,0.0000010784596,0.00028768138,0.0004626589],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007210254,0.00043460386,0.00024498164,0.0011203436,0.0014884386,0.000013310555,0.0024996533,0.8974112,0.06892395,0.0007546221,0.024463655,0.0025730976],"study_design_scores_gemma":[0.013969446,0.009468494,0.021515958,0.0067764767,0.0014088036,0.0020811693,0.006028809,0.35173553,0.4761785,0.0023383184,0.09781763,0.010680858],"about_ca_topic_score_codex":0.0012397129,"about_ca_topic_score_gemma":0.00002068494,"teacher_disagreement_score":0.94094443,"about_ca_system_score_codex":0.00020113878,"about_ca_system_score_gemma":0.000038753366,"threshold_uncertainty_score":0.97115844},"labels":[],"label_agreement":null},{"id":"W2082051679","doi":"10.1002/etep.154","title":"Incorporating multi‐state unit models in composite system adequacy assessment","year":2007,"lang":"en","type":"article","venue":"European Transactions on Electrical Power","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Derating; Reliability engineering; Reliability (semiconductor); Statistic; Contingency; State (computer science); Computer science; Engineering; Statistics; Mathematics; Power (physics); Electrical engineering; Voltage; Algorithm","score_opus":0.01455909274867203,"score_gpt":0.23507207813459788,"score_spread":0.22051298538592584,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2082051679","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.030996915,0.00009176438,0.92051077,0.000022648803,0.0003582097,0.00030254386,0.000012223056,0.00057023077,0.04713468],"genre_scores_gemma":[0.9967058,0.000011921593,0.0028943685,0.000055207027,0.000017147035,0.00000898735,0.0000036555687,0.00006895633,0.00023396513],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99812055,0.00020590179,0.000622755,0.00029957053,0.00023795146,0.00051327597],"domain_scores_gemma":[0.99928385,0.00013498685,0.00005604487,0.00030528323,0.00005389408,0.00016591832],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010001538,0.00024107019,0.0002731617,0.00030243245,0.00010379513,0.000042242817,0.00021124765,0.00005817628,0.000009490909],"category_scores_gemma":[0.000006011599,0.00023780156,0.00010256485,0.0007164157,0.00003075121,0.00019906818,0.0000037424754,0.00071691425,0.00011901593],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000110107416,0.00058025535,0.00027788474,0.0001767864,0.00008935654,0.00042247793,0.00072925596,0.97292864,0.0068569276,0.0031857255,0.00008059457,0.014561987],"study_design_scores_gemma":[0.0020249197,0.00030958132,0.013243939,0.00044057376,0.000026070036,0.00006429218,0.00021886914,0.97815704,0.0027220286,0.00010948387,0.0018651664,0.0008180474],"about_ca_topic_score_codex":0.00002986704,"about_ca_topic_score_gemma":0.000045947396,"teacher_disagreement_score":0.96570885,"about_ca_system_score_codex":0.00043985702,"about_ca_system_score_gemma":0.000023260995,"threshold_uncertainty_score":0.9697266},"labels":[],"label_agreement":null},{"id":"W2083246289","doi":"10.1109/tpwrs.2011.2177999","title":"Use of Markov Models in Assessing Spare Transformer Requirements for Distribution Stations","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Spare part; Reliability engineering; Transformer; Markov chain; Probabilistic logic; Distribution transformer; Redundancy (engineering); Engineering; Computer science; Mathematics; Electrical engineering; Statistics; Voltage; Operations management","score_opus":0.05507827211679493,"score_gpt":0.2724118621373251,"score_spread":0.21733359002053015,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2083246289","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03454219,0.00017333784,0.9603968,0.000016149992,0.002699317,0.00083809707,0.000873421,0.000102537255,0.0003581472],"genre_scores_gemma":[0.99904144,0.000029967303,0.0004249337,0.000005771957,0.000009302903,0.00030895445,0.000029089448,0.000032254462,0.00011829471],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986238,0.0000576641,0.00056870136,0.00015631037,0.00020024215,0.0003933031],"domain_scores_gemma":[0.99936754,0.0001387243,0.000059929516,0.00025359387,0.000088940615,0.00009126948],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037526485,0.00017493765,0.00028331793,0.00012512653,0.00006815765,0.000043655236,0.00008226391,0.00012081094,0.000008713817],"category_scores_gemma":[0.000006519098,0.00017584494,0.00011595096,0.00023207934,0.000028457978,0.0013352986,2.65613e-7,0.00012890514,0.0000047665494],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000071090675,0.00040960443,0.00020258744,0.0010843134,0.00013153885,7.495004e-7,0.0019955905,0.9883469,0.004757013,0.0010493386,0.0008561578,0.0010951322],"study_design_scores_gemma":[0.003764172,0.0003770935,0.0030029493,0.003599177,0.00028478567,0.000040741343,0.0040346826,0.9021561,0.047586605,0.00019791565,0.0331905,0.0017652508],"about_ca_topic_score_codex":0.00012118268,"about_ca_topic_score_gemma":0.000056719025,"teacher_disagreement_score":0.96449924,"about_ca_system_score_codex":0.00028587074,"about_ca_system_score_gemma":0.000024838357,"threshold_uncertainty_score":0.7170748},"labels":[],"label_agreement":null},{"id":"W2083911114","doi":"10.1109/repcon.2012.6194561","title":"Leveraging mandatory and enforceable Electric Reliability Standards for non-registered rural electric utilities","year":2012,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Natural Environment Research Council","keywords":"Blackout; Reliability (semiconductor); Enforcement; Electricity; Certification; Electric power industry; Commission; Electric utility; Business; Environmental economics; Reliability engineering; Engineering; Computer security; Computer science; Law; Finance; Economics; Electric power system; Electrical engineering; Political science; Power (physics)","score_opus":0.011832852750888101,"score_gpt":0.23263540904267507,"score_spread":0.22080255629178697,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2083911114","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8556619,0.0040882016,0.113487996,0.00006319105,0.0010371208,0.0010406909,0.0000439436,0.0005843174,0.023992635],"genre_scores_gemma":[0.99743,0.0001616907,0.0005747178,0.00005578063,0.00012298865,0.00010817161,0.0000058566784,0.000034315544,0.0015064682],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983687,0.000027185468,0.00036255128,0.00020756343,0.00022243662,0.00081159803],"domain_scores_gemma":[0.9991091,0.0001662022,0.00003955728,0.00038593094,0.0001267868,0.00017243525],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012608034,0.00023642094,0.00033384436,0.00010870919,0.00012855987,0.00005592636,0.00013556129,0.00011331822,0.00004757215],"category_scores_gemma":[0.00017388078,0.00021035754,0.00009246413,0.00020202048,0.00003719887,0.0004770232,0.000032119548,0.0001603162,0.000006937722],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0024439634,0.0010425868,0.16036992,0.04314276,0.0015958695,0.000012378236,0.034474324,0.0059475745,0.1364443,0.0559848,0.4214753,0.13706625],"study_design_scores_gemma":[0.004902106,0.0006480183,0.03663339,0.00044935258,0.0001955706,0.00013259467,0.0029426955,0.24893971,0.082508095,0.003987869,0.61598927,0.0026713249],"about_ca_topic_score_codex":0.00007316647,"about_ca_topic_score_gemma":0.000006754119,"teacher_disagreement_score":0.24299213,"about_ca_system_score_codex":0.00037226488,"about_ca_system_score_gemma":0.000070776616,"threshold_uncertainty_score":0.8578131},"labels":[],"label_agreement":null},{"id":"W2084602284","doi":"10.1109/pmaps.2010.5529011","title":"Effects of demand side management on bulk system adequacy evaluation","year":2010,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Demand side; Reliability (semiconductor); Load management; Reliability engineering; Electric power system; Electricity; Computer science; Point (geometry); Variety (cybernetics); Demand response; Wind power; Load balancing (electrical power); Power (physics); Engineering; Electrical engineering; Environmental economics; Economics","score_opus":0.004013684645255827,"score_gpt":0.20299917884572893,"score_spread":0.1989854942004731,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2084602284","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6567603,0.00018615415,0.046592694,0.000036602632,0.0029194793,0.0015586602,0.0000019036365,0.00045431574,0.29148993],"genre_scores_gemma":[0.999146,0.000004739588,0.0004553455,0.0000101590895,0.00003294616,0.00007957063,0.0000010754925,0.000010820589,0.00025938786],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99933195,0.000027600285,0.00017934392,0.00011489776,0.0002188035,0.0001273933],"domain_scores_gemma":[0.99956477,0.00008923975,0.000024203504,0.0002450454,0.000039887313,0.000036868176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048987375,0.00008669189,0.0001346278,0.000051072486,0.000016016618,0.000008314747,0.000090916335,0.00005209436,0.00001563052],"category_scores_gemma":[0.000039337046,0.00007119929,0.000040050123,0.00006789369,0.000011289405,0.000046206107,0.000014077242,0.000078953824,0.000081233804],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009719398,0.00034323588,0.00035577547,0.042950086,0.0006322508,0.000052233907,0.0010487314,0.10486345,0.27182028,0.49614444,0.0070589795,0.07463335],"study_design_scores_gemma":[0.0031119958,0.0002191911,0.019938296,0.0018034492,0.00027905218,0.00001666191,0.00028870488,0.3868185,0.57220143,0.0007984457,0.013887752,0.0006365153],"about_ca_topic_score_codex":0.000011530591,"about_ca_topic_score_gemma":0.000011848173,"teacher_disagreement_score":0.49534598,"about_ca_system_score_codex":0.00005127453,"about_ca_system_score_gemma":0.0000043613923,"threshold_uncertainty_score":0.29034227},"labels":[],"label_agreement":null},{"id":"W2084623947","doi":"10.2316/journal.203.2006.2.203-3407","title":"RELIABILITY WORTH ASSESSMENT FOR DISTRIBUTION SYSTEMS: AUTOMATED VS. TRADITIONAL CONFIGURATIONS","year":2006,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Profitability index; Restructuring; Computer science; Reliability engineering; Automation; Context (archaeology); Quality (philosophy); Risk analysis (engineering); Service (business); Operations research; Engineering; Economics; Business","score_opus":0.006989037830951743,"score_gpt":0.22484503932906552,"score_spread":0.21785600149811377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2084623947","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21135785,0.003599244,0.7358184,0.0007248804,0.031736363,0.00044867807,0.0016515579,0.00056502013,0.014098017],"genre_scores_gemma":[0.99877495,0.00003811302,0.00015196086,0.000014374373,0.00051056355,0.000047339174,0.000202563,0.000015137172,0.00024500256],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983868,0.00005675683,0.00084475754,0.00013527239,0.00040609355,0.00017029025],"domain_scores_gemma":[0.9986495,0.0001486621,0.00023758328,0.00010780055,0.00077414187,0.00008236362],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005003522,0.00015171657,0.00028948745,0.0000961446,0.00006224727,0.00017313282,0.00018555713,0.00009636656,0.000008536061],"category_scores_gemma":[0.00004207052,0.00013107852,0.00012677089,0.0000674556,0.000041864954,0.00032149532,0.000007975445,0.000101437836,9.875738e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017983749,0.00031664144,0.0014376302,0.00031412864,0.0006063543,0.000046035784,0.00015020746,0.49140662,0.0029183265,0.4153267,0.087027125,0.00027035945],"study_design_scores_gemma":[0.0025576968,0.00034364764,0.06453016,0.00071155734,0.00008890126,0.0010831219,0.00039532184,0.45412037,0.00029786915,0.0022018277,0.47311193,0.00055759744],"about_ca_topic_score_codex":0.0001487442,"about_ca_topic_score_gemma":0.000014751313,"teacher_disagreement_score":0.7874171,"about_ca_system_score_codex":0.0003443571,"about_ca_system_score_gemma":0.00007340394,"threshold_uncertainty_score":0.53452265},"labels":[],"label_agreement":null},{"id":"W2085930154","doi":"10.1049/ip-gtd:20030694","title":"Estimating customer outage costs due to a specific failure event","year":2003,"lang":"en","type":"article","venue":"IEE Proceedings - Generation Transmission and Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Event (particle physics); Business; Reliability engineering; Computer science; Actuarial science; Operations management; Economics; Engineering","score_opus":0.009120074414348669,"score_gpt":0.21503000971392228,"score_spread":0.2059099352995736,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2085930154","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1816055,0.00031125656,0.81553006,0.00032094106,0.00042684277,0.00039081796,0.000033918404,0.00021390479,0.001166733],"genre_scores_gemma":[0.9931449,0.000037343485,0.0064025465,0.0000500059,0.00011527203,0.000060626742,0.000073636525,0.000017688175,0.000097955555],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989521,0.000013057636,0.000311202,0.00028216967,0.0001887383,0.00025274133],"domain_scores_gemma":[0.999534,0.00000868593,0.000034546152,0.0000702426,0.00012459896,0.00022791533],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031775006,0.00018419641,0.00017485343,0.000051182415,0.00018029037,0.00012871662,0.000055729302,0.000113946764,0.000049069433],"category_scores_gemma":[0.000037785197,0.000171042,0.0000465358,0.00023074933,0.000018053153,0.00023549118,0.000005344132,0.00012242852,0.000037122318],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052468113,0.00015640976,0.00036458112,0.0008208851,0.000039468043,0.000010006599,0.0023805175,0.01462813,0.7583831,0.051848024,0.10508282,0.066233575],"study_design_scores_gemma":[0.00079153397,0.000076215845,0.00044692244,0.00028191952,0.00002275605,0.00009408271,0.00027949936,0.104022995,0.15975001,0.00022218443,0.7334664,0.00054549775],"about_ca_topic_score_codex":0.0000027959097,"about_ca_topic_score_gemma":0.0000020190453,"teacher_disagreement_score":0.8115394,"about_ca_system_score_codex":0.00016114645,"about_ca_system_score_gemma":0.000015024169,"threshold_uncertainty_score":0.6974891},"labels":[],"label_agreement":null},{"id":"W2087248951","doi":"10.1007/s13198-010-0020-y","title":"Incorporating wind power in generating system reliability evaluation","year":2010,"lang":"en","type":"article","venue":"International Journal of Systems Assurance Engineering and Management","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Reliability engineering; Reliability (semiconductor); Electric power system; Engineering; Power (physics); Electrical engineering","score_opus":0.004872381663384981,"score_gpt":0.20997877550575988,"score_spread":0.2051063938423749,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2087248951","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95545936,0.0007485311,0.030270094,0.00006183094,0.011533675,0.00038001852,0.000005406477,0.000082631304,0.0014584615],"genre_scores_gemma":[0.99639237,0.00004810175,0.0032374691,0.000004428893,0.0002622964,0.00002154827,0.0000013055158,0.000018615345,0.000013837309],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998364,0.00003659853,0.00075057714,0.00014704163,0.00053919933,0.00016260838],"domain_scores_gemma":[0.9992184,0.00006474368,0.00018436076,0.00015702182,0.00031056153,0.00006487974],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022762697,0.00015131864,0.00026758446,0.00025534694,0.00002160332,0.00010660271,0.00023405091,0.000069325346,0.0000021688631],"category_scores_gemma":[0.000119365955,0.00014222227,0.00005086445,0.000119323384,0.00001553113,0.00030890023,0.00003500141,0.0002876061,0.0000020590385],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009469824,0.000017928116,0.0025619133,0.00057838805,0.000105851446,0.000058797443,0.00017824248,0.98646253,0.005132868,0.0030189476,0.00012157592,0.0017534985],"study_design_scores_gemma":[0.00094409136,0.000026596625,0.017582595,0.0015446091,0.000023130739,0.0002526761,0.00047649475,0.9744218,0.00015202019,0.000018674968,0.0043270085,0.000230286],"about_ca_topic_score_codex":0.000022420576,"about_ca_topic_score_gemma":0.000013052214,"teacher_disagreement_score":0.040933046,"about_ca_system_score_codex":0.0002465809,"about_ca_system_score_gemma":0.000019169065,"threshold_uncertainty_score":0.57996553},"labels":[],"label_agreement":null},{"id":"W2087568097","doi":"10.1049/ip-gtd:20010562","title":"Maintaining supply reliability of small isolated power systems using renewable energy","year":2001,"lang":"en","type":"article","venue":"IEE Proceedings - Generation Transmission and Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":82,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Renewable energy; Reliability engineering; Wind power; Probabilistic logic; Electric power system; Environmental economics; Photovoltaics; Intermittent energy source; Reliability (semiconductor); Energy source; Computer science; Environmental science; Distributed generation; Photovoltaic system; Engineering; Power (physics); Electrical engineering; Economics","score_opus":0.013438026681260732,"score_gpt":0.20496131555478583,"score_spread":0.1915232888735251,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2087568097","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38133347,0.0007749359,0.61652225,0.000055163346,0.00026673067,0.00017017484,0.00003400349,0.00015361978,0.000689665],"genre_scores_gemma":[0.9986329,0.00045294547,0.0005665781,0.000013747815,0.000059137386,0.000019837269,0.0001158253,0.000019863408,0.00011916205],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99866134,0.000023444285,0.00054533913,0.00030419853,0.00017948801,0.00028617293],"domain_scores_gemma":[0.99932176,0.000016495385,0.000097586686,0.00010745722,0.00030119336,0.00015551753],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043500337,0.00020518772,0.00027512375,0.00006448792,0.00015295754,0.0000813899,0.000081553524,0.00020314415,0.000026691412],"category_scores_gemma":[0.00003834372,0.00019165703,0.00006380806,0.00028881893,0.000049985254,0.00029523447,0.0000112624975,0.00010234378,7.6103123e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023755952,0.00014938471,0.0043477938,0.0007847495,0.000048363174,0.0000045435377,0.0007589315,0.17712797,0.8049303,0.005579375,0.003803281,0.002227705],"study_design_scores_gemma":[0.0005375285,0.000107192165,0.00035807615,0.0002638644,0.00003252,0.00006040634,0.00023396761,0.9248202,0.043216027,0.00021821065,0.029873278,0.00027876734],"about_ca_topic_score_codex":0.00035198094,"about_ca_topic_score_gemma":0.000009050284,"teacher_disagreement_score":0.76171434,"about_ca_system_score_codex":0.00014494716,"about_ca_system_score_gemma":0.000032619497,"threshold_uncertainty_score":0.7815547},"labels":[],"label_agreement":null},{"id":"W2088442609","doi":"10.1109/icpst.2006.321923","title":"Non-Coherence in Transmission Line Arrangements","year":2006,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Coherence (philosophical gambling strategy); Transmission system; Reliability (semiconductor); Computer science; Transmission line; Intuition; Transmission (telecommunications); Reliability engineering; Electric power transmission; Electric power system; Power transmission; Engineering; Telecommunications; Power (physics); Electrical engineering; Mathematics","score_opus":0.005284545054404763,"score_gpt":0.19251766304900203,"score_spread":0.18723311799459727,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2088442609","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42873496,0.00044761115,0.30305028,0.00016608494,0.00047563674,0.00040115596,0.000002838685,0.00035908064,0.26636234],"genre_scores_gemma":[0.99748373,0.000012667444,0.0008854594,0.000017777376,0.000025162517,0.000014578585,0.0000022516701,0.000007343557,0.0015510035],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995434,0.0000040237032,0.00015240654,0.00008809683,0.00006376821,0.00014828969],"domain_scores_gemma":[0.9998553,0.0000071153613,0.0000055290584,0.000101752674,0.000008120111,0.000022232241],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008178687,0.00006670108,0.000087271204,0.000031908887,0.000008183586,0.000006999542,0.00006971425,0.00003742985,0.00009164488],"category_scores_gemma":[0.0000014124413,0.000056356876,0.000020468566,0.00010227944,0.000007269078,0.000061256054,0.0000042360116,0.00005650186,0.000059683105],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009376699,0.00082603004,0.047246672,0.0026270328,0.000051336137,0.00013682438,0.0015436646,0.33843052,0.39803368,0.0034616897,0.085803196,0.1217456],"study_design_scores_gemma":[0.0036976356,0.00013739629,0.11838431,0.0009964947,0.000013679454,0.00001041443,0.00014119834,0.4156071,0.17810728,0.004283919,0.27746966,0.001150907],"about_ca_topic_score_codex":0.00021382955,"about_ca_topic_score_gemma":0.00016907534,"teacher_disagreement_score":0.5687488,"about_ca_system_score_codex":0.000029927003,"about_ca_system_score_gemma":0.0000037312006,"threshold_uncertainty_score":0.22981666},"labels":[],"label_agreement":null},{"id":"W2089419227","doi":"10.1109/tste.2011.2181878","title":"Computation of Dynamic Operating Balancing Reserve for Wind Power Integration for the Time-Horizon 1–48 Hours","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":116,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Unavailability; Time horizon; Wind power; Electric power system; Computer science; Reliability (semiconductor); Computation; Horizon; Reliability engineering; Power (physics); Mathematical optimization; Engineering; Mathematics","score_opus":0.006012515770543302,"score_gpt":0.22496160561211156,"score_spread":0.21894908984156827,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2089419227","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017719122,0.00028203634,0.97996265,0.000103699196,0.00093946524,0.0005349059,0.000028800758,0.000104256746,0.0003250621],"genre_scores_gemma":[0.9968391,0.000017657176,0.001320027,0.00002534558,0.000047784008,0.00024236063,0.000010400907,0.000040910105,0.0014563842],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989548,0.000035732824,0.00030134455,0.0001401537,0.00012299736,0.000445026],"domain_scores_gemma":[0.99907774,0.00033380583,0.000056625016,0.0001951941,0.00026850897,0.00006810263],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005920127,0.00015317524,0.00019142011,0.00010779456,0.00023660032,0.000034006818,0.00011604916,0.00009893004,0.000009569795],"category_scores_gemma":[0.00005264161,0.00012435291,0.00012890203,0.00021043344,0.000031394597,0.0003500173,0.0000011504521,0.00010332844,0.0000017779298],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007877581,0.00007753231,0.0000024351648,0.00027542395,0.00008807987,3.12072e-7,0.0008381294,0.9759047,0.0074586878,0.0019774672,0.0009984663,0.012299973],"study_design_scores_gemma":[0.00081530906,0.00033988472,0.000036166773,0.00016095754,0.00008115795,0.00000538835,0.0059333695,0.925439,0.061530914,0.00042522684,0.0049399547,0.00029266218],"about_ca_topic_score_codex":0.00016236212,"about_ca_topic_score_gemma":0.00006268972,"teacher_disagreement_score":0.97912,"about_ca_system_score_codex":0.00031136003,"about_ca_system_score_gemma":0.000053680407,"threshold_uncertainty_score":0.50709647},"labels":[],"label_agreement":null},{"id":"W2090052210","doi":"10.1243/1748006xjrr218","title":"Reliability assessment of a wind power delivery system","year":2008,"lang":"en","type":"article","venue":"Proceedings of the Institution of Mechanical Engineers Part O Journal of Risk and Reliability","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Electric power system; Renewable energy; Reliability engineering; Sizing; Electric power transmission; Transmission line; Transmission (telecommunications); Reliability (semiconductor); Transmission system; Power system simulator for engineering; Engineering; Computer science; Automotive engineering; Power (physics); Electrical engineering","score_opus":0.006361742821705281,"score_gpt":0.19867907956973754,"score_spread":0.19231733674803225,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2090052210","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99110293,0.00043215996,0.0063058934,0.00004431481,0.0012048369,0.00029200304,0.00003863908,0.000035173205,0.00054407166],"genre_scores_gemma":[0.9960342,0.00081117975,0.003085278,0.000002935906,0.000046581452,0.0000027113228,2.521058e-7,0.000011991064,0.000004894102],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99745244,0.000042216696,0.0014842807,0.00019731154,0.0006068304,0.00021693482],"domain_scores_gemma":[0.9975601,0.0001932065,0.0007672519,0.00024843565,0.001084944,0.00014610139],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025507933,0.0002174498,0.0007835582,0.00010721176,0.00008749456,0.0000060339203,0.00039425108,0.00020997606,0.0000046465707],"category_scores_gemma":[0.0011577094,0.00014505061,0.0003836521,0.00032234125,0.000441882,0.00031393376,0.000092525035,0.0005438399,2.659031e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017618288,0.00277746,0.09580872,0.025100145,0.00122827,0.000017877976,0.0052538975,0.6423273,0.12107121,0.09918249,0.0036426159,0.0018281712],"study_design_scores_gemma":[0.0122585185,0.0044329716,0.3256328,0.015215382,0.002024672,0.0020299184,0.006734232,0.21335316,0.39126855,0.007774475,0.016761666,0.0025136445],"about_ca_topic_score_codex":0.000024214127,"about_ca_topic_score_gemma":4.8195574e-7,"teacher_disagreement_score":0.42897415,"about_ca_system_score_codex":0.0002102618,"about_ca_system_score_gemma":0.00013687131,"threshold_uncertainty_score":0.59149927},"labels":[],"label_agreement":null},{"id":"W2092081531","doi":"10.1109/tste.2014.2364778","title":"Data Constrained Adequacy Assessment for Wind Resource Planning","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Wind speed; Electric power system; Environmental science; Offshore wind power; Meteorology; Electricity generation; Computer science; Power (physics); Engineering; Electrical engineering; Geography","score_opus":0.016853006495066252,"score_gpt":0.25698152394081775,"score_spread":0.2401285174457515,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2092081531","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0007385003,0.000072524825,0.9837054,0.00015768918,0.00046778965,0.00022766013,0.000105258114,0.00036915363,0.014156002],"genre_scores_gemma":[0.992518,0.000010294539,0.0019344458,0.00013893789,0.00010296528,0.00009928265,0.000043641205,0.00005160865,0.0051007955],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985433,0.000052780826,0.0003016024,0.0003710046,0.00016817386,0.0005630873],"domain_scores_gemma":[0.99858195,0.00033086917,0.00003838226,0.0008398609,0.00008436475,0.0001245515],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005213976,0.00021249538,0.00025742163,0.00014168386,0.00023983915,0.00006761134,0.00040220504,0.00012246789,0.000031055264],"category_scores_gemma":[0.000023401373,0.00021825047,0.0000768285,0.00019634338,0.000059176422,0.000274116,0.0000036990732,0.0001860942,0.0000032237501],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000478204,0.00007463112,0.0000015697835,0.00035374172,0.00009301911,0.000011002914,0.00012136641,0.968337,0.00038322696,0.011966322,0.0064822803,0.012128024],"study_design_scores_gemma":[0.00076563255,0.00012905394,0.0000068626423,0.00007045501,0.00003659498,0.000010160576,0.0012538738,0.28127387,0.0023707906,0.00070736994,0.71309495,0.0002804144],"about_ca_topic_score_codex":0.00007163652,"about_ca_topic_score_gemma":0.000020020107,"teacher_disagreement_score":0.9917795,"about_ca_system_score_codex":0.00020154426,"about_ca_system_score_gemma":0.00008056069,"threshold_uncertainty_score":0.8899996},"labels":[],"label_agreement":null},{"id":"W2092799643","doi":"10.1049/ip-gtd:20040708","title":"Incorporating reliability index distributions in small isolated generating system reliability performance assessment","year":2004,"lang":"en","type":"article","venue":"IEE Proceedings - Generation Transmission and Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Range (aeronautics); Probabilistic logic; Index (typography); Electric power system; Wind power; Computer science; Power (physics); Statistics; Engineering; Mathematics; Electrical engineering","score_opus":0.009375901404949597,"score_gpt":0.20965113847859107,"score_spread":0.20027523707364148,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2092799643","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5876039,0.00009610314,0.4108867,0.00018108077,0.0002074631,0.00044884242,0.000055426626,0.00031714985,0.00020330267],"genre_scores_gemma":[0.9953548,0.00009524917,0.003790902,0.000014959918,0.00011234808,0.00016714097,0.0004315049,0.00002344634,0.000009684508],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99776465,0.00004181453,0.0009356546,0.0005826659,0.00024722068,0.0004280174],"domain_scores_gemma":[0.9991117,0.00002221159,0.00013880577,0.00018351925,0.0003235021,0.00022026613],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0011556235,0.00033793924,0.00035824726,0.00008398874,0.00043659186,0.00017727987,0.00013290568,0.0002943705,0.0000050125414],"category_scores_gemma":[0.00007939852,0.00032238575,0.00007524787,0.0005707747,0.00008750521,0.0006078604,0.000027292506,0.0004439622,0.0000033371032],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021592178,0.00070916116,0.06839197,0.0065782913,0.00005148744,0.000011447673,0.0016113597,0.5426293,0.3243049,0.030012492,0.0004970989,0.02498654],"study_design_scores_gemma":[0.0013268014,0.00012098224,0.016785813,0.0005189673,0.000021961072,0.000030101564,0.00023907065,0.95911217,0.020426134,0.0003485063,0.00062078313,0.00044871855],"about_ca_topic_score_codex":0.000093898714,"about_ca_topic_score_gemma":0.00002827534,"teacher_disagreement_score":0.41648287,"about_ca_system_score_codex":0.0012072519,"about_ca_system_score_gemma":0.0001233828,"threshold_uncertainty_score":0.9999228},"labels":[],"label_agreement":null},{"id":"W2093952996","doi":"10.1109/ccece.2014.6901156","title":"Literature survey and comparison of consumer interruption costs in North America and Europe","year":2014,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"De facto; Business; Electricity; Key (lock); Norm (philosophy); Marketing; Computer science; Engineering; Political science; Computer security","score_opus":0.015686821904051636,"score_gpt":0.24383910601684644,"score_spread":0.2281522841127948,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2093952996","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9921752,0.0010740851,0.0044972035,0.000011392858,0.00009805228,0.00007704028,0.000012313891,0.00003262721,0.002022065],"genre_scores_gemma":[0.9995641,0.00021515047,0.00014032821,0.000018404051,0.000004091144,0.0000018358577,0.000012048685,0.0000057388243,0.000038261842],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995562,0.00007103502,0.00016253408,0.00009242113,0.000036721936,0.00008108151],"domain_scores_gemma":[0.99973,0.00008682811,0.000019761777,0.00009330386,0.00003860281,0.00003153531],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012701949,0.00006590844,0.00017174204,0.000039138704,0.0000063787247,0.000015218917,0.00003358304,0.000029664274,0.000003565351],"category_scores_gemma":[0.0000838499,0.000054822864,0.000006567593,0.00014357189,0.00004294968,0.000057955236,0.000019087725,0.00008251922,0.0000039316315],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020597332,0.000023294197,0.9806343,0.0002443802,0.000010169121,5.7286985e-7,0.0011791219,0.00028195864,0.00050423964,0.00010479778,0.0011254484,0.015871176],"study_design_scores_gemma":[0.0002604318,0.000053221105,0.944047,0.0001153845,0.0000022359386,0.0000025676018,0.000050815117,0.039455663,0.00012769472,0.000004021344,0.015775677,0.00010534135],"about_ca_topic_score_codex":0.0001376814,"about_ca_topic_score_gemma":0.002739847,"teacher_disagreement_score":0.039173704,"about_ca_system_score_codex":0.000008977333,"about_ca_system_score_gemma":0.000001741789,"threshold_uncertainty_score":0.22356115},"labels":[],"label_agreement":null},{"id":"W2094575198","doi":"10.1016/j.epsr.2004.01.008","title":"Evaluation of generation and transmission maintenance strategies based on reliability worth","year":2004,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kinectrics (Canada)","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Revenue; Scheduling (production processes); Monte Carlo method; Operations research; Engineering; Random variable; Computer science; Condition-based maintenance; Maintenance engineering; Order (exchange); Operations management; Economics; Mathematics; Statistics; Power (physics)","score_opus":0.04620291920991427,"score_gpt":0.3130232648846329,"score_spread":0.26682034567471863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2094575198","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.765914,0.0066778935,0.1954436,0.00025630076,0.0007839431,0.0027155613,0.000013222686,0.00023503644,0.02796041],"genre_scores_gemma":[0.9994481,0.00012413684,0.00011231977,0.00000451794,0.00003888229,0.00017054736,0.000005017078,0.000025194684,0.00007124797],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9961275,0.00069433905,0.00047157754,0.00038641164,0.0018168415,0.00050333684],"domain_scores_gemma":[0.99812794,0.00016572393,0.000050540286,0.0004925851,0.0010414415,0.000121761404],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009542396,0.00017511897,0.0002830961,0.00034472306,0.00011675094,0.000082727805,0.00018278278,0.00015596136,0.000013368275],"category_scores_gemma":[0.0004085396,0.00014754641,0.000053489657,0.00084303826,0.00008084842,0.00021281654,0.0000113699425,0.00039282633,0.000010804726],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008254881,0.00017861271,0.00010754323,0.0007153999,0.000036922793,0.0000053086665,0.0005598991,0.9335847,0.04941447,0.003641968,0.0011134321,0.010559227],"study_design_scores_gemma":[0.0013873617,0.0005653569,0.0019382479,0.0005212932,0.000019614967,0.000009277272,0.00021509838,0.9790931,0.012441625,0.0008506691,0.0027190559,0.00023929753],"about_ca_topic_score_codex":0.00017034398,"about_ca_topic_score_gemma":0.000023479068,"teacher_disagreement_score":0.23353411,"about_ca_system_score_codex":0.00073692534,"about_ca_system_score_gemma":0.0005500381,"threshold_uncertainty_score":0.6016768},"labels":[],"label_agreement":null},{"id":"W2094873823","doi":"10.1049/iet-gtd:20050261","title":"Reliability assessment of an automated distribution system","year":2007,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Automation; Reliability (semiconductor); Reliability engineering; Scheme (mathematics); Computer science; Fault (geology); Service (business); Process automation system; Real-time computing; Engineering","score_opus":0.009017738949466437,"score_gpt":0.2658004757375996,"score_spread":0.2567827367881331,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2094873823","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33731282,0.00006447163,0.66006505,0.000029312028,0.0005377599,0.00032215394,0.00045960455,0.00097392715,0.00023489924],"genre_scores_gemma":[0.9920705,0.00002204651,0.0017144554,0.0000052187406,0.00011161177,0.000026921074,0.006018138,0.000018406261,0.00001272366],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978989,0.00013438065,0.0008572769,0.00032878158,0.0004451601,0.0003355123],"domain_scores_gemma":[0.9989087,0.00003799782,0.00011686067,0.00041525572,0.00031517816,0.00020603879],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017656016,0.00022096689,0.0002929007,0.00004023003,0.00015392057,0.00003917795,0.00015641365,0.00024365402,0.00002135479],"category_scores_gemma":[0.000032309028,0.0002063323,0.00011671537,0.00035455386,0.000054264066,0.00036210526,0.000008546086,0.00016553773,0.0000057504108],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011870356,0.0005905859,0.0006439116,0.0018533489,0.000067681794,0.000013329536,0.00026901506,0.18894222,0.75829405,0.013167609,0.00895793,0.027081607],"study_design_scores_gemma":[0.0004736532,0.000103682745,0.024370573,0.00011465545,0.00003134382,0.000011519665,0.00008584867,0.8327286,0.13185468,0.000024453902,0.009975049,0.00022589738],"about_ca_topic_score_codex":0.000036426918,"about_ca_topic_score_gemma":0.000013253477,"teacher_disagreement_score":0.6583506,"about_ca_system_score_codex":0.00069845625,"about_ca_system_score_gemma":0.00006984924,"threshold_uncertainty_score":0.8413987},"labels":[],"label_agreement":null},{"id":"W2095324173","doi":"10.1109/icqr2mse.2012.6246397","title":"Coordinating maintenance with spares logistics to minimize levelized cost of wind energy","year":2012,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Cost of electricity by source; Maintenance engineering; Computer science; Wind power; Reliability engineering; Marine engineering; Operations research; Electricity generation; Engineering; Electrical engineering; Power (physics)","score_opus":0.01564776208937133,"score_gpt":0.21170883446861954,"score_spread":0.19606107237924822,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2095324173","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011470994,0.00022080123,0.9392722,0.00007755873,0.00039624868,0.00014108134,0.000026589098,0.0001619119,0.048232585],"genre_scores_gemma":[0.9822178,0.000015077053,0.016008968,0.000091194524,0.000057405618,0.000020330079,0.0000024268425,0.000025105237,0.0015616833],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99901104,0.000015407935,0.00027454697,0.00012690727,0.00014543156,0.00042667452],"domain_scores_gemma":[0.9993179,0.00012529372,0.00004379155,0.00026551003,0.00009575348,0.00015174161],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001972001,0.00015415093,0.00028415656,0.000048147278,0.00002447825,0.000010572727,0.00015103236,0.000057025027,0.00007988388],"category_scores_gemma":[0.00015615879,0.00011591724,0.00003433985,0.000160077,0.00005580155,0.00010293326,0.000038122755,0.00006330105,0.00001280094],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00086877355,0.00074472296,0.065100245,0.0033432979,0.000776839,0.000050260955,0.005335095,0.4905143,0.043534987,0.25134686,0.08801108,0.050373543],"study_design_scores_gemma":[0.006081988,0.00045777898,0.032556094,0.002618426,0.00016632237,0.00017343582,0.004066186,0.075567305,0.15097713,0.0005145923,0.72384703,0.0029737246],"about_ca_topic_score_codex":0.00014730169,"about_ca_topic_score_gemma":0.0000696232,"teacher_disagreement_score":0.9707468,"about_ca_system_score_codex":0.00006899864,"about_ca_system_score_gemma":0.000015197704,"threshold_uncertainty_score":0.47269678},"labels":[],"label_agreement":null},{"id":"W2095978179","doi":"10.1109/tpwrs.2005.856992","title":"An Aggregate Weibull Approach for Modeling Short-Term System Generating Capacity","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Spot contract; Electricity; Electricity market; Weibull distribution; Electric power system; Deregulation; Reliability (semiconductor); Economics; Term (time); Reliability engineering; Electricity price forecasting; Aggregate (composite); Computer science; Econometrics; Engineering; Power (physics); Finance; Macroeconomics; Futures contract; Electrical engineering","score_opus":0.023051349411904176,"score_gpt":0.2238200022317906,"score_spread":0.20076865281988643,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2095978179","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0812977,0.00033839754,0.9113536,0.000008394855,0.00324507,0.001168999,0.00018039145,0.0011457104,0.0012617197],"genre_scores_gemma":[0.99196726,0.000016723217,0.0068166475,0.000015417225,0.0001622554,0.00076297583,0.00001072673,0.00011046161,0.0001375564],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99766165,0.00010261573,0.0007691145,0.0005484572,0.0003010623,0.00061710423],"domain_scores_gemma":[0.99873364,0.000054126675,0.000058826703,0.0007643002,0.00014558253,0.0002435043],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006288499,0.00041067324,0.00052232726,0.00016531881,0.0003185965,0.00017427742,0.00032451126,0.00026789584,0.0000038666576],"category_scores_gemma":[0.0000031293569,0.0004013965,0.00023308456,0.0001715166,0.000032498778,0.0004663154,8.826207e-7,0.00032590446,0.00002728604],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019368783,0.00009586829,0.000002386275,0.0006747786,0.00008865799,0.0000013965404,0.00072147866,0.9898785,0.007739399,0.00017148237,0.00007262108,0.00053408754],"study_design_scores_gemma":[0.00035348174,0.00009360913,6.0883895e-7,0.00027848248,0.00004666792,0.000084743835,0.0006217077,0.9913968,0.0056484295,8.9247936e-7,0.0010328833,0.00044170333],"about_ca_topic_score_codex":0.000071800234,"about_ca_topic_score_gemma":0.000043938835,"teacher_disagreement_score":0.9106695,"about_ca_system_score_codex":0.0005073691,"about_ca_system_score_gemma":0.000028073606,"threshold_uncertainty_score":0.9998438},"labels":[],"label_agreement":null},{"id":"W2095998951","doi":"10.1109/ccece.2002.1015190","title":"Application of wellbeing concepts in short term generating unit preventive maintenance scheduling","year":2003,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Unavailability; Preventive maintenance; Reliability engineering; Scheduling (production processes); Computer science; Probabilistic logic; Maintenance engineering; Electric power system; Economic shortage; Power system simulation; Dependability; Operations research; Engineering; Power (physics); Operations management","score_opus":0.008426232192946512,"score_gpt":0.24219455305120532,"score_spread":0.23376832085825883,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2095998951","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5301347,0.00019836392,0.45868856,0.0000052995,0.00012623917,0.00026253582,0.0000015261684,0.00007220887,0.010510591],"genre_scores_gemma":[0.9863199,0.000022808614,0.013430236,0.000011925151,0.0000147520495,0.000049556198,0.0000024299568,0.000015204528,0.00013318317],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99911433,0.0000424261,0.00036230314,0.00017125884,0.00008723593,0.00022243819],"domain_scores_gemma":[0.99963754,0.000046756813,0.000023349206,0.00020704596,0.000050304294,0.000034973735],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003904157,0.000110120156,0.00018781815,0.00005239965,0.000021952295,0.000008932088,0.00010072957,0.00006240953,0.000012196567],"category_scores_gemma":[0.00007417077,0.00010741862,0.00003903393,0.00020378751,0.00003279264,0.00011516694,0.000013063579,0.00011460455,0.0000061018295],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008204162,0.000083437575,0.10075343,0.0006905884,0.00005060825,0.0000058789988,0.0015384121,0.36372292,0.47438097,0.051839605,0.000057199955,0.006868736],"study_design_scores_gemma":[0.00074534153,0.00004172189,0.017235298,0.00074870896,0.000016708682,0.000016705138,0.001321054,0.64353323,0.33191416,0.0008867534,0.0029298135,0.0006104992],"about_ca_topic_score_codex":0.00003197655,"about_ca_topic_score_gemma":0.000100492056,"teacher_disagreement_score":0.45618522,"about_ca_system_score_codex":0.000063735286,"about_ca_system_score_gemma":0.000016999966,"threshold_uncertainty_score":0.4380404},"labels":[],"label_agreement":null},{"id":"W2096144057","doi":"10.1109/psce.2009.4840220","title":"A reliability improvement roadmap based on a predictive model and extrapolation technique","year":2009,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Representativeness heuristic; Benchmark (surveying); Extrapolation; Overhead (engineering); Computer science; Set (abstract data type); Engineering; Power (physics); Statistics; Mathematics","score_opus":0.004786997389859869,"score_gpt":0.1968426460019678,"score_spread":0.19205564861210792,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096144057","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034189288,0.000023539898,0.9428772,0.00019150879,0.000057612393,0.0008195052,0.0000112194875,0.0005207544,0.021309407],"genre_scores_gemma":[0.99367094,0.0000062181857,0.005908799,0.00019570225,0.000012141288,0.00009878759,0.0000024180379,0.000007965429,0.00009699897],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993202,0.000013348483,0.00018227834,0.00020745932,0.00011442969,0.00016230109],"domain_scores_gemma":[0.9995885,0.000025953073,0.000016582046,0.00026892655,0.000036379453,0.0000636846],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028313618,0.00012193,0.00012156606,0.000047953996,0.000029809979,0.000014395828,0.000052491985,0.00008326956,0.000007015571],"category_scores_gemma":[0.00003363693,0.000102627695,0.00003397546,0.00007168849,0.000018959267,0.0001069213,0.000006096771,0.000109872104,0.0000021007734],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011443672,0.00017603276,0.00011547529,0.0001695501,0.000009412475,0.0000017423384,0.00023766443,0.90838945,0.07524342,0.0029383933,0.0011331163,0.011471291],"study_design_scores_gemma":[0.00021173114,0.00028561265,0.0021447109,0.000047031535,0.0000043409636,8.474103e-7,0.000009886447,0.9861444,0.0071589085,0.0036823377,0.00019460662,0.00011557971],"about_ca_topic_score_codex":0.000011630686,"about_ca_topic_score_gemma":0.00000412704,"teacher_disagreement_score":0.95948166,"about_ca_system_score_codex":0.00011720506,"about_ca_system_score_gemma":0.000016610056,"threshold_uncertainty_score":0.4185036},"labels":[],"label_agreement":null},{"id":"W2096528909","doi":"10.1109/tpwrs.2006.876644","title":"Major Event Day Segmentation","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Computer science; Event (particle physics); Electric power system; Segmentation; Index (typography); Range (aeronautics); Electric utility; Reliability engineering; Data mining; Power (physics); Engineering; Artificial intelligence; Electrical engineering","score_opus":0.005124689124077807,"score_gpt":0.1986637364620699,"score_spread":0.19353904733799207,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096528909","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0125307515,0.00033256895,0.97084355,0.00003799626,0.0077819414,0.0004936617,0.00006849814,0.00055415975,0.007356844],"genre_scores_gemma":[0.99671084,0.000011465787,0.000079324825,0.00001728455,0.0000314988,0.0001911756,0.0000048121033,0.000040008727,0.0029135668],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987608,0.00006413943,0.00041707628,0.00022292677,0.0002462534,0.00028878363],"domain_scores_gemma":[0.999457,0.00005117375,0.00004065643,0.0003385407,0.000044701927,0.00006790823],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024272532,0.00019874258,0.00021107394,0.00011981739,0.000100446225,0.000058564136,0.000121073,0.00010814585,0.00006788823],"category_scores_gemma":[0.0000010946898,0.00019137384,0.00011765811,0.00019105308,0.000024267569,0.00017165295,3.5699048e-7,0.00015754248,0.00038627407],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021382584,0.00022148156,0.00003292419,0.0003485743,0.00012518557,0.000016668866,0.0005306582,0.9642653,0.01995254,0.0006657309,0.013234499,0.00058509764],"study_design_scores_gemma":[0.006486125,0.0009038074,0.0022472634,0.002049844,0.00038258958,0.00042848208,0.002821284,0.25960582,0.3514155,0.00042572644,0.36914617,0.004087404],"about_ca_topic_score_codex":0.00024583822,"about_ca_topic_score_gemma":0.000087473156,"teacher_disagreement_score":0.9841801,"about_ca_system_score_codex":0.00023731377,"about_ca_system_score_gemma":0.000014585042,"threshold_uncertainty_score":0.78039986},"labels":[],"label_agreement":null},{"id":"W2096825275","doi":"","title":"High Voltage Transmission Equipment Forced Outage Statistics Including Different Fault Types","year":2008,"lang":"en","type":"article","venue":"Proceedings of the 10th International Conference on Probablistic Methods Applied to Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Transmission (telecommunications); Transmission line; Electric power transmission; Fault (geology); Statistics; Computer science; Power (physics); Engineering; Electrical engineering; Telecommunications; Mathematics; Physics","score_opus":0.04726545995703081,"score_gpt":0.29900856575837303,"score_spread":0.25174310580134224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096825275","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020205399,0.00006233338,0.9179987,0.00022825589,0.0035346998,0.0016254883,0.00018240571,0.00022264055,0.055940133],"genre_scores_gemma":[0.9656641,0.00003217755,0.0321836,0.0000723505,0.00006860719,0.00028101815,0.000008752401,0.000048490372,0.0016409241],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.997402,0.0000312936,0.0008931133,0.00046295897,0.0008016374,0.0004090098],"domain_scores_gemma":[0.99856114,0.0001732149,0.00029408277,0.0002533992,0.0005285447,0.00018962397],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008563662,0.000397126,0.000631091,0.00019896202,0.00015533139,0.00011779478,0.0010208648,0.00014552833,0.0000874605],"category_scores_gemma":[0.0002820153,0.00028119283,0.000099082186,0.00023289243,0.00009845747,0.000109800705,0.00019830509,0.00032509607,0.000023311863],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015820417,0.00009099693,0.00006507447,0.00071756385,0.00018020935,0.0000018143982,0.0015465579,0.004488866,0.14218147,0.8459606,0.0031317156,0.0014769126],"study_design_scores_gemma":[0.0054588574,0.0014192668,0.00262983,0.008076647,0.00043418945,0.00020270474,0.0032591296,0.36673594,0.42061213,0.09166823,0.09518639,0.004316706],"about_ca_topic_score_codex":0.000035252117,"about_ca_topic_score_gemma":0.0000013247982,"teacher_disagreement_score":0.9454587,"about_ca_system_score_codex":0.00028504888,"about_ca_system_score_gemma":0.0000446778,"threshold_uncertainty_score":0.999964},"labels":[],"label_agreement":null},{"id":"W2096907829","doi":"10.1109/pes.2006.1709608","title":"Risk assessment of rural diesel generation stations","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"Saint Petersburg State University; BC Hydro","keywords":"Reliability (semiconductor); Reliability engineering; Probabilistic logic; Computer science; Unit (ring theory); Engineering","score_opus":0.00472748739580314,"score_gpt":0.21115672972088517,"score_spread":0.20642924232508203,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096907829","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6996401,0.0005487073,0.29570433,0.000023946392,0.0015621965,0.00020208702,0.00009467079,0.00041041843,0.0018135543],"genre_scores_gemma":[0.9581328,0.000104695464,0.040991526,0.000013537976,0.00043445444,0.000049473834,0.000043579374,0.00005859244,0.00017132172],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984938,0.000036293615,0.0005654184,0.0001789503,0.00028261464,0.0004429123],"domain_scores_gemma":[0.9993417,0.00007910857,0.000107794156,0.00027681838,0.00013127075,0.00006326952],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005351994,0.00026363836,0.00029587178,0.00005275611,0.00010730732,0.000046476212,0.0001461058,0.00012959383,0.000011547955],"category_scores_gemma":[0.000035601246,0.0002798932,0.0002451197,0.00026122938,0.000033091175,0.00019262965,0.000020992997,0.00025286525,0.000004615336],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[4.0715364e-7,0.000019990599,0.0016048327,0.000089583584,0.000053106247,4.00603e-7,0.00025912808,0.8143609,0.1764512,0.00036363536,0.0067292075,0.00006760352],"study_design_scores_gemma":[0.00029778172,0.000023719818,0.0055007953,0.00008754801,0.00003447023,0.00000312481,0.00014538516,0.96987575,0.0216672,0.00003498083,0.0019682227,0.00036099387],"about_ca_topic_score_codex":0.00028283647,"about_ca_topic_score_gemma":0.000026614114,"teacher_disagreement_score":0.25849274,"about_ca_system_score_codex":0.00021357383,"about_ca_system_score_gemma":0.000027455173,"threshold_uncertainty_score":0.9999653},"labels":[],"label_agreement":null},{"id":"W2097116508","doi":"10.1109/tpwrs.2009.2021232","title":"Effects of Wind Power on Bulk System Adequacy Evaluation Using the Well-Being Analysis Framework","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":42,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Electric power system; Probabilistic logic; Monte Carlo method; Reliability engineering; Wind power; Reliability (semiconductor); Bridge (graph theory); Wind speed; Computer science; Engineering; Power (physics); Statistics; Mathematics; Electrical engineering; Meteorology","score_opus":0.007635261280937314,"score_gpt":0.23498952050441715,"score_spread":0.22735425922347985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2097116508","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13335498,0.0005795442,0.8558241,0.0000399087,0.004730419,0.0012864926,0.000014222701,0.00028652404,0.0038838028],"genre_scores_gemma":[0.99963975,0.000012581762,0.00009876938,0.000040995517,0.000032808122,0.000055353623,0.0000011057812,0.000040903014,0.00007770897],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99715614,0.00039706434,0.0007678058,0.00040808273,0.00084454083,0.0004263813],"domain_scores_gemma":[0.998027,0.00057128066,0.00018287536,0.00091031066,0.00019557077,0.00011295618],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0011331267,0.00036894812,0.00068264507,0.00045129124,0.00022181636,0.00008710925,0.00032316466,0.00028781017,0.000027956527],"category_scores_gemma":[0.000028489796,0.00028806372,0.00045360177,0.001278171,0.000047725513,0.00017866777,0.0000010362844,0.00046995946,0.000052703494],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041652132,0.00011126801,0.000007641168,0.00037518516,0.0006946502,0.0000061984274,0.001625868,0.99340665,0.002329916,0.0012266168,0.00004370689,0.00013065958],"study_design_scores_gemma":[0.0011802925,0.0006449947,0.00095350697,0.0045416816,0.0029109234,0.000049096496,0.0018082212,0.95577425,0.030021831,0.000101895166,0.0010930315,0.0009202925],"about_ca_topic_score_codex":0.00008281652,"about_ca_topic_score_gemma":0.00000555952,"teacher_disagreement_score":0.8662848,"about_ca_system_score_codex":0.0005421548,"about_ca_system_score_gemma":0.000041702646,"threshold_uncertainty_score":0.99995714},"labels":[],"label_agreement":null},{"id":"W2097661129","doi":"10.1109/ccece.1999.804924","title":"Electric service reliability worth determination in the Nepal Power System","year":2003,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Service (business); Sample (material); Electric power system; Reliability engineering; Customer service; Electric power; Computer science; Survey data collection; Power (physics); Survey sampling; Telecommunications; Engineering; Business; Marketing; Statistics; Sociology; Mathematics","score_opus":0.004803040203184321,"score_gpt":0.18390211193860367,"score_spread":0.17909907173541936,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2097661129","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7874756,0.00024542594,0.012278701,0.00016499335,0.0006624863,0.0006351739,0.0000016981969,0.00040004772,0.19813585],"genre_scores_gemma":[0.99943894,0.0000042221736,0.00025852758,0.00013640652,0.00001141064,0.000055934994,8.221867e-7,0.00001151803,0.00008219664],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989621,0.00015110559,0.00027801786,0.00017272006,0.00016392107,0.00027213024],"domain_scores_gemma":[0.9993569,0.00012342191,0.000021423282,0.00040799778,0.000057612935,0.000032598],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009899501,0.00012193599,0.00014187425,0.000058505346,0.000035576282,0.000030563435,0.00019220154,0.000079696234,0.000022906735],"category_scores_gemma":[0.00009597221,0.00008406306,0.000040891995,0.00063792686,0.000007671037,0.0001305121,0.0000050029776,0.00016455218,0.00007309468],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002593038,0.0019622415,0.16909766,0.01779056,0.00022398004,0.00046768706,0.04136426,0.10467019,0.01722971,0.59155613,0.0283213,0.027056977],"study_design_scores_gemma":[0.0033532549,0.00036274793,0.21301118,0.0007709715,0.000083818646,0.00070227997,0.0114215,0.5594267,0.012209261,0.0028773157,0.19321077,0.0025702112],"about_ca_topic_score_codex":0.000063476145,"about_ca_topic_score_gemma":0.00025349876,"teacher_disagreement_score":0.58867884,"about_ca_system_score_codex":0.00018951102,"about_ca_system_score_gemma":0.00002062549,"threshold_uncertainty_score":0.34279922},"labels":[],"label_agreement":null},{"id":"W2097775822","doi":"10.1109/tpwrd.2004.832404","title":"Historic Performance-Based Distribution System Risk Assessment","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":66,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Incentive; IT service continuity; Reliability engineering; Electricity; Service (business); Work (physics); Order (exchange); Risk analysis (engineering); Remedial education; Engineering; Electricity market; Computer science; Operations research; Economics; Business; Finance; Power (physics); Microeconomics; Economy","score_opus":0.004954793871317489,"score_gpt":0.176758634165352,"score_spread":0.1718038402940345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2097775822","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21390197,0.000090684916,0.7802559,0.000027531381,0.0033147426,0.00022963782,0.00019476649,0.00066796824,0.0013167782],"genre_scores_gemma":[0.9992371,0.000101290934,0.0004117619,0.000024747465,0.00002404289,0.00009475441,0.000012172976,0.0000317087,0.000062413375],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987662,0.000039254028,0.0003222615,0.0002526967,0.0002949919,0.00032462005],"domain_scores_gemma":[0.999302,0.000040762385,0.000049887607,0.00040321637,0.00008980374,0.00011430784],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022528345,0.00022790507,0.00021955514,0.000104182735,0.00022211112,0.000033689397,0.00015938937,0.00013103243,0.000031894397],"category_scores_gemma":[0.000001657542,0.0002271031,0.00016469821,0.00025515436,0.000040702726,0.00023173532,6.081055e-7,0.0003715043,0.00019306884],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038110284,0.00014827063,0.000038460537,0.00025153748,0.00006111447,0.000009663064,0.00009272395,0.9963499,0.00045502628,0.00009100272,0.00043802938,0.0020262154],"study_design_scores_gemma":[0.012872758,0.0027613868,0.012804654,0.003708984,0.0009054451,0.0001925728,0.0010482919,0.72905135,0.14217454,0.00009707819,0.09012213,0.004260813],"about_ca_topic_score_codex":0.00008805617,"about_ca_topic_score_gemma":0.000019542824,"teacher_disagreement_score":0.7853351,"about_ca_system_score_codex":0.0025982475,"about_ca_system_score_gemma":0.000096293144,"threshold_uncertainty_score":0.92609954},"labels":[],"label_agreement":null},{"id":"W2098057619","doi":"10.1109/icps.2005.1436354","title":"Impact of photovoltaic power sources on a power system's capacity reliability levels","year":2005,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Photovoltaic system; Dispatchable generation; Grid-connected photovoltaic power system; Electric power system; Stand-alone power system; Reliability (semiconductor); Reliability engineering; Base load power plant; Electricity generation; Wind power; Automotive engineering; Maximum power point tracking; Engineering; Peaking power plant; Electric power; Power (physics); Computer science; Distributed generation; Electrical engineering; Renewable energy","score_opus":0.011529767176029522,"score_gpt":0.22272975343025841,"score_spread":0.2111999862542289,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2098057619","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93928224,0.00008952537,0.0029290938,0.000022214757,0.00036457976,0.00038534752,0.00009133072,0.00054051547,0.056295175],"genre_scores_gemma":[0.99898875,0.000002962912,0.00052130077,0.00002618317,0.000032834527,0.000022626513,0.0000011707779,0.00003502202,0.00036913386],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99824935,0.00006853517,0.0005772414,0.00033259304,0.00030645813,0.00046584124],"domain_scores_gemma":[0.9986676,0.0001318785,0.000079067795,0.000816874,0.0001372901,0.000167316],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00059771433,0.00030648467,0.00050112716,0.000104665785,0.00004574872,0.000024186073,0.0002687768,0.00017677048,0.0006335384],"category_scores_gemma":[0.00012753827,0.00022797717,0.00034967854,0.00021760885,0.00010052447,0.00020893158,0.0000330079,0.00023679175,0.00029542923],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007803984,0.0026711004,0.09332229,0.005207092,0.0017284771,0.000036232454,0.016454503,0.48827124,0.30862066,0.012620762,0.06864835,0.0016388962],"study_design_scores_gemma":[0.0046868506,0.002973719,0.60473174,0.002240078,0.00013410162,0.00019881451,0.0020050083,0.08084213,0.22601466,0.0004449213,0.07207637,0.0036516187],"about_ca_topic_score_codex":0.00041474635,"about_ca_topic_score_gemma":0.000048123326,"teacher_disagreement_score":0.51140946,"about_ca_system_score_codex":0.00061222643,"about_ca_system_score_gemma":0.000041603384,"threshold_uncertainty_score":0.92966396},"labels":[],"label_agreement":null},{"id":"W2098153837","doi":"10.1109/tdc.2004.1432514","title":"Resource adequacy assessment considering transmission and generation via market simulations","year":2005,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"ABB (Canada)","funders":"","keywords":"Unavailability; Reliability (semiconductor); Transmission (telecommunications); Electricity market; Resource (disambiguation); Computer science; Reliability engineering; Environmental economics; Transmission system; Electric power system; Investment (military); Energy market; Electricity; Power (physics); Telecommunications; Engineering; Economics; Computer network","score_opus":0.011722720472177265,"score_gpt":0.23245332888377074,"score_spread":0.22073060841159348,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2098153837","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07626709,0.00035178376,0.89065385,0.0007550258,0.00008513975,0.00020530539,0.000003388428,0.00028388872,0.031394504],"genre_scores_gemma":[0.9829604,0.000027759716,0.016241247,0.000079879195,0.000076099044,0.0000065317126,0.0000048787565,0.000011460598,0.00059173774],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99948,0.000024079074,0.00017500238,0.00011862603,0.00007767906,0.00012457727],"domain_scores_gemma":[0.9997402,0.00005325125,0.000010814977,0.00011840451,0.000014660695,0.00006269911],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013646981,0.00008252266,0.000089048895,0.000033291723,0.000063368265,0.000029238543,0.000030127489,0.000047058104,0.00025174618],"category_scores_gemma":[0.0000073468887,0.00007550945,0.000019313467,0.000046643734,0.000013382562,0.00015101688,0.00000825801,0.000070244954,0.000004346981],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008236098,0.00004955951,0.0007723982,0.00021775952,0.00004641697,0.0000031237007,0.00079274684,0.7330743,0.097643726,0.0019354096,0.019846907,0.14560942],"study_design_scores_gemma":[0.00015728833,0.000006986766,0.0005984958,0.000018043836,0.0000048647958,0.000005684309,0.000016975531,0.81117564,0.0024682058,0.000042087762,0.18541957,0.00008614934],"about_ca_topic_score_codex":0.0000049168098,"about_ca_topic_score_gemma":0.000030590883,"teacher_disagreement_score":0.90669334,"about_ca_system_score_codex":0.000052628235,"about_ca_system_score_gemma":0.0000075616135,"threshold_uncertainty_score":0.3079186},"labels":[],"label_agreement":null},{"id":"W2098868471","doi":"10.1049/ip-gtd:20010582","title":"Interruptible load analysis using sequential Monte Carlo simulation","year":2001,"lang":"en","type":"article","venue":"IEE Proceedings - Generation Transmission and Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Monte Carlo method; Computer science; Index (typography); Operations research; Mathematical optimization; Reliability engineering; Engineering; Mathematics; Statistics","score_opus":0.02946341466373572,"score_gpt":0.2640226382195432,"score_spread":0.23455922355580747,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2098868471","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.52710384,0.00028352358,0.47199512,0.000039133512,0.0001325615,0.00012476504,0.00001996238,0.00013759466,0.00016350091],"genre_scores_gemma":[0.9990855,0.00018582812,0.0003900115,0.000019335183,0.00013153763,0.000010861907,0.00007728299,0.000012280893,0.000087401626],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99895847,0.000011379941,0.00033026238,0.00026269213,0.00022572887,0.00021148642],"domain_scores_gemma":[0.999513,0.0000074191603,0.000051837815,0.00006834372,0.00023077668,0.00012864574],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024379023,0.00016838036,0.00019820522,0.000093725925,0.00017187065,0.00013632503,0.000054427284,0.00013396514,0.00004100176],"category_scores_gemma":[0.000020790018,0.00016189703,0.00009804422,0.0005286218,0.000026600526,0.00044791933,0.000007815608,0.000098703065,0.000003018956],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006656187,0.000044428678,0.0021116917,0.00014545851,0.0001441937,0.0000024621777,0.00086229504,0.8494043,0.13727327,0.0002741339,0.00051366317,0.009157593],"study_design_scores_gemma":[0.00032102875,0.000024017392,0.0004279137,0.000032825,0.00017689475,0.0000111224235,0.00006842958,0.97938746,0.010163403,0.000028170003,0.009172518,0.00018620407],"about_ca_topic_score_codex":0.00004233585,"about_ca_topic_score_gemma":0.000011453402,"teacher_disagreement_score":0.4719816,"about_ca_system_score_codex":0.00023049339,"about_ca_system_score_gemma":0.000021823264,"threshold_uncertainty_score":0.66019696},"labels":[],"label_agreement":null},{"id":"W2099240939","doi":"10.1109/mper.2001.4311233","title":"The Present Status of Maintenance Strategies and the Impact of Maintenance on Reliability","year":2001,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":294,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Power Generation","funders":"","keywords":"Component (thermodynamics); Reliability engineering; Reliability (semiconductor); Probabilistic logic; Heuristic; Computer science; Predictive maintenance; Preventive maintenance; Maintenance actions; Condition-based maintenance; Operations research; Engineering; Artificial intelligence; Power (physics)","score_opus":0.007946417662619292,"score_gpt":0.24461904305901844,"score_spread":0.23667262539639913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2099240939","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32099542,0.62916034,0.027036069,0.001444323,0.002827063,0.0046627778,0.00012466878,0.0005313989,0.013217959],"genre_scores_gemma":[0.83927536,0.16044852,0.00007026826,0.000015875348,0.000024232511,0.00007267587,7.145283e-7,0.000027796712,0.000064556254],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9981037,0.000084292114,0.0007354324,0.00023240075,0.00025295344,0.0005912646],"domain_scores_gemma":[0.9980068,0.00065559126,0.00014857815,0.0009194943,0.00015986488,0.000109623594],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012377991,0.0003008258,0.0006801224,0.000034230576,0.00004485717,0.000034617333,0.0003704277,0.00006199754,0.000012390951],"category_scores_gemma":[0.00057298894,0.00015093587,0.0002996609,0.0003124809,0.0002857843,0.00015841283,0.000037884907,0.000296624,0.000005232454],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006612154,0.00024017761,0.0011990699,0.024116792,0.0009395737,0.000030217767,0.0016376397,0.8780651,0.0019843634,0.039567024,0.032345448,0.019213391],"study_design_scores_gemma":[0.0065617776,0.0013879644,0.054888505,0.05619497,0.0004070925,0.00034425475,0.00072116626,0.16034803,0.002280119,0.0039714226,0.71033883,0.0025559035],"about_ca_topic_score_codex":0.00016160785,"about_ca_topic_score_gemma":0.0000064124742,"teacher_disagreement_score":0.71771705,"about_ca_system_score_codex":0.00013439669,"about_ca_system_score_gemma":0.000060619284,"threshold_uncertainty_score":0.6154986},"labels":[],"label_agreement":null},{"id":"W2099304133","doi":"10.1109/ccece.1996.548121","title":"Flexible generator maintenance scheduling considering uncertainties of objectives and parameters","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Robustness (evolution); Computer science; Reliability engineering; Scheduling (production processes); Fuzzy set; Fuzzy logic; Mathematical optimization; Operations research; Engineering; Mathematics; Artificial intelligence","score_opus":0.01837379248420311,"score_gpt":0.20090221846630385,"score_spread":0.18252842598210073,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2099304133","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91935986,0.004173981,0.06051801,0.00010171011,0.000589025,0.00020904475,0.0000071113564,0.0003973407,0.014643902],"genre_scores_gemma":[0.9842812,0.00036828886,0.014869067,0.000039977087,0.000016037126,0.00001255651,2.3590971e-7,0.000015652467,0.00039702543],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992766,0.00001624248,0.00023399381,0.00016093618,0.000080323065,0.0002319467],"domain_scores_gemma":[0.999608,0.00008276232,0.000028546363,0.00017839755,0.000044440047,0.000057884354],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012122997,0.00012775639,0.00022581141,0.000055556273,0.00003518202,0.00002240484,0.000069061934,0.0000515417,0.00004261635],"category_scores_gemma":[0.000086430206,0.00011268161,0.000041558,0.000106977444,0.00012379188,0.00013677399,0.000025951551,0.00008311732,0.000008285113],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007083677,0.00019450972,0.019465197,0.0051548863,0.00090250437,0.00004983332,0.014468766,0.66422164,0.18070316,0.070162065,0.011856681,0.032749932],"study_design_scores_gemma":[0.0010611616,0.00013361083,0.0009468337,0.0006292924,0.00003574463,0.000056791556,0.0041790884,0.69141793,0.28990388,0.0023686425,0.008414748,0.00085228105],"about_ca_topic_score_codex":0.000040039024,"about_ca_topic_score_gemma":0.000015230401,"teacher_disagreement_score":0.10920073,"about_ca_system_score_codex":0.00003265764,"about_ca_system_score_gemma":0.00000500325,"threshold_uncertainty_score":0.45950228},"labels":[],"label_agreement":null},{"id":"W2099338622","doi":"10.1109/tpwrs.2005.846188","title":"Introduction to Cumulant-Based Probabilistic Optimal Power Flow (P-OPF)","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":44,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Power flow; Probabilistic logic; Cumulant; Mathematical optimization; AC power; Electric power system; Computer science; Flow (mathematics); Power (physics); Reliability engineering; Control theory (sociology); Mathematics; Engineering; Voltage; Statistics; Electrical engineering; Artificial intelligence","score_opus":0.007290677900398316,"score_gpt":0.204909744080159,"score_spread":0.1976190661797607,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2099338622","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013298762,0.0001263287,0.97197586,0.001004578,0.0100112865,0.0010888078,0.00011905161,0.0009816883,0.0013936143],"genre_scores_gemma":[0.9957333,0.0000045442425,0.0021522054,0.00011773235,0.00022636847,0.00036667648,0.0000051147126,0.00008454731,0.0013094622],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99773127,0.00009240306,0.00062872533,0.00056073314,0.00040220076,0.00058469374],"domain_scores_gemma":[0.99859667,0.00007984307,0.000049543793,0.0008470039,0.00014633588,0.0002805965],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0004090156,0.00038994485,0.00043114772,0.00028799364,0.00014599993,0.000111197594,0.00026636195,0.00020175257,0.0002867561],"category_scores_gemma":[0.000017814995,0.00038004352,0.000187829,0.0004308698,0.00004829433,0.0002604648,0.000001222936,0.00036251717,0.0015498938],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006671069,0.00015410135,0.0000010393303,0.00014523909,0.00005658246,0.0000045312922,0.0004501039,0.9830426,0.0016331815,0.00006953257,0.013954477,0.00042192463],"study_design_scores_gemma":[0.0008336636,0.00042605313,0.000021888394,0.0002846272,0.000055620218,0.00008719416,0.00021884241,0.6004056,0.010217477,0.0000032514733,0.38664785,0.00079795223],"about_ca_topic_score_codex":0.000035002526,"about_ca_topic_score_gemma":0.000051954004,"teacher_disagreement_score":0.9824346,"about_ca_system_score_codex":0.00055622135,"about_ca_system_score_gemma":0.00005377754,"threshold_uncertainty_score":0.9998652},"labels":[],"label_agreement":null},{"id":"W2100448376","doi":"10.1109/ccece.1993.332493","title":"A fuzzy logic based approach for HL1 reliability evaluation","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Energie NB Power (Canada); University of New Brunswick","funders":"","keywords":"Fuzzy logic; Fuzzy inference system; Reliability (semiconductor); Inference; Adaptive neuro fuzzy inference system; Computer science; Data mining; Rule of inference; Fuzzy number; Process (computing); Fuzzy control system; Reliability theory; Artificial intelligence; Reliability engineering; Fuzzy set; Mathematics; Power (physics); Statistics; Engineering; Failure rate","score_opus":0.041663427346623615,"score_gpt":0.23926253193663946,"score_spread":0.19759910459001584,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2100448376","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002913965,0.0003316602,0.7995273,0.00019828299,0.00033365175,0.0012478763,0.00001120212,0.00047097603,0.19496511],"genre_scores_gemma":[0.9719877,0.0000040769105,0.026910832,0.000113600065,0.00004612109,0.0004494566,0.000014793346,0.000015185472,0.000458224],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990976,0.00004199698,0.0002210959,0.00022819983,0.00018135124,0.000229779],"domain_scores_gemma":[0.9993486,0.000081681814,0.000018479319,0.00037354766,0.0001232868,0.000054436834],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00092389964,0.000116441646,0.00015177451,0.000033864508,0.000040037325,0.000018387029,0.00011292573,0.00008894141,0.00019226666],"category_scores_gemma":[0.00025340423,0.00009695885,0.000089831825,0.000119650635,0.000024804833,0.00009006377,0.000007599825,0.00006715054,0.00004627622],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030993426,0.00040595647,0.00043457348,0.0015967545,0.00004067147,5.085423e-7,0.0003278744,0.900682,0.0012074815,0.008952946,0.067743905,0.018576343],"study_design_scores_gemma":[0.00048682716,0.000035708752,0.0001501903,0.0000084661315,0.00001582754,9.568114e-7,0.000026595515,0.9874203,0.0004288843,0.0021928074,0.009096519,0.00013688912],"about_ca_topic_score_codex":0.000007220947,"about_ca_topic_score_gemma":0.000002440663,"teacher_disagreement_score":0.9690738,"about_ca_system_score_codex":0.00014196502,"about_ca_system_score_gemma":0.000008834461,"threshold_uncertainty_score":0.39538673},"labels":[],"label_agreement":null},{"id":"W2100935434","doi":"10.1109/tec.2006.882415","title":"Multistate Wind Energy Conversion System Models for Adequacy Assessment of Generating Systems Incorporating Wind Energy","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Conversion","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":313,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Electric power system; Monte Carlo method; Reliability (semiconductor); Reliability engineering; Energy transformation; Sampling (signal processing); Electricity generation; Energy (signal processing); Computer science; Wind speed; Engineering; Power (physics); Electrical engineering; Meteorology","score_opus":0.01647586914828242,"score_gpt":0.21190826906514784,"score_spread":0.19543239991686542,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2100935434","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028948244,0.0002932192,0.96621317,0.000013517341,0.003186072,0.0002330809,0.00014321523,0.00036637194,0.0006031122],"genre_scores_gemma":[0.99610215,0.00032706716,0.0025783565,0.00003931738,0.00012385081,0.000083614716,0.000050160004,0.00009217039,0.000603292],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99731934,0.00017944352,0.0009480049,0.00056084036,0.00049112143,0.0005012321],"domain_scores_gemma":[0.9983735,0.00026245174,0.00031103098,0.0005354715,0.00030341223,0.000214129],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003049367,0.00046080872,0.0006889688,0.00033101442,0.00048648255,0.00003507281,0.0002809127,0.00031933392,0.00001094208],"category_scores_gemma":[0.0000036955803,0.0004760668,0.00029968878,0.00033286915,0.000116122246,0.0005180452,0.000006008062,0.00019094352,0.000002530952],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008169817,0.00009270906,0.0000064965675,0.0006907681,0.00014504655,0.00001928762,0.000153116,0.9689804,0.025608,0.003003704,0.00033891347,0.00087991735],"study_design_scores_gemma":[0.00148396,0.00021052513,0.0000035624169,0.0004983685,0.00006432536,0.000053108346,0.0004381028,0.8971146,0.097498424,0.000014287761,0.00219937,0.00042138647],"about_ca_topic_score_codex":0.002307646,"about_ca_topic_score_gemma":0.00006274098,"teacher_disagreement_score":0.9671539,"about_ca_system_score_codex":0.0006797839,"about_ca_system_score_gemma":0.00015354669,"threshold_uncertainty_score":0.9997691},"labels":[],"label_agreement":null},{"id":"W2100990002","doi":"10.1109/tpwrs.2008.2002296","title":"Security Coordinated Maintenance Scheduling in Deregulation Based on Genco Contribution to Unserved Energy","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":42,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Scheduling (production processes); Deregulation; Reliability engineering; Schedule; Engineering; Computer science; Operations research; Operations management; Economics","score_opus":0.008196667815333517,"score_gpt":0.19509095127587334,"score_spread":0.18689428346053982,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2100990002","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15654153,0.00009608702,0.83896005,0.00011696854,0.0027121957,0.0005327333,0.000058913272,0.00039465132,0.0005868859],"genre_scores_gemma":[0.9993005,0.00001732743,0.00007651673,0.00013008768,0.00001616334,0.0002498112,0.000009484854,0.000044953555,0.00015520399],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99801844,0.00016240678,0.0005993012,0.00041127368,0.00030800982,0.00050056033],"domain_scores_gemma":[0.9989751,0.00012538276,0.00006147729,0.00048200422,0.00018082582,0.000175239],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000380504,0.000303856,0.00041307992,0.00036589423,0.00015429831,0.00003385262,0.0001778016,0.00023281164,0.0000203652],"category_scores_gemma":[0.000022353375,0.00031225552,0.0001272876,0.00071861356,0.000038831786,0.00017622062,8.7511967e-7,0.000283474,0.00006988855],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013272701,0.00013298984,0.00008861655,0.00007113639,0.000023172039,0.000025998066,0.00021923943,0.9968304,0.0016490353,0.00047342022,0.0003079767,0.000045298922],"study_design_scores_gemma":[0.0015698023,0.00023924292,0.0009798046,0.00082743994,0.00001223058,0.000039410934,0.000099819226,0.9738298,0.016266957,0.00003180098,0.0055854525,0.0005182126],"about_ca_topic_score_codex":0.0003985879,"about_ca_topic_score_gemma":0.0003384869,"teacher_disagreement_score":0.84275895,"about_ca_system_score_codex":0.0006789968,"about_ca_system_score_gemma":0.00005483073,"threshold_uncertainty_score":0.99993294},"labels":[],"label_agreement":null},{"id":"W2101284911","doi":"10.1109/ccece.2000.849568","title":"Power system reliability in a deregulated environment","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Computer science; Database transaction; Reliability (semiconductor); Probabilistic logic; Reliability engineering; Transmission (telecommunications); Computer security; Computer security model; Set (abstract data type); Security analysis; Electric power system; Distributed computing; Power (physics); Engineering; Telecommunications; Database","score_opus":0.004658622104919873,"score_gpt":0.1448918231264543,"score_spread":0.14023320102153441,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2101284911","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7502877,0.0009267042,0.010517992,0.000208084,0.00066464377,0.0006132737,0.0000065722625,0.0011121914,0.23566282],"genre_scores_gemma":[0.9987902,0.000025054873,0.00031347052,0.000016100907,0.000008079909,0.000031111053,5.7685503e-7,0.000015347234,0.00080002716],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99909675,0.000031705393,0.00029334304,0.0001959872,0.000117265874,0.00026492757],"domain_scores_gemma":[0.99948543,0.00002768952,0.000012662078,0.00040200725,0.000007208365,0.00006502119],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020756754,0.00012378063,0.00017856603,0.00004440662,0.000015658927,0.000010584181,0.000108320804,0.00008755966,0.00071436365],"category_scores_gemma":[0.000013622832,0.00010879521,0.000045693563,0.00010462602,0.000026432628,0.00008175029,0.00002116783,0.000104163184,0.0006660088],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009355175,0.0018294611,0.05256538,0.007116929,0.00029486974,0.0004950935,0.0118756,0.77433866,0.01462026,0.04040536,0.08512983,0.011234985],"study_design_scores_gemma":[0.0016023774,0.000097578086,0.03364098,0.00042122183,0.0000119639135,0.00007042049,0.0009705679,0.84369206,0.002948834,0.0002113214,0.11536019,0.00097250653],"about_ca_topic_score_codex":0.000025719937,"about_ca_topic_score_gemma":0.000008687651,"teacher_disagreement_score":0.24850251,"about_ca_system_score_codex":0.0003300295,"about_ca_system_score_gemma":0.0000015674113,"threshold_uncertainty_score":0.8560418},"labels":[],"label_agreement":null},{"id":"W2101816493","doi":"10.1109/39.920959","title":"Front Cover","year":2001,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Purchasing power parity; Currency; Reliability (semiconductor); Purchasing; Purchasing power; Economics; Business; Value (mathematics); Actuarial science; Econometrics; Power (physics); Computer science; Monetary economics; Operations management; Macroeconomics; Exchange rate","score_opus":0.006601754847946444,"score_gpt":0.20010831409329363,"score_spread":0.19350655924534718,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2101816493","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009893542,0.6451815,0.26748702,0.00049890147,0.010705856,0.0013671269,0.000026028585,0.0033857794,0.06145429],"genre_scores_gemma":[0.8406856,0.15408473,0.0012576032,0.00090084784,0.00025963146,0.00018754543,0.0000072206562,0.0001588301,0.002458003],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989102,0.000011245151,0.00034824378,0.0001915397,0.00016268235,0.00037610898],"domain_scores_gemma":[0.9993174,0.00003760991,0.000022559047,0.00046010292,0.00003591722,0.00012641212],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0002542464,0.00023399938,0.00039317735,0.000045857985,0.000016957474,0.000018575707,0.00021536103,0.00006769647,0.0006343107],"category_scores_gemma":[0.00006237089,0.00021779716,0.00014121296,0.00017654133,0.000011471988,0.00013924162,0.0000141378005,0.00018997955,0.0021769416],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011889354,0.00012879178,0.0004359405,0.029378243,0.00041353868,0.00033874213,0.00039278134,0.19137411,0.0067290594,0.0011264962,0.7553298,0.014340598],"study_design_scores_gemma":[0.00010107616,0.000013321795,0.00016811077,0.0032099173,0.000021996208,0.000079193785,0.0000010304963,0.005443258,0.0002283999,0.0000070883607,0.99043137,0.0002952435],"about_ca_topic_score_codex":0.0000031699385,"about_ca_topic_score_gemma":7.54088e-7,"teacher_disagreement_score":0.83079207,"about_ca_system_score_codex":0.00010146676,"about_ca_system_score_gemma":0.000009710111,"threshold_uncertainty_score":0.9986},"labels":[],"label_agreement":null},{"id":"W2102294353","doi":"10.1109/ccece.2003.1226469","title":"Impact of equipment availability on composite system reliability","year":2004,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Electric power system; Transmission system; Probabilistic logic; Monte Carlo method; Electricity; Electricity generation; Computer science; Transmission (telecommunications); Mains electricity; Electric power transmission; Component (thermodynamics); Function (biology); Engineering; Power (physics); Electrical engineering; Telecommunications; Voltage","score_opus":0.0079665390342331,"score_gpt":0.22711876247814342,"score_spread":0.2191522234439103,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2102294353","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95629907,0.000049988015,0.008865816,0.000027582682,0.00039401845,0.00038785767,0.000033200187,0.0004919446,0.03345051],"genre_scores_gemma":[0.99925274,0.0000044101344,0.00062072027,0.000007445443,0.000020234824,0.0000300206,0.0000029313574,0.000016235888,0.000045287376],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99872226,0.0000383554,0.00048406707,0.00024956447,0.00021593564,0.0002898141],"domain_scores_gemma":[0.99896497,0.0000638636,0.000044729044,0.0007225784,0.00008648275,0.00011740146],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047417305,0.00019231277,0.00035508754,0.00004698837,0.000029488789,0.000011539292,0.00018486002,0.000087620305,0.00006028191],"category_scores_gemma":[0.00003863124,0.00014301993,0.00022887602,0.00015386046,0.000067507186,0.00008666465,0.000031946285,0.00013030518,0.0001441066],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020291004,0.00070950645,0.025991665,0.0030649866,0.00020882074,0.000010571597,0.00064439804,0.93609655,0.017779656,0.013231183,0.0013276791,0.00073209044],"study_design_scores_gemma":[0.007260757,0.0037682147,0.78192294,0.0031263183,0.00012552552,0.00009373451,0.00054228306,0.036346555,0.15847632,0.0034208708,0.0025503985,0.0023660793],"about_ca_topic_score_codex":0.00044341627,"about_ca_topic_score_gemma":0.0000137903235,"teacher_disagreement_score":0.89975,"about_ca_system_score_codex":0.0012781504,"about_ca_system_score_gemma":0.000045985093,"threshold_uncertainty_score":0.58321834},"labels":[],"label_agreement":null},{"id":"W2102371808","doi":"10.1109/pess.2000.866963","title":"Customer-responsive bulk transmission system reliability performance standards for use in a competitive electricity market","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Reliability (semiconductor); Electricity market; Electricity; Competition (biology); Computer science; Transmission system; Electric utility; Transmission (telecommunications); Risk analysis (engineering); Reliability engineering; Service (business); Business; Environmental economics; Telecommunications; Marketing; Engineering; Economics","score_opus":0.009678366983125315,"score_gpt":0.2053417389134532,"score_spread":0.19566337193032787,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2102371808","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7074121,0.0007402502,0.1956989,0.0002011558,0.0009028825,0.003603807,0.00048228243,0.0013654198,0.089593165],"genre_scores_gemma":[0.9965384,0.00017609085,0.0016849869,0.000027400401,0.000024959867,0.00016792763,0.0000033645852,0.000030264478,0.001346595],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99824023,0.000115556744,0.00048361774,0.00035309675,0.000303411,0.0005040822],"domain_scores_gemma":[0.9987456,0.00046923652,0.000039476123,0.00035009347,0.00027507188,0.000120499004],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011041794,0.00024210627,0.00041416433,0.0001461823,0.000077175406,0.000037542864,0.00017003024,0.00015130467,0.00016031369],"category_scores_gemma":[0.00020179836,0.00021051014,0.00011501056,0.00038507866,0.000049357157,0.00034367494,0.000014895565,0.00022989845,0.000020646208],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.017648363,0.0033914146,0.04306734,0.07987051,0.0008438997,0.00031104274,0.018529385,0.21276963,0.016911738,0.039408926,0.3802089,0.18703884],"study_design_scores_gemma":[0.0012404099,0.00016907106,0.0037520735,0.00057538715,0.00001450594,0.000017882367,0.00017332172,0.8093174,0.0034640604,0.000011330303,0.1808832,0.0003813626],"about_ca_topic_score_codex":0.00005767183,"about_ca_topic_score_gemma":0.00005159777,"teacher_disagreement_score":0.5965478,"about_ca_system_score_codex":0.00093733665,"about_ca_system_score_gemma":0.000039719347,"threshold_uncertainty_score":0.85843545},"labels":[],"label_agreement":null},{"id":"W2102447398","doi":"10.1109/ccece.1999.804882","title":"Generating unit commitment using a reliability framework","year":2003,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Computer science; Reliability engineering; Unit (ring theory); Power system simulation; Engineering; Psychology; Power (physics); Electric power system","score_opus":0.022544536005273428,"score_gpt":0.24644503934423267,"score_spread":0.22390050333895925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2102447398","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46578327,0.00026180976,0.5103851,0.000028183129,0.00085056014,0.00021300152,0.0000025218353,0.00036957095,0.02210596],"genre_scores_gemma":[0.9070406,0.00000918131,0.09261936,0.00010631667,0.000035949077,0.0000126067935,6.7286004e-7,0.000018502067,0.00015680077],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991227,0.00007126848,0.0002527643,0.00016711553,0.0001114875,0.00027471],"domain_scores_gemma":[0.99935097,0.000092957474,0.000017909162,0.00041611234,0.000042005664,0.00008007436],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043148253,0.00013270031,0.00016380961,0.000024946798,0.000080921185,0.00003100546,0.000091684014,0.00009652755,0.00017785221],"category_scores_gemma":[0.00021737027,0.00011851471,0.000053885746,0.00016237475,0.00002798946,0.000082350154,0.000015553102,0.00017835862,0.00003945052],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003826551,0.000115329036,0.015730467,0.0004321424,0.000071233495,0.000011108899,0.00086463854,0.88233656,0.006815831,0.09058559,0.0018605316,0.0011727465],"study_design_scores_gemma":[0.00052875315,0.000054029104,0.00070084125,0.00032222,0.00003728394,0.000050047198,0.00074604864,0.8039091,0.020418417,0.0129240565,0.15934782,0.0009613792],"about_ca_topic_score_codex":0.00003274958,"about_ca_topic_score_gemma":0.000009802619,"teacher_disagreement_score":0.44125733,"about_ca_system_score_codex":0.00011657358,"about_ca_system_score_gemma":0.000020484731,"threshold_uncertainty_score":0.48328897},"labels":[],"label_agreement":null},{"id":"W2102708400","doi":"10.1109/wescan.1995.493937","title":"Development of customer survey instruments for reliability worth evaluation in electric power systems","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Work (physics); Government (linguistics); Electric power; Electric power industry; Computer science; Electric power system; Engineering management; Power (physics); Business; Engineering; Electricity; Electrical engineering","score_opus":0.03249888218825363,"score_gpt":0.24068237699374265,"score_spread":0.20818349480548903,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2102708400","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98495233,0.0002461105,0.0071239243,0.000004968384,0.0005861239,0.0011453998,0.000007932343,0.00006862223,0.005864578],"genre_scores_gemma":[0.9986442,0.000012163913,0.0009179327,0.0000039882666,0.000003957769,0.00021809063,0.00000915436,0.00001387419,0.0001766711],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985919,0.00008824774,0.00059855275,0.00019295656,0.0002700017,0.00025832432],"domain_scores_gemma":[0.9993855,0.000088922454,0.000052741914,0.00024219905,0.0001886918,0.000041964107],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002361042,0.0001215692,0.00024437424,0.00012534168,0.000020714348,0.0000102238755,0.00011263164,0.000082631435,0.00007005971],"category_scores_gemma":[0.00023583153,0.000109629655,0.00003433828,0.00037413868,0.000010081808,0.00010965605,0.000012396077,0.00006893021,0.000031492622],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003183777,0.0021489435,0.6056771,0.0063794786,0.00051129196,0.000001811216,0.011420566,0.23806557,0.011566558,0.0018150684,0.018693116,0.10340209],"study_design_scores_gemma":[0.001722254,0.000059875743,0.2762504,0.00018778129,0.000014046412,0.000001909034,0.00014912018,0.7042773,0.0036354898,0.000037430957,0.013205717,0.0004587016],"about_ca_topic_score_codex":0.00008153111,"about_ca_topic_score_gemma":0.00023587012,"teacher_disagreement_score":0.4662117,"about_ca_system_score_codex":0.0003772888,"about_ca_system_score_gemma":0.000036370464,"threshold_uncertainty_score":0.44705677},"labels":[],"label_agreement":null},{"id":"W2103063085","doi":"10.1109/pesgm.2014.6938969","title":"Generation system reliability evaluation incorporating correlations of wind speeds with different distributions","year":2014,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Weibull distribution; Reliability (semiconductor); Wind speed; Monte Carlo method; Log-normal distribution; Probability distribution; Reliability engineering; Computer science; Wind power; Probability density function; Mathematics; Statistics; Meteorology; Engineering; Physics; Power (physics)","score_opus":0.018076894331796583,"score_gpt":0.22088062864556604,"score_spread":0.20280373431376947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2103063085","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5285876,0.000015205638,0.46373534,0.00003155832,0.00028807909,0.00033697998,0.000017198348,0.00014597384,0.006842086],"genre_scores_gemma":[0.99852085,7.7510265e-7,0.001201736,0.0000023782472,0.00007789811,0.00003507961,0.0001093215,0.000011512501,0.00004045233],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988951,0.00011953891,0.00040223097,0.00016921188,0.00028185945,0.00013207497],"domain_scores_gemma":[0.999113,0.00008166222,0.000092824084,0.00036382998,0.0002942838,0.000054372707],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007534464,0.0001262258,0.00020218792,0.00004390243,0.00008618088,0.000019844543,0.000073797884,0.00006987331,0.000018704555],"category_scores_gemma":[0.00013560729,0.00009488124,0.00004158476,0.00018410277,0.000050338273,0.00014627531,0.00001356474,0.000090546426,0.000008037566],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000149215875,0.000120924255,0.03190179,0.0007441412,0.00006752849,2.711127e-7,0.00031634286,0.84000695,0.011353927,0.112479106,0.00078787055,0.0022062],"study_design_scores_gemma":[0.00031552964,0.00006457921,0.019688897,0.00011121298,0.000053192634,0.0000042486313,0.0001069644,0.9740662,0.00510279,0.00021921581,0.00013679807,0.00013038622],"about_ca_topic_score_codex":0.000038522357,"about_ca_topic_score_gemma":0.00012347715,"teacher_disagreement_score":0.46993327,"about_ca_system_score_codex":0.00027176406,"about_ca_system_score_gemma":0.000028218952,"threshold_uncertainty_score":0.38691446},"labels":[],"label_agreement":null},{"id":"W2103826187","doi":"10.1007/s13198-010-0022-9","title":"Estimation of cost of unserved energy: a customer survey approach","year":2010,"lang":"en","type":"article","venue":"International Journal of Systems Assurance Engineering and Management","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Estimation; Investment (military); Order (exchange); Business; Power (physics); Environmental economics; Transport engineering; Engineering; Finance; Economics","score_opus":0.006677605319313404,"score_gpt":0.20381942563552433,"score_spread":0.19714182031621091,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2103826187","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29380286,0.00095010694,0.6975123,0.000023375422,0.0058562793,0.00022486913,0.00004445088,0.0000430884,0.0015426049],"genre_scores_gemma":[0.9974197,0.00028905566,0.0021450862,0.0000019077293,0.000065338885,0.000011125237,0.0000044706694,0.000013517807,0.00004975658],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989138,0.000019292924,0.0005724659,0.00007615152,0.00031965596,0.00009862884],"domain_scores_gemma":[0.99925065,0.00007144375,0.00027432246,0.000118853946,0.00023885115,0.00004588173],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00071274134,0.0001068295,0.00028576097,0.00020831308,0.0000071000954,0.000021809245,0.00022612927,0.000047767222,0.0000014185526],"category_scores_gemma":[0.00006204299,0.00009694306,0.000056693214,0.00010280263,0.00002129705,0.00014556968,0.000023309376,0.000109280394,4.4725846e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002479602,0.00004230442,0.001055591,0.0009807047,0.0003961888,0.00000688325,0.000096529635,0.9855262,0.002662989,0.0055826306,0.00043528975,0.003189892],"study_design_scores_gemma":[0.0010842696,0.000041896645,0.053485952,0.0011466888,0.000046453108,0.00013377522,0.000094212664,0.92925245,0.0021620654,0.0000192197,0.012291519,0.00024148585],"about_ca_topic_score_codex":0.000097902775,"about_ca_topic_score_gemma":0.000010643445,"teacher_disagreement_score":0.70361686,"about_ca_system_score_codex":0.000032332613,"about_ca_system_score_gemma":0.000008721897,"threshold_uncertainty_score":0.39532232},"labels":[],"label_agreement":null},{"id":"W2104475181","doi":"10.1109/tia.2009.2036504","title":"Assessment of Transmission-Line Common-Mode, Station-Originated, and Fault-Type Forced-Outage Rates","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Electric power transmission; Reliability (semiconductor); Transmission line; Reliability engineering; Fault (geology); Transmission (telecommunications); Line (geometry); Power transmission; Power (physics); Engineering; Mode (computer interface); Computer science; Electrical engineering; Mathematics","score_opus":0.012480912252382853,"score_gpt":0.30542717359049865,"score_spread":0.2929462613381158,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2104475181","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.057457913,0.00007149458,0.9390437,0.00032467794,0.00012639229,0.00061781023,0.00018255174,0.00022664823,0.001948793],"genre_scores_gemma":[0.9966988,0.00017035005,0.0024721094,0.000054817177,0.00002096623,0.00017675606,0.000021525406,0.000018513118,0.00036615363],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99901694,0.000025821879,0.00038955142,0.00021999468,0.00015235,0.0001953624],"domain_scores_gemma":[0.99926716,0.00010481243,0.0000540978,0.00034629565,0.000100697165,0.00012695113],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010968097,0.00017936259,0.00023283059,0.00011295185,0.00012966212,0.000022362869,0.00013950275,0.00026130423,0.000054684708],"category_scores_gemma":[0.0000014610517,0.00017877317,0.000054802276,0.00043225684,0.00006605345,0.00014998834,4.8024145e-7,0.0005660295,0.0000070867886],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032932265,0.00061426836,0.00011230301,0.00029110274,0.00012283942,0.0000020108948,0.00044000143,0.86249036,0.04545397,0.006828197,0.00051527313,0.083096735],"study_design_scores_gemma":[0.002864787,0.0009095821,0.005938301,0.0006259371,0.0003291687,0.00006368586,0.0007582018,0.64411294,0.23942319,0.005775414,0.097723626,0.0014751601],"about_ca_topic_score_codex":0.000027366796,"about_ca_topic_score_gemma":0.000009557941,"teacher_disagreement_score":0.9392409,"about_ca_system_score_codex":0.00007275355,"about_ca_system_score_gemma":0.000053629574,"threshold_uncertainty_score":0.7290159},"labels":[],"label_agreement":null},{"id":"W2104551580","doi":"10.1049/ip-gtd:20030397","title":"Composite system reliability evaluation incorporating a six-phase transmission line","year":2003,"lang":"en","type":"article","venue":"IEE Proceedings - Generation Transmission and Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Transmission line; Reliability engineering; Transmission system; Phase (matter); Transmission (telecommunications); Point (geometry); Line (geometry); Computer science; Engineering; Mathematics; Telecommunications; Physics","score_opus":0.017857395843779076,"score_gpt":0.25137863255143816,"score_spread":0.2335212367076591,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2104551580","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4250854,0.0009822008,0.57082784,0.00016223315,0.000344884,0.00084815786,0.000049391845,0.00045133705,0.001248578],"genre_scores_gemma":[0.996738,0.000109885244,0.0024367194,0.000020427302,0.00010367658,0.00012579095,0.0004142768,0.000026052874,0.000025175672],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99796313,0.00009017152,0.000701598,0.00047718876,0.0004705703,0.00029736687],"domain_scores_gemma":[0.99897677,0.000024693058,0.00011811966,0.0001324216,0.00047378807,0.00027421504],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0016671321,0.00030233787,0.00030590914,0.0000707978,0.00038519967,0.00015338245,0.00008140919,0.00024279719,0.000027999316],"category_scores_gemma":[0.000086169224,0.00027347522,0.000089028676,0.00035071225,0.00005491618,0.00050479296,0.0000058101846,0.00021957672,0.0000068729846],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001617097,0.00034003067,0.0003450104,0.002350475,0.000037064565,0.0000026029545,0.00090171053,0.012438543,0.8757137,0.0139181735,0.00241112,0.09137983],"study_design_scores_gemma":[0.0021370228,0.00014482862,0.00013811082,0.00031984478,0.00008349753,0.000040027913,0.00019380712,0.7901616,0.1886528,0.0003272646,0.017445961,0.00035522337],"about_ca_topic_score_codex":0.0000075306334,"about_ca_topic_score_gemma":0.0000011689717,"teacher_disagreement_score":0.7777231,"about_ca_system_score_codex":0.00033766436,"about_ca_system_score_gemma":0.000064709784,"threshold_uncertainty_score":0.99997175},"labels":[],"label_agreement":null},{"id":"W2105059868","doi":"10.1109/tpwrs.2013.2291446","title":"Use of Mobile Unit Substations in Redundant Customer Delivery Systems","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Reliability engineering; Transformer; Probabilistic logic; Markov chain; Computer science; Markov model; Mobile telephony; Engineering; Operations research; Telecommunications; Electrical engineering; Mobile radio; Artificial intelligence","score_opus":0.018393798882227058,"score_gpt":0.21319556549481544,"score_spread":0.19480176661258838,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2105059868","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24208443,0.00045850786,0.7470671,0.000007712117,0.006627789,0.0009828795,0.00018090934,0.0003263441,0.0022643341],"genre_scores_gemma":[0.9985823,0.00008171903,0.000053007476,0.000007953343,0.000010119825,0.0003558334,0.0000037466316,0.00005301444,0.0008522806],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99804425,0.00020279508,0.0008189347,0.00027699495,0.0002924297,0.0003646127],"domain_scores_gemma":[0.9987121,0.00030733855,0.00009678349,0.0006112339,0.00015412387,0.00011839118],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004462486,0.00025167462,0.00049631065,0.00040574872,0.0000667894,0.00006639367,0.00018973571,0.00017516619,0.000017488908],"category_scores_gemma":[0.000009556437,0.00024733253,0.00012588075,0.00052674464,0.00006922272,0.00033458084,9.725135e-7,0.00028044757,0.00014171792],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000215485,0.0001239587,0.00008550253,0.0004594374,0.00006533015,0.0000041376047,0.00081734126,0.9944811,0.0027645996,0.0005993741,0.0004505612,0.00012713102],"study_design_scores_gemma":[0.002067283,0.000589179,0.00097469037,0.003365519,0.00014167992,0.00014322964,0.00403553,0.746187,0.010230134,0.000014432176,0.23069225,0.0015591106],"about_ca_topic_score_codex":0.0011999052,"about_ca_topic_score_gemma":0.00028854184,"teacher_disagreement_score":0.7564979,"about_ca_system_score_codex":0.00016899615,"about_ca_system_score_gemma":0.000036066114,"threshold_uncertainty_score":0.9999979},"labels":[],"label_agreement":null},{"id":"W2105095940","doi":"","title":"Incorporating multistate unit models in composite system adequacy assessment","year":2004,"lang":"en","type":"article","venue":"IEEE International Conference on Probabilistic Methods Applied to Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Derating; Reliability engineering; Reliability (semiconductor); Statistic; Computer science; Point (geometry); Contingency; Engineering; Statistics; Mathematics; Power (physics)","score_opus":0.07335873096877843,"score_gpt":0.35131442511698124,"score_spread":0.2779556941482028,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2105095940","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016069015,0.000025034124,0.868407,0.00013217458,0.004396791,0.001763117,0.000086614484,0.00043768654,0.10868253],"genre_scores_gemma":[0.9120383,0.0000036087858,0.08670248,0.000052782107,0.00006882486,0.00096483756,0.000020633192,0.000061860635,0.00008664925],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9964497,0.0002903484,0.0013348929,0.0007347239,0.0006634356,0.0005268827],"domain_scores_gemma":[0.99821603,0.00030115177,0.00023648376,0.00063610176,0.00034538953,0.00026485376],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0022242505,0.00048804868,0.0007429252,0.00039387756,0.00007973111,0.00027860614,0.00079209544,0.00018992314,0.000013903947],"category_scores_gemma":[0.000075305165,0.00047446904,0.00008761147,0.0003857531,0.00007375544,0.00020896396,0.000082799954,0.00051678816,0.00010577876],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003414164,0.00005665327,0.000014695212,0.00025457292,0.000039096656,0.000017459744,0.00037891127,0.50910753,0.0077429987,0.4819875,0.00001613225,0.00035026995],"study_design_scores_gemma":[0.0021499381,0.00019893293,0.00025404064,0.0029114776,0.000024551315,0.00006310398,0.0018114821,0.95300037,0.0019303699,0.035736512,0.0007972356,0.0011220179],"about_ca_topic_score_codex":0.00034985386,"about_ca_topic_score_gemma":0.00006628415,"teacher_disagreement_score":0.89596933,"about_ca_system_score_codex":0.0016022691,"about_ca_system_score_gemma":0.0001871599,"threshold_uncertainty_score":0.9997707},"labels":[],"label_agreement":null},{"id":"W2105697967","doi":"10.1109/wescan.1995.493961","title":"A comparison of Monte Carlo simulation techniques for composite power system reliability assessment","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":99,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Monte Carlo method; Reliability (semiconductor); Computer science; Reliability engineering; Electric power system; Sampling (signal processing); Composite number; Power (physics); Simulation; Algorithm; Engineering; Mathematics; Statistics","score_opus":0.02066600492102644,"score_gpt":0.2967674092996149,"score_spread":0.2761014043785885,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2105697967","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22441329,0.00034748952,0.7414761,0.00007251589,0.000587951,0.0018876285,0.000056094414,0.0014337853,0.02972511],"genre_scores_gemma":[0.9874491,0.0000028393963,0.012278355,0.000007209273,0.000017254222,0.00009927145,0.0000016959469,0.000019463927,0.00012477323],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988744,0.00003555951,0.0005498639,0.00018485422,0.00016084907,0.00019446696],"domain_scores_gemma":[0.9991508,0.00017625117,0.00007576933,0.00037789863,0.00016915683,0.000050109116],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032036853,0.00014358878,0.0003942446,0.000050840565,0.000039103008,0.00001599494,0.0001247906,0.00010175228,0.000018849249],"category_scores_gemma":[0.00002443468,0.00012729544,0.000115534254,0.000099382705,0.000029131652,0.000116277355,0.000019682877,0.00008836569,0.0000042485067],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032523556,0.0003071881,0.014451314,0.0033484502,0.000085366046,8.28688e-7,0.0010611578,0.966126,0.0051565147,0.0022298552,0.005037257,0.0021635273],"study_design_scores_gemma":[0.00018546323,0.00010576449,0.0013163083,0.00014867308,0.000016035588,8.383872e-7,0.00018503194,0.9846045,0.006608605,0.000013882999,0.0066723283,0.00014256327],"about_ca_topic_score_codex":0.00002925067,"about_ca_topic_score_gemma":0.000008301798,"teacher_disagreement_score":0.76303583,"about_ca_system_score_codex":0.00023605129,"about_ca_system_score_gemma":0.0000045469674,"threshold_uncertainty_score":0.5190957},"labels":[],"label_agreement":null},{"id":"W2106270777","doi":"10.1142/s0218539309003599","title":"RESIDENTIAL CUSTOMERS' OUTAGE COST ANALYSIS FOR URBAN AND SEMI-URBAN AREAS IN A DEVELOPING COUNTRY","year":2009,"lang":"en","type":"article","venue":"International Journal of Reliability Quality and Safety Engineering","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Electricity; Mains electricity; Environmental economics; Valuation (finance); Urban area; Consumption (sociology); Cost analysis; Computer science; Business; Reliability engineering; Economics; Engineering; Finance; Voltage; Electrical engineering","score_opus":0.010677800217571493,"score_gpt":0.26630662762361645,"score_spread":0.255628827406045,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106270777","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7160502,0.0014259969,0.27849972,0.0018816845,0.0012785416,0.00041126253,0.0001413289,0.000085658416,0.00022560229],"genre_scores_gemma":[0.997106,0.0005137463,0.0020522487,0.00010638615,0.00017210656,0.0000061809546,0.0000149137795,0.000011720986,0.000016673413],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99801147,0.000049288563,0.0010884412,0.00022310588,0.00037312374,0.00025456183],"domain_scores_gemma":[0.99876004,0.00048427173,0.00016397102,0.00015901367,0.0003077285,0.00012495798],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002288084,0.00019867571,0.0005291105,0.00038463128,0.000037841437,0.00008230829,0.00024299182,0.00014159267,0.0000035457067],"category_scores_gemma":[0.0007617999,0.0001991304,0.00016283807,0.0002894682,0.000043136297,0.00037465675,0.00003323824,0.00032113513,3.2771015e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011851181,0.00017279696,0.13292149,0.0012032926,0.0016633184,0.00007526283,0.004446978,0.8241644,0.0016039151,0.02791385,0.0005651756,0.004084436],"study_design_scores_gemma":[0.0033357705,0.0001347402,0.8023781,0.00095548615,0.0002426546,0.00009525903,0.000503621,0.14400667,0.0005532455,0.001755936,0.045185383,0.0008531154],"about_ca_topic_score_codex":0.000044927045,"about_ca_topic_score_gemma":0.00007052209,"teacher_disagreement_score":0.6801577,"about_ca_system_score_codex":0.00039205293,"about_ca_system_score_gemma":0.00005465836,"threshold_uncertainty_score":0.8120302},"labels":[],"label_agreement":null},{"id":"W2107866704","doi":"10.1109/pes.2009.5275810","title":"Adequacy criteria and methods for wind power transmission planning","year":2009,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Wind speed; Probabilistic logic; Reliability engineering; Reliability (semiconductor); Power system simulator for engineering; Computer science; Electric power system; Grid; Transmission (telecommunications); Turbine; Electric power transmission; Power (physics); Engineering; Meteorology; Telecommunications; Electrical engineering; Mathematics","score_opus":0.015065607406622881,"score_gpt":0.3326474794544106,"score_spread":0.3175818720477877,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2107866704","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014625624,0.00154514,0.9729854,0.00029939483,0.00023430993,0.00021393495,0.0000020449745,0.00021608014,0.009878086],"genre_scores_gemma":[0.850327,0.000016888293,0.14917678,0.00014710096,0.000023445216,0.0000045191173,0.0000013632924,0.000010222601,0.00029268337],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99950767,0.000019051513,0.00014244457,0.0001236041,0.000031639185,0.00017560837],"domain_scores_gemma":[0.9997049,0.000101029604,0.000007900466,0.000101618934,0.0000152135835,0.00006936401],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002869012,0.000092504255,0.00014046411,0.000029383444,0.000034106943,0.000025016767,0.000052738083,0.00006268608,0.000041851134],"category_scores_gemma":[0.000032362754,0.00007550808,0.000035337685,0.000040343068,0.0000094485285,0.00010973833,0.000003417847,0.000052167114,0.000001545238],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016738982,0.00007275239,0.00010583659,0.00075633894,0.000067594236,0.000008266681,0.0072059045,0.00190337,0.35027295,0.011980997,0.024298523,0.6031601],"study_design_scores_gemma":[0.0012666523,0.00037922862,0.0051725404,0.00035029056,0.000026808651,0.000037460664,0.0003145336,0.10254806,0.039604843,0.0085043125,0.84120923,0.0005860094],"about_ca_topic_score_codex":0.0000011256598,"about_ca_topic_score_gemma":7.7085254e-8,"teacher_disagreement_score":0.8357014,"about_ca_system_score_codex":0.000012364895,"about_ca_system_score_gemma":0.0000038059015,"threshold_uncertainty_score":0.307913},"labels":[],"label_agreement":null},{"id":"W2108170783","doi":"10.1109/ccece.1999.804923","title":"Determination of interruptible load carrying capability using sequential Monte Carlo simulation","year":2003,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Monte Carlo method; Computer science; Bisection method; Electric power system; Mathematical optimization; Power (physics); Algorithm; Mathematics; Statistics","score_opus":0.02938441124460873,"score_gpt":0.2717132971932941,"score_spread":0.2423288859486854,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2108170783","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7185205,0.00007254802,0.2772227,0.000001645767,0.00044594368,0.00015592368,0.0000034216318,0.00009265019,0.0034846514],"genre_scores_gemma":[0.99593943,0.00000211135,0.0039622365,0.000004286295,0.000014919551,0.000003720706,4.1509452e-7,0.0000129365,0.000059932867],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991756,0.00005193093,0.00031616192,0.00014070785,0.0001500843,0.00016553642],"domain_scores_gemma":[0.99951226,0.000048129554,0.000043636515,0.0002159593,0.00014228452,0.00003770908],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003644477,0.00010398131,0.00016728647,0.000047941598,0.000028191216,0.000013318448,0.0000616485,0.000072664356,0.0000359982],"category_scores_gemma":[0.00015191072,0.00010375164,0.000066822206,0.000119925906,0.000029926994,0.00021990089,0.0000112000935,0.000068520596,0.000003009389],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000058591977,0.000016103335,0.0016317811,0.00026795908,0.000011395808,0.0000011999654,0.0007702524,0.9777485,0.018188123,0.00018297009,0.0000052837995,0.0011705627],"study_design_scores_gemma":[0.00018702785,0.000015709024,0.00014671423,0.000052352876,0.000013500516,0.000005666244,0.00013419695,0.97037715,0.028481228,0.00010127554,0.0003626215,0.00012256768],"about_ca_topic_score_codex":0.00028905482,"about_ca_topic_score_gemma":0.00012963598,"teacher_disagreement_score":0.2774189,"about_ca_system_score_codex":0.0003238364,"about_ca_system_score_gemma":0.000036260044,"threshold_uncertainty_score":0.4230869},"labels":[],"label_agreement":null},{"id":"W2109247480","doi":"10.1109/tia.2005.855050","title":"Impact of Circuit Breaker Failure Modes on the Reliability of the Gold Book Standard Network","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Circuit breaker; Reliability (semiconductor); Reliability engineering; Engineering; Failure mode and effects analysis; Power (physics); Electrical engineering; Circuit reliability; Distribution board; Point (geometry); Sulfur hexafluoride circuit breaker; Failure rate; Electronic engineering; Short circuit; Arc-fault circuit interrupter; Voltage; Mathematics; Physics","score_opus":0.01091422991943798,"score_gpt":0.22677853722151234,"score_spread":0.21586430730207437,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109247480","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2142915,0.0001236842,0.76728284,0.0037301225,0.00027214858,0.0025206069,0.0011884022,0.0002872416,0.010303446],"genre_scores_gemma":[0.99892503,0.000018876066,0.000089158144,0.00009171606,0.000074547024,0.00046084975,0.0000011989763,0.00002216477,0.0003164452],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99889064,0.00006211344,0.00039739543,0.0001945216,0.00022491763,0.0002304024],"domain_scores_gemma":[0.99838984,0.00024183336,0.000089845686,0.0010822003,0.00013349419,0.00006280969],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002646267,0.00017464922,0.00021373278,0.00003347395,0.00014712506,0.000011948191,0.00037135236,0.000279845,0.00017181804],"category_scores_gemma":[0.000008309946,0.00010970917,0.00023856112,0.00054823584,0.00016583763,0.000095747106,0.000001902373,0.0008280316,0.000019696883],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016067828,0.00011408905,0.000082915765,0.000033240496,0.000062553605,2.4129054e-8,0.00012488377,0.9872494,0.000971795,0.0012295072,0.0081962235,0.0019193187],"study_design_scores_gemma":[0.0039350092,0.0010979129,0.025720611,0.0024734254,0.0010309808,0.00008274961,0.0016810537,0.12777404,0.28635755,0.011443895,0.5354448,0.0029579985],"about_ca_topic_score_codex":0.00004456434,"about_ca_topic_score_gemma":0.00006432348,"teacher_disagreement_score":0.8594753,"about_ca_system_score_codex":0.0002414867,"about_ca_system_score_gemma":0.00009517364,"threshold_uncertainty_score":0.44738102},"labels":[],"label_agreement":null},{"id":"W2110458909","doi":"10.1007/s13198-010-0021-x","title":"Comparison of alternative probabilistic techniques for adequacy assessment of small isolated wind/diesel systems","year":2010,"lang":"en","type":"article","venue":"International Journal of Systems Assurance Engineering and Management","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan; Manitoba Hydro","funders":"National Natural Science Foundation of China; University of Saskatchewan","keywords":"Monte Carlo method; Probabilistic logic; Convolution (computer science); Diesel fuel; Wind power; Computer science; Reliability engineering; Engineering; Mathematics; Statistics; Machine learning; Artificial intelligence; Automotive engineering","score_opus":0.012872542027189711,"score_gpt":0.27813036306321826,"score_spread":0.2652578210360285,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2110458909","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18621176,0.0012903577,0.80252886,0.000048083286,0.008151622,0.001055352,0.00006807618,0.00008271078,0.0005631681],"genre_scores_gemma":[0.9927595,0.00019735825,0.0067283786,0.0000013702341,0.00019273935,0.000052712916,0.0000028591485,0.000023139819,0.00004189745],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99830675,0.000019900359,0.001036087,0.00012804825,0.00034950464,0.00015969563],"domain_scores_gemma":[0.99853325,0.00016750519,0.00048117465,0.00015647187,0.0006032598,0.000058351336],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00073483295,0.00017380381,0.0005595851,0.0002631848,0.000015228674,0.000044821158,0.00035590393,0.0000714989,8.0860866e-7],"category_scores_gemma":[0.000071594615,0.00015545801,0.000099817065,0.00008299501,0.000033804845,0.00013980079,0.000038486207,0.00020154969,1.552261e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007149961,0.0001545374,0.0020309996,0.006905922,0.0013999536,0.00001408089,0.0004166679,0.94083774,0.019532505,0.026156077,0.00038357073,0.0020964397],"study_design_scores_gemma":[0.0010322229,0.00030067828,0.0044347267,0.0038633007,0.0001008505,0.000078410034,0.00038492313,0.96782947,0.0024886355,0.00006118528,0.019137489,0.0002881183],"about_ca_topic_score_codex":0.000034818044,"about_ca_topic_score_gemma":0.0000048676698,"teacher_disagreement_score":0.80654776,"about_ca_system_score_codex":0.00009240989,"about_ca_system_score_gemma":0.000018212922,"threshold_uncertainty_score":0.6339394},"labels":[],"label_agreement":null},{"id":"W2110673191","doi":"10.1109/pes.2009.5275728","title":"Composite generation and transmission system adequacy assessment considering wind energy seasonal characteristics","year":2009,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind speed; Wind power; Monte Carlo method; Reliability (semiconductor); Environmental science; Meteorology; Sampling (signal processing); Transmission system; Reliability engineering; Transmission (telecommunications); Scale (ratio); Electric power system; Computer science; Statistics; Engineering; Telecommunications; Mathematics; Power (physics); Geography","score_opus":0.00871730781164489,"score_gpt":0.20782891035042791,"score_spread":0.19911160253878302,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2110673191","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3295882,0.00047738172,0.66176116,0.00023874729,0.0004063146,0.00014213899,0.000010003462,0.000434437,0.006941634],"genre_scores_gemma":[0.99595445,0.00007360894,0.0036669963,0.00008616175,0.00010430042,0.0000033492552,0.000018036466,0.000010462707,0.00008264201],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992867,0.000028459694,0.00023653805,0.00015646167,0.000120899866,0.0001709315],"domain_scores_gemma":[0.9997038,0.000021106067,0.000023568686,0.000117079086,0.000030904393,0.00010351626],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011581485,0.00013208117,0.00018691974,0.00003098793,0.000068624446,0.0000631642,0.00004431169,0.00006672434,0.000011410837],"category_scores_gemma":[0.000002195648,0.00011898966,0.000029577473,0.000044803117,0.000012854135,0.00012642282,0.000006521286,0.00007371849,0.0000021184974],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003047175,0.00010638308,0.0018823707,0.0010795817,0.000110766705,0.000081123275,0.0005763119,0.011132359,0.74038386,0.07602044,0.0020423122,0.16655399],"study_design_scores_gemma":[0.0004016293,0.000062691775,0.016133076,0.00025413153,0.000021545702,0.00009218741,0.000051670144,0.95811707,0.009707738,0.000042449796,0.01482748,0.0002883346],"about_ca_topic_score_codex":0.000008862171,"about_ca_topic_score_gemma":0.000002176311,"teacher_disagreement_score":0.9469847,"about_ca_system_score_codex":0.00009139453,"about_ca_system_score_gemma":0.000015590993,"threshold_uncertainty_score":0.48522574},"labels":[],"label_agreement":null},{"id":"W2110830467","doi":"10.1109/epc.2008.4763375","title":"Evaluating capacity probability distributions of aged power equipment: Method and example","year":2008,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"TransCanada (Canada)","funders":"","keywords":"Unavailability; Reliability engineering; Reliability (semiconductor); Probability distribution; Computer science; Transmission (telecommunications); Component (thermodynamics); Probability model; Power (physics); Power transmission; Engineering; Statistics; Mathematics; Telecommunications","score_opus":0.08706507984177957,"score_gpt":0.2963408399830146,"score_spread":0.209275760141235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2110830467","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6559699,0.000061329716,0.339006,0.000019924379,0.00008729135,0.000218182,0.000028029512,0.0001117646,0.004497525],"genre_scores_gemma":[0.95123416,0.000007816343,0.04863439,0.000005815239,0.00000645036,0.000025804338,0.000003967892,0.000006880801,0.00007474145],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99909604,0.00009682609,0.00029095568,0.00017603282,0.00014321264,0.0001969277],"domain_scores_gemma":[0.99940485,0.00014355722,0.00003179389,0.00027488102,0.00007819624,0.00006671537],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009381244,0.0001029157,0.00020877615,0.000020992333,0.00008085297,0.000006008486,0.00007368215,0.000054925567,0.00010008984],"category_scores_gemma":[0.00021826189,0.00008947701,0.000047708414,0.00011878419,0.00009704512,0.0001042187,0.00003952095,0.00009930339,0.0000034387406],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015388794,0.0014199879,0.06331793,0.0064244936,0.00087199453,0.000023961213,0.043675415,0.033575717,0.6604687,0.15766934,0.010199224,0.022199335],"study_design_scores_gemma":[0.0043123118,0.000886499,0.5200594,0.0005119215,0.00017380921,0.00040835663,0.0008145761,0.13086754,0.2554776,0.07414026,0.010156875,0.0021908167],"about_ca_topic_score_codex":0.00021222098,"about_ca_topic_score_gemma":0.00004571904,"teacher_disagreement_score":0.45674148,"about_ca_system_score_codex":0.00006947625,"about_ca_system_score_gemma":0.000018170424,"threshold_uncertainty_score":0.3648767},"labels":[],"label_agreement":null},{"id":"W2111272836","doi":"10.1109/tdc.2006.1668721","title":"Project Evaluation and Selection at BC Hydro","year":2006,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Reliability (semiconductor); Index (typography); Customer satisfaction; Selection (genetic algorithm); Duration (music); Computer science; Reliability engineering; Process (computing); Operations research; Engineering; Business; Marketing; Artificial intelligence; Power (physics)","score_opus":0.008890356361735564,"score_gpt":0.2242965596275264,"score_spread":0.21540620326579082,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2111272836","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86403716,0.00026862626,0.008982495,0.00003707375,0.00018741116,0.0003753556,9.557336e-7,0.00032709228,0.12578385],"genre_scores_gemma":[0.99767536,0.0000074704235,0.00022824656,0.00000615323,0.00003953946,0.000029304803,0.0000029444795,0.0000057204384,0.0020052702],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996576,0.000014141384,0.00008016656,0.000080276885,0.00008187977,0.00008597785],"domain_scores_gemma":[0.99990535,0.000010316451,0.0000070144315,0.000041798226,0.000026138632,0.000009357735],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019156348,0.000047010064,0.00004853548,0.000025225481,0.000027245327,0.000010442896,0.000015116439,0.00003162959,0.000039600138],"category_scores_gemma":[0.000009740407,0.000040797364,0.000010889931,0.000068831105,0.000007353294,0.00006537129,0.0000060833663,0.000025012696,0.000025178097],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007667269,0.0001727594,0.052216116,0.0014170511,0.00013073198,0.000004274304,0.0012546782,0.21240486,0.2615905,0.014025823,0.41196644,0.044740062],"study_design_scores_gemma":[0.000392112,0.00003186177,0.016988432,0.000021747213,0.000017839577,0.000024839654,0.00002106878,0.90151143,0.017862676,0.00084260333,0.062110383,0.00017501945],"about_ca_topic_score_codex":0.00030317006,"about_ca_topic_score_gemma":0.00057634513,"teacher_disagreement_score":0.6891066,"about_ca_system_score_codex":0.00011006555,"about_ca_system_score_gemma":0.0000068958366,"threshold_uncertainty_score":0.16636682},"labels":[],"label_agreement":null},{"id":"W2112265799","doi":"10.1109/wescan.1995.493962","title":"A basic framework for composite power system security evaluation","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Electric power system; Reliability (semiconductor); Computer science; Transient (computer programming); State (computer science); Power (physics); Engineering; Algorithm","score_opus":0.016194606274385695,"score_gpt":0.22964714340229941,"score_spread":0.21345253712791373,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2112265799","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07380815,0.00146821,0.82172143,0.0002279698,0.002549977,0.0015922587,0.000033080065,0.0011994495,0.09739949],"genre_scores_gemma":[0.99645424,0.000004184176,0.0031489846,0.000048309455,0.000059961796,0.00015378308,0.0000030573958,0.00001802517,0.0001094435],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992306,0.000031299067,0.00020131498,0.00015289035,0.0001733475,0.00021049903],"domain_scores_gemma":[0.99944323,0.00010988405,0.000020930402,0.00027227073,0.000096863936,0.00005680245],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039734883,0.00010852769,0.00015653901,0.00003215924,0.00004637791,0.000029241448,0.00009860899,0.00010428054,0.0002200257],"category_scores_gemma":[0.000058801295,0.0000981204,0.00007506771,0.00009766268,0.000012129591,0.00009047209,0.000009934473,0.00008915472,0.00017058139],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009078731,0.0004503682,0.001503132,0.008330848,0.0005998495,0.0000125879205,0.0131792715,0.03724131,0.0040168124,0.7503666,0.17057934,0.013629054],"study_design_scores_gemma":[0.0004397156,0.000042987736,0.00022460482,0.00027483053,0.000033059114,0.000011559155,0.00025972942,0.9751071,0.0013519814,0.0037779652,0.018239828,0.00023668715],"about_ca_topic_score_codex":0.000003949816,"about_ca_topic_score_gemma":0.000003876893,"teacher_disagreement_score":0.93786573,"about_ca_system_score_codex":0.00016898767,"about_ca_system_score_gemma":0.0000035170913,"threshold_uncertainty_score":0.40012336},"labels":[],"label_agreement":null},{"id":"W2112943655","doi":"10.1109/ccece.2005.1556988","title":"Wind power simulation model for reliability evaluation","year":2006,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Wind speed; Reliability (semiconductor); Reliability engineering; Electric power system; Computer science; Power (physics); Wind power forecasting; Marine engineering; Meteorology; Engineering; Electrical engineering","score_opus":0.017536608374961887,"score_gpt":0.2572065908899037,"score_spread":0.23966998251494184,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2112943655","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12879524,0.000049280992,0.85124236,0.000052404277,0.00026588218,0.0006615602,0.000010576135,0.00023868225,0.01868402],"genre_scores_gemma":[0.99613464,3.9222024e-7,0.003033172,0.000019220728,0.000036693185,0.000043935266,0.000016597636,0.000013882697,0.00070145814],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99930364,0.000014048354,0.00022090113,0.00015056599,0.0001547602,0.00015608128],"domain_scores_gemma":[0.9994795,0.00008061209,0.000017284425,0.00022600239,0.00017414776,0.000022480279],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00061042205,0.000085164495,0.00009724417,0.000025215315,0.000032807253,0.000015552992,0.00005297811,0.00007097951,0.00004143926],"category_scores_gemma":[0.00009534892,0.0000776525,0.000056219505,0.00005818006,0.000012585472,0.00015751769,0.000005850352,0.000036885584,0.000016440777],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006124883,0.000014378403,0.00009422713,0.0000355281,0.00000238125,1.817008e-8,0.000042320396,0.99602246,0.00037132157,0.0012895307,0.0018206114,0.00030110287],"study_design_scores_gemma":[0.0002858598,0.000010092516,0.0010908789,0.000007390091,0.000009469663,1.5794474e-7,0.000007398164,0.9825982,0.0003599447,0.013047026,0.0024838108,0.00009981321],"about_ca_topic_score_codex":0.000016133154,"about_ca_topic_score_gemma":0.00002114868,"teacher_disagreement_score":0.86733943,"about_ca_system_score_codex":0.00014077582,"about_ca_system_score_gemma":0.00001853231,"threshold_uncertainty_score":0.3166577},"labels":[],"label_agreement":null},{"id":"W2113090146","doi":"10.1109/wescan.1991.160558","title":"Reliability evaluation of subtransmission systems","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Sensitivity (control systems); Computer science; Range (aeronautics); Engineering; Electronic engineering; Power (physics)","score_opus":0.027516598544144517,"score_gpt":0.22437943343044078,"score_spread":0.19686283488629627,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2113090146","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6997456,0.004478493,0.0408813,0.000066880166,0.0017606356,0.00093520543,0.000008930697,0.00052233,0.25160065],"genre_scores_gemma":[0.99946207,0.000052148214,0.000115428884,0.0000025162155,0.000017080645,0.000021198452,8.683644e-7,0.0000075103126,0.0003211791],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99915886,0.00006414421,0.0002581979,0.00010251456,0.00030411416,0.00011214283],"domain_scores_gemma":[0.9994643,0.000034292734,0.000019201632,0.00027591613,0.00016571999,0.000040568975],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009336224,0.000068209825,0.0001314482,0.000027833023,0.00001335339,0.0000060195216,0.00007399317,0.000057816123,0.00035240504],"category_scores_gemma":[0.000076453885,0.000054585766,0.000040897823,0.00010353331,0.000019446441,0.00008973164,0.0000044477656,0.00004867676,0.000047499874],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014530136,0.00028264002,0.0021489062,0.0035561542,0.00007671697,0.0000013604122,0.0018378183,0.8711274,0.040318184,0.005301296,0.036871154,0.038463783],"study_design_scores_gemma":[0.00023490218,0.000015951526,0.0013114617,0.00007412834,0.00001772185,0.0000023485513,0.00005403824,0.9875439,0.003016328,0.0001459307,0.0075004403,0.00008283871],"about_ca_topic_score_codex":0.000037208607,"about_ca_topic_score_gemma":0.0000029907208,"teacher_disagreement_score":0.2997165,"about_ca_system_score_codex":0.00007481492,"about_ca_system_score_gemma":0.0000049308405,"threshold_uncertainty_score":0.3858588},"labels":[],"label_agreement":null},{"id":"W2113879869","doi":"10.1109/pess.2002.1043453","title":"Feasibility study of maintenance cost reduction in redundant customer delivery systems","year":2003,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Reliability engineering; Corrective maintenance; Preventive maintenance; Predictive maintenance; Cost reduction; Maintenance engineering; Reliability (semiconductor); Redundancy (engineering); Computer science; Planned maintenance; Proactive maintenance; Work (physics); Risk analysis (engineering); Operations management; Engineering; Business","score_opus":0.01929524922373706,"score_gpt":0.2327054515383177,"score_spread":0.21341020231458063,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2113879869","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97376275,0.0002641316,0.0014147449,0.000005671244,0.0013999905,0.001346741,0.000004675315,0.00012881326,0.021672461],"genre_scores_gemma":[0.999253,0.000035969515,0.000069713955,0.0000024414742,0.000013561979,0.00008753967,7.3746634e-7,0.00001642104,0.0005206484],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9985849,0.00014677018,0.0005506739,0.00026106322,0.00017560781,0.00028095255],"domain_scores_gemma":[0.9992925,0.000032241624,0.0000529295,0.00045928755,0.000104474784,0.000058559315],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008133737,0.0001472188,0.00032751693,0.00010045731,0.000022538348,0.000013767586,0.00011880367,0.00007148066,0.00001745374],"category_scores_gemma":[0.000084624335,0.00012866697,0.00004326368,0.0003467103,0.00004187276,0.00015068222,0.000013317477,0.00014992859,0.000025641677],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048315918,0.007442109,0.17513882,0.004418244,0.00039351013,0.00011543727,0.013173263,0.7031388,0.037149955,0.036212344,0.01986532,0.002469051],"study_design_scores_gemma":[0.037678592,0.0031219625,0.3285539,0.0050604213,0.00035190943,0.0012648794,0.30544207,0.15359825,0.04674467,0.0015138977,0.10932482,0.0073446594],"about_ca_topic_score_codex":0.0006268965,"about_ca_topic_score_gemma":0.00026969667,"teacher_disagreement_score":0.5495405,"about_ca_system_score_codex":0.00031713213,"about_ca_system_score_gemma":0.000027185313,"threshold_uncertainty_score":0.52468866},"labels":[],"label_agreement":null},{"id":"W2113956231","doi":"10.1109/tpwrs.2011.2130850","title":"Investigation of the 2.5 Beta Methodology","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; BETA (programming language); Beta distribution; Econometrics; Event (particle physics); Value (mathematics); Statistics; Computer science; Mathematics; Engineering; Power (physics)","score_opus":0.06732011776826904,"score_gpt":0.22392868727152057,"score_spread":0.15660856950325153,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2113956231","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050299037,0.00016246417,0.93443584,0.000027224733,0.008004682,0.000354861,0.000027678154,0.00016950413,0.0065187253],"genre_scores_gemma":[0.9991645,0.000009212107,0.0003844086,0.000021794476,0.0000059606664,0.00005586356,2.0602066e-7,0.00002046497,0.0003375699],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9989786,0.00021595243,0.000355467,0.00014097124,0.00013995616,0.000169012],"domain_scores_gemma":[0.9992501,0.00009879393,0.000062271116,0.00047988276,0.00005686697,0.000052046064],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042976858,0.00012643346,0.0002233081,0.00007333544,0.00005289742,0.0000062633876,0.00022485701,0.000120136574,0.000037084366],"category_scores_gemma":[0.0000051311945,0.00009240319,0.0001192284,0.000220301,0.000097843396,0.000085727115,7.809833e-7,0.00017659711,0.000036185957],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048267338,0.0006702177,0.004951321,0.0071611414,0.0033551357,0.000028675782,0.1330818,0.37983355,0.39682508,0.05166961,0.017512798,0.004428011],"study_design_scores_gemma":[0.0008295512,0.00031192353,0.0053000515,0.0007367023,0.00016375541,0.00011520552,0.0016063256,0.00871056,0.9718823,0.0006793453,0.008989464,0.000674841],"about_ca_topic_score_codex":0.00018948603,"about_ca_topic_score_gemma":0.000041719533,"teacher_disagreement_score":0.9488655,"about_ca_system_score_codex":0.000050964787,"about_ca_system_score_gemma":0.000020929847,"threshold_uncertainty_score":0.37680927},"labels":[],"label_agreement":null},{"id":"W2114190564","doi":"10.1109/ccece.1999.804981","title":"New techniques to determine appropriate system capacity requirements","year":2003,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Probabilistic logic; Computer science; Risk analysis (engineering); Reliability engineering; Probabilistic risk assessment; Artificial intelligence; Engineering","score_opus":0.021712829737003236,"score_gpt":0.21831809925076706,"score_spread":0.19660526951376384,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2114190564","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020753236,0.000048188493,0.6885883,0.000033892935,0.0009160011,0.0006468962,0.000004974626,0.0018429877,0.2871655],"genre_scores_gemma":[0.9413187,0.0000029353346,0.055995237,0.000066596855,0.000060228274,0.00004884316,5.1762504e-7,0.00002409056,0.0024828815],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991528,0.000025605792,0.00024542498,0.00017813542,0.00012693727,0.00027112363],"domain_scores_gemma":[0.9994235,0.000010922864,0.000016197895,0.000350073,0.000032312026,0.00016699101],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002697178,0.0001382743,0.00018330415,0.000051218827,0.000026943148,0.000025189374,0.00013635153,0.00006725771,0.000051153456],"category_scores_gemma":[0.00004187779,0.00011898579,0.00004259685,0.00014275128,0.000007040831,0.00009923985,0.000016517166,0.000065609755,0.00025599517],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006735986,0.00018552472,0.0021935788,0.007300942,0.0004109502,0.000098455566,0.0028776121,0.0028550518,0.4483399,0.21356934,0.19059552,0.13150574],"study_design_scores_gemma":[0.00034500423,0.00010322961,0.00013029405,0.00044763528,0.000017822369,0.00006304073,0.00015890147,0.0017359601,0.43876016,0.0005629892,0.5570515,0.0006234727],"about_ca_topic_score_codex":0.00009694681,"about_ca_topic_score_gemma":0.000037413134,"teacher_disagreement_score":0.9205654,"about_ca_system_score_codex":0.00017803688,"about_ca_system_score_gemma":0.000014607367,"threshold_uncertainty_score":0.48520997},"labels":[],"label_agreement":null},{"id":"W2114264522","doi":"10.1109/ccece.2003.1226410","title":"Use of probability methods for planning customer delivery systems","year":2004,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada); McMaster University","funders":"","keywords":"Margin (machine learning); Reliability (semiconductor); Electricity; Electricity market; Computer science; Cover (algebra); Order (exchange); Electric power system; Delivery system; Transmission system; Function (biology); Reliability engineering; Operations research; Transmission (telecommunications); Business; Engineering; Telecommunications; Finance; Power (physics)","score_opus":0.061549058544391404,"score_gpt":0.30295254670545674,"score_spread":0.24140348816106533,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2114264522","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06619773,0.00049652427,0.9299286,0.000013200667,0.0007277474,0.0006520508,0.000013995606,0.00024650426,0.001723664],"genre_scores_gemma":[0.82065725,0.000007103253,0.17906472,0.000010547029,0.00002309711,0.000087996545,0.0000020506159,0.000016015327,0.00013124748],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99923486,0.00003449981,0.00031911218,0.00014494968,0.00006353305,0.00020303695],"domain_scores_gemma":[0.99932945,0.00022291676,0.000033023087,0.00026430082,0.000100120786,0.00005017147],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005254965,0.000106307416,0.00024757558,0.000042350683,0.000021696023,0.000018076664,0.00009302879,0.00007894394,0.0000034282477],"category_scores_gemma":[0.00013680104,0.00008904044,0.00008180437,0.000097107004,0.000032727163,0.00017769042,0.00001659708,0.000060058857,0.00000551252],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029181543,0.00004665376,0.0004143739,0.0021448515,0.00008057231,8.8972985e-7,0.0004589407,0.9599354,0.011241174,0.022657175,0.0009025928,0.002088188],"study_design_scores_gemma":[0.0032760478,0.00041190832,0.0027513553,0.0022276768,0.00018945079,0.00006736213,0.00095142797,0.3891295,0.15988176,0.010607166,0.42866677,0.0018395991],"about_ca_topic_score_codex":0.0001536036,"about_ca_topic_score_gemma":0.000005172136,"teacher_disagreement_score":0.7544595,"about_ca_system_score_codex":0.000108166234,"about_ca_system_score_gemma":0.000022915832,"threshold_uncertainty_score":0.3630964},"labels":[],"label_agreement":null},{"id":"W2114661994","doi":"10.1109/tec.2004.827718","title":"Generating Capacity Adequacy Associated With Wind Energy","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Conversion","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":345,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Wind speed; Reliability (semiconductor); Monte Carlo method; Range (aeronautics); Electricity generation; Reliability engineering; Energy (signal processing); Computer science; Environmental science; Engineering; Power (physics); Meteorology; Statistics; Electrical engineering; Mathematics; Aerospace engineering","score_opus":0.008797977929852582,"score_gpt":0.17138064693023963,"score_spread":0.16258266900038704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2114661994","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18931405,0.00004500003,0.8084423,0.000061401945,0.0008749025,0.000044953853,0.000018641293,0.00039953974,0.00079920515],"genre_scores_gemma":[0.9989469,0.00007263177,0.00034703026,0.00018432303,0.000038357768,0.000015046655,0.0000075761295,0.000038380225,0.00034977036],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99893904,0.000043558382,0.00021248181,0.0002581245,0.00022828471,0.00031850958],"domain_scores_gemma":[0.9994589,0.00005407661,0.000041469128,0.000256676,0.000067407054,0.000121489575],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008972097,0.0002241018,0.00021007797,0.000111531444,0.00019939676,0.000025785816,0.00012251752,0.00016475546,0.000062456595],"category_scores_gemma":[0.0000038672656,0.00020668595,0.000094132105,0.00027510457,0.000062456296,0.00021991979,7.698717e-7,0.00018634197,0.000017066825],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024009736,0.00008863526,0.0000032304633,0.000019208961,0.00008990809,0.000011740304,0.00015802473,0.9877158,0.0099391,0.00032418544,0.00011026107,0.0015158997],"study_design_scores_gemma":[0.004027606,0.0005336434,0.000069748,0.00064307614,0.00012251052,0.000047222962,0.00019860337,0.15671934,0.82545465,0.00025178722,0.010866331,0.0010654712],"about_ca_topic_score_codex":0.00067972456,"about_ca_topic_score_gemma":0.00062616606,"teacher_disagreement_score":0.83099645,"about_ca_system_score_codex":0.00041812955,"about_ca_system_score_gemma":0.00004424504,"threshold_uncertainty_score":0.84284085},"labels":[],"label_agreement":null},{"id":"W2114976271","doi":"10.1109/icpst.2000.897134","title":"A probabilistic technique for the evaluation of transient recovery voltages across circuit breakers of series capacitor compensated transmission lines","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Transient recovery voltage; Circuit breaker; Transient (computer programming); Capacitor; Transient voltage suppressor; Electric power transmission; Context (archaeology); Voltage; Transmission line; Probabilistic logic; Electric power system; Fault (geology); Engineering; Power transmission; Electronic engineering; Electrical engineering; Power (physics); Computer science; Power factor; Constant power circuit; Physics","score_opus":0.043188351316053274,"score_gpt":0.25765378748571305,"score_spread":0.21446543616965977,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2114976271","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17007269,0.0014303442,0.821331,0.00028266356,0.00060369563,0.0046659284,0.00021146382,0.00021177766,0.0011904113],"genre_scores_gemma":[0.9986813,0.000092267546,0.00067618384,0.000005151546,0.000019361956,0.00036516337,0.0000046937785,0.000016426851,0.00013942124],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989902,0.00004939797,0.00041490546,0.00013487024,0.00023795903,0.00017267092],"domain_scores_gemma":[0.9991228,0.00020095118,0.00005945574,0.00024224013,0.00034616704,0.000028383478],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000948628,0.00012408123,0.00023879386,0.000027815411,0.0000477706,0.000008781368,0.00012988561,0.00009140937,0.00005702151],"category_scores_gemma":[0.00012751135,0.00008339435,0.00011730438,0.00015157476,0.00011233947,0.00010889742,0.000004008817,0.000063825755,7.461528e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000169886,0.00025031867,0.00005081556,0.005630153,0.00024537343,4.9341287e-7,0.010408645,0.15234281,0.7576614,0.00077909156,0.0024903861,0.06997064],"study_design_scores_gemma":[0.0015132488,0.000465422,0.0014311918,0.00092660356,0.00024098837,0.000027812672,0.0014500071,0.54148394,0.44135615,0.0017864285,0.008908087,0.00041011753],"about_ca_topic_score_codex":0.000049192517,"about_ca_topic_score_gemma":0.00006545843,"teacher_disagreement_score":0.82860863,"about_ca_system_score_codex":0.00005820862,"about_ca_system_score_gemma":0.000016710961,"threshold_uncertainty_score":0.3400723},"labels":[],"label_agreement":null},{"id":"W2115131262","doi":"10.1109/wescan.1993.270561","title":"Value-based reliability evaluation of electric distribution systems","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Value (mathematics); Computer science; Reliability theory; Power (physics); Engineering; Failure rate","score_opus":0.017605249506287612,"score_gpt":0.21452547026499405,"score_spread":0.19692022075870644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2115131262","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.67958057,0.0030881823,0.28097084,0.00011549302,0.0014642503,0.0013628249,0.000053007465,0.00067265326,0.032692157],"genre_scores_gemma":[0.9997531,0.000015214227,0.00006020182,0.0000046597875,0.000023677623,0.000055952612,0.000014717351,0.000008716088,0.00006371578],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99879843,0.0001294883,0.0003362412,0.00014631002,0.00040812156,0.00018139226],"domain_scores_gemma":[0.99922764,0.000074384756,0.00004214474,0.00034691065,0.00026594134,0.00004300223],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001343771,0.00009749792,0.00017122824,0.00003658,0.000023140292,0.000011258739,0.000091469934,0.00007867584,0.0000969881],"category_scores_gemma":[0.0002676622,0.00008636521,0.00006143313,0.00030467537,0.000018595705,0.000084226,0.000004975357,0.00007253355,0.000045159162],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000073002307,0.00013387381,0.00096043415,0.0006927508,0.000025001145,3.3290428e-7,0.00005553008,0.9767444,0.004062453,0.004295027,0.009282811,0.003740098],"study_design_scores_gemma":[0.0003085241,0.000031464035,0.0016953603,0.000041238007,0.000030649062,0.0000012299033,0.000010618063,0.9895015,0.0060728625,0.00012662292,0.002084204,0.00009573292],"about_ca_topic_score_codex":0.00006525318,"about_ca_topic_score_gemma":0.000002118595,"teacher_disagreement_score":0.32017255,"about_ca_system_score_codex":0.00033633527,"about_ca_system_score_gemma":0.000017702307,"threshold_uncertainty_score":0.3521871},"labels":[],"label_agreement":null},{"id":"W2115491595","doi":"10.1049/cp:20051348","title":"Distribution systems reliability assessment a new approach for new planning requirements","year":2005,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Reliability engineering; Computer science; Reliability (semiconductor); Systems engineering; Engineering","score_opus":0.03370125721371463,"score_gpt":0.28689629119967164,"score_spread":0.253195033985957,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2115491595","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00235258,0.00027850538,0.97779477,0.00017740166,0.0006270095,0.000932527,0.000040892744,0.0004669164,0.017329406],"genre_scores_gemma":[0.9502573,0.000009290599,0.04257421,0.000031647003,0.00052808254,0.00012745772,0.00018986507,0.000027042024,0.0062550833],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986699,0.000024621948,0.0004233079,0.00030849426,0.00019694357,0.00037673328],"domain_scores_gemma":[0.9992508,0.000054020093,0.00004513558,0.0004021696,0.000048538535,0.00019929542],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005639253,0.0001774643,0.00025187116,0.000023596993,0.00006275081,0.00007149755,0.00017595392,0.00010784702,0.000022015502],"category_scores_gemma":[0.000064367225,0.00015838598,0.00008699402,0.00010735725,0.000013223378,0.000272968,0.00002635643,0.00011244869,0.000023888584],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030793923,0.000093451985,0.001143848,0.00077019155,0.00007196676,5.125554e-7,0.00023623163,0.629847,0.00061326264,0.00873206,0.35375568,0.0047050444],"study_design_scores_gemma":[0.00081325317,0.00004077776,0.0009365956,0.00009563599,0.000022977343,0.000005221028,0.00013660546,0.60417026,0.00021498285,0.00017549792,0.39311787,0.00027034074],"about_ca_topic_score_codex":0.00015680605,"about_ca_topic_score_gemma":0.0000047384574,"teacher_disagreement_score":0.94790477,"about_ca_system_score_codex":0.00058890536,"about_ca_system_score_gemma":0.00009077708,"threshold_uncertainty_score":0.6458793},"labels":[],"label_agreement":null},{"id":"W2115713297","doi":"10.1109/tia.2005.855049","title":"Impact of Manual Versus Automatic Transfer Switching on the Reliability Levels of an Industrial Plant","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Circuit breaker; Reliability (semiconductor); Duration (music); Reliability engineering; Engineering; Transfer (computing); Maximum power transfer theorem; Power (physics); Electric power system; Point (geometry); State (computer science); Computer science; Automotive engineering; Electrical engineering; Mathematics","score_opus":0.03948208510921898,"score_gpt":0.28305474766699146,"score_spread":0.2435726625577725,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2115713297","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82469195,0.000004909554,0.17247146,0.00017800524,0.00021853154,0.0007682316,0.0008540628,0.00015820429,0.0006546432],"genre_scores_gemma":[0.99934167,0.0000037649281,0.00017334423,0.000010740737,0.00008822,0.00032969168,0.0000043580617,0.0000241322,0.00002408956],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9986444,0.00008580342,0.0005571559,0.00023110895,0.00024409966,0.00023743743],"domain_scores_gemma":[0.99856794,0.00043365348,0.000056966437,0.00077451055,0.000058902602,0.000108040695],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038154586,0.00020884092,0.00027045858,0.00010578473,0.00013276025,0.000013828368,0.00032328608,0.00040007016,0.00022382595],"category_scores_gemma":[0.0000121036,0.00016018926,0.00019235024,0.00037008422,0.000094695555,0.00016692809,9.082614e-7,0.0010043029,0.000020448826],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001983322,0.00090607995,0.000028465302,0.000086145934,0.00023288427,3.6255923e-7,0.0008366037,0.9336292,0.0073460867,0.000807495,0.00020833711,0.055720016],"study_design_scores_gemma":[0.0092916265,0.0033357134,0.012829032,0.0010372923,0.00076134794,0.0000563678,0.0022566475,0.41622502,0.5453777,0.0007385706,0.006020635,0.0020700935],"about_ca_topic_score_codex":0.00007508736,"about_ca_topic_score_gemma":0.000045850422,"teacher_disagreement_score":0.5380316,"about_ca_system_score_codex":0.00022968589,"about_ca_system_score_gemma":0.00010160246,"threshold_uncertainty_score":0.6532329},"labels":[],"label_agreement":null},{"id":"W2115817572","doi":"10.1109/ccece.2005.1557007","title":"Consideration of multi-state weathermodels in reliability evaluation of transmission and distribution systems","year":2006,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Adverse weather; Extreme weather; Overhead (engineering); Reliability engineering; Computer science; Electric power transmission; Environmental science; Meteorology; Power (physics); Engineering; Climate change; Electrical engineering","score_opus":0.017154721434344218,"score_gpt":0.23571764111307908,"score_spread":0.21856291967873487,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2115817572","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7190302,0.0005665179,0.27954268,0.00001047288,0.000058787457,0.0003753774,0.000022019274,0.00002611822,0.00036781578],"genre_scores_gemma":[0.9996369,0.000029515555,0.00026930083,4.2942608e-7,0.000003255626,0.000019545498,0.000018728662,0.0000045973015,0.000017759841],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99911875,0.00009912448,0.00042568,0.00010718993,0.00016774636,0.00008150329],"domain_scores_gemma":[0.9996124,0.00004591604,0.000045497633,0.00011731669,0.00016300619,0.000015845513],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011374345,0.00006806967,0.00016846626,0.000029757019,0.000009502519,0.000005102557,0.000022720604,0.000054632215,0.000003999963],"category_scores_gemma":[0.000040203606,0.000059033337,0.000021119313,0.000078043304,0.000033188328,0.0001082091,0.0000034995792,0.000038906936,3.0331174e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001604498,0.00007763336,0.0031996705,0.0006768646,0.000004838249,1.7059202e-7,0.00025662984,0.9625852,0.02923206,0.0011181114,0.000044723085,0.0027880585],"study_design_scores_gemma":[0.00059790333,0.000014042127,0.024141386,0.00013135227,0.000009866886,0.0000011645383,0.00004221831,0.95984864,0.014234288,0.0008852873,0.000035724628,0.00005810025],"about_ca_topic_score_codex":0.00078239077,"about_ca_topic_score_gemma":0.00012792781,"teacher_disagreement_score":0.28060666,"about_ca_system_score_codex":0.0000859176,"about_ca_system_score_gemma":0.000020648473,"threshold_uncertainty_score":0.24073097},"labels":[],"label_agreement":null},{"id":"W2116436230","doi":"10.1109/wescan.1995.494055","title":"Evaluation of the marginal outage costs in interconnected generating systems","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Interconnection; Reliability engineering; Computer science; Marginal cost; Network topology; Mathematical optimization; Order (exchange); Topology (electrical circuits); Power (physics); Engineering; Mathematics; Telecommunications; Computer network; Electrical engineering","score_opus":0.027472296463275748,"score_gpt":0.21642509840124907,"score_spread":0.1889528019379733,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2116436230","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9630467,0.0008522439,0.0030732953,0.000039321345,0.0009802977,0.0004076875,0.0000032962507,0.00006441062,0.03153271],"genre_scores_gemma":[0.999683,0.000005642082,0.00005304254,0.000008090801,0.000022177595,0.000029634324,4.1365738e-7,0.000006663481,0.00019134281],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991959,0.00013703591,0.00023695383,0.000077748125,0.00024251157,0.00010985339],"domain_scores_gemma":[0.9996408,0.00003366671,0.000026463029,0.0001882368,0.00009650453,0.000014293211],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009192191,0.00006169884,0.00010435885,0.000032625627,0.000013020317,0.000012288108,0.00010195654,0.000038147602,0.00009020128],"category_scores_gemma":[0.00016470137,0.0000428537,0.00002669898,0.0001381562,0.000012620518,0.00006242362,0.000015564174,0.00007253566,0.000013002933],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000044757544,0.00009715509,0.008997188,0.00058095827,0.0000830264,0.0000026546743,0.0031668206,0.90962374,0.047707707,0.0045153275,0.004552841,0.020668112],"study_design_scores_gemma":[0.00023665225,0.0000059635195,0.0017071646,0.00015364449,0.000008557262,0.0000039635647,0.00022292187,0.9960885,0.0012448363,0.000009991029,0.0002638821,0.000053896012],"about_ca_topic_score_codex":0.00012694455,"about_ca_topic_score_gemma":0.00035637536,"teacher_disagreement_score":0.08646479,"about_ca_system_score_codex":0.00020794409,"about_ca_system_score_gemma":0.0000064835594,"threshold_uncertainty_score":0.17475231},"labels":[],"label_agreement":null},{"id":"W2116546168","doi":"10.1109/icps.2001.966512","title":"Application of customer interruption costs in transmission network reliability planning","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":55,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Computer science; Process (computing); Power (physics); Engineering","score_opus":0.01432951226182248,"score_gpt":0.23576623046424436,"score_spread":0.2214367182024219,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2116546168","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16062663,0.00088538293,0.761695,0.000105450505,0.0003269248,0.0005303027,0.0000020384043,0.0003144427,0.0755138],"genre_scores_gemma":[0.9987768,0.000047683425,0.0010250016,0.000013150803,0.000023593,0.000027686974,0.0000023470955,0.00000915065,0.00007460562],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99930006,0.000025889134,0.00030339693,0.00013072809,0.000082016006,0.00015791367],"domain_scores_gemma":[0.99968684,0.000041336072,0.000024702978,0.00018981525,0.000021948956,0.00003537293],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026751368,0.000079416146,0.00014566512,0.00004229973,0.000011741666,0.0000038193143,0.00008046164,0.00007823256,0.00007867982],"category_scores_gemma":[0.000011940928,0.00007172607,0.00003494224,0.00020785372,0.000019755758,0.00009708,0.0000076269916,0.00010653804,0.00003423256],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040912262,0.0001430198,0.028534338,0.000636326,0.000013414796,0.0000018846399,0.001720807,0.79741573,0.0067277397,0.0014419664,0.005946961,0.1573769],"study_design_scores_gemma":[0.00030922997,0.000023753375,0.013415401,0.0002715946,0.000004211942,0.0000023929201,0.00006574332,0.9558381,0.0012835547,0.00018624871,0.028447136,0.00015265544],"about_ca_topic_score_codex":0.000048126134,"about_ca_topic_score_gemma":0.000010573485,"teacher_disagreement_score":0.83815014,"about_ca_system_score_codex":0.00010832232,"about_ca_system_score_gemma":0.0000015911829,"threshold_uncertainty_score":0.29249042},"labels":[],"label_agreement":null},{"id":"W2117105423","doi":"10.1109/tpwrd.2005.855445","title":"Delivery Point Reliability Indices of a Bulk Electric System Using Sequential Monte Carlo Simulation","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":63,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Monte Carlo method; Reliability (semiconductor); Reliability engineering; Probability distribution; Electric power system; Computer science; Point (geometry); Statistics; Engineering; Power (physics); Mathematics; Physics","score_opus":0.011678397865678137,"score_gpt":0.217559446793368,"score_spread":0.20588104892768985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2117105423","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6886615,0.0003140697,0.30892766,0.000012949705,0.0010306444,0.00036651676,0.00006799948,0.0003430812,0.00027557043],"genre_scores_gemma":[0.9990264,0.000060900526,0.00070631853,0.000025835732,0.000055989658,0.00002493879,0.000001050693,0.000050284383,0.000048239806],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99790615,0.00011369607,0.0007616027,0.00039594198,0.00039482067,0.00042776845],"domain_scores_gemma":[0.99877834,0.00018036847,0.00013238398,0.00054397696,0.00023840585,0.00012651343],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00040375485,0.00031596606,0.00043664072,0.00035300298,0.0001443233,0.000032670607,0.00021586937,0.00023945134,0.000050363135],"category_scores_gemma":[0.000008766443,0.00033016276,0.0002963319,0.00047768935,0.00006387657,0.00057660433,0.0000025923716,0.00036457856,0.000045227],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011368097,0.00011485381,0.000020425401,0.00027703788,0.00009953163,0.0000053667595,0.00060457684,0.9874413,0.0100476965,0.0000052558203,0.00003731367,0.0012329526],"study_design_scores_gemma":[0.0005777319,0.00013225676,0.00009416333,0.00028754247,0.00012731816,0.000026738151,0.00023260344,0.9517726,0.04596538,0.0000049076516,0.0004183719,0.00036039163],"about_ca_topic_score_codex":0.00037902148,"about_ca_topic_score_gemma":0.00006906607,"teacher_disagreement_score":0.31036493,"about_ca_system_score_codex":0.0010079214,"about_ca_system_score_gemma":0.000090805726,"threshold_uncertainty_score":0.99991506},"labels":[],"label_agreement":null},{"id":"W2117115770","doi":"10.1109/wescan.1993.270563","title":"Adequacy evaluation in generation, transmission and distribution systems of an electric power system","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Electric power system; Computer science; Transmission (telecommunications); Transmission system; Electric power transmission; Power transmission; Power (physics); Engineering; Electrical engineering; Telecommunications","score_opus":0.014269344032808634,"score_gpt":0.20653268845776973,"score_spread":0.1922633444249611,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2117115770","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8849834,0.0037674294,0.10832083,0.000016292015,0.00026615377,0.00055972504,0.000008330591,0.00012613964,0.0019516512],"genre_scores_gemma":[0.99976903,0.000058065547,0.000056598656,0.0000014161693,0.000020493291,0.000036325833,0.000020812464,0.000007771091,0.000029496072],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991314,0.00010130797,0.00032238182,0.00013469486,0.00018206662,0.00012814383],"domain_scores_gemma":[0.99968827,0.000016817214,0.000028634353,0.00013914777,0.00008014589,0.000046980254],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005706241,0.00008391806,0.00015564695,0.000061628285,0.000021380329,0.000017692899,0.00004401611,0.000076970144,0.000019785915],"category_scores_gemma":[0.000019843113,0.00007354199,0.000017379452,0.00020337227,0.00000721165,0.00020099907,0.0000024944532,0.000052195195,0.0000036960125],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054622957,0.0005292592,0.0022221727,0.0057268464,0.00010606953,0.000013142645,0.0048957174,0.5335214,0.3281317,0.039501328,0.00467114,0.0806266],"study_design_scores_gemma":[0.00032420785,0.000048913673,0.0011696919,0.00009846306,0.000008851157,0.000012294229,0.00011354272,0.9941962,0.0034024618,0.0000050538188,0.0005348798,0.00008548656],"about_ca_topic_score_codex":0.00006390332,"about_ca_topic_score_gemma":0.000011924317,"teacher_disagreement_score":0.46067476,"about_ca_system_score_codex":0.00016472928,"about_ca_system_score_gemma":0.0000066562648,"threshold_uncertainty_score":0.29989555},"labels":[],"label_agreement":null},{"id":"W2117910985","doi":"10.1080/15325000500241266","title":"Impact of Load Shedding Philosophies on Bulk Electric System Reliability Analysis Using Sequential Monte Carlo Simulation","year":2005,"lang":"en","type":"article","venue":"Electric Power Components and Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Load Shedding; Monte Carlo method; Reliability (semiconductor); Reliability engineering; Electric power system; Electricity; Point (geometry); Computer science; Process (computing); Engineering; Simulation; Statistics; Mathematics; Power (physics)","score_opus":0.01880802738214488,"score_gpt":0.2588798469956606,"score_spread":0.2400718196135157,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2117910985","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98484623,0.0029282535,0.010254694,0.0000074273166,0.0005088887,0.00059955975,0.00003174593,0.0002480384,0.0005751345],"genre_scores_gemma":[0.9996623,0.000042257274,0.000043580232,0.0000032432315,0.00016523588,0.000016236265,0.0000043388013,0.000039490726,0.000023311884],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99713516,0.00021082758,0.0009834985,0.00048662248,0.0006034662,0.0005804338],"domain_scores_gemma":[0.9985614,0.00018584049,0.0002689862,0.0005600913,0.0002544334,0.00016924932],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00084475183,0.0004039067,0.00097415777,0.0006713896,0.00014254796,0.00008960131,0.00021116273,0.00019310747,0.000005772455],"category_scores_gemma":[0.000066734035,0.00034612685,0.00040012528,0.0014744652,0.000028854369,0.0002634856,0.00003068847,0.00025726896,0.000007188775],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009441334,0.0000626961,0.003578949,0.00026945712,0.0007372847,0.000004330364,0.00026555668,0.98031497,0.014431419,0.00009403639,0.000022859758,0.00012403891],"study_design_scores_gemma":[0.00049672875,0.00017888974,0.008080698,0.00018103489,0.00026657357,0.000021051133,0.000024316472,0.9899566,0.00033072772,0.0000055590413,0.00012761145,0.0003302089],"about_ca_topic_score_codex":0.0010660945,"about_ca_topic_score_gemma":0.0000060771977,"teacher_disagreement_score":0.014816048,"about_ca_system_score_codex":0.0019617667,"about_ca_system_score_gemma":0.00006847516,"threshold_uncertainty_score":0.9998991},"labels":[],"label_agreement":null},{"id":"W2118894361","doi":"10.1109/tpwrd.2010.2078839","title":"Weather Normalization of Reliability Indices","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Nova Scotia Department of Energy","funders":"","keywords":"Normalization (sociology); Reliability (semiconductor); Meteorology; Weather forecasting; Lightning (connector); Wind speed; Environmental science; Reliability engineering; Computer science; Engineering; Geography","score_opus":0.004164862807553832,"score_gpt":0.18501123325860794,"score_spread":0.18084637045105412,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2118894361","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6560154,0.00003256251,0.33646092,0.000027746788,0.0025437016,0.00017210873,0.0000653069,0.00022422508,0.0044580223],"genre_scores_gemma":[0.9992708,0.00004722803,0.00040525227,0.000030605966,0.000015559213,0.00002204981,0.0000013345443,0.000023383769,0.00018378244],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991463,0.000025313788,0.00029823088,0.00017445549,0.00017381912,0.00018189925],"domain_scores_gemma":[0.99930465,0.00007034645,0.000039611143,0.00040806163,0.00010908012,0.000068245645],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021629452,0.00014057921,0.00017324027,0.00011635503,0.000052901192,0.000012010373,0.00015093148,0.00015838425,0.00036652896],"category_scores_gemma":[0.0000078973535,0.00013444027,0.00011209772,0.00020042801,0.000084824416,0.00023317714,7.1510607e-7,0.00031755856,0.00007914395],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000375368,0.0016578105,0.0015787879,0.001254813,0.0004381327,0.000016177979,0.0071195215,0.44525817,0.5146178,0.0010842534,0.004337466,0.02226167],"study_design_scores_gemma":[0.0013892603,0.0003860664,0.0044011874,0.0002403355,0.00012362732,0.000036288642,0.00034855885,0.032368626,0.92190593,0.00049251306,0.037309993,0.0009975907],"about_ca_topic_score_codex":0.000056506025,"about_ca_topic_score_gemma":0.0000934892,"teacher_disagreement_score":0.41288957,"about_ca_system_score_codex":0.00003824169,"about_ca_system_score_gemma":0.000024345109,"threshold_uncertainty_score":0.5482315},"labels":[],"label_agreement":null},{"id":"W2118976337","doi":"10.1109/wescan.1995.493964","title":"An adequacy equivalent approach for composite power system reliability evaluation","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Computer science; Electric power system; Sensitivity (control systems); Power (physics); Engineering; Electronic engineering","score_opus":0.028728835777580956,"score_gpt":0.24837851161616953,"score_spread":0.21964967583858858,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2118976337","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.071334355,0.00052415987,0.8410507,0.000058675483,0.0008968704,0.0022204283,0.00003451223,0.001172177,0.08270816],"genre_scores_gemma":[0.98962873,0.0000038069372,0.009662182,0.00002434681,0.00006429977,0.00037250828,0.000026931843,0.000030787112,0.00018637917],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99849135,0.00010184861,0.0003982434,0.00035362577,0.00031389142,0.00034104448],"domain_scores_gemma":[0.9988952,0.00006108284,0.000037766746,0.00067970506,0.0001989662,0.00012727264],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012353586,0.0001851016,0.00025321788,0.00004880511,0.00007815629,0.000049479364,0.00022121836,0.00011417517,0.000117486714],"category_scores_gemma":[0.000046579466,0.0001615113,0.00011126875,0.000119665434,0.000029779845,0.00027901787,0.000016129816,0.000094426236,0.00005338616],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013089833,0.0014629564,0.0017302192,0.008400777,0.0002500458,0.0000029623593,0.0042421697,0.89536786,0.020091066,0.023269929,0.030579763,0.014471321],"study_design_scores_gemma":[0.000535945,0.0000913693,0.00042089322,0.000039971736,0.00003138129,0.0000074283034,0.00028912048,0.9943537,0.0011476071,0.000060333423,0.0027999575,0.00022225494],"about_ca_topic_score_codex":0.000010802902,"about_ca_topic_score_gemma":0.0000014301606,"teacher_disagreement_score":0.9182944,"about_ca_system_score_codex":0.0003864928,"about_ca_system_score_gemma":0.000007642419,"threshold_uncertainty_score":0.65862393},"labels":[],"label_agreement":null},{"id":"W2119297662","doi":"10.1109/pes.2007.386052","title":"Severity Index for Estimating the Impact of Wind Generation on System Vulnerability","year":2007,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Wind power; Reliability engineering; Electric power system; Probabilistic logic; Computer science; Index (typography); Vulnerability (computing); Vulnerability index; Electricity generation; Vulnerability assessment; Operations research; Engineering; Computer security; Power (physics); Electrical engineering; Artificial intelligence","score_opus":0.01170471543793501,"score_gpt":0.25319486221774795,"score_spread":0.24149014677981295,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2119297662","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.594075,0.00008422465,0.4032985,0.000010105337,0.0016166725,0.00038572444,0.000022134096,0.00026263282,0.00024499197],"genre_scores_gemma":[0.9767652,0.0000019538322,0.02234903,0.000014555647,0.00074910885,0.00003441352,0.0000068010813,0.00006436465,0.000014529091],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99812055,0.000038822713,0.0006589145,0.0003117046,0.0002716675,0.0005983645],"domain_scores_gemma":[0.9987772,0.00039066162,0.00012469561,0.00044794756,0.0001547133,0.00010479544],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00295084,0.00033285003,0.00038312585,0.00004254362,0.00017242628,0.00004599304,0.00024799752,0.00019732583,0.0000021125084],"category_scores_gemma":[0.00019810257,0.00025993836,0.0005261241,0.00026024794,0.000042917385,0.00012473868,0.000023291635,0.0003325415,0.0000017801035],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009865772,0.00001771608,0.00043894158,0.00038512534,0.00011472644,5.2822e-7,0.0008024549,0.9358467,0.061065603,0.00011067722,0.00082675973,0.0003809144],"study_design_scores_gemma":[0.00029212705,0.00006840526,0.0023119734,0.00020258901,0.00001636106,0.000008441112,0.00013992858,0.97534716,0.021243006,0.000007360732,0.00009087167,0.00027175163],"about_ca_topic_score_codex":0.00010362595,"about_ca_topic_score_gemma":0.0000054754523,"teacher_disagreement_score":0.38269022,"about_ca_system_score_codex":0.00063047104,"about_ca_system_score_gemma":0.000034058914,"threshold_uncertainty_score":0.9999853},"labels":[],"label_agreement":null},{"id":"W2120431356","doi":"10.1109/tpwrs.2009.2023263","title":"Composite System Adequacy Assessment Incorporating Large-Scale Wind Energy Conversion Systems Considering Wind Speed Correlation","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":110,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind speed; Wind power; Reliability (semiconductor); Monte Carlo method; Electric power system; Scale (ratio); Transmission system; Reliability engineering; Engineering; Transmission (telecommunications); Computer science; Automotive engineering; Power (physics); Meteorology; Mathematics; Statistics; Electrical engineering","score_opus":0.007928361752800176,"score_gpt":0.20937675400592046,"score_spread":0.20144839225312028,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2120431356","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046387184,0.00056206086,0.928499,0.00004163366,0.01574494,0.0009324152,0.00013183111,0.0012141033,0.0064868266],"genre_scores_gemma":[0.99901587,0.000018353025,0.00019140467,0.000040539348,0.00007556686,0.000017382261,0.000021942553,0.00007790573,0.0005410465],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9965255,0.00030164537,0.001215524,0.00061110203,0.00066722854,0.000678976],"domain_scores_gemma":[0.99828196,0.0001822471,0.00030306194,0.0007423616,0.00019495968,0.00029540173],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00073861756,0.00055627775,0.0008272406,0.00035022933,0.00043938932,0.00028135884,0.00027428477,0.00038528608,0.000014284766],"category_scores_gemma":[0.000003511461,0.0005720049,0.00023056961,0.00046670635,0.000053755757,0.0005780553,0.0000031547386,0.00053426065,0.00010086271],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043419805,0.00014466344,0.00012568462,0.0006448005,0.00013753907,0.000046492096,0.0006839335,0.9879918,0.0083232885,0.0012922989,0.0005049902,0.00006105784],"study_design_scores_gemma":[0.0016773165,0.00031163185,0.00028647442,0.0024168687,0.00011040424,0.00032268092,0.0041327816,0.9825456,0.002406068,0.000008233537,0.004957691,0.0008242397],"about_ca_topic_score_codex":0.00023411534,"about_ca_topic_score_gemma":0.000020138623,"teacher_disagreement_score":0.9526287,"about_ca_system_score_codex":0.0010596705,"about_ca_system_score_gemma":0.00008156966,"threshold_uncertainty_score":0.9996731},"labels":[],"label_agreement":null},{"id":"W2120587342","doi":"10.1080/15325000590885586","title":"Incorporating Reliability Index Probability Distributions in Financial Risk Assessment with Performance Based Regulation","year":2005,"lang":"en","type":"article","venue":"Electric Power Components and Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Incentive; Reliability engineering; Financial risk; Profit (economics); Monte Carlo method; Electric power; Risk analysis (engineering); Work (physics); Finance; Computer science; Power (physics); Engineering; Business; Economics; Microeconomics","score_opus":0.006378275313255927,"score_gpt":0.19028339458022034,"score_spread":0.1839051192669644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2120587342","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92955923,0.00020240739,0.06832392,0.000055168402,0.00022833604,0.000810407,0.000024904071,0.00015150146,0.0006441483],"genre_scores_gemma":[0.9990989,0.000013543438,0.00064083363,0.000007068824,0.00004696434,0.00013842771,0.000023485942,0.00001591653,0.000014836447],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981833,0.00018340428,0.0005910161,0.0003631439,0.00029517672,0.0003839269],"domain_scores_gemma":[0.9991809,0.00009340717,0.00014645347,0.00036949324,0.00011109882,0.00009865821],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001178577,0.00022890801,0.00035437485,0.00011566748,0.00016145722,0.00006874793,0.00012301614,0.00012120954,0.000004177829],"category_scores_gemma":[0.00007625636,0.00019117781,0.000036682242,0.0004925253,0.000050641196,0.00031783668,0.00002075278,0.0003735393,0.000003364178],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000109378176,0.00022572665,0.70612556,0.00044439713,0.00001715337,0.0000026661346,0.0001231713,0.28867072,0.0013274368,0.0007593759,0.00013474711,0.0020596692],"study_design_scores_gemma":[0.00052337465,0.00007411829,0.48493764,0.00011427869,0.0000051429515,0.000005422595,0.0000043804484,0.5131481,0.000074358744,0.00007981727,0.00087690476,0.00015641867],"about_ca_topic_score_codex":0.00019612246,"about_ca_topic_score_gemma":0.00008084407,"teacher_disagreement_score":0.22447744,"about_ca_system_score_codex":0.0006254406,"about_ca_system_score_gemma":0.00010403723,"threshold_uncertainty_score":0.77960044},"labels":[],"label_agreement":null},{"id":"W2121524796","doi":"10.1109/naps.2008.5307327","title":"Optimal wind installation considering capacity and energy credits","year":2008,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Renewable energy; Electric power system; Monte Carlo method; Reliability engineering; Computer science; Grid; Intermittent energy source; Environmental economics; Automotive engineering; Distributed generation; Engineering; Power (physics); Electrical engineering; Economics","score_opus":0.01686621765405306,"score_gpt":0.17641085172494675,"score_spread":0.1595446340708937,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2121524796","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91996014,0.00015862391,0.042505518,0.000025260082,0.00026808138,0.000027134929,0.0000022597403,0.00021918924,0.036833763],"genre_scores_gemma":[0.99740475,0.00007697212,0.002105027,0.000026870644,0.000045612207,0.0000019346062,9.897535e-7,0.00000810554,0.0003297438],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996008,0.000007545305,0.00011175113,0.000094546915,0.000060669336,0.00012463945],"domain_scores_gemma":[0.99980336,0.00002531159,0.000008958185,0.00009100627,0.000019291076,0.000052091513],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000047310063,0.00007261168,0.00009375649,0.00002573378,0.00004682277,0.000008919055,0.000027184002,0.000048148468,0.000022771157],"category_scores_gemma":[0.000018608782,0.000069262926,0.000015417245,0.00004254198,0.000048431524,0.00013947934,0.000014899751,0.000045689132,0.0000048033485],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000664631,0.00013537086,0.030377159,0.0010602288,0.00036125738,0.00024234812,0.010947263,0.7547252,0.077936806,0.07154306,0.040009476,0.012595354],"study_design_scores_gemma":[0.0017625557,0.0001385116,0.054458868,0.00018782224,0.0000232537,0.0014130076,0.00039409188,0.4935096,0.059951626,0.0007010072,0.38613728,0.0013223973],"about_ca_topic_score_codex":0.00007862148,"about_ca_topic_score_gemma":0.000047146765,"teacher_disagreement_score":0.3461278,"about_ca_system_score_codex":0.000024329835,"about_ca_system_score_gemma":0.0000073300703,"threshold_uncertainty_score":0.28244603},"labels":[],"label_agreement":null},{"id":"W2121739843","doi":"10.1109/smartgridcomm.2012.6486040","title":"A smart meter based approach to power reliability index for enterprise-level power grid","year":2012,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Reliability (semiconductor); Reliability engineering; Computer science; Smart grid; Mean time between failures; Maximization; Smart meter; Power (physics); Monte Carlo method; Grid; Mathematical optimization; Failure rate; Engineering; Statistics; Electrical engineering; Mathematics","score_opus":0.01887595973502005,"score_gpt":0.22222451212906547,"score_spread":0.20334855239404542,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2121739843","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03444928,0.00007615189,0.9010796,0.00019287787,0.0026101938,0.0013270521,0.00012106888,0.000490159,0.059653614],"genre_scores_gemma":[0.9724542,6.664562e-7,0.025280487,0.00074559916,0.00009303119,0.00045068518,0.0000133304875,0.000056749013,0.0009052467],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9981203,0.0000467441,0.00043462266,0.0003687149,0.00023676235,0.0007928544],"domain_scores_gemma":[0.9985556,0.0001551514,0.000030386005,0.00077748776,0.000115745104,0.00036563902],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010132986,0.00029903365,0.000369288,0.00010736844,0.00005305432,0.00003915657,0.00029542137,0.00017295648,0.00018448809],"category_scores_gemma":[0.00023921177,0.00024751888,0.00023189595,0.00019969452,0.00003539096,0.00029220138,0.00006294984,0.00016592404,0.00014758372],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013627855,0.004892092,0.11372984,0.0037254505,0.0006964073,0.0000034833672,0.008578329,0.03173757,0.009014951,0.010888243,0.8129697,0.0024011752],"study_design_scores_gemma":[0.00239411,0.00034914678,0.049932044,0.00013483985,0.00006380958,0.00001538168,0.0004656952,0.041942306,0.00843585,0.00023647769,0.89432764,0.0017026754],"about_ca_topic_score_codex":0.000029618815,"about_ca_topic_score_gemma":0.0000068596432,"teacher_disagreement_score":0.9380049,"about_ca_system_score_codex":0.00019285583,"about_ca_system_score_gemma":0.000025894524,"threshold_uncertainty_score":0.99999774},"labels":[],"label_agreement":null},{"id":"W2121793142","doi":"10.1109/60.875501","title":"Electric power system reliability criteria determination in a developing country-an investigation in Nepal","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Conversion","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Electric power system; Reliability engineering; Electric power; Developing country; Power (physics); Computer science; Engineering; Risk analysis (engineering); Business; Economics; Economic growth","score_opus":0.006246809439307671,"score_gpt":0.20066688572393296,"score_spread":0.1944200762846253,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2121793142","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8729784,0.000024841383,0.12521888,0.00005165023,0.00072719,0.00017365032,0.000006528148,0.00025631164,0.00056254474],"genre_scores_gemma":[0.9992581,0.0000769317,0.00040010997,0.00008411145,0.000014002459,0.00006385786,0.000008034984,0.000023528866,0.00007131844],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986111,0.00016160448,0.00042215086,0.0003230691,0.00018861987,0.00029348306],"domain_scores_gemma":[0.99951446,0.00006498805,0.000029660323,0.00026752072,0.000045763612,0.00007758851],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034827722,0.0001906976,0.0002198771,0.00032767668,0.00006895308,0.00002806751,0.0001289536,0.00019790823,0.000078679754],"category_scores_gemma":[0.000003982107,0.00021098026,0.00004429879,0.0006659606,0.000028234175,0.0005083732,5.814481e-7,0.00019861416,0.000023623355],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00080884044,0.0005024931,0.0009302356,0.0015362973,0.00004159791,0.000120367746,0.005137508,0.88165826,0.037472565,0.0011806057,0.0002235672,0.07038767],"study_design_scores_gemma":[0.0011723466,0.00014907007,0.0030830884,0.00053981016,0.000012444149,0.0000258712,0.00023131126,0.94260305,0.049688984,0.00008855697,0.0019353494,0.00047013746],"about_ca_topic_score_codex":0.00078558316,"about_ca_topic_score_gemma":0.00070598046,"teacher_disagreement_score":0.1262797,"about_ca_system_score_codex":0.0010999234,"about_ca_system_score_gemma":0.00006194317,"threshold_uncertainty_score":0.8603525},"labels":[],"label_agreement":null},{"id":"W2122997089","doi":"10.2172/941540","title":"Tracking the Reliability of the U.S. Electric Power System: An Assessment of Publicly Available Information Reported to State Public Utility Commissions","year":2008,"lang":"en","type":"report","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":58,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Blackout; Reliability (semiconductor); Electric utility; State (computer science); Reliability engineering; Electricity; Service (business); Electric power; Electric power system; Computer science; Power (physics); Risk analysis (engineering); Business; Operations research; Engineering; Electrical engineering; Marketing","score_opus":0.037203423562860535,"score_gpt":0.2828098827777371,"score_spread":0.24560645921487656,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2122997089","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23935665,0.0005623679,0.0312811,0.00085010554,0.0059399777,0.007259832,0.0005932904,0.0012903267,0.71286637],"genre_scores_gemma":[0.99817586,0.00019914213,0.00025718726,0.0000312639,0.000025320676,0.00013264165,0.000057266974,0.000039354138,0.0010819557],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99400246,0.00039771225,0.0028379222,0.00043002493,0.0017424023,0.0005894555],"domain_scores_gemma":[0.99193734,0.0002219177,0.0011556352,0.003412076,0.0030423752,0.0002306278],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.006863783,0.00044309406,0.000993802,0.00028070895,0.00024082049,0.000118205084,0.0010986668,0.00036827757,0.00015690917],"category_scores_gemma":[0.0020956232,0.0002545644,0.00037675572,0.0014824724,0.00012625172,0.0010076235,0.00021725158,0.00086777913,0.0000098608225],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011281793,0.0017963222,0.13339758,0.033127204,0.0019066932,0.000020091597,0.005973811,0.033938356,0.0018220217,0.0017373724,0.77160394,0.014563779],"study_design_scores_gemma":[0.0004299223,0.00024003614,0.15394726,0.0012352308,0.0001798899,0.00030502363,0.0010055052,0.04542544,0.0017470829,0.00005221095,0.7945201,0.00091233634],"about_ca_topic_score_codex":0.0030515743,"about_ca_topic_score_gemma":0.00043792944,"teacher_disagreement_score":0.7588192,"about_ca_system_score_codex":0.0011917806,"about_ca_system_score_gemma":0.0029367632,"threshold_uncertainty_score":0.99999064},"labels":[],"label_agreement":null},{"id":"W2124468416","doi":"10.1109/pmaps.2006.360336","title":"Assessment of Asset Safety Risk for Transmission Stations","year":2006,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Risk analysis (engineering); Asset (computer security); Risk assessment; Hazardous waste; Electricity; Electric utility; Electric power industry; Safety standards; Reliability engineering; Business; Computer science; Engineering; Computer security; Electrical engineering","score_opus":0.0046321503281296994,"score_gpt":0.23456932196921365,"score_spread":0.22993717164108396,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2124468416","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005935033,0.000047929567,0.9594778,0.000038986553,0.00011783145,0.00022593602,0.0001323586,0.00009215209,0.033931967],"genre_scores_gemma":[0.96215147,0.000030001398,0.037300702,0.0000032934229,0.000014559316,0.000024274192,0.00002624032,0.000007713108,0.00044172816],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99955755,0.000011254449,0.00020628299,0.00006601462,0.00006242248,0.00009645047],"domain_scores_gemma":[0.9997358,0.000084602034,0.000021012404,0.00010236139,0.000036630023,0.000019627849],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017848518,0.00005185626,0.000098960205,0.000021662745,0.00002665437,0.0000043136274,0.00004289309,0.00003054916,0.000038166436],"category_scores_gemma":[0.0000062303775,0.000042842406,0.000051089024,0.000051136078,0.000008910294,0.000046610407,0.0000022245104,0.000035631674,0.0000012521716],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029410807,0.000222704,0.007978391,0.0015779728,0.00010925842,7.9050795e-7,0.0002813522,0.67367935,0.02610275,0.22827223,0.036561888,0.025183897],"study_design_scores_gemma":[0.0010699616,0.00009710581,0.107931055,0.000086036875,0.00004441961,0.0000011957264,0.00012586925,0.54957813,0.010377286,0.009071326,0.32136464,0.00025299485],"about_ca_topic_score_codex":0.000097092765,"about_ca_topic_score_gemma":0.00007091387,"teacher_disagreement_score":0.95621645,"about_ca_system_score_codex":0.00003473578,"about_ca_system_score_gemma":0.000018377023,"threshold_uncertainty_score":0.17470627},"labels":[],"label_agreement":null},{"id":"W2124538928","doi":"10.1109/pess.2000.867474","title":"A security based approach for generating unit scheduling","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Computer science; Scheduling (production processes); Unit (ring theory); Mathematical optimization; Mathematics","score_opus":0.025893067693672014,"score_gpt":0.20780591045814165,"score_spread":0.18191284276446962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2124538928","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016804287,0.00026154667,0.95666283,0.000037293783,0.00015903688,0.00025306907,0.0000064687624,0.00039527626,0.025420174],"genre_scores_gemma":[0.87145436,0.0000029901096,0.12805316,0.000085282925,0.000076110286,0.00007020945,0.0000051769484,0.000016172702,0.00023655617],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994232,0.000011807131,0.00015163225,0.00013359457,0.000062886545,0.00021687218],"domain_scores_gemma":[0.9996837,0.000045751207,0.000011584579,0.00017296961,0.000034540724,0.000051491803],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018408857,0.0000942552,0.00011714151,0.000028246675,0.000056682333,0.000027902266,0.0000870415,0.000058576166,0.000068092035],"category_scores_gemma":[0.000051017814,0.00008634516,0.00005649661,0.0000910949,0.0000114302065,0.00006701219,0.000007807131,0.000077244236,0.000013065299],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000029747105,0.00006111923,0.000194019,0.00074975804,0.00002544484,8.421475e-7,0.00032047063,0.98758024,0.0032222646,0.003618565,0.0030905074,0.0011337895],"study_design_scores_gemma":[0.0002338534,0.000010680896,0.000003372011,0.00001395741,0.000004123911,0.0000014728927,0.000053879154,0.9912912,0.0021992864,0.000045984943,0.00602355,0.000118606884],"about_ca_topic_score_codex":0.000007642297,"about_ca_topic_score_gemma":0.0000068833906,"teacher_disagreement_score":0.85465,"about_ca_system_score_codex":0.000024897046,"about_ca_system_score_gemma":0.0000037358154,"threshold_uncertainty_score":0.35210532},"labels":[],"label_agreement":null},{"id":"W2124543688","doi":"10.1109/tpwrs.2009.2032758","title":"Reliability Evaluation Considering Wind and Hydro Power Coordination","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":111,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Electric power system; Reliability engineering; Reliability (semiconductor); Monte Carlo method; Wind speed; Engineering; Automotive engineering; Power (physics); Electrical engineering; Meteorology","score_opus":0.011996562118138748,"score_gpt":0.2292736440673071,"score_spread":0.21727708194916837,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2124543688","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37175706,0.00068957335,0.61016536,0.00025346194,0.00530375,0.0014162535,0.000038953753,0.0006793613,0.009696255],"genre_scores_gemma":[0.99955,0.00002165995,0.00008055428,0.000051034054,0.000012302286,0.0000528266,0.0000019393221,0.000026463234,0.00020321217],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99824923,0.00014272238,0.00049796904,0.0003860635,0.0004059281,0.0003180881],"domain_scores_gemma":[0.9990162,0.000118712655,0.000061422164,0.00048436548,0.00018506621,0.00013423411],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000988576,0.00026091214,0.00032114374,0.00016203556,0.00015048822,0.000095586365,0.00010318436,0.00018631821,0.000064014006],"category_scores_gemma":[0.00002979649,0.0002593711,0.00008866197,0.00023007744,0.000056417244,0.00038430744,6.906453e-7,0.00026748792,0.000053586413],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010815957,0.00037077023,0.0000764562,0.00041162557,0.00017757148,0.00001465932,0.0036364815,0.95950204,0.026184794,0.000730315,0.00316433,0.0056228116],"study_design_scores_gemma":[0.00583202,0.0016825754,0.010716816,0.00178803,0.00038933114,0.0005149716,0.002402052,0.89099574,0.03396897,0.0015603633,0.047243424,0.002905702],"about_ca_topic_score_codex":0.000028671397,"about_ca_topic_score_gemma":0.00000724974,"teacher_disagreement_score":0.62779295,"about_ca_system_score_codex":0.0003045009,"about_ca_system_score_gemma":0.000035343193,"threshold_uncertainty_score":0.9999859},"labels":[],"label_agreement":null},{"id":"W2124602339","doi":"10.1243/1748006xjrr249","title":"Effect of hourly wind trends on the peak load-carrying capability of wind-integrated power systems","year":2009,"lang":"en","type":"article","venue":"Proceedings of the Institution of Mechanical Engineers Part O Journal of Risk and Reliability","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Wind speed; Turbine; Power (physics); Automotive engineering; Environmental science; Marine engineering; Electric power system; Engineering; Meteorology; Electrical engineering; Mechanical engineering","score_opus":0.004627208618187897,"score_gpt":0.19896290525922514,"score_spread":0.19433569664103723,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2124602339","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9962787,0.0006124274,0.0010287545,0.0001672168,0.0009651172,0.0003384757,0.00005095291,0.000025056635,0.0005332796],"genre_scores_gemma":[0.99964285,0.00020033638,0.000095598356,0.0000041725725,0.000037582668,0.0000017560858,3.5178604e-7,0.000010397435,0.0000069539497],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99737775,0.000109249086,0.0013848906,0.0001991984,0.000695274,0.00023360523],"domain_scores_gemma":[0.9973872,0.0004959004,0.00086099515,0.00029021577,0.00085081544,0.00011487362],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0055784886,0.00027293927,0.0009227125,0.00012353064,0.000069241745,0.000013020692,0.00047420972,0.00022621483,0.000005810831],"category_scores_gemma":[0.0032825256,0.000144388,0.00044717288,0.0004888744,0.00034174975,0.00020321428,0.000038535032,0.0006786143,2.1724166e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0065206606,0.0019081437,0.010329885,0.010918016,0.0011973289,0.000004480903,0.005911859,0.69556254,0.19517858,0.05985185,0.0026518658,0.0099647725],"study_design_scores_gemma":[0.0068461476,0.011398577,0.024800211,0.011945386,0.0014550326,0.00021009112,0.0023358567,0.061139468,0.87008995,0.0038147434,0.004823818,0.0011407472],"about_ca_topic_score_codex":0.000045630604,"about_ca_topic_score_gemma":9.518997e-7,"teacher_disagreement_score":0.6749113,"about_ca_system_score_codex":0.00017940173,"about_ca_system_score_gemma":0.000074276904,"threshold_uncertainty_score":0.58879715},"labels":[],"label_agreement":null},{"id":"W2125754972","doi":"10.1109/naps.1990.151386","title":"Modeling rural power quality","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Power (physics); Quality (philosophy); Electrical impedance; Voltage; Electrical engineering; Computer science; Supply network; Electric power; Power quality; Engineering; Physics","score_opus":0.021537084767930124,"score_gpt":0.2195299753046806,"score_spread":0.19799289053675048,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2125754972","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46121868,0.000678657,0.20738313,0.00019146522,0.0008295939,0.000110521156,0.0000034844577,0.00096134195,0.32862312],"genre_scores_gemma":[0.9981086,0.000024620194,0.00036100653,0.00006812586,0.000021395697,0.0000051238967,3.970359e-7,0.000009853034,0.0014008386],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99948126,0.000011633242,0.0001727568,0.00007158431,0.00008254261,0.00018024797],"domain_scores_gemma":[0.9997113,0.000012743938,0.000004558044,0.00020317927,0.000019269717,0.000048988917],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012557238,0.000073429605,0.00010238412,0.0000166741,0.000020595813,0.000014672651,0.00008128679,0.000042137795,0.00067397783],"category_scores_gemma":[0.000019405326,0.00006283464,0.000046242545,0.00005389313,0.000008956221,0.000099467274,0.000011597649,0.00006995585,0.00043803867],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000977903,0.00013141899,0.0009345044,0.00038848922,0.00010713225,0.0000104125365,0.0036100943,0.88587606,0.0060165217,0.054509267,0.04116684,0.0072395103],"study_design_scores_gemma":[0.00011311943,0.000006150563,0.000075226606,0.000014824336,0.0000014331255,0.0000034168402,0.00018799002,0.99389607,0.00017764597,0.0002765112,0.005108177,0.00013941266],"about_ca_topic_score_codex":0.00004403065,"about_ca_topic_score_gemma":0.000014930051,"teacher_disagreement_score":0.5368899,"about_ca_system_score_codex":0.000031945136,"about_ca_system_score_gemma":9.670136e-7,"threshold_uncertainty_score":0.7379585},"labels":[],"label_agreement":null},{"id":"W2126039691","doi":"","title":"Canadian experience in the collection of transmission and distribution component unavailability data","year":2004,"lang":"en","type":"article","venue":"IEEE International Conference on Probabilistic Methods Applied to Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Unavailability; Component (thermodynamics); Reliability (semiconductor); Data collection; Computer science; Reliability engineering; Transmission (telecommunications); Electric power system; Operations research; Telecommunications; Power (physics); Engineering; Statistics","score_opus":0.08599252939998,"score_gpt":0.34390283194887905,"score_spread":0.257910302548899,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2126039691","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.120230116,0.00007422283,0.8621574,0.00083867594,0.0021632323,0.0020206266,0.00035623214,0.00006718294,0.012092319],"genre_scores_gemma":[0.9959541,0.000017726785,0.0036631352,0.000035232355,0.000017216673,0.00023598803,0.00005232387,0.000010237637,0.000014070064],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982434,0.00018995449,0.0005716266,0.0004273394,0.00033175296,0.00023592517],"domain_scores_gemma":[0.99882835,0.000215385,0.0000699569,0.0006120878,0.00013283131,0.00014137985],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019608617,0.0001831818,0.00028355827,0.00011331659,0.000059499158,0.00007217986,0.00069489767,0.000098556135,0.000019563744],"category_scores_gemma":[0.0001840914,0.0001435262,0.000023753675,0.00026426802,0.00008745891,0.00009045104,0.000031482883,0.00019275233,0.000006504497],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003915182,0.00047522687,0.0004947625,0.00097188563,0.00011552749,0.000017554645,0.018286169,0.11996252,0.046104632,0.8027113,0.0012060949,0.009262805],"study_design_scores_gemma":[0.0074977833,0.0015672968,0.032609556,0.0058238795,0.00014756442,0.00034771115,0.017362874,0.68030226,0.024614638,0.08024088,0.14547591,0.0040096613],"about_ca_topic_score_codex":0.011859365,"about_ca_topic_score_gemma":0.004130532,"teacher_disagreement_score":0.87572396,"about_ca_system_score_codex":0.00061670545,"about_ca_system_score_gemma":0.0001545718,"threshold_uncertainty_score":0.99472076},"labels":[],"label_agreement":null},{"id":"W2126097922","doi":"10.1109/ccece.1996.548124","title":"Quantitative reliability assessment of electric power systems in developing countries","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Probabilistic logic; Developing country; Electric power system; Reliability engineering; Computer science; Electric power; Transmission system; Power (physics); Power transmission; Electric power transmission; Risk analysis (engineering); Transmission (telecommunications); Engineering; Economics; Business; Electrical engineering; Telecommunications; Economic growth","score_opus":0.015245449456743526,"score_gpt":0.2503956929994045,"score_spread":0.23515024354266098,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2126097922","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7642672,0.0032861137,0.16218999,0.00034207018,0.0010933472,0.00078934256,0.000011474946,0.00033311674,0.06768736],"genre_scores_gemma":[0.99710625,0.00036495188,0.0023304177,0.000023830897,0.000003302109,0.000034991986,5.9284554e-7,0.000012017237,0.00012365938],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988442,0.00006069409,0.00048499648,0.0001708654,0.0001830558,0.00025619112],"domain_scores_gemma":[0.999383,0.00019540751,0.000046134424,0.00023603319,0.00010833399,0.00003113203],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000524627,0.00012654935,0.0003098756,0.00011564243,0.0000184094,0.000016834878,0.00012181633,0.00007212663,0.00006076303],"category_scores_gemma":[0.00007749662,0.000111180896,0.000037348684,0.0003758883,0.00003145142,0.00015416025,0.000016018563,0.000113222915,0.000022616638],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029849209,0.0002816664,0.05345583,0.0046632793,0.0001582302,0.000025256257,0.003676391,0.1733861,0.0035755679,0.7509173,0.009642782,0.00018772205],"study_design_scores_gemma":[0.00066733384,0.000220689,0.051530853,0.0005785698,0.000010621914,0.000011145974,0.0007429859,0.9054304,0.0020063268,0.0003708141,0.037840977,0.0005893191],"about_ca_topic_score_codex":0.00012918668,"about_ca_topic_score_gemma":0.000030592866,"teacher_disagreement_score":0.7505465,"about_ca_system_score_codex":0.00033021564,"about_ca_system_score_gemma":0.00002856607,"threshold_uncertainty_score":0.45338255},"labels":[],"label_agreement":null},{"id":"W2126772035","doi":"10.1109/wescan.1997.627109","title":"A hybrid deterministic/probabilistic technique for HVDC system reliability evaluation","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Probabilistic logic; Reliability (semiconductor); Transmission system; Computer science; Component (thermodynamics); Transmission (telecommunications); High-voltage direct current; Electric power transmission; Diagram; Voltage; Engineering; Electrical engineering; Artificial intelligence; Direct current","score_opus":0.021150566355712934,"score_gpt":0.23194282324463802,"score_spread":0.21079225688892508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2126772035","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015369018,0.00023807335,0.9305834,0.00007693275,0.0012420155,0.0049475324,0.000074465715,0.0014484408,0.04602011],"genre_scores_gemma":[0.9919177,0.0000039775978,0.005125305,0.000016793256,0.000076039156,0.0025249198,0.000007949688,0.00003374281,0.00029353803],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998534,0.00006884361,0.00047583025,0.00034014296,0.00024071924,0.00034044494],"domain_scores_gemma":[0.9987738,0.0002298257,0.000043995224,0.00061508105,0.00024320597,0.000094070194],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013339906,0.00019819892,0.0002802948,0.000054995144,0.00007545417,0.00003476959,0.00019017467,0.00009309059,0.00011639047],"category_scores_gemma":[0.00062414503,0.00017838158,0.0001182847,0.00009610608,0.000049255017,0.00011402991,0.000020562691,0.000099429635,0.00009229101],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003484591,0.0018203463,0.0009645333,0.07976988,0.00059665594,0.00009971219,0.0027160184,0.32131627,0.067881994,0.14496522,0.24728145,0.13223949],"study_design_scores_gemma":[0.0003913482,0.000088143825,0.000060794384,0.00016645415,0.000055709825,0.000059268597,0.000042321568,0.982191,0.005920176,0.0019543732,0.0087807635,0.00028959417],"about_ca_topic_score_codex":0.000011243147,"about_ca_topic_score_gemma":0.000005541187,"teacher_disagreement_score":0.97654873,"about_ca_system_score_codex":0.0005173642,"about_ca_system_score_gemma":0.000017614379,"threshold_uncertainty_score":0.72741896},"labels":[],"label_agreement":null},{"id":"W2127325323","doi":"10.1109/pmaps.2014.6960672","title":"Evaluation of wind capacity credit using discrete convolution considering the mechanical failure of wind turbines","year":2014,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Turbine; Reliability (semiconductor); Convolution (computer science); Reliability engineering; Wind speed; Computer science; Capacity planning; Power (physics); Marine engineering; Environmental science; Engineering; Meteorology; Electrical engineering; Mechanical engineering","score_opus":0.03492176325355785,"score_gpt":0.24189147005293218,"score_spread":0.20696970679937432,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127325323","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90767455,0.000076857694,0.090366185,0.00008249699,0.0004501816,0.00027992667,0.0000080509235,0.000047669084,0.0010140543],"genre_scores_gemma":[0.9986145,0.0000020438351,0.0012843119,0.0000072289226,0.000070414215,0.0000024314206,0.0000014436378,0.0000103065195,0.0000073492556],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988104,0.0001681699,0.00034494433,0.00012438779,0.000403127,0.00014897618],"domain_scores_gemma":[0.9991593,0.00014031121,0.00008484913,0.00029106977,0.00029239504,0.00003207911],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020466035,0.000107002736,0.00022247515,0.00003193792,0.000038322032,0.000009116957,0.00010713424,0.00008784464,0.000045431017],"category_scores_gemma":[0.00051237753,0.00007468742,0.00006771782,0.000098104625,0.00009968462,0.00013012641,0.00002892389,0.000100879646,0.0000020889213],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022879827,0.000031386717,0.0008856279,0.0006348946,0.00019813562,2.166716e-7,0.0010580973,0.50084776,0.47636166,0.018627744,0.0004687246,0.0008628859],"study_design_scores_gemma":[0.0003819926,0.000029758512,0.0016389644,0.00015968783,0.00012286051,0.000008487823,0.00024630592,0.9231763,0.07103937,0.0027043887,0.00037824098,0.0001136264],"about_ca_topic_score_codex":0.00013322914,"about_ca_topic_score_gemma":0.00014647008,"teacher_disagreement_score":0.4223286,"about_ca_system_score_codex":0.000073867915,"about_ca_system_score_gemma":0.0000320052,"threshold_uncertainty_score":0.30456647},"labels":[],"label_agreement":null},{"id":"W2127417755","doi":"10.1109/pesgm.2012.6343943","title":"Basic models and methodologies for common mode and dependent transmission outage events","year":2012,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Adverse weather; Reliability (semiconductor); Common-mode signal; Mode (computer interface); Reliability engineering; Transmission (telecommunications); Computer science; Failure mode and effects analysis; Power transmission; Power (physics); Telecommunications; Engineering; Meteorology","score_opus":0.0611350592734468,"score_gpt":0.305296901740839,"score_spread":0.2441618424673922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127417755","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15335992,0.0017114207,0.8428173,0.000059396632,0.00015502107,0.00025113023,0.000010416067,0.00012524975,0.0015101157],"genre_scores_gemma":[0.96603245,0.00022938167,0.033450983,0.000024306762,0.000014906189,0.00003353684,0.0000016273764,0.000011774897,0.00020102502],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99948376,0.000032984553,0.00012571934,0.00009816383,0.000052479907,0.000206905],"domain_scores_gemma":[0.9996502,0.00014543218,0.000009894012,0.00010292666,0.000008844607,0.00008271154],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039833636,0.000094371906,0.0001619475,0.000021908345,0.000033404955,0.000008656662,0.00004586014,0.00006626117,0.000003376843],"category_scores_gemma":[0.000013714889,0.00007216304,0.000025138379,0.000016362428,0.000013434997,0.0002318789,0.000018653996,0.000049917515,7.4297304e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004997732,0.00030697713,0.015842455,0.009156169,0.00046821148,0.000003960999,0.021893723,0.15708941,0.062143173,0.070991315,0.0037729512,0.65783185],"study_design_scores_gemma":[0.001418317,0.00009796924,0.0033651087,0.00016051724,0.000071692244,0.0000325476,0.00074663537,0.90890557,0.026146319,0.04926751,0.009216626,0.0005711886],"about_ca_topic_score_codex":0.000028872637,"about_ca_topic_score_gemma":0.0000132707855,"teacher_disagreement_score":0.81267256,"about_ca_system_score_codex":0.000016740423,"about_ca_system_score_gemma":0.0000020310902,"threshold_uncertainty_score":0.29427236},"labels":[],"label_agreement":null},{"id":"W2127512607","doi":"10.1109/tpwrs.2003.814909","title":"Software implementation of online risk-based security assessment","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":98,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PricewaterhouseCoopers (Canada)","funders":"","keywords":"Computer science; Visualization; Software security assurance; Software; Probabilistic risk assessment; Probabilistic logic; Security management; Network security; Risk management; Risk analysis (engineering); Computer security; Risk assessment; Software engineering; Reliability engineering; Data mining; Information security; Engineering; Security service; Artificial intelligence","score_opus":0.007663946340115724,"score_gpt":0.2540567788291577,"score_spread":0.246392832489042,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127512607","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08978137,0.00016880063,0.9050523,0.000011357486,0.0031168899,0.00051273184,0.0006332776,0.0002648205,0.00045845966],"genre_scores_gemma":[0.99884236,0.000031142557,0.0009310212,0.000012809331,0.000006111243,0.000095429496,0.00000806329,0.00003338652,0.000039680035],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99852663,0.00017432241,0.0005362858,0.00022064739,0.00028439044,0.0002577175],"domain_scores_gemma":[0.9991596,0.000111762216,0.00011379944,0.0004195527,0.0001070348,0.00008830478],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040158504,0.00020071278,0.0003024573,0.00013429516,0.000078608784,0.000022397388,0.000115091636,0.00010531801,0.00011076335],"category_scores_gemma":[0.0000061523365,0.00019740319,0.00014592218,0.0002578327,0.00003084114,0.000112491856,3.0519612e-7,0.0002473204,0.000015889782],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051640756,0.0013485728,0.003745807,0.0024447883,0.00066732254,0.000014127182,0.0023206107,0.9798385,0.0031797013,0.0011370501,0.0024858995,0.0027659622],"study_design_scores_gemma":[0.023871096,0.0049132234,0.027012423,0.004002673,0.0014314492,0.00020690566,0.029563924,0.3029847,0.37037584,0.00082808326,0.22793512,0.0068745357],"about_ca_topic_score_codex":0.00026107673,"about_ca_topic_score_gemma":0.00028461104,"teacher_disagreement_score":0.909061,"about_ca_system_score_codex":0.00021504244,"about_ca_system_score_gemma":0.000093466006,"threshold_uncertainty_score":0.80498683},"labels":[],"label_agreement":null},{"id":"W2128104514","doi":"10.1109/icps.2000.854355","title":"Deregulated transmission system reliability planning criteria based on historical equipment performance data","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Planner; Rule of thumb; Computer science; Reliability (semiconductor); Business system planning; Electric power system; Reliability engineering; Contingency; Probabilistic logic; Electric power industry; Operations research; Transmission system; Transmission (telecommunications); Engineering; Systems engineering; Electricity; Power (physics); Artificial intelligence; Telecommunications","score_opus":0.04158185945482982,"score_gpt":0.23166291401167052,"score_spread":0.1900810545568407,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2128104514","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1742286,0.0021100806,0.6428986,0.0013004618,0.0052752057,0.0015503259,0.000067842106,0.0054823775,0.16708651],"genre_scores_gemma":[0.99718225,0.000014663359,0.0021298754,0.00004905807,0.00004530831,0.000019376123,0.000022805061,0.000028552675,0.00050811155],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984032,0.000060278446,0.00043979313,0.00043650542,0.00029255459,0.00036768234],"domain_scores_gemma":[0.99852145,0.00007680392,0.000029701472,0.0011823007,0.000035249694,0.00015450835],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049414503,0.00022222253,0.0002855459,0.00006609972,0.000095623844,0.000029916413,0.00044402236,0.00013055996,0.00038853986],"category_scores_gemma":[0.000027950095,0.00018259216,0.00004932653,0.00016028067,0.000019298617,0.00022165976,0.000039730803,0.00018807242,0.00008765326],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003623809,0.00081076147,0.0020936995,0.013658243,0.000094209965,0.000112453825,0.0015209955,0.5138156,0.0066112424,0.00021913527,0.4155644,0.04513689],"study_design_scores_gemma":[0.00034129267,0.00007823339,0.0005911641,0.0005645416,0.000010482674,0.000006897925,0.000020556403,0.9336483,0.0007199082,0.0000012653707,0.06379829,0.0002190496],"about_ca_topic_score_codex":0.000019212644,"about_ca_topic_score_gemma":4.927305e-7,"teacher_disagreement_score":0.82295364,"about_ca_system_score_codex":0.0009562855,"about_ca_system_score_gemma":0.000009871566,"threshold_uncertainty_score":0.74458927},"labels":[],"label_agreement":null},{"id":"W2128125383","doi":"10.1109/ccece.2005.1557005","title":"Basic considerations in generating capacity adequacy evaluation","year":2006,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Computer science; Reliability engineering; Range (aeronautics); Engineering","score_opus":0.02373348689301929,"score_gpt":0.22118272791780458,"score_spread":0.19744924102478528,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2128125383","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.870933,0.00024835128,0.06231315,0.000133946,0.00040671066,0.00035074295,0.0000042808474,0.00023323654,0.0653766],"genre_scores_gemma":[0.9958085,9.908296e-7,0.003923684,0.000043169566,0.00006270052,0.000050379975,0.00000521506,0.0000069070766,0.000098461314],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938023,0.000046572106,0.0002223805,0.00010088801,0.00011392241,0.0001359985],"domain_scores_gemma":[0.9997346,0.00006308339,0.000012059482,0.00012402334,0.000049421964,0.000016802462],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004525947,0.00006629083,0.00008803897,0.00004493284,0.00003531313,0.000026914779,0.00002500363,0.000040882802,0.00017505081],"category_scores_gemma":[0.00010385798,0.00006496369,0.000021093874,0.000087632485,0.0000129772625,0.00013112076,0.000004758888,0.00006927057,0.00003407906],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[6.4036544e-7,0.000037551996,0.0038295975,0.00006305992,0.000007033057,0.0000026850876,0.00030628993,0.91458654,0.03195257,0.040408853,0.0074899653,0.0013152328],"study_design_scores_gemma":[0.0003541993,0.0000057911493,0.009981408,0.000027798524,0.000005580585,0.0000073334004,0.000048644037,0.97552603,0.0075509083,0.005343224,0.0009993917,0.00014966149],"about_ca_topic_score_codex":0.00046663466,"about_ca_topic_score_gemma":0.003023511,"teacher_disagreement_score":0.124875516,"about_ca_system_score_codex":0.00012214166,"about_ca_system_score_gemma":0.000021645057,"threshold_uncertainty_score":0.26491424},"labels":[],"label_agreement":null},{"id":"W2128250426","doi":"10.1109/naps.2008.5307377","title":"Composite generation and transmission system reliability evaluation incorporating two wind energy facilities considering wind speed correlation","year":2008,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind speed; Wind power; Monte Carlo method; Reliability (semiconductor); Transmission system; Reliability engineering; Transmission (telecommunications); Wind engineering; Environmental science; Computer science; Marine engineering; Simulation; Meteorology; Engineering; Structural engineering; Statistics; Electrical engineering; Mathematics; Telecommunications; Power (physics); Physics","score_opus":0.024349132307968223,"score_gpt":0.21706345718038134,"score_spread":0.1927143248724131,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2128250426","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8398251,0.0004897717,0.15337992,0.000036426587,0.0006326662,0.00038576502,0.000008485804,0.0003792625,0.004862582],"genre_scores_gemma":[0.99738145,0.00003175373,0.0021679718,0.00001380472,0.000098115794,0.0000055680475,0.000049982787,0.000020773401,0.00023055621],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983466,0.00018598611,0.0005651992,0.00033162948,0.0003587895,0.00021179534],"domain_scores_gemma":[0.9992682,0.00010370766,0.00008058649,0.00025004614,0.00019362642,0.000103833314],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007817426,0.00022004807,0.00028324925,0.00008425111,0.00026893674,0.000047006044,0.000057908885,0.00012279717,0.000023572988],"category_scores_gemma":[0.000049102186,0.00020952903,0.000050806277,0.00013460642,0.00009383212,0.0004655749,0.000018681641,0.0001262027,0.000006877754],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021538055,0.000019167885,0.0049196417,0.00040873763,0.000027053431,0.000005829723,0.0016746096,0.93233395,0.055371538,0.0013367271,0.0002503948,0.0036307904],"study_design_scores_gemma":[0.00068231014,0.000030398272,0.0018742217,0.00013075881,0.000023205277,0.00010197977,0.0003429042,0.98719066,0.0085462425,0.00014638355,0.00068838114,0.00024252123],"about_ca_topic_score_codex":0.00038446332,"about_ca_topic_score_gemma":0.000051411083,"teacher_disagreement_score":0.15755635,"about_ca_system_score_codex":0.00029669254,"about_ca_system_score_gemma":0.000052818352,"threshold_uncertainty_score":0.85443455},"labels":[],"label_agreement":null},{"id":"W2128724481","doi":"10.1109/tia.2004.836299","title":"Considerations in Applying Short-Circuit Tests for On-Site Commissioning of IPP Mid-Size Generators","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Jacobs (Canada)","funders":"","keywords":"Project commissioning; Reliability engineering; Reliability (semiconductor); Generator (circuit theory); Synchronization (alternating current); Power grid; Engineering; Computer science; Electric power system; Electric power industry; Power (physics); Electrical engineering; Electricity; Publishing","score_opus":0.03275774168949715,"score_gpt":0.2661418893256617,"score_spread":0.23338414763616455,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2128724481","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08636761,0.0000555586,0.9089266,0.00029684813,0.0003092108,0.0019197091,0.00031963972,0.00026016822,0.0015446808],"genre_scores_gemma":[0.9931309,0.000011703031,0.0025681634,0.00008494889,0.000050210867,0.0040432545,0.0000074375967,0.000037660866,0.000065718436],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9987462,0.000021865328,0.0005197014,0.0002881434,0.00014715426,0.00027692656],"domain_scores_gemma":[0.99881375,0.0004476361,0.000047966634,0.00048230408,0.00008657632,0.00012179106],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017650289,0.0002037987,0.0002547431,0.00017456924,0.0002579239,0.00002774586,0.00013433909,0.00034354857,0.000037126585],"category_scores_gemma":[0.000023458413,0.00022632602,0.00010454186,0.0004650666,0.00007679116,0.00011214798,0.0000010153307,0.0006349269,0.000018737432],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000073141005,0.00030794129,0.00012197138,0.00011337804,0.000040040253,0.0000011213514,0.0003430697,0.96709067,0.024843955,0.0040339646,0.00020954521,0.0028870087],"study_design_scores_gemma":[0.0037800544,0.00029734158,0.001957519,0.001352309,0.00017645075,0.00006756577,0.0010379497,0.008479796,0.94928503,0.013285071,0.018757686,0.001523209],"about_ca_topic_score_codex":0.000039371404,"about_ca_topic_score_gemma":0.00016224032,"teacher_disagreement_score":0.9586109,"about_ca_system_score_codex":0.00024067883,"about_ca_system_score_gemma":0.00010742077,"threshold_uncertainty_score":0.9229307},"labels":[],"label_agreement":null},{"id":"W2128762848","doi":"10.1109/ias.1996.563901","title":"Value-based distribution system reliability planning","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Alberta Energy; University of Alberta","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Electric power system; Variance (accounting); Point (geometry); Computer science; Power (physics); Engineering; Operations research","score_opus":0.010209437553187243,"score_gpt":0.18444635526214745,"score_spread":0.17423691770896022,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2128762848","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09744541,0.0006552926,0.7803301,0.00024145888,0.0016416436,0.0004406026,0.00006794468,0.0034719023,0.11570561],"genre_scores_gemma":[0.9992364,0.0000020543816,0.0004472156,0.00002642616,0.0000463158,0.000026531363,0.000014381341,0.0000136576755,0.00018700545],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991073,0.000035835856,0.00025218073,0.00018138981,0.000159147,0.00026412462],"domain_scores_gemma":[0.9994372,0.00006726787,0.000019498355,0.00035787094,0.000037150265,0.00008100758],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030256913,0.00012690309,0.00016413818,0.000020070216,0.00005798749,0.000028877976,0.0001306844,0.00008540022,0.000088298155],"category_scores_gemma":[0.000056145018,0.00011156115,0.0000691977,0.00013993362,0.000027240272,0.000094337134,0.000011870191,0.00011214752,0.0002219102],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019980618,0.00012953076,0.0052066254,0.0030754798,0.00004603786,0.00003814533,0.00033938736,0.8735455,0.00079849054,0.021512985,0.09289877,0.0023890277],"study_design_scores_gemma":[0.00025005604,0.000021781052,0.0013528918,0.00017329927,0.000008569559,0.0000072126045,0.00007904235,0.96252483,0.0015990497,0.000027374452,0.033763245,0.00019266363],"about_ca_topic_score_codex":0.000019265144,"about_ca_topic_score_gemma":7.3860167e-7,"teacher_disagreement_score":0.901791,"about_ca_system_score_codex":0.00029870513,"about_ca_system_score_gemma":0.0000043610858,"threshold_uncertainty_score":0.45493317},"labels":[],"label_agreement":null},{"id":"W2129651074","doi":"10.1109/tpwrs.2008.920078","title":"Effects of Load Forecast Uncertainty on Bulk Electric System Reliability Evaluation","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":126,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Range (aeronautics); Electric power system; Load factor; Transmission system; Load management; Computer science; Transmission (telecommunications); Engineering; Power (physics); Electrical engineering; Structural engineering","score_opus":0.009881543955925448,"score_gpt":0.2064224155983556,"score_spread":0.19654087164243017,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2129651074","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4241839,0.00086107274,0.5558213,0.000018069248,0.009159358,0.0028603568,0.000059359845,0.0007674194,0.006269161],"genre_scores_gemma":[0.9990591,0.000051229155,0.000025057494,0.000009593162,0.00002633844,0.00054875296,0.0000020149823,0.000054893382,0.00022305135],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9969399,0.0003225461,0.00079892605,0.00047236422,0.001003136,0.00046313455],"domain_scores_gemma":[0.9980306,0.00044204498,0.00014283082,0.0007895876,0.0004441059,0.00015080787],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010732249,0.0003741522,0.00062328647,0.00024301343,0.00017478805,0.00002014586,0.0002500856,0.00026110074,0.000013582084],"category_scores_gemma":[0.000050639337,0.0003397831,0.00026957633,0.00061318313,0.000068075846,0.00015855551,9.871318e-7,0.0003688067,0.00013508312],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017341542,0.0003212093,0.000014083457,0.0026871325,0.0001575748,0.000016199823,0.0010005216,0.98581105,0.008196126,0.00016816074,0.0009911458,0.00046339803],"study_design_scores_gemma":[0.0040952307,0.0018410847,0.00074315164,0.0032424547,0.0003369884,0.0002981539,0.00044850662,0.8075151,0.17499927,0.000027102109,0.0051624607,0.0012904789],"about_ca_topic_score_codex":0.0003077795,"about_ca_topic_score_gemma":0.00002102344,"teacher_disagreement_score":0.5748752,"about_ca_system_score_codex":0.0019698604,"about_ca_system_score_gemma":0.00018817533,"threshold_uncertainty_score":0.9999054},"labels":[],"label_agreement":null},{"id":"W2131326927","doi":"10.1109/ccece.2005.1556978","title":"Impacts of energy storage on power system reliability performance","year":2006,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":58,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Energy storage; Reliability engineering; Reliability (semiconductor); Renewable energy; Wind power; Electric power system; Computer science; Monte Carlo method; Energy (signal processing); Computer data storage; Electricity generation; Distributed generation; Power (physics); Engineering; Electrical engineering","score_opus":0.0028947534809781903,"score_gpt":0.1641477484810884,"score_spread":0.1612529950001102,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2131326927","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8527732,0.000119050484,0.0061348947,0.000014497611,0.00056984596,0.0000922086,0.000010091469,0.00037715936,0.13990906],"genre_scores_gemma":[0.99932104,0.000008985589,0.000119776174,0.000014158112,0.000030407333,0.000010951048,0.0000027094939,0.000019173587,0.00047281443],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9990127,0.000025232659,0.00035238083,0.0001677029,0.0001819227,0.00026005477],"domain_scores_gemma":[0.9993159,0.000048595877,0.000041788287,0.00047642147,0.00006173713,0.00005554379],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002625651,0.00014993158,0.00024363678,0.000056783585,0.000025558445,0.0000091523125,0.00013731727,0.000087024986,0.000032985317],"category_scores_gemma":[0.000015939564,0.00012032832,0.00007487114,0.00014374472,0.00003574446,0.00011160314,0.000016486232,0.000078779296,0.000035184203],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033327617,0.0007105766,0.041548744,0.009836276,0.00014099234,0.000039358998,0.0005340359,0.6377443,0.025692763,0.2186984,0.06323564,0.0014856211],"study_design_scores_gemma":[0.0028440987,0.001375735,0.26640493,0.0025367416,0.000057555364,0.00008770088,0.0005224423,0.25458282,0.32947448,0.00042519908,0.1394827,0.0022055942],"about_ca_topic_score_codex":0.00036298519,"about_ca_topic_score_gemma":0.000045311117,"teacher_disagreement_score":0.3831615,"about_ca_system_score_codex":0.00020359278,"about_ca_system_score_gemma":0.000015608903,"threshold_uncertainty_score":0.49068463},"labels":[],"label_agreement":null},{"id":"W2131439847","doi":"10.1109/tpwrs.2009.2016458","title":"Reliability Evaluation for Distribution System With Renewable Distributed Generation During Islanded Mode of Operation","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":190,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Probabilistic logic; Wind power; Renewable energy; Electric power system; Distributed generation; Electricity; Electricity generation; Computer science; Electricity market; Limiting; Engineering; Power (physics); Risk analysis (engineering); Electrical engineering; Business","score_opus":0.010906976360255583,"score_gpt":0.2260919295911663,"score_spread":0.21518495323091072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2131439847","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13900867,0.00006861747,0.85655975,0.000026855712,0.0013057078,0.0017643294,0.00082263653,0.00028645297,0.00015697256],"genre_scores_gemma":[0.99899596,0.0000081925455,0.00014801625,0.0000028027941,0.000031341235,0.00047031083,0.00026151884,0.000023767678,0.000058118872],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981408,0.00012456374,0.0006525804,0.00035210937,0.00044944484,0.00028046282],"domain_scores_gemma":[0.99877095,0.000044416593,0.00012353076,0.0004998375,0.0004840312,0.000077248944],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00063494727,0.00024228226,0.00037443687,0.000081941755,0.00019568647,0.000065971915,0.00012094777,0.00017081524,0.0000044991248],"category_scores_gemma":[0.000013867018,0.00021208153,0.000108821565,0.00025063378,0.000026396625,0.00034816956,4.1713508e-7,0.000115633746,0.000004117071],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014536649,0.000085825624,0.0000040558193,0.00039817614,0.00004176793,4.1090547e-7,0.00017949574,0.96582,0.03285803,0.00014091707,0.0002601032,0.00006586363],"study_design_scores_gemma":[0.0013473055,0.00033608993,0.00018404462,0.00033788657,0.00008668251,0.00001988914,0.00020595393,0.9002035,0.09680916,0.00000899438,0.00021106387,0.00024940845],"about_ca_topic_score_codex":0.00014860506,"about_ca_topic_score_gemma":0.000106315645,"teacher_disagreement_score":0.85998726,"about_ca_system_score_codex":0.00081893767,"about_ca_system_score_gemma":0.00006447845,"threshold_uncertainty_score":0.86484337},"labels":[],"label_agreement":null},{"id":"W2131718788","doi":"10.1109/pes.2006.1709375","title":"Asset health index method for diesel generation unit replacement planning","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Unit (ring theory); Reliability engineering; Index (typography); Asset management; Asset (computer security); Reliability (semiconductor); Unit cost; Computer science; Risk analysis (engineering); Operations management; Operations research; Engineering; Business; Finance","score_opus":0.01581970985303973,"score_gpt":0.2698358575390519,"score_spread":0.2540161476860122,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2131718788","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05846089,0.0016488214,0.93541926,0.00019037176,0.0023332539,0.0005890559,0.00006997117,0.00080269185,0.00048567876],"genre_scores_gemma":[0.70621175,0.00004880507,0.29022563,0.00033404081,0.0016898675,0.00033783817,0.0001713144,0.00019304472,0.000787694],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99763393,0.000054447373,0.0007076703,0.00044686507,0.0002907326,0.0008663648],"domain_scores_gemma":[0.99914896,0.00014418652,0.00012267745,0.00035201854,0.000105058156,0.00012709896],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0016823789,0.00039760806,0.0004452815,0.000072868024,0.00022270506,0.00009762611,0.00019174017,0.00019473628,0.0000055176047],"category_scores_gemma":[0.000054912038,0.0004354011,0.0002753458,0.00027137165,0.000016303331,0.00017190487,0.000029601837,0.00029078292,0.000004304626],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000045098222,0.000017815073,0.00039106232,0.00029985016,0.000069160385,7.1640227e-7,0.00041055385,0.9026697,0.034891535,0.00026360207,0.06081388,0.00016759802],"study_design_scores_gemma":[0.0005254952,0.000057467914,0.0003474874,0.0001707492,0.000014388974,0.000008015816,0.00009580201,0.9385836,0.009287402,0.000027916636,0.050416566,0.00046506574],"about_ca_topic_score_codex":0.00023596837,"about_ca_topic_score_gemma":0.00002589287,"teacher_disagreement_score":0.64775085,"about_ca_system_score_codex":0.00040275117,"about_ca_system_score_gemma":0.000049078546,"threshold_uncertainty_score":0.9998098},"labels":[],"label_agreement":null},{"id":"W2132365641","doi":"10.1109/ccece.2005.1556977","title":"Transmission system adequacy evaluation considering wind power","year":2006,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Electric power system; Renewable energy; Power optimizer; Base load power plant; Renewable portfolio standard; Intermittent energy source; Computer science; Automotive engineering; Electrical engineering; Reliability engineering; Distributed generation; Environmental science; Power (physics); Engineering; Maximum power point tracking; Feed-in tariff; Energy policy; Voltage","score_opus":0.008016938793784482,"score_gpt":0.2006365470391436,"score_spread":0.19261960824535912,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2132365641","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2404261,0.0018025963,0.25659114,0.0001320417,0.0012763097,0.0007962181,0.0000058672713,0.0015663067,0.4974034],"genre_scores_gemma":[0.99874663,0.000002927468,0.0008297908,0.000010114289,0.000043485798,0.000013514797,0.0000047360904,0.00001841783,0.00033040842],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991163,0.00003672836,0.00026532722,0.00014735297,0.00023091865,0.00020338316],"domain_scores_gemma":[0.9996496,0.000037626014,0.000017756258,0.00018931211,0.00005938649,0.000046345907],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042949946,0.00011600076,0.00014702788,0.00004530823,0.000042243453,0.00002725473,0.0000647362,0.000074391064,0.00016998082],"category_scores_gemma":[0.000010824145,0.00010061899,0.000054814285,0.00009132412,0.000014154586,0.00013612492,0.0000058796877,0.00007076222,0.0000977295],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050853865,0.00015084771,0.0014741772,0.0032090002,0.00014866055,0.000056206543,0.0015813911,0.692269,0.14645252,0.08592308,0.04148489,0.027199347],"study_design_scores_gemma":[0.0019857981,0.00006291151,0.0069302325,0.0009406461,0.000083526356,0.0001224054,0.0009629253,0.75583875,0.042544845,0.0010110181,0.18863088,0.00088606443],"about_ca_topic_score_codex":0.00007609243,"about_ca_topic_score_gemma":0.0000137516445,"teacher_disagreement_score":0.7583205,"about_ca_system_score_codex":0.00016295073,"about_ca_system_score_gemma":0.00001980291,"threshold_uncertainty_score":0.41031232},"labels":[],"label_agreement":null},{"id":"W2132449394","doi":"10.1109/ccece.1998.685592","title":"An analysis of extreme-weather-related transmission line outages","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Electric power transmission; Reliability (semiconductor); Transmission line; Probabilistic logic; Computer science; Storm; Meteorology; Electricity; Power transmission; Electric power system; Markov chain; Icing; Reliability engineering; Transmission (telecommunications); Monte Carlo method; Telecommunications; Power (physics); Engineering; Geography; Electrical engineering; Statistics","score_opus":0.016631211562699366,"score_gpt":0.2131069993778735,"score_spread":0.19647578781517414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2132449394","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5722613,0.0020402113,0.38560322,0.0001912378,0.00022992685,0.00021019315,0.000021632703,0.00079508574,0.038647205],"genre_scores_gemma":[0.99723744,0.00013679893,0.00067647465,0.000010180135,0.000006768306,0.0000027166134,0.0000060123484,0.00001143425,0.0019121867],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993263,0.000023003713,0.00028211757,0.00012945698,0.00010307554,0.00013604706],"domain_scores_gemma":[0.999566,0.00002264302,0.000020689142,0.00029013577,0.000030265694,0.00007025762],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0001301271,0.00009541968,0.0002552455,0.00014564706,0.000014847699,0.00000678415,0.00011518698,0.00007933371,0.0019170301],"category_scores_gemma":[0.000006744487,0.00007507312,0.00013373361,0.00049397745,0.000019125266,0.00008940652,0.00000338313,0.000062310195,0.000020945341],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015774567,0.0005317725,0.0057355138,0.0003227288,0.002068569,0.000014094429,0.006289142,0.7938923,0.101873375,0.0013961652,0.0014080093,0.086452544],"study_design_scores_gemma":[0.00015082471,0.000040530475,0.0018599242,0.000021555656,0.0002123983,7.2302157e-7,0.000080609876,0.9886697,0.00471228,0.000031917843,0.0041066543,0.00011289728],"about_ca_topic_score_codex":0.000039456572,"about_ca_topic_score_gemma":0.000030979176,"teacher_disagreement_score":0.42497614,"about_ca_system_score_codex":0.000018289249,"about_ca_system_score_gemma":0.0000012693803,"threshold_uncertainty_score":0.99899536},"labels":[],"label_agreement":null},{"id":"W2132745496","doi":"10.1109/tpwrs.2009.2016485","title":"Unit Commitment Risk Analysis of Wind Integrated Power Systems","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":97,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Power system simulation; Electric power system; Reliability engineering; Power (physics); Wind speed; Engineering; Automotive engineering; Nameplate capacity; Base load power plant; Electricity generation; Computer science; Operations research; Control theory (sociology); Electrical engineering; Meteorology; Control (management)","score_opus":0.009659329868559023,"score_gpt":0.2152592002114046,"score_spread":0.20559987034284558,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2132745496","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09292133,0.0011017661,0.89226705,0.000025974565,0.005393737,0.00088110956,0.0007316615,0.0005271898,0.006150168],"genre_scores_gemma":[0.99891204,0.00009211993,0.000033665612,0.000018560706,0.000006100199,0.000046261703,0.00001239094,0.00003949388,0.000839354],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99733543,0.00026799258,0.0010485749,0.000401774,0.0004782743,0.00046795755],"domain_scores_gemma":[0.9981699,0.00015907547,0.00020804771,0.0010230393,0.00023960327,0.00020033163],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00063801446,0.00042012794,0.0010014769,0.0007955057,0.00012797801,0.00008628359,0.00035604314,0.00026757576,0.000082172686],"category_scores_gemma":[0.000009057156,0.00037155274,0.00045039112,0.001799742,0.000065552435,0.00018754661,9.548969e-7,0.00046194787,0.00008362737],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053219832,0.0002878269,0.00015521537,0.0001224427,0.0023315568,0.000010193755,0.0010375041,0.9936765,0.0009467532,0.00033021483,0.00092804275,0.00012054473],"study_design_scores_gemma":[0.0038029228,0.002603285,0.0095480485,0.002510338,0.0062816176,0.00010823477,0.009653671,0.83462757,0.009446509,0.000035420835,0.11829465,0.0030877423],"about_ca_topic_score_codex":0.0007158093,"about_ca_topic_score_gemma":0.000093385526,"teacher_disagreement_score":0.9059907,"about_ca_system_score_codex":0.00028625963,"about_ca_system_score_gemma":0.000039685747,"threshold_uncertainty_score":0.99987364},"labels":[],"label_agreement":null},{"id":"W2132757196","doi":"10.1109/wescan.1993.270562","title":"Determination of the interruptible load carrying capability in a generation system","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Capital Power (Canada)","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Computer science; Duration (music); Probabilistic logic; Process (computing); Service (business); Load balancing (electrical power); Load management; Electric power system; Operations research; Power (physics); Engineering; Artificial intelligence; Electrical engineering; Operating system; Mathematics; Business","score_opus":0.01967201988701013,"score_gpt":0.20134774802671415,"score_spread":0.181675728139704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2132757196","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9575007,0.00017939079,0.02179017,0.000041584863,0.00070079416,0.00028660253,0.0000025437923,0.00010204059,0.019396149],"genre_scores_gemma":[0.9995379,0.0000036216325,0.00027026143,0.0000058271953,0.000018783014,0.000017703424,2.2626584e-7,0.000005275736,0.00014040818],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99942774,0.000039657363,0.00024069696,0.00008875086,0.00010535814,0.00009781605],"domain_scores_gemma":[0.9996777,0.00001789749,0.000024589128,0.00022404114,0.000042170257,0.000013564772],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025267908,0.00005917003,0.000101955884,0.000026864342,0.000015939173,0.000007961689,0.00009401035,0.000043563537,0.000018132434],"category_scores_gemma":[0.000047185727,0.000042613887,0.000037691563,0.0001358888,0.000017522458,0.000090742375,0.000015574573,0.000059081507,0.00000714344],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029215398,0.00051971857,0.07438314,0.014203421,0.00008942442,0.000019781011,0.049783673,0.16871049,0.54605305,0.019788008,0.004893915,0.12152616],"study_design_scores_gemma":[0.00013823099,0.000008469463,0.0013764942,0.00011883095,0.0000029890673,0.0000075873095,0.00021795288,0.9797666,0.018053021,0.000012185595,0.00023040651,0.00006724025],"about_ca_topic_score_codex":0.00015642977,"about_ca_topic_score_gemma":0.00070055167,"teacher_disagreement_score":0.81105614,"about_ca_system_score_codex":0.0003295957,"about_ca_system_score_gemma":0.000005537417,"threshold_uncertainty_score":0.17377439},"labels":[],"label_agreement":null},{"id":"W2133044003","doi":"10.1109/ccece.2002.1015172","title":"Composite system reliability evaluation incorporating an HVDC link and a static synchronous series compensator","year":2003,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Control theory (sociology); Transmission system; Capacitor; Static VAR compensator; Computer science; Electrical impedance; Series (stratigraphy); Electric power system; Transmission (telecommunications); Electronic engineering; Engineering; Voltage; AC power; Electrical engineering; Power (physics); Physics; Telecommunications","score_opus":0.009840170265013276,"score_gpt":0.21928521092975456,"score_spread":0.2094450406647413,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2133044003","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9501674,0.00037158807,0.035487775,0.00006144028,0.00062156434,0.0009693614,0.000013794042,0.0007319728,0.011575097],"genre_scores_gemma":[0.9891801,0.000006211361,0.010626215,0.000020995565,0.000029794954,0.000066651424,0.000011554534,0.000024131852,0.000034331595],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99849963,0.00030089283,0.0004356495,0.0002914364,0.00023630793,0.00023606101],"domain_scores_gemma":[0.99913627,0.00009250162,0.00006414237,0.0004129803,0.00015956644,0.00013455153],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015056623,0.00019787268,0.00030634826,0.00004390338,0.0001217868,0.00008325906,0.00008478667,0.000085567386,0.000018824758],"category_scores_gemma":[0.00012202136,0.0001739458,0.000031014177,0.0001322352,0.00007653572,0.00043181333,0.000018067312,0.000128152,0.000017954098],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002437606,0.00056715455,0.066620454,0.028205974,0.0005507841,0.00008896748,0.015033718,0.5084523,0.047998548,0.30156502,0.0013793542,0.02929394],"study_design_scores_gemma":[0.0010119983,0.00026506308,0.005688465,0.000460996,0.0000853432,0.00018685508,0.0027383815,0.98151726,0.00395485,0.0021030563,0.0013522614,0.00063547515],"about_ca_topic_score_codex":0.000069159025,"about_ca_topic_score_gemma":0.00009587247,"teacher_disagreement_score":0.47306493,"about_ca_system_score_codex":0.00029513333,"about_ca_system_score_gemma":0.00005923989,"threshold_uncertainty_score":0.7093304},"labels":[],"label_agreement":null},{"id":"W2133068933","doi":"10.1109/pes.2006.1709337","title":"Estimation of wind penetration as limited by frequency deviation","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Wind power; Penetration (warfare); Frequency deviation; Wind speed; Environmental science; Standard deviation; Thermal; Thermal power station; Meteorology; Control theory (sociology); Marine engineering; Computer science; Engineering; Electrical engineering; Physics; Mathematics; Automatic frequency control; Statistics","score_opus":0.002946868158427234,"score_gpt":0.18121158747135563,"score_spread":0.1782647193129284,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2133068933","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8356175,0.0009791795,0.1597672,0.000036926416,0.00085076754,0.00022644571,0.000027232483,0.00044191306,0.002052871],"genre_scores_gemma":[0.98320144,0.00003182335,0.016302314,0.000022925069,0.00014942184,0.000017594692,0.000077305995,0.00005294778,0.00014420484],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985976,0.000022299335,0.0005369151,0.00022548363,0.000266216,0.00035143885],"domain_scores_gemma":[0.9994862,0.000063876905,0.00010188174,0.00021170426,0.00008287981,0.000053469368],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00038545445,0.00024197341,0.00024139855,0.000049298545,0.00005801885,0.000038686496,0.0001260319,0.0001867774,0.000011300913],"category_scores_gemma":[0.00006334398,0.00027481423,0.0001561588,0.00030436754,0.000021542706,0.00026084838,0.00000972483,0.00016813113,0.000014272088],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[8.414766e-7,0.00001485081,0.00021274031,0.00013180566,0.000021871234,3.3784968e-7,0.00014907622,0.67987967,0.31446058,0.00026628026,0.0047252965,0.00013665073],"study_design_scores_gemma":[0.00027899837,0.000033675475,0.0011644835,0.00016719254,0.000023198138,0.0000057057173,0.000028441009,0.8261207,0.1707103,0.0001189684,0.0009862133,0.00036212945],"about_ca_topic_score_codex":0.00025511612,"about_ca_topic_score_gemma":0.0000068156323,"teacher_disagreement_score":0.14758399,"about_ca_system_score_codex":0.00018997038,"about_ca_system_score_gemma":0.000020516507,"threshold_uncertainty_score":0.9999704},"labels":[],"label_agreement":null},{"id":"W2133633527","doi":"10.1109/tec.2006.875475","title":"Considering Load-Carrying Capability and Wind Speed Correlation of WECS in Generation Adequacy Assessment","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Conversion","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":218,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Wind speed; Reliability (semiconductor); Monte Carlo method; Electric power system; Reliability engineering; Renewable energy; Engineering; Power (physics); Environmental science; Meteorology; Statistics; Electrical engineering; Mathematics","score_opus":0.010020038791085857,"score_gpt":0.20504422184959256,"score_spread":0.19502418305850672,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2133633527","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6089447,0.00006360782,0.38943872,0.00002899244,0.0007819018,0.000093806906,0.0000061009205,0.00005668881,0.0005854959],"genre_scores_gemma":[0.9994215,0.0000622116,0.0003841984,0.000011425891,0.0000241497,0.0000032515234,0.0000055812566,0.0000131241095,0.00007459401],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99908835,0.000055716308,0.0003335121,0.00020030918,0.00017360016,0.00014850534],"domain_scores_gemma":[0.9996131,0.0000812436,0.000047247497,0.00016609063,0.00005603679,0.000036294052],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021093921,0.00013027752,0.0001855625,0.00012092663,0.00006024492,0.000012739375,0.000039981176,0.00011242345,0.000025484489],"category_scores_gemma":[0.000003527905,0.00014327967,0.000048252885,0.00015227373,0.000050876886,0.00021012,0.0000010141567,0.00013507804,0.0000016592815],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016399752,0.00005604282,0.0007092203,0.000089185356,0.000009330434,0.000002125597,0.000126136,0.93364334,0.06348431,0.00018478023,0.000041652573,0.0016374679],"study_design_scores_gemma":[0.00096362754,0.000055606033,0.0030369968,0.00011701041,0.000022262811,0.000006582776,0.000117593794,0.85593075,0.13891922,0.00010556288,0.00052578986,0.00019899089],"about_ca_topic_score_codex":0.0011562451,"about_ca_topic_score_gemma":0.00052539475,"teacher_disagreement_score":0.39047676,"about_ca_system_score_codex":0.00034491357,"about_ca_system_score_gemma":0.00004203504,"threshold_uncertainty_score":0.5842775},"labels":[],"label_agreement":null},{"id":"W2133932915","doi":"10.1109/epec.2009.5420868","title":"Effects of seasonality and locality on the operating capacity benefits of wind power","year":2009,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Wind speed; Turbine; Environmental science; Marine engineering; Wind profile power law; Electric power system; Meteorology; Power (physics); Engineering; Electrical engineering; Geography","score_opus":0.007698770248995063,"score_gpt":0.1845587180192016,"score_spread":0.17685994777020653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2133932915","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9913292,0.00021520491,0.0010332661,0.00016601368,0.00007056132,0.00019623298,0.000008636759,0.00003393581,0.006946983],"genre_scores_gemma":[0.9997446,0.000008851002,0.0001042862,0.00011182305,0.000008182641,0.0000013951778,2.3201075e-7,0.0000035935116,0.000017018772],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99942994,0.00005416386,0.00018021019,0.000100231766,0.00011903072,0.000116436524],"domain_scores_gemma":[0.9994729,0.00023066626,0.00002599625,0.00019092821,0.000044369746,0.000035100726],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004291292,0.00008740985,0.00017975408,0.000007757627,0.00002464572,0.000006548293,0.0000791561,0.00004713158,0.000010615494],"category_scores_gemma":[0.00016133813,0.000054838616,0.000036402213,0.0000681109,0.00005558513,0.000045989706,0.000012099804,0.00008858729,0.0000012336927],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012639252,0.0009161212,0.027818471,0.0057559568,0.0003478356,0.0000056564804,0.0076361317,0.059658848,0.1694974,0.70968246,0.0034864368,0.015068282],"study_design_scores_gemma":[0.00045950568,0.00026167583,0.6349345,0.0005158903,0.000018297877,0.000003859722,0.00011047483,0.006548811,0.35543707,0.0012543505,0.00023748117,0.0002181048],"about_ca_topic_score_codex":0.000046012075,"about_ca_topic_score_gemma":0.000009675276,"teacher_disagreement_score":0.70842814,"about_ca_system_score_codex":0.000016454738,"about_ca_system_score_gemma":0.0000053497633,"threshold_uncertainty_score":0.22362539},"labels":[],"label_agreement":null},{"id":"W2134515451","doi":"10.1109/tpel.2002.800995","title":"Multiterminal LVDC system for optimal acquisition of power in wind-farm using induction generators","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Electronics","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":119,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Wind power; Power optimizer; Wind speed; Turbine; Induction generator; Engineering; Automotive engineering; Voltage; Control theory (sociology); Converters; AC power; Power (physics); Electrical engineering; Maximum power point tracking; Computer science; Meteorology; Physics; Mechanical engineering","score_opus":0.012090771419746937,"score_gpt":0.21713274343622413,"score_spread":0.2050419720164772,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2134515451","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.54336756,0.00038627148,0.45447794,0.000012349173,0.0011005059,0.00036839445,0.000039907784,0.0001201413,0.0001269396],"genre_scores_gemma":[0.9983397,0.000045138822,0.0014429666,0.00001331087,0.00002560473,0.00004542997,0.0000022233933,0.0000482433,0.00003738255],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985884,0.0000411164,0.00046619485,0.00026586244,0.00017801182,0.0004604342],"domain_scores_gemma":[0.99946964,0.00003955214,0.00006976071,0.0002725909,0.000086330496,0.000062120285],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00021014742,0.00022427911,0.00029473187,0.0002676363,0.00008174094,0.000020137779,0.00011921485,0.00020938952,0.000036242833],"category_scores_gemma":[0.0000027565825,0.00024616413,0.00015398757,0.00033843325,0.00003592003,0.0001964677,6.98734e-7,0.0002991579,0.000007946295],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001471901,0.0003787513,0.000017350372,0.0004137236,0.000120286895,0.000006310622,0.0012766614,0.890463,0.10423463,0.0003981565,0.00006285354,0.0024810706],"study_design_scores_gemma":[0.001892753,0.0007140643,0.000056489564,0.00038809804,0.000086409374,0.00012261176,0.00047003225,0.60250545,0.391231,0.000019259995,0.0019242323,0.0005896365],"about_ca_topic_score_codex":0.000016673139,"about_ca_topic_score_gemma":0.000033248896,"teacher_disagreement_score":0.45497215,"about_ca_system_score_codex":0.0007815248,"about_ca_system_score_gemma":0.000033806307,"threshold_uncertainty_score":0.99999905},"labels":[],"label_agreement":null},{"id":"W2134592070","doi":"10.1109/wescan.1997.627110","title":"Composite generation and transmission system adequacy assessment with time varying loads using a contingency enumeration approach","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Enumeration; Contingency; Monte Carlo method; Reliability engineering; Computer science; Transmission (telecommunications); Composite number; Selection (genetic algorithm); Transmission system; Variety (cybernetics); Engineering; Statistics; Mathematics; Algorithm; Telecommunications; Machine learning; Artificial intelligence","score_opus":0.017023776266369667,"score_gpt":0.20120263983799205,"score_spread":0.1841788635716224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2134592070","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14380726,0.0005003462,0.84239787,0.000018742589,0.00007196084,0.0003333604,0.0000016572814,0.00026094844,0.012607872],"genre_scores_gemma":[0.96154,0.000018779565,0.038190093,0.000009771545,0.000056852386,0.000017568214,0.000010314823,0.000019661884,0.0001370049],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99919504,0.00004797055,0.00023734654,0.00020123462,0.00014632262,0.00017208635],"domain_scores_gemma":[0.99971825,0.000013575463,0.000034013177,0.00012986956,0.000038974005,0.00006534001],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001693193,0.00014454476,0.00018526937,0.000047586993,0.0001243871,0.00008268078,0.00004381301,0.000064267544,0.000022699533],"category_scores_gemma":[0.00000126703,0.00011556931,0.00002306508,0.00009853159,0.0000143819625,0.00027259346,0.000006985,0.00008794092,0.0000057729158],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001543001,0.000112361995,0.0007136045,0.0017027463,0.00012044422,0.000010104823,0.002171484,0.26112074,0.719852,0.001210655,0.00029902474,0.012671438],"study_design_scores_gemma":[0.00036694756,0.00003159457,0.000069011425,0.00014614392,0.000026927075,0.000058143418,0.00004421629,0.99546665,0.0034014985,0.0000011660748,0.00022578714,0.00016190302],"about_ca_topic_score_codex":0.00002425801,"about_ca_topic_score_gemma":9.161094e-7,"teacher_disagreement_score":0.8177327,"about_ca_system_score_codex":0.00011573099,"about_ca_system_score_gemma":0.0000061243227,"threshold_uncertainty_score":0.47127798},"labels":[],"label_agreement":null},{"id":"W2135194886","doi":"10.1109/ccece.1996.548120","title":"Conceptual framework for composite power system health analysis","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Electric power system; Probabilistic logic; Computer science; Risk analysis (engineering); Transient (computer programming); Power transmission; Power (physics); Systems engineering; Engineering; Artificial intelligence","score_opus":0.01547982371971951,"score_gpt":0.23059738046022432,"score_spread":0.2151175567405048,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135194886","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006961422,0.0015012991,0.9768711,0.00031405207,0.000666339,0.00036508948,0.000048036363,0.00073205476,0.0125406245],"genre_scores_gemma":[0.98453134,0.00001689147,0.014687492,0.00021790508,0.00004161278,0.000040877472,0.000005512857,0.000017106531,0.0004412578],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99906075,0.000025963705,0.00030548542,0.00017916466,0.00010752685,0.00032111554],"domain_scores_gemma":[0.9993554,0.00012959442,0.00003583819,0.00031715978,0.000040668634,0.00012133848],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018104874,0.0001259894,0.00037083463,0.000077635224,0.000065437045,0.000025930458,0.00012893377,0.000083970735,0.00017376394],"category_scores_gemma":[0.000017358303,0.000110808454,0.00018651146,0.00034546418,0.000032717046,0.00005732577,0.000011150909,0.000092957016,0.00010137996],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015352314,0.00009193004,0.0016391601,0.0009025156,0.0017777468,0.0000049830633,0.0051810397,0.041829288,0.0000829852,0.8928475,0.05459238,0.0010351184],"study_design_scores_gemma":[0.00096732914,0.00028139868,0.0016361102,0.00041407513,0.0003114375,0.00001750164,0.0046622525,0.80094665,0.0004966008,0.0004965286,0.18881927,0.00095083873],"about_ca_topic_score_codex":0.000019879895,"about_ca_topic_score_gemma":0.000016253936,"teacher_disagreement_score":0.97756994,"about_ca_system_score_codex":0.00015207927,"about_ca_system_score_gemma":0.0000040968657,"threshold_uncertainty_score":0.45186377},"labels":[],"label_agreement":null},{"id":"W2135335961","doi":"10.1109/tec.2005.847996","title":"Evaluation of Different Operating Strategies in Small Stand-Alone Power Systems","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Conversion","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":158,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Diesel fuel; Automotive engineering; Reliability (semiconductor); Energy storage; Wind power; Reliability engineering; Engineering; Environmental science; Power (physics); Computer science; Electrical engineering","score_opus":0.016213843604188025,"score_gpt":0.21848656312514364,"score_spread":0.2022727195209556,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135335961","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5388223,0.00040212373,0.4575766,0.00002328786,0.00097298704,0.00016021045,0.000009850071,0.000084497144,0.0019481634],"genre_scores_gemma":[0.99964267,0.0001262626,0.000060866172,0.0000069028824,0.000013199825,0.000041894964,0.0000018551113,0.00001600302,0.00009035708],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989119,0.00012846374,0.00032573953,0.00016371383,0.00029680826,0.00017336068],"domain_scores_gemma":[0.9995346,0.000051027953,0.000036747148,0.00019981073,0.00013362373,0.000044164197],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044036537,0.00014406716,0.00021172289,0.00015166977,0.000041860112,0.000022431113,0.00008737003,0.00010031277,0.000060329396],"category_scores_gemma":[0.000003379551,0.00013329778,0.000059198614,0.00013573328,0.00002417941,0.00019676566,7.342916e-7,0.00012049732,0.000006436342],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014589003,0.000084184496,0.0000055133137,0.00007566909,0.00002948606,6.540804e-7,0.0003547819,0.9848039,0.011281053,0.00026155426,0.000022687895,0.0030659307],"study_design_scores_gemma":[0.0012813588,0.00010511946,0.000113031776,0.00036043557,0.000050145205,0.0000036116555,0.0012048767,0.8774655,0.11862486,0.000028791126,0.0005598712,0.00020243964],"about_ca_topic_score_codex":0.0002279966,"about_ca_topic_score_gemma":0.00051321473,"teacher_disagreement_score":0.46082038,"about_ca_system_score_codex":0.00038248493,"about_ca_system_score_gemma":0.000056135475,"threshold_uncertainty_score":0.5435726},"labels":[],"label_agreement":null},{"id":"W2136136616","doi":"","title":"Risk based equivalent wind capacity in power generating systems","year":2004,"lang":"en","type":"article","venue":"IEEE International Conference on Probabilistic Methods Applied to Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Turbine; Generator (circuit theory); Automotive engineering; Wind speed; Steam turbine; Capacity factor; Computer science; Electricity generation; Engineering; Power (physics); Marine engineering; Environmental science; Electrical engineering; Meteorology; Mechanical engineering; Physics","score_opus":0.07853349645383233,"score_gpt":0.3164238685043859,"score_spread":0.23789037205055358,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2136136616","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11055293,0.00008585502,0.83344483,0.00012803884,0.011833703,0.002304965,0.00019069065,0.0003668819,0.04109208],"genre_scores_gemma":[0.97383493,0.0000066114585,0.025004271,0.00009865286,0.0001412551,0.0007179824,0.0000110952815,0.00007498339,0.000110208166],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9956801,0.00045478655,0.0014020919,0.0009187349,0.0008286428,0.00071565044],"domain_scores_gemma":[0.99771804,0.00045398102,0.0002753013,0.0008472703,0.00038179202,0.0003236088],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0034484402,0.0005828801,0.0008197932,0.0004140325,0.0000990264,0.00035631633,0.0008363536,0.000290896,0.00007826659],"category_scores_gemma":[0.0005877191,0.00055123493,0.00013510979,0.00037538115,0.000099486686,0.00013758619,0.000060220384,0.0006506131,0.00019923878],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060562605,0.0001214559,0.00005974171,0.00021997982,0.00007021812,0.0000124770895,0.0006570233,0.820996,0.016138265,0.16133724,0.00014216146,0.00018487098],"study_design_scores_gemma":[0.0057389773,0.0008890058,0.0009524211,0.00461648,0.00009244288,0.00009885693,0.002120289,0.94138485,0.011124496,0.014317496,0.015053945,0.0036107425],"about_ca_topic_score_codex":0.0005166715,"about_ca_topic_score_gemma":0.00006449562,"teacher_disagreement_score":0.863282,"about_ca_system_score_codex":0.0014411503,"about_ca_system_score_gemma":0.00018397131,"threshold_uncertainty_score":0.99969393},"labels":[],"label_agreement":null},{"id":"W2136510001","doi":"","title":"BC Hydro perspective on distribution islanding for customer reliability improvement","year":2009,"lang":"en","type":"article","venue":"2009 CIGRE/IEEE PES Joint Symposium Integration of Wide-Scale Renewable Resources Into the Power Delivery System","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Islanding; Renewable energy; Reliability (semiconductor); Hydroelectricity; Distribution (mathematics); Power (physics); Power station; Electric potential energy; Engineering; Reliability engineering; Environmental science; Electrical engineering; Business; Distributed generation; Mathematics; Physics","score_opus":0.00671864326679525,"score_gpt":0.21183226510578165,"score_spread":0.2051136218389864,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2136510001","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.719778,0.0014267189,0.22640885,0.0032378363,0.0038908587,0.0047583906,0.00056777033,0.0011953054,0.038736288],"genre_scores_gemma":[0.9979049,0.00014743357,0.00030847391,0.00010520623,0.00023898955,0.00018476819,0.000059170194,0.000054803037,0.0009962721],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9961185,0.00024143333,0.001451556,0.00077210733,0.00071517087,0.00070124323],"domain_scores_gemma":[0.996994,0.00041575183,0.0004871279,0.001125642,0.0007881246,0.00018934207],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001688438,0.0006271114,0.0008936833,0.00024070284,0.00040595708,0.00014203937,0.0005699999,0.0003225705,0.000021467302],"category_scores_gemma":[0.00018008312,0.00046066483,0.00059591467,0.00041091646,0.00019139067,0.0003740498,0.000043229265,0.0003811252,0.000054573855],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016310284,0.00075484114,0.00032263825,0.0020071534,0.00056022155,0.000010696228,0.030342426,0.56145483,0.34072733,0.0053685866,0.052933153,0.003887119],"study_design_scores_gemma":[0.0030411067,0.0042570243,0.0010516078,0.005229788,0.0005282235,0.000071519826,0.033759084,0.2542945,0.61582226,0.0019996567,0.0775209,0.0024243323],"about_ca_topic_score_codex":0.0018925857,"about_ca_topic_score_gemma":0.00031343743,"teacher_disagreement_score":0.3071603,"about_ca_system_score_codex":0.0023626427,"about_ca_system_score_gemma":0.00007449161,"threshold_uncertainty_score":0.9997845},"labels":[],"label_agreement":null},{"id":"W2136998843","doi":"10.1109/wescan.1997.627112","title":"Reliability assessment of an electric power system using a reliability network equivalent approach","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Electric power system; Computer science; Task (project management); Power (physics); Point (geometry); Set (abstract data type); Engineering; Mathematics","score_opus":0.018108907977700893,"score_gpt":0.23604816435735357,"score_spread":0.21793925637965267,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2136998843","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7186579,0.00044364866,0.21424925,0.000012150358,0.0008963644,0.0010070762,0.000011751633,0.0008681669,0.06385367],"genre_scores_gemma":[0.97035396,0.000018239043,0.029333996,0.0000140759585,0.00008880705,0.0000504952,0.0000035602366,0.00004692651,0.00008994832],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9968964,0.00028258844,0.0009874078,0.00060469314,0.00048525276,0.00074367115],"domain_scores_gemma":[0.9978969,0.00011536183,0.00013295421,0.0014293187,0.00020530574,0.00022012086],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0018729207,0.0003459147,0.000683106,0.000086475,0.000098244156,0.000036848636,0.00040494776,0.00022179038,0.00011859924],"category_scores_gemma":[0.000072082235,0.00030015365,0.00021315194,0.0006816843,0.00007564554,0.00034321894,0.00007726452,0.00034066694,0.00001055536],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014129992,0.0005949281,0.003975581,0.0024669524,0.00007400185,0.000005351512,0.00025128006,0.98358595,0.002826173,0.004747079,0.0010568433,0.0004017365],"study_design_scores_gemma":[0.0003088336,0.000129029,0.0051216125,0.000110385496,0.000037065194,0.000030051015,0.00015632715,0.99270004,0.0002970215,0.000098748365,0.00066991634,0.00034095204],"about_ca_topic_score_codex":0.00010346604,"about_ca_topic_score_gemma":0.0000030349822,"teacher_disagreement_score":0.25169605,"about_ca_system_score_codex":0.0008737048,"about_ca_system_score_gemma":0.000038657872,"threshold_uncertainty_score":0.99994504},"labels":[],"label_agreement":null},{"id":"W2137399405","doi":"10.1109/wescan.1995.494054","title":"A generalized method for distribution system reliability evaluation","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Computer science; Reliability engineering; Distribution (mathematics); Computer program; Mathematics; Engineering; Programming language","score_opus":0.02560422856967169,"score_gpt":0.2678595212909361,"score_spread":0.2422552927212644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2137399405","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007895751,0.00028527004,0.9826867,0.00014590033,0.00077941205,0.0010374889,0.00006929763,0.0006047803,0.0064953947],"genre_scores_gemma":[0.9758196,0.0000070978144,0.0231157,0.00001797806,0.00007730522,0.0005292322,0.00005348478,0.000014700702,0.00036489888],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990068,0.0001044301,0.0002867423,0.00019913215,0.00019326819,0.00020963857],"domain_scores_gemma":[0.99931955,0.00010260027,0.000026396547,0.000314148,0.00018298221,0.00005433486],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016597915,0.000109527304,0.00018155089,0.000017650373,0.000053501484,0.000024033052,0.00009386241,0.00008527933,0.00009734573],"category_scores_gemma":[0.00020822363,0.00009432583,0.000096455115,0.00011211702,0.000010596361,0.00010123262,0.000009397703,0.000048219466,0.0000465617],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009944782,0.00025703764,0.00030649116,0.006314859,0.00024319247,0.0000021149222,0.0010308992,0.3419997,0.011286058,0.17728706,0.3517988,0.109374344],"study_design_scores_gemma":[0.00051024987,0.000018161363,0.000091666414,0.000027844635,0.000031209438,0.0000047023245,0.00004151693,0.95647335,0.0020334697,0.00033875575,0.040312085,0.000116963514],"about_ca_topic_score_codex":0.000030434607,"about_ca_topic_score_gemma":0.0000073331307,"teacher_disagreement_score":0.9679239,"about_ca_system_score_codex":0.0004370805,"about_ca_system_score_gemma":0.0000059550584,"threshold_uncertainty_score":0.38464957},"labels":[],"label_agreement":null},{"id":"W2137488205","doi":"10.1109/ccece.2005.1556967","title":"Reliability performance index probability distribution analysis of bulk electricity systems","year":2006,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Monte Carlo method; Reliability engineering; Probability distribution; Computer science; Electric power system; Probability density function; Index (typography); Random variable; Dimension (graph theory); Power (physics); Statistics; Engineering; Mathematics","score_opus":0.004478181930021777,"score_gpt":0.1762697871444838,"score_spread":0.17179160521446202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2137488205","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8724901,0.00014809932,0.121716686,0.000008428228,0.00022654734,0.00036475385,0.00008169809,0.0003039848,0.004659721],"genre_scores_gemma":[0.99956965,0.000016219077,0.0000697228,0.0000019611962,0.000028398545,0.000043043543,0.00008542574,0.000008789654,0.00017676642],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99836826,0.00006120384,0.0006843953,0.00028831404,0.00027020383,0.00032759097],"domain_scores_gemma":[0.9989295,0.000089352354,0.000087481814,0.00060584844,0.0002356402,0.000052169744],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008387594,0.00017392116,0.0004976284,0.0001074269,0.000048232174,0.000020059762,0.00018106285,0.00013507128,0.000022244845],"category_scores_gemma":[0.000086378626,0.00014814605,0.00018197644,0.0015676476,0.00008200674,0.00017952561,0.000023382312,0.00014479172,0.0000069699126],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020905109,0.0001243902,0.1745837,0.00070705276,0.00015717668,3.0525607e-7,0.000019589677,0.8208139,0.0007226441,0.0019456786,0.0006934563,0.0002112069],"study_design_scores_gemma":[0.000103296945,0.00002510879,0.38632044,0.0000169723,0.0001212726,9.047131e-7,0.0000061763926,0.6103118,0.0018304498,0.0001711937,0.00094813807,0.00014421153],"about_ca_topic_score_codex":0.0013653287,"about_ca_topic_score_gemma":0.00013540272,"teacher_disagreement_score":0.21173674,"about_ca_system_score_codex":0.00036369066,"about_ca_system_score_gemma":0.000026208141,"threshold_uncertainty_score":0.60412204},"labels":[],"label_agreement":null},{"id":"W2138170029","doi":"10.1109/pes.2006.1709366","title":"Probabilistic reliability evaluation for interconnecting the power systems in North East Asia","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Interconnection; Reliability engineering; Probabilistic logic; East Asia; Computer science; Generator (circuit theory); Line (geometry); Electric power system; Power (physics); Tie line; Engineering; Telecommunications; Geography; China; Mathematics; Artificial intelligence","score_opus":0.009714966767452534,"score_gpt":0.21018121031362474,"score_spread":0.2004662435461722,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2138170029","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9477516,0.0014592241,0.043065026,0.00012986118,0.0039472287,0.0020684935,0.000046451216,0.0005567539,0.00097539957],"genre_scores_gemma":[0.9964079,0.000006293217,0.002317666,0.000021972714,0.00031966527,0.00073858147,0.000023178352,0.00009635793,0.0000683589],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99723554,0.00011113092,0.0008966013,0.0005168785,0.0004208599,0.00081899617],"domain_scores_gemma":[0.99861884,0.00038439548,0.00011799914,0.00053682236,0.00026906034,0.00007285269],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0032658402,0.000417554,0.00042804552,0.00006340935,0.00015203815,0.00013283944,0.00033516673,0.00019965264,0.0000051542524],"category_scores_gemma":[0.00053669454,0.00036321473,0.00031427608,0.00050284306,0.000050423427,0.00021901334,0.000038214446,0.00042120626,0.000007088218],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000053562158,0.000031362888,0.0012514171,0.00041181745,0.000031326712,7.130722e-7,0.0008758474,0.99066633,0.0040076394,0.00029880946,0.0023591376,0.000060268914],"study_design_scores_gemma":[0.0005339457,0.00003291817,0.004340853,0.0002809947,0.000035595935,0.000010510051,0.00049641565,0.9894641,0.0005137587,0.00006719578,0.0037519885,0.0004717001],"about_ca_topic_score_codex":0.0003247472,"about_ca_topic_score_gemma":0.00026102932,"teacher_disagreement_score":0.048656363,"about_ca_system_score_codex":0.00081860414,"about_ca_system_score_gemma":0.000051590046,"threshold_uncertainty_score":0.999882},"labels":[],"label_agreement":null},{"id":"W2139223354","doi":"10.1109/wescan.1993.270564","title":"Effect of dependent outages on composite system reliability performance","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Network topology; Reliability engineering; Circuit breaker; Electric power system; Computer science; Mode (computer interface); Maintenance engineering; Composite number; Power (physics); Engineering; Computer network; Electrical engineering; Operating system","score_opus":0.004341174271469849,"score_gpt":0.17893358101410337,"score_spread":0.17459240674263352,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2139223354","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9340573,0.00015501634,0.0009054307,0.000014462806,0.0005698604,0.00030426754,0.0000068917398,0.00041339968,0.0635734],"genre_scores_gemma":[0.99935144,0.000028689874,0.00006109753,0.000006952778,0.000022205015,0.000024168436,7.80479e-7,0.000014832089,0.00048986037],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990585,0.0000742306,0.0002940397,0.00017221668,0.00019312276,0.0002078887],"domain_scores_gemma":[0.99928904,0.0001633434,0.00003114332,0.00042987402,0.000029324558,0.000057279085],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004904097,0.00015492938,0.00030050657,0.000042067008,0.0000310301,0.000009579101,0.00015756652,0.00007030407,0.00004574812],"category_scores_gemma":[0.000025613897,0.00011385513,0.00007705514,0.00008483374,0.00003124977,0.00007804317,0.000020702226,0.00012040011,0.00023561156],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00066202914,0.00064320833,0.14393109,0.07821394,0.00044815263,0.0000625629,0.0022084517,0.6538227,0.03421879,0.0040126685,0.011763041,0.07001335],"study_design_scores_gemma":[0.0013727522,0.0015399178,0.009534448,0.0011510861,0.000050677427,0.000039952774,0.000058885784,0.58615017,0.39696395,0.0000032201706,0.0025998964,0.0005350488],"about_ca_topic_score_codex":0.000014447223,"about_ca_topic_score_gemma":0.0000018131168,"teacher_disagreement_score":0.36274517,"about_ca_system_score_codex":0.00012962257,"about_ca_system_score_gemma":0.0000013277202,"threshold_uncertainty_score":0.46428776},"labels":[],"label_agreement":null},{"id":"W2139259917","doi":"10.1109/pesmg.2013.6672942","title":"A two-stage framework for power transformer asset maintenance management&amp;#x2014;Part II: Validation results","year":2013,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Reliability engineering; Transformer; Computer science; Time horizon; Asset management; Maintenance engineering; Schedule; Scheduling (production processes); Mathematical optimization; Operations research; Engineering; Voltage; Finance; Mathematics; Electrical engineering; Economics","score_opus":0.015404492133336133,"score_gpt":0.2475621498133894,"score_spread":0.23215765768005325,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2139259917","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019618249,0.00004863215,0.8274722,0.0010209096,0.001464532,0.0018092927,0.00017772752,0.0006207081,0.14776777],"genre_scores_gemma":[0.8612044,0.00009691201,0.089371465,0.00042963997,0.0001177716,0.0008638679,0.00011797705,0.00007821074,0.04771975],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982171,0.000025569885,0.00054826133,0.0003854306,0.00020916258,0.00061448314],"domain_scores_gemma":[0.99895465,0.00013774553,0.000056993416,0.0006083452,0.00011559098,0.00012668116],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005004429,0.0002674264,0.00027294084,0.000083040184,0.00012002291,0.00009363845,0.000268911,0.00015042143,0.00058110553],"category_scores_gemma":[0.00010377355,0.00022922666,0.00014970731,0.00019473837,0.000039905313,0.00045523094,0.000024672396,0.00018052362,0.00055288896],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019186719,0.00019820442,0.00007248027,0.0013788589,0.00029640092,0.0000033054685,0.0015894928,0.008270268,0.0026902405,0.38213038,0.5989967,0.0041818065],"study_design_scores_gemma":[0.0014072629,0.0000750107,0.00022176099,0.0002754498,0.000026177586,0.0000033551355,0.00033820057,0.0017252075,0.0019021968,0.010415335,0.9831261,0.00048393602],"about_ca_topic_score_codex":0.000051749,"about_ca_topic_score_gemma":0.00003768654,"teacher_disagreement_score":0.8415862,"about_ca_system_score_codex":0.000102127524,"about_ca_system_score_gemma":0.000009074023,"threshold_uncertainty_score":0.93475914},"labels":[],"label_agreement":null},{"id":"W2141175331","doi":"10.1109/tpwrs.2003.821441","title":"Determining Rational Redundancy of 500-kV Reactors in Transmission Systems Using a Probability-Based Economic Analysis Approach: BCTC's Practice","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Unavailability; Redundancy (engineering); Reliability engineering; Probabilistic logic; Electric power system; Power transmission; Transmission system; Electric power transmission; Electric power industry; Computer science; Engineering; Transmission (telecommunications); Electricity; Power (physics); Electrical engineering","score_opus":0.018692920180526755,"score_gpt":0.2363148887579004,"score_spread":0.21762196857737365,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2141175331","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.095437236,0.0003078494,0.9000463,0.000023369812,0.0016934024,0.0010769848,0.00008809081,0.00018557442,0.0011412065],"genre_scores_gemma":[0.99624765,0.000015918053,0.0034364238,0.000007840281,0.00001681924,0.00019504323,0.000009352101,0.000054159646,0.00001676913],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99702716,0.00029171322,0.0013224762,0.0005527603,0.0003829114,0.00042295898],"domain_scores_gemma":[0.9985454,0.00026839564,0.00026949093,0.00064065243,0.000120209406,0.00015583597],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0011006239,0.00037328087,0.0008172634,0.0007583781,0.00010745871,0.00008655316,0.00024308624,0.00027603217,0.000008607641],"category_scores_gemma":[0.000018360091,0.0003758628,0.0003466046,0.00085318286,0.000081498154,0.0005519229,0.0000010659412,0.00037962975,0.00000828487],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007765477,0.00028235302,0.00007382838,0.00067441404,0.00030583798,0.0000068080726,0.0010621413,0.99493295,0.002302686,0.00021969885,0.0000036883046,0.000057911893],"study_design_scores_gemma":[0.0017614923,0.00020079072,0.00014668255,0.0010746999,0.00050379895,0.000081677485,0.0012370552,0.98821574,0.0049110814,0.0000271805,0.0011919742,0.00064780086],"about_ca_topic_score_codex":0.0014219589,"about_ca_topic_score_gemma":0.00009862238,"teacher_disagreement_score":0.9008104,"about_ca_system_score_codex":0.001216097,"about_ca_system_score_gemma":0.00029863775,"threshold_uncertainty_score":0.99986935},"labels":[],"label_agreement":null},{"id":"W2141394237","doi":"10.1109/tpwrs.2008.926081","title":"Fuzzy Models of Overhead Power Line Weather-Related Outages","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"TransCanada (Canada)","funders":"","keywords":"Unavailability; Overhead (engineering); Fuzzy logic; Reliability engineering; Overhead line; Electric power system; Electric power transmission; Computer science; Line (geometry); Power (physics); Engineering; Electrical engineering; Mathematics; Artificial intelligence","score_opus":0.015876904408087422,"score_gpt":0.20608669216018385,"score_spread":0.19020978775209643,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2141394237","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09452587,0.0015231237,0.862357,0.00005189811,0.0075126207,0.00070060126,0.00022037429,0.0007683328,0.032340176],"genre_scores_gemma":[0.99589086,0.00017626972,0.00007127143,0.000016529193,0.000010138615,0.00006995247,0.0000020212508,0.000075451855,0.0036875373],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99799055,0.00007926724,0.00080153585,0.00033102822,0.00038499848,0.00041264604],"domain_scores_gemma":[0.99882907,0.00009558512,0.00009680575,0.00069849024,0.00013204024,0.00014799104],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00025629296,0.00033512848,0.000577487,0.00021777346,0.00011141921,0.0000176761,0.0002521479,0.00028283603,0.00006820007],"category_scores_gemma":[0.0000044524313,0.00031230354,0.00027250062,0.00034818015,0.00011090554,0.00028671388,0.0000012795915,0.0003625623,0.00016060309],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050863433,0.00026863607,0.000013531944,0.00026301466,0.0002957603,0.00003062158,0.0037677782,0.988038,0.0047578956,0.0008057696,0.0016413816,0.00006676901],"study_design_scores_gemma":[0.014717474,0.0054432666,0.0007830575,0.007522902,0.0006718309,0.003323979,0.006835893,0.74672216,0.13296366,0.002280247,0.07081663,0.007918898],"about_ca_topic_score_codex":0.0001474783,"about_ca_topic_score_gemma":0.000017447259,"teacher_disagreement_score":0.901365,"about_ca_system_score_codex":0.00014148802,"about_ca_system_score_gemma":0.00004209637,"threshold_uncertainty_score":0.9999329},"labels":[],"label_agreement":null},{"id":"W2141411744","doi":"10.1109/ccece.2003.1226417","title":"Considering renewable energy in small isolated power system expansion","year":2004,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Renewable energy; Wind power; Intermittent energy source; Environmental economics; Photovoltaic system; Offset (computer science); Energy source; Energy development; Electric power system; Energy engineering; Reliability (semiconductor); Environmental science; Computer science; Power (physics); Distributed generation; Engineering; Electrical engineering; Economics","score_opus":0.007247808096019962,"score_gpt":0.17037524373684265,"score_spread":0.1631274356408227,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2141411744","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40343416,0.001028269,0.46820885,0.00009391998,0.0016660764,0.00026068263,0.00000333077,0.0018710213,0.123433694],"genre_scores_gemma":[0.9985723,0.000019458685,0.00090891775,0.00004487148,0.00001348798,0.000019162422,0.0000014506824,0.000024363033,0.00039600977],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991241,0.000016827944,0.00030167925,0.00018508799,0.000062986575,0.0003093018],"domain_scores_gemma":[0.999597,0.000023466084,0.00001754566,0.00026589134,0.0000263815,0.00006972881],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014247512,0.00014048399,0.00021091317,0.00008949007,0.000024095361,0.000021635095,0.000096567484,0.00010934552,0.000022414377],"category_scores_gemma":[0.000014877367,0.00013056364,0.000040981162,0.00018977461,0.00001415594,0.000099048346,0.000026561665,0.000078874866,0.000033913562],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019631543,0.000039048773,0.0002337594,0.00037194884,0.000026307775,0.00014121353,0.00061246974,0.9572613,0.027531262,0.012906601,0.00067383744,0.00018261926],"study_design_scores_gemma":[0.012042008,0.00060261326,0.0019102403,0.009825148,0.00005351938,0.0011038553,0.009741402,0.42781046,0.42710018,0.0076298397,0.097741164,0.0044395747],"about_ca_topic_score_codex":0.0041599767,"about_ca_topic_score_gemma":0.0049011223,"teacher_disagreement_score":0.59513813,"about_ca_system_score_codex":0.0002847395,"about_ca_system_score_gemma":0.000027501277,"threshold_uncertainty_score":0.62886685},"labels":[],"label_agreement":null},{"id":"W2142465965","doi":"10.1109/wescan.1995.493965","title":"A probabilistic technique for operating reserve assessment using system operating states","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Probabilistic logic; Reliability engineering; Computer science; Degree (music); Unit (ring theory); Power system simulation; Electric power system; Operations research; Engineering; Mathematics; Artificial intelligence; Power (physics)","score_opus":0.029306880537818727,"score_gpt":0.26530010504146223,"score_spread":0.23599322450364352,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2142465965","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044982206,0.00023402333,0.9376424,0.00008565161,0.0004334917,0.0028192294,0.00003255314,0.0009523618,0.012818077],"genre_scores_gemma":[0.8926786,0.00000465212,0.106207654,0.000022958402,0.00006927631,0.0007370401,0.000004977906,0.000044432352,0.00023037514],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99863976,0.00005652329,0.00048953935,0.00027126548,0.00014172323,0.0004011584],"domain_scores_gemma":[0.9992832,0.00014243205,0.000038577593,0.00031808068,0.00014178337,0.00007593333],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007205684,0.00019828914,0.00028881614,0.000053172294,0.00018587583,0.00013537692,0.00017457192,0.0000883675,0.000032714386],"category_scores_gemma":[0.000111660054,0.00016938207,0.00006975372,0.00015017689,0.000022991719,0.00021181144,0.000044491666,0.00014341956,0.0000061139986],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000037345837,0.00010151941,0.00041085418,0.009981536,0.00012169419,0.000019263753,0.0011860166,0.81174123,0.14713354,0.025914485,0.002889932,0.0004962025],"study_design_scores_gemma":[0.00021368211,0.000054673183,0.000010307688,0.0005864739,0.000011962008,0.00003272733,0.0006359619,0.9921188,0.005502352,0.00006547568,0.00053441146,0.00023319988],"about_ca_topic_score_codex":0.000104008075,"about_ca_topic_score_gemma":0.000032601503,"teacher_disagreement_score":0.8476964,"about_ca_system_score_codex":0.00046808325,"about_ca_system_score_gemma":0.000019735447,"threshold_uncertainty_score":0.69072},"labels":[],"label_agreement":null},{"id":"W2142881558","doi":"","title":"Adequacy assessment of composite generation and transmission systems incorporating wind energy conversion systems","year":2010,"lang":"en","type":"article","venue":"University Library - University of Saskatchewan (University of Saskatchewan)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Saskatchewan","keywords":"Wind power; Environmental science; Composite number; Computer science; Meteorology; Engineering; Geography; Electrical engineering","score_opus":0.00533097205149673,"score_gpt":0.15593777598199432,"score_spread":0.15060680393049758,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2142881558","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9479298,0.00023426049,0.048686795,0.00012234108,0.0005140317,0.000401142,0.00033181944,0.0002376155,0.0015421794],"genre_scores_gemma":[0.98910445,0.00023949133,0.008139803,0.0000054854104,0.00004157175,2.2236305e-8,0.00014227984,0.000030850162,0.002296027],"study_design_codex":"bench_or_experimental","study_design_gemma":"qualitative","domain_scores_codex":[0.9981013,0.00021881258,0.00035793064,0.0005205916,0.00044624403,0.00035515113],"domain_scores_gemma":[0.9982568,0.00014022927,0.00051025447,0.0005324066,0.0002164544,0.000343828],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00028362984,0.00037170845,0.00086302107,0.0005096755,0.00036988093,0.000027334696,0.00075370655,0.00047133176,0.000104042374],"category_scores_gemma":[0.00000297404,0.00051924575,0.0002448673,0.000578849,0.000750575,0.0019177998,0.00030175855,0.00045099153,0.0000027386532],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012344798,0.0010319545,0.041790787,0.0090184,0.0017216369,0.0006391797,0.1760375,0.055344526,0.7013569,0.0039028355,0.0024222375,0.005499588],"study_design_scores_gemma":[0.0048874915,0.00047396144,0.006212323,0.0010426869,0.00051503035,0.000046111047,0.78274435,0.17754814,0.007741404,0.00006668067,0.017497335,0.0012245169],"about_ca_topic_score_codex":0.016506577,"about_ca_topic_score_gemma":0.001271563,"teacher_disagreement_score":0.69361544,"about_ca_system_score_codex":0.0001297836,"about_ca_system_score_gemma":0.0004291141,"threshold_uncertainty_score":0.99972594},"labels":[],"label_agreement":null},{"id":"W2143336951","doi":"10.1504/ijrs.2008.020774","title":"Adequacy assessment of composite power generation and transmission systems with wind energy","year":2008,"lang":"en","type":"article","venue":"International Journal of Reliability and Safety","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Composite number; Wind power; Energy (signal processing); Transmission (telecommunications); Electricity generation; Power (physics); Materials science; Environmental science; Composite material; Electrical engineering; Engineering; Physics; Mathematics; Statistics; Thermodynamics","score_opus":0.007389417795375862,"score_gpt":0.21836977490842327,"score_spread":0.2109803571130474,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2143336951","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83802104,0.0012869487,0.15892883,0.00029973857,0.0005698133,0.000079685415,0.000016750371,0.000013019551,0.0007841673],"genre_scores_gemma":[0.9962374,0.0018092169,0.0018235557,0.00001789132,0.00007234055,0.0000010369927,0.0000036754257,0.000007852482,0.000027061848],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99883384,0.000065796834,0.0005394023,0.000110764115,0.00036208262,0.00008809755],"domain_scores_gemma":[0.99920124,0.00008684065,0.00015168816,0.00009468288,0.00038043325,0.000085093336],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042035233,0.00010774633,0.00025879417,0.000076307944,0.000044056273,0.000018729537,0.00011305097,0.0000636213,0.000008093912],"category_scores_gemma":[0.000016154125,0.000079254016,0.000051435083,0.00004774872,0.00010953477,0.0002521193,0.00001507764,0.00013456607,1.0464476e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021922444,0.0008653631,0.121166214,0.00089661864,0.001455517,0.00030513064,0.005207718,0.75896174,0.071416244,0.017199034,0.0014109476,0.018923242],"study_design_scores_gemma":[0.008874748,0.002075896,0.43492228,0.0023928776,0.0001661297,0.006662368,0.0005491387,0.40633276,0.010141349,0.0007067697,0.12616712,0.0010085701],"about_ca_topic_score_codex":0.00003227235,"about_ca_topic_score_gemma":0.0000028568686,"teacher_disagreement_score":0.35262898,"about_ca_system_score_codex":0.000086814456,"about_ca_system_score_gemma":0.000053836076,"threshold_uncertainty_score":0.3231885},"labels":[],"label_agreement":null},{"id":"W2143664118","doi":"10.1002/eej.20961","title":"Estimating mean life of an aged power equipment group with operation data sequence","year":2009,"lang":"en","type":"article","venue":"Electrical Engineering in Japan","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Weibull distribution; Sequence (biology); Reliability engineering; Power (physics); Statistics; Computer science; Estimation; Engineering; Mathematics; Systems engineering","score_opus":0.014257361509587804,"score_gpt":0.23069420430197082,"score_spread":0.216436842792383,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2143664118","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7926984,0.00017563078,0.20610057,0.000037668513,0.00014300867,0.0002769853,0.0000058794926,0.00033661257,0.0002252624],"genre_scores_gemma":[0.9813135,0.000004864695,0.01854424,0.00002922735,0.00004100546,0.0000105010095,0.000030025954,0.000022527354,0.000004083741],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99877506,0.000022506734,0.00035768072,0.00027751332,0.00021587337,0.0003513657],"domain_scores_gemma":[0.99924505,0.000049923554,0.000030274949,0.00053055765,0.000020311963,0.00012390685],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040208467,0.00017569358,0.00026239973,0.00011545689,0.000020486528,0.000028073744,0.00037404697,0.00007345384,0.0000062485574],"category_scores_gemma":[0.00016131967,0.00016107952,0.000018389832,0.00039384433,0.000013021047,0.00038464557,0.000023935962,0.0002692979,0.0000024567753],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017722567,0.000073928,0.00016015151,0.00007571484,0.000015819476,0.000009369258,0.0004217941,0.96990407,0.025526807,0.0008834006,0.000045228153,0.0028659967],"study_design_scores_gemma":[0.00038852484,0.00039740425,0.0056568426,0.00013459887,0.000006116859,0.000013421328,0.000010329456,0.9919845,0.0011191845,0.000018430612,0.0000600322,0.00021065306],"about_ca_topic_score_codex":0.00002632066,"about_ca_topic_score_gemma":0.00001817213,"teacher_disagreement_score":0.18861514,"about_ca_system_score_codex":0.00012485433,"about_ca_system_score_gemma":0.000026295389,"threshold_uncertainty_score":0.6568632},"labels":[],"label_agreement":null},{"id":"W2144116881","doi":"10.1109/epec.2009.5420767","title":"Development of an interactive reliability model for wind and hydro power systems","year":2009,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Electric power system; Reliability (semiconductor); Monte Carlo method; Reliability engineering; Wind speed; Environmental science; Computer science; Automotive engineering; Power (physics); Engineering; Meteorology; Electrical engineering","score_opus":0.010109048531859705,"score_gpt":0.22758646890202475,"score_spread":0.21747742037016504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144116881","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.71251225,0.000060987022,0.28275856,0.00002015761,0.00017488275,0.00043062214,0.000010113277,0.00011071374,0.0039217006],"genre_scores_gemma":[0.9821325,0.0000021166347,0.017648075,0.000016705428,0.0000055063633,0.000014771973,0.0000027418996,0.000008675773,0.00016890955],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99924654,0.000010593117,0.00032099578,0.0001784263,0.000080050704,0.00016339502],"domain_scores_gemma":[0.9995717,0.000039040402,0.000031858915,0.00021382574,0.00007360252,0.00006999597],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031650855,0.00011277905,0.00021409073,0.00003310777,0.00002691585,0.000014577577,0.00008179102,0.00006274698,0.0000031254986],"category_scores_gemma":[0.000034033837,0.00009522408,0.00002850071,0.00003902475,0.00001868628,0.00021045728,0.000011135275,0.000054881188,0.0000013080372],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047779692,0.0007355981,0.00022899453,0.0023726511,0.0002091249,0.0000028919376,0.037331328,0.8804186,0.047528133,0.013839869,0.001779214,0.015075787],"study_design_scores_gemma":[0.00029070984,0.00007487101,0.00065037794,0.00007847519,0.0000054776774,0.0000034155496,0.00040717714,0.9907169,0.0051720357,0.0005500963,0.0018894915,0.00016101944],"about_ca_topic_score_codex":0.0000046937234,"about_ca_topic_score_gemma":0.000006519775,"teacher_disagreement_score":0.26962024,"about_ca_system_score_codex":0.00007510026,"about_ca_system_score_gemma":0.00002537108,"threshold_uncertainty_score":0.38831252},"labels":[],"label_agreement":null},{"id":"W2144182143","doi":"10.1109/pes.2007.385621","title":"Determination of Substation Models for Composite System Reliability Evaluation","year":2007,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba; Manitoba Hydro","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Monte Carlo method; Computer science; Transmission system; Grid; Transmission (telecommunications); Engineering; Power (physics)","score_opus":0.01267169764492639,"score_gpt":0.23955689225584573,"score_spread":0.22688519461091933,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144182143","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38654035,0.00019301953,0.6110715,0.0000056538365,0.0011511479,0.00047131695,0.000013100416,0.00026624574,0.00028765068],"genre_scores_gemma":[0.9049057,0.0000074759537,0.0948089,0.000006416052,0.000120868935,0.00007811771,0.000017601718,0.000045579814,0.000009349772],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983191,0.000030520594,0.0006482295,0.00025700504,0.00035981918,0.00038531405],"domain_scores_gemma":[0.99886805,0.00025808602,0.00011625652,0.00025967893,0.0004251033,0.00007283706],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036486832,0.00021008878,0.0002814765,0.000059594564,0.000065286134,0.000021393009,0.0001334126,0.00016327585,8.772716e-7],"category_scores_gemma":[0.00009619913,0.00023294309,0.0002342176,0.00021434411,0.000021766102,0.00025311043,0.00001113842,0.00012258296,0.0000010215739],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008518159,0.0000128686825,0.00005419843,0.00097290863,0.000019922081,1.983469e-7,0.0010881163,0.8615914,0.13483003,0.00032114566,0.000079942256,0.00102076],"study_design_scores_gemma":[0.00037027124,0.000023614788,0.00031892484,0.00023826835,0.000038155897,0.0000032087692,0.00018793729,0.91891724,0.07952437,0.000073726296,0.000096040065,0.00020825607],"about_ca_topic_score_codex":0.000019525976,"about_ca_topic_score_gemma":0.000003885206,"teacher_disagreement_score":0.5183653,"about_ca_system_score_codex":0.00054803304,"about_ca_system_score_gemma":0.000020999705,"threshold_uncertainty_score":0.94991434},"labels":[],"label_agreement":null},{"id":"W2144237091","doi":"10.1109/tec.2009.2016035","title":"Probabilistic Evaluation of Transient Stability of a Wind Farm","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Conversion","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":60,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Transient (computer programming); Emtp; Probabilistic logic; Electric power system; Context (archaeology); Wind power; Stability (learning theory); Engineering; Control theory (sociology); Reliability engineering; Computer science; Power (physics); Electrical engineering; Geography; Machine learning; Artificial intelligence; Physics; Control (management)","score_opus":0.017450729434048528,"score_gpt":0.21799402403837168,"score_spread":0.20054329460432316,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144237091","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.65600836,0.00008761288,0.34095022,0.000042365056,0.00064096804,0.00026071208,0.000029664938,0.00008409119,0.0018960277],"genre_scores_gemma":[0.9998366,0.000036731886,0.0000718553,0.000012846252,0.000006547051,0.000008732584,0.0000024270294,0.000008067327,0.000016183965],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99886656,0.000090777474,0.00034300677,0.00017343304,0.0003857195,0.00014052696],"domain_scores_gemma":[0.9993191,0.00005596713,0.000049437283,0.0003018702,0.00022181538,0.000051829025],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004353914,0.00012376976,0.0002179944,0.00010014112,0.000030740484,0.0000027943518,0.000094387,0.000091681344,0.000093853756],"category_scores_gemma":[0.000008125352,0.00012048476,0.00012496163,0.00021468235,0.000060502076,0.000074936266,2.5283944e-7,0.0000852494,0.0000020910597],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001470338,0.00048180658,0.00000494713,0.00028707137,0.000051954026,5.138263e-7,0.0007988699,0.8592249,0.09156051,0.00029148767,0.00003109689,0.047119815],"study_design_scores_gemma":[0.0011934622,0.00039701792,0.0004846121,0.00016141996,0.0001458884,0.0000025233517,0.00015029011,0.24332502,0.75313973,0.0003288872,0.00048881787,0.00018233046],"about_ca_topic_score_codex":0.000063975946,"about_ca_topic_score_gemma":0.00005255471,"teacher_disagreement_score":0.6615792,"about_ca_system_score_codex":0.00017836502,"about_ca_system_score_gemma":0.00005397641,"threshold_uncertainty_score":0.49132258},"labels":[],"label_agreement":null},{"id":"W2144255607","doi":"10.1109/ccece.2002.1015165","title":"Reliability evaluation of composite electric power systems incorporating FACTS","year":2003,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Electric power system; Computer science; Composite number; Transmission system; Power transmission; Power (physics); Transmission (telecommunications); Engineering; Telecommunications","score_opus":0.014200592137953777,"score_gpt":0.22867976536087778,"score_spread":0.214479173222924,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144255607","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8732269,0.0007630302,0.03209309,0.0000057139314,0.00078813505,0.00061465043,0.0000032125183,0.00020758637,0.09229773],"genre_scores_gemma":[0.9994231,0.0000044338735,0.000457015,0.000005891041,0.0000055758483,0.000030589246,0.000002084403,0.000014131333,0.000057209072],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985621,0.00022626155,0.00044554783,0.00017057479,0.0003982677,0.00019725651],"domain_scores_gemma":[0.9990571,0.00008779161,0.00007769902,0.00035045083,0.00037065166,0.00005629459],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022792497,0.00012549706,0.00023616831,0.000067082474,0.00003101593,0.00001827361,0.00009073677,0.00008204548,0.00003624777],"category_scores_gemma":[0.00036264575,0.00010970959,0.000051878178,0.00030122531,0.000019641351,0.00014704607,0.000008004205,0.000103285565,0.000025166932],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000126728855,0.00014428624,0.007735657,0.0009010701,0.000086682674,0.0000014006075,0.00044918965,0.80908126,0.15518203,0.024532836,0.0013131589,0.00055977376],"study_design_scores_gemma":[0.0011895876,0.00014888584,0.015008408,0.00024955106,0.000092807335,0.00003054894,0.00037457654,0.8862352,0.09009879,0.003072506,0.0028839607,0.0006151754],"about_ca_topic_score_codex":0.000050902927,"about_ca_topic_score_gemma":0.000005401075,"teacher_disagreement_score":0.12619622,"about_ca_system_score_codex":0.00020408166,"about_ca_system_score_gemma":0.000059339567,"threshold_uncertainty_score":0.44738272},"labels":[],"label_agreement":null},{"id":"W2144321286","doi":"10.1109/ccece.2002.1015181","title":"Customer outage cost evaluation of an actual failure event","year":2003,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Duration (music); Reliability engineering; Event (particle physics); Computer science; Power (physics); Function (biology); Operations research; Engineering","score_opus":0.017079633517802055,"score_gpt":0.2606111866859806,"score_spread":0.24353155316817854,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144321286","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8558056,0.00014272849,0.035286654,0.000039124738,0.0008116976,0.0007677966,0.000014282322,0.00021663633,0.106915474],"genre_scores_gemma":[0.9992189,0.0000025103757,0.00047227496,0.000012623487,0.000011683187,0.000025014599,0.0000039151046,0.000009292613,0.0002437795],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99933094,0.00006483024,0.00016248971,0.00009042632,0.00022825073,0.0001230757],"domain_scores_gemma":[0.9996133,0.00001642297,0.000017580554,0.00021001128,0.00009584432,0.000046841826],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007470143,0.00007031316,0.00010262718,0.00003072144,0.0000120427785,0.0000063873804,0.000059486894,0.000050553997,0.00048251057],"category_scores_gemma":[0.00008654826,0.000059863123,0.00003240401,0.00007434262,0.000013462547,0.00012274852,0.0000040994805,0.000051015482,0.000077543555],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039479197,0.00070813776,0.0020537674,0.0009707447,0.00034585214,0.00000753256,0.00785765,0.75007296,0.061735228,0.061001256,0.032093316,0.08311408],"study_design_scores_gemma":[0.0031213977,0.0001768758,0.005286746,0.00015890264,0.00018046779,0.000036848895,0.0039032476,0.36751616,0.16014174,0.0013270073,0.45723617,0.0009144615],"about_ca_topic_score_codex":0.000011191321,"about_ca_topic_score_gemma":0.00010551836,"teacher_disagreement_score":0.42514282,"about_ca_system_score_codex":0.00007335164,"about_ca_system_score_gemma":0.000025668296,"threshold_uncertainty_score":0.52831525},"labels":[],"label_agreement":null},{"id":"W2145075499","doi":"10.1109/pes.2009.5275360","title":"Development of a dynamic equivalent model for Ontario's external system","year":2009,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Independent Electricity System Operator","funders":"","keywords":"Computer science; Quality assurance; Key (lock); System dynamics; Reliability engineering; Work (physics); Energy management system; Energy management; Energy (signal processing); Engineering; Computer security; Mechanical engineering; Operations management","score_opus":0.014582408579416716,"score_gpt":0.22110776562474468,"score_spread":0.20652535704532796,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2145075499","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15674411,0.00006346298,0.8381624,0.0000075959874,0.00016021429,0.00023894958,0.0000031259065,0.00013573599,0.0044843764],"genre_scores_gemma":[0.8903791,9.2055063e-7,0.10821511,0.000009083685,0.0000048406614,0.000026179929,0.0000012882815,0.0000067950486,0.0013566914],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99929875,0.0000025210934,0.00030797135,0.000106578766,0.00009810225,0.00018606966],"domain_scores_gemma":[0.99973565,0.00000837395,0.00002502253,0.00015191083,0.000035033732,0.000043984044],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001560647,0.0000940283,0.00016856084,0.000030144116,0.000020608168,0.000006687667,0.00011117837,0.000040670628,0.000006483721],"category_scores_gemma":[0.0000027795118,0.00008150291,0.00005722755,0.000025712845,0.0000053603007,0.000047742207,0.000009287351,0.000039103106,0.000004547484],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024648118,0.00039396138,0.00017486785,0.0074002654,0.00028782667,0.000009889347,0.026833195,0.61988574,0.14764318,0.09293804,0.0017110833,0.102475494],"study_design_scores_gemma":[0.00026315716,0.000021657164,0.0005987587,0.00023456995,0.000006459047,0.0000044992817,0.00008461868,0.9952593,0.0023719682,0.00020395083,0.0008310696,0.00012000019],"about_ca_topic_score_codex":0.0000640921,"about_ca_topic_score_gemma":0.0029756918,"teacher_disagreement_score":0.733635,"about_ca_system_score_codex":0.00048145145,"about_ca_system_score_gemma":0.000066994566,"threshold_uncertainty_score":0.33235925},"labels":[],"label_agreement":null},{"id":"W2146029760","doi":"10.1109/ccece.1996.548125","title":"Variance reduction techniques for use with sequential Monte Carlo simulation in bulk power system reliability evaluation","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Control variates; Variance reduction; Monte Carlo method; Reliability (semiconductor); Computer science; Reduction (mathematics); Variance (accounting); Reliability engineering; Process (computing); Sequential estimation; Power (physics); Algorithm; Statistics; Hybrid Monte Carlo; Mathematics; Engineering; Markov chain Monte Carlo","score_opus":0.025023910102348317,"score_gpt":0.2474750964614972,"score_spread":0.2224511863591489,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2146029760","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37524265,0.00013204571,0.61608064,0.00008153884,0.0008772457,0.003567937,0.000022767652,0.0011587208,0.0028364128],"genre_scores_gemma":[0.9921908,0.000004785403,0.007094958,0.0000056908125,0.000053106713,0.0004197277,0.0000037742732,0.000026369938,0.00020083107],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998766,0.000079804595,0.0003755813,0.00030940856,0.00024202975,0.000227165],"domain_scores_gemma":[0.99916446,0.000074071286,0.000056016946,0.00038011186,0.00028504175,0.00004029401],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00086550356,0.0001572881,0.00020213544,0.000085552834,0.000043407497,0.000047822457,0.00007502194,0.00013187758,0.000023837643],"category_scores_gemma":[0.00011056628,0.0001375369,0.00004800747,0.00020960828,0.000026470534,0.00060204556,0.00000858714,0.00010180746,0.000005887245],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056159555,0.000038200636,0.00020215641,0.00028448543,0.00001380127,8.7060937e-7,0.0003826953,0.9963751,0.000715245,0.00032399947,0.00028593,0.001321396],"study_design_scores_gemma":[0.00041939542,0.000078311205,0.00035845704,0.0001920134,0.00002055577,0.000008709602,0.000095548945,0.99457765,0.0019544968,0.000029340898,0.002085022,0.0001805012],"about_ca_topic_score_codex":0.00020425067,"about_ca_topic_score_gemma":0.00004904332,"teacher_disagreement_score":0.61694807,"about_ca_system_score_codex":0.0007190733,"about_ca_system_score_gemma":0.000014399746,"threshold_uncertainty_score":0.5608592},"labels":[],"label_agreement":null},{"id":"W2146292227","doi":"10.1109/tec.2004.842376","title":"Incorporating Well-Being Considerations in Generating Systems Using Energy Storage","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Conversion","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":78,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Probabilistic logic; Reliability (semiconductor); Reliability engineering; Electric power system; Computer science; Wind power; Energy storage; Engineering; Power (physics); Artificial intelligence","score_opus":0.009437024073364463,"score_gpt":0.19459129482825416,"score_spread":0.1851542707548897,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2146292227","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0769804,0.00022578354,0.9187778,0.000048439375,0.0018959552,0.000094620984,0.0000067563697,0.0002954897,0.0016747302],"genre_scores_gemma":[0.9968421,0.00005884569,0.0024426242,0.00015911911,0.00014948832,0.000035156165,0.0000041515427,0.00004584302,0.0002626592],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984878,0.0001256531,0.0005227052,0.0003132542,0.0002116099,0.00033898983],"domain_scores_gemma":[0.99932516,0.0001405759,0.00007459372,0.00028799943,0.00006429865,0.000107398235],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00022634988,0.00025216246,0.00028297593,0.00032190062,0.00028463654,0.00007401243,0.00009642676,0.00017928457,0.000052458796],"category_scores_gemma":[0.0000054322663,0.00028190666,0.00009074812,0.00030417353,0.000043359316,0.00043526484,0.0000020536534,0.0002308494,0.000016120204],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005752753,0.000039755174,0.000009028077,0.000043807595,0.000021810338,0.00001648986,0.00019375702,0.974682,0.022200366,0.0015211108,0.00010928309,0.0011568505],"study_design_scores_gemma":[0.00044942187,0.000024888308,0.0000024424862,0.00019978745,0.000015969417,0.000038522638,0.00019528382,0.9492028,0.047021054,0.000039765513,0.0025260772,0.00028402975],"about_ca_topic_score_codex":0.0010396253,"about_ca_topic_score_gemma":0.0008414369,"teacher_disagreement_score":0.91986173,"about_ca_system_score_codex":0.00055968226,"about_ca_system_score_gemma":0.00006149342,"threshold_uncertainty_score":0.9999633},"labels":[],"label_agreement":null},{"id":"W2146414592","doi":"10.1109/pes.2011.6039084","title":"Ranking sections of a low voltage distribution feeder","year":2011,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Ranking (information retrieval); Reliability (semiconductor); Reliability engineering; Distribution (mathematics); Section (typography); Rank (graph theory); Investment (military); Computer science; Engineering; Mathematics; Artificial intelligence","score_opus":0.010281166585761427,"score_gpt":0.16872605809123786,"score_spread":0.15844489150547644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2146414592","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2094571,0.000066780565,0.7346073,0.0000058667874,0.0005939961,0.00011247617,0.00002120834,0.00027554974,0.05485975],"genre_scores_gemma":[0.9995103,0.000006325279,0.00018231187,0.000004764953,0.000014660481,0.000007975826,0.0000044780545,0.0000056579047,0.00026354587],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99965864,0.0000050903527,0.00012722623,0.00005931663,0.00004641008,0.00010330653],"domain_scores_gemma":[0.99979806,0.000010303407,0.000012358793,0.00012496224,0.000031143325,0.000023159397],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008565376,0.00004996319,0.00007942691,0.000015964499,0.000019172374,0.0000033345157,0.000049250026,0.000036975198,0.00012311384],"category_scores_gemma":[0.0000170008,0.00004420215,0.000039637038,0.000088043875,0.00001822147,0.0000696652,0.000008894345,0.000045818342,0.000024704703],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028357757,0.0017880178,0.046140596,0.010451511,0.0013359683,0.000055434815,0.03954161,0.027975654,0.28205597,0.446558,0.11530549,0.028508179],"study_design_scores_gemma":[0.002188957,0.00023259214,0.12258918,0.0008459527,0.00009760314,0.000076594944,0.0024527193,0.095472924,0.7090035,0.008399094,0.057303365,0.0013374953],"about_ca_topic_score_codex":0.00010359909,"about_ca_topic_score_gemma":0.00004737382,"teacher_disagreement_score":0.7900532,"about_ca_system_score_codex":0.00002711212,"about_ca_system_score_gemma":0.00000446568,"threshold_uncertainty_score":0.18025114},"labels":[],"label_agreement":null},{"id":"W2146700789","doi":"10.1109/tdc.1991.169487","title":"Separable insulated connector loadbreak testing. I. The switching characteristic and its implications","year":2002,"lang":"en","type":"article","venue":"Proceedings of the 1991 IEEE Power Engineering Society Transmission and Distribution Conference","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; Hydro One (Canada)","funders":"","keywords":"Cable gland; Reliability (semiconductor); Separable space; Reliability engineering; Voltage; Computer science; Service (business); Electrical engineering; Electronic engineering; Topology (electrical circuits); Engineering; Mathematics; Telecommunications; Physics; Power (physics)","score_opus":0.01786387198078637,"score_gpt":0.18938394020365332,"score_spread":0.17152006822286694,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2146700789","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97472924,0.0014628499,0.020952651,0.0013362949,0.0002635529,0.00044799416,0.00012112144,0.00032550687,0.0003608004],"genre_scores_gemma":[0.9992871,0.00043873512,0.00013216576,0.000031475425,0.000016921902,0.000029373196,0.000004403518,0.000015655376,0.00004417102],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99911815,0.00000448144,0.00028631897,0.00020644568,0.00013315701,0.0002514268],"domain_scores_gemma":[0.99942327,0.000097955184,0.00007134511,0.00010364138,0.00019630615,0.00010748642],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019888204,0.00019812297,0.00020112745,0.000013060132,0.00020603568,0.000079101745,0.00021079362,0.0001064888,0.000012282114],"category_scores_gemma":[0.00010937355,0.00013425938,0.000078661,0.00027960708,0.000055431257,0.0001754364,0.000028149036,0.00026672977,0.0000014809305],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009490056,0.00006689561,0.00075718784,0.0014199526,0.00010338576,1.8137732e-7,0.0031194196,0.0010955262,0.98123956,0.006983963,0.0027814377,0.0024230008],"study_design_scores_gemma":[0.00058125425,0.000048322825,0.034491748,0.0008945447,0.00008438858,0.00006132867,0.00021381523,0.9272543,0.021818476,0.00025278988,0.013826822,0.0004721741],"about_ca_topic_score_codex":0.0000068406016,"about_ca_topic_score_gemma":9.439538e-8,"teacher_disagreement_score":0.9594211,"about_ca_system_score_codex":0.0000409667,"about_ca_system_score_gemma":0.000008125767,"threshold_uncertainty_score":0.5474938},"labels":[],"label_agreement":null},{"id":"W2147366589","doi":"10.1109/wescan.1997.627111","title":"Effect of wind turbine parameters on the capacity adequacy of generating systems using wind energy","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Turbine; Wind power; Wind speed; Marine engineering; Steam turbine; Electricity; Matching (statistics); Environmental science; Automotive engineering; Computer science; Engineering; Meteorology; Electrical engineering; Mechanical engineering; Mathematics; Statistics","score_opus":0.022802432877194835,"score_gpt":0.1988821776984228,"score_spread":0.17607974482122798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2147366589","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9901079,0.00041054873,0.0055637658,0.000014272029,0.0004830884,0.00020058008,0.0000082461265,0.000053781925,0.003157804],"genre_scores_gemma":[0.9996045,0.000011292332,0.00020857806,0.000015958489,0.000043761218,0.000004140153,5.4060666e-7,0.000018097788,0.00009310613],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988953,0.00018200708,0.00038292815,0.00014097747,0.00018646894,0.00021235071],"domain_scores_gemma":[0.9989958,0.0004740649,0.00008783557,0.00036607045,0.00003566192,0.000040587398],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005139488,0.00016425343,0.00034889134,0.000048582177,0.0000389902,0.000015066221,0.00015080567,0.00007854673,0.000027041877],"category_scores_gemma":[0.00012829863,0.000101625585,0.00009858025,0.00015332043,0.000064299544,0.00006568998,0.000017151528,0.00010490977,0.000003322659],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011754517,0.000026772916,0.00022431016,0.00079138693,0.00010545444,0.000001924285,0.00035660545,0.9076042,0.08756452,0.002150207,0.00042585982,0.0007369903],"study_design_scores_gemma":[0.00023044726,0.00019084137,0.00002015572,0.00032353724,0.00002325636,0.000009437508,0.00004609243,0.8023622,0.19637847,0.0000062260356,0.00028143032,0.0001279126],"about_ca_topic_score_codex":0.00059734116,"about_ca_topic_score_gemma":0.000009087276,"teacher_disagreement_score":0.10881395,"about_ca_system_score_codex":0.000059929233,"about_ca_system_score_gemma":0.00000336361,"threshold_uncertainty_score":0.41441712},"labels":[],"label_agreement":null},{"id":"W2147496886","doi":"10.1109/psce.2009.4839935","title":"Security coordinated maintenance scheduling in deregulation based on genco contribution to unserved energy","year":2009,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Scheduling (production processes); Computer science; Electric power system; Schedule; Reliability engineering; Operator (biology); Operations research; Engineering; Power (physics); Operations management","score_opus":0.004379961701572377,"score_gpt":0.19714563367072074,"score_spread":0.19276567196914837,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2147496886","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40811938,0.0000648705,0.5855319,0.0012211927,0.000308926,0.00030623798,0.0000069934413,0.00044337157,0.0039971024],"genre_scores_gemma":[0.9985233,0.000004450365,0.00057528436,0.0007664763,0.000025136274,0.00002050515,0.000019438916,0.00001035771,0.000055034558],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99895954,0.00004799026,0.00029668421,0.00022703019,0.00012579058,0.0003429822],"domain_scores_gemma":[0.9994944,0.000047483012,0.000023649347,0.0002414087,0.000099089186,0.00009398045],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003163017,0.00015294364,0.0002033849,0.00012998389,0.000032215896,0.000023621897,0.00010849927,0.00011224096,0.000021998698],"category_scores_gemma":[0.00013170279,0.00014685799,0.000046447454,0.0004214028,0.000009330962,0.00010833288,0.000006553048,0.00010560131,0.000019534067],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009728634,0.00007466743,0.00065423344,0.000028645249,0.000005029801,0.000009092106,0.000051980733,0.9572221,0.005546466,0.03408723,0.0006548168,0.0015684218],"study_design_scores_gemma":[0.0007582692,0.000096876785,0.014335881,0.00020158621,0.0000025723866,0.0000013508076,0.000016450742,0.9649034,0.014669448,0.0021206855,0.002671635,0.00022181819],"about_ca_topic_score_codex":0.000096178126,"about_ca_topic_score_gemma":0.00034467332,"teacher_disagreement_score":0.5904039,"about_ca_system_score_codex":0.00031338923,"about_ca_system_score_gemma":0.000018391303,"threshold_uncertainty_score":0.5988695},"labels":[],"label_agreement":null},{"id":"W2149172856","doi":"10.1109/tia.2003.816554","title":"Reliability modeling of distributed generation in conventional distribution systems planning and analysis","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":244,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Distributed generation; Electric utility; Deferral; Maintenance engineering; Electric power system; Equivalence (formal languages); Order (exchange); Electric power industry; Computer science; Engineering; Electricity; Power (physics); Economics; Electrical engineering; Renewable energy; Finance","score_opus":0.021571007985304685,"score_gpt":0.2431833835739649,"score_spread":0.22161237558866023,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2149172856","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14394705,0.000105235486,0.8547314,0.000013306227,0.000107563166,0.0003416693,0.0005746008,0.00006052948,0.00011868198],"genre_scores_gemma":[0.9990912,0.000016141546,0.00022038628,0.0000022374875,0.000013042544,0.0004598116,0.00017180231,0.00000811452,0.00001727006],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989871,0.00006422879,0.0004487104,0.00022496395,0.00012516952,0.00014986147],"domain_scores_gemma":[0.9994796,0.000055050743,0.000049190498,0.00026426723,0.00008820801,0.00006368529],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031593486,0.00011829494,0.00021323425,0.00012864459,0.000094595554,0.000019292254,0.000059761365,0.00024538813,0.000012176039],"category_scores_gemma":[0.000009648187,0.00013089408,0.000068529414,0.0008346677,0.000045839017,0.00011518083,4.894054e-7,0.00035731145,0.0000018697443],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000032210992,0.000073290415,0.00054768834,0.000053978663,0.000059476053,1.6248175e-7,0.000030669962,0.99731994,0.00045477622,0.0013586183,0.000022765578,0.000075402],"study_design_scores_gemma":[0.00021519963,0.000010440887,0.00073283224,0.00003251494,0.0001054028,0.0000034830468,0.00015204836,0.9962021,0.0017912767,0.00010390804,0.0005247461,0.00012600624],"about_ca_topic_score_codex":0.00004568589,"about_ca_topic_score_gemma":0.0000144372,"teacher_disagreement_score":0.85514414,"about_ca_system_score_codex":0.00016154579,"about_ca_system_score_gemma":0.000026853118,"threshold_uncertainty_score":0.53377056},"labels":[],"label_agreement":null},{"id":"W2149461550","doi":"10.1109/naps.2008.5307340","title":"Load forecast uncertainty considerations in bulk electric system reliability assessment","year":2008,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Range (aeronautics); Computer science; Electric power system; Transmission system; Transmission (telecommunications); Engineering; Telecommunications; Power (physics)","score_opus":0.012668672163125705,"score_gpt":0.21801005170391233,"score_spread":0.20534137954078663,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2149461550","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.78622335,0.00040952335,0.035057593,0.00035041332,0.0010817883,0.0011431907,0.000017735703,0.0012717166,0.17444469],"genre_scores_gemma":[0.99822885,0.000030730007,0.0012874504,0.000039793395,0.000033160555,0.00011641067,0.0000031292723,0.000016371432,0.00024408518],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99856204,0.00006868835,0.0004923177,0.00026876538,0.00023637938,0.0003718217],"domain_scores_gemma":[0.99913985,0.00019110604,0.000029904426,0.00041977665,0.00013032356,0.000089015266],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005375234,0.00017277233,0.00029860032,0.00008260267,0.00009672705,0.000020335354,0.00009651526,0.00010317589,0.00007322955],"category_scores_gemma":[0.00012796844,0.00015429263,0.0000720125,0.00031592662,0.0000406181,0.00014446455,0.00002065104,0.00022988374,0.000055811768],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002803304,0.00038321363,0.033152107,0.0016369738,0.000095883115,0.0002888199,0.0017997599,0.847813,0.0041563003,0.07790119,0.032020435,0.00072424486],"study_design_scores_gemma":[0.0014911938,0.00012848963,0.042383168,0.00023082372,0.00001814621,0.0004318137,0.00048556336,0.93926966,0.0019128744,0.0013792517,0.011474601,0.0007943882],"about_ca_topic_score_codex":0.00057690404,"about_ca_topic_score_gemma":0.0006386339,"teacher_disagreement_score":0.21200551,"about_ca_system_score_codex":0.0017291262,"about_ca_system_score_gemma":0.00026196416,"threshold_uncertainty_score":0.6291871},"labels":[],"label_agreement":null},{"id":"W2149798573","doi":"10.1109/ccece.2002.1015167","title":"Incorporating reliability index probability distributions in performance based regulation","year":2003,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Index (typography); Reliability engineering; Computer science; Probability distribution; Statistics; Mathematics; Engineering; Power (physics)","score_opus":0.008360015138713114,"score_gpt":0.1881806932629937,"score_spread":0.17982067812428057,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2149798573","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8080994,0.000017301065,0.17387801,0.00006464857,0.0002226545,0.00043284165,0.000007405069,0.00029619952,0.016981551],"genre_scores_gemma":[0.9960399,0.0000013038914,0.0037898615,0.000011226127,0.000008537066,0.000078121935,0.000012289553,0.000009945171,0.00004881365],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988659,0.000092813185,0.0004189736,0.00023464623,0.00013425366,0.00025343028],"domain_scores_gemma":[0.9993268,0.000076744465,0.000035467336,0.00042517946,0.00007610728,0.000059649552],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010582074,0.0001333644,0.00016871252,0.00005077375,0.000058898568,0.000018744007,0.00008962631,0.000101786616,0.00006414275],"category_scores_gemma":[0.0003953038,0.00012526235,0.00004197405,0.00044398184,0.0000641543,0.0002539964,0.000010293446,0.00018241601,0.000017530489],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013631599,0.0001267465,0.5584185,0.00052524585,0.0000037908756,7.547854e-7,0.00006039698,0.424627,0.0005879505,0.014567211,0.00020202994,0.0008667205],"study_design_scores_gemma":[0.00047330142,0.000028364218,0.36039257,0.00009235572,0.000002992951,0.0000023846226,0.000024489098,0.62111425,0.006600641,0.008735036,0.0022592857,0.0002743208],"about_ca_topic_score_codex":0.000035992023,"about_ca_topic_score_gemma":0.00015201008,"teacher_disagreement_score":0.19802594,"about_ca_system_score_codex":0.00038147738,"about_ca_system_score_gemma":0.00006563402,"threshold_uncertainty_score":0.510805},"labels":[],"label_agreement":null},{"id":"W2150000094","doi":"10.1109/pmaps.2014.6960587","title":"A practical application of the Delphi method in maintenance-targeted resource allocation of distribution utilities","year":2014,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Computer science; Component (thermodynamics); Delphi; Process (computing); Resource allocation; Order (exchange); Delphi method; Risk analysis (engineering); Distribution (mathematics); Operations research; Scheme (mathematics); Reliability engineering; Systems engineering; Engineering; Business; Artificial intelligence","score_opus":0.009507454033066996,"score_gpt":0.25168989703950495,"score_spread":0.24218244300643796,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2150000094","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0197113,0.000023990118,0.97634304,0.0006702979,0.00005883164,0.00025907048,0.000012045354,0.000045405137,0.0028760398],"genre_scores_gemma":[0.9954753,0.000004646387,0.004382779,0.000021942522,0.000010277936,0.00003727193,0.000012267066,0.0000061739183,0.000049331058],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991797,0.00012680946,0.0003401187,0.00010578845,0.00012449383,0.00012309346],"domain_scores_gemma":[0.9993025,0.00021159108,0.0000762989,0.00031306595,0.0000779335,0.000018618262],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008618383,0.00006845074,0.0001527696,0.000022242612,0.000012875736,0.0000029698515,0.00010940362,0.00006736559,0.000004205906],"category_scores_gemma":[0.00051477575,0.00004874488,0.0000446049,0.00021214786,0.000056205514,0.000065634864,0.000022762813,0.00009163132,0.0000017228465],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015931675,0.0002877331,0.006247008,0.0017816585,0.00005478741,2.4006988e-7,0.0020486692,0.050274767,0.052410115,0.85303444,0.010157071,0.023544203],"study_design_scores_gemma":[0.0004198155,0.000040687144,0.03787724,0.00014908596,0.000017544657,0.0000059810454,0.00072784803,0.8381946,0.06677005,0.0038733664,0.051774494,0.0001492762],"about_ca_topic_score_codex":0.00020918273,"about_ca_topic_score_gemma":0.00011213874,"teacher_disagreement_score":0.97576404,"about_ca_system_score_codex":0.00006706882,"about_ca_system_score_gemma":0.00001484789,"threshold_uncertainty_score":0.19877586},"labels":[],"label_agreement":null},{"id":"W2150133617","doi":"10.1109/ccece.2004.1347733","title":"Identifying transmission deficiencies in composite electric power systems","year":2004,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Electric power system; Reliability engineering; Transmission (telecommunications); Transmission system; Computer science; Electric power transmission; Power transmission; Function (biology); Power (physics); Electrical engineering; Engineering; Telecommunications","score_opus":0.008184010683138494,"score_gpt":0.20108748301565033,"score_spread":0.19290347233251184,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2150133617","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6011716,0.003461254,0.378594,0.00003728817,0.00047622956,0.0002243256,7.4053764e-7,0.00036192537,0.015672605],"genre_scores_gemma":[0.99938846,0.00007067929,0.0003930952,0.000014169804,0.0000050688063,0.000012713161,6.664373e-7,0.000012871827,0.00010230405],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99918157,0.000014633063,0.00024683008,0.00013871987,0.00013604791,0.000282219],"domain_scores_gemma":[0.99976224,0.000018526918,0.000012192784,0.00013805261,0.00001786206,0.000051146646],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019497055,0.00010659823,0.0001574713,0.0001266155,0.000032330114,0.000044157896,0.00012059982,0.00006124296,0.000008802027],"category_scores_gemma":[0.0000055786563,0.00009133565,0.00004069783,0.00034999827,0.000010331023,0.00014763181,0.0000075307626,0.00011490774,0.00005470251],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012929878,0.00009965633,0.0008316378,0.0007205386,0.000018288809,0.00004748365,0.0027384253,0.6487132,0.33266735,0.013318613,0.00021629657,0.0006156232],"study_design_scores_gemma":[0.009857213,0.0006025549,0.072746105,0.0071587083,0.00007969599,0.00088264345,0.0067182784,0.47349837,0.36502343,0.007923781,0.05067689,0.0048323227],"about_ca_topic_score_codex":0.00017185377,"about_ca_topic_score_gemma":0.000017540075,"teacher_disagreement_score":0.39821678,"about_ca_system_score_codex":0.00018610545,"about_ca_system_score_gemma":0.000015579795,"threshold_uncertainty_score":0.37245598},"labels":[],"label_agreement":null},{"id":"W2150175898","doi":"10.1109/pes.2008.4596545","title":"Benefits of Employing an On-line Security Limit Derivation Tool in Electricity Markets","year":2008,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Independent Electricity System Operator","funders":"","keywords":"Electricity market; Electricity; Portfolio; Limit (mathematics); Benchmark (surveying); Computer science; Electric power system; Process (computing); Work (physics); Risk analysis (engineering); Power (physics); Business; Engineering; Electrical engineering; Finance; Mechanical engineering","score_opus":0.02326573210330921,"score_gpt":0.22139446755536307,"score_spread":0.19812873545205387,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2150175898","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9923871,0.000082810584,0.0037507513,0.00002578788,0.000106137275,0.00016312659,0.0000041898384,0.00014323535,0.0033368678],"genre_scores_gemma":[0.9994647,0.00010676633,0.0003013362,0.000042130076,0.000024621977,0.000010539079,0.000004272978,0.000012019985,0.000033602802],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99923,0.000028972987,0.00028175674,0.00014230797,0.00012545186,0.0001914739],"domain_scores_gemma":[0.99961805,0.00006667263,0.000025860621,0.00021735468,0.00004414142,0.000027903608],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002362735,0.00009988323,0.00017434046,0.00009092678,0.000023339817,0.0000042202428,0.00009738873,0.00007378109,0.000020317115],"category_scores_gemma":[0.00010866679,0.00009666424,0.000030751653,0.00025322026,0.000014111768,0.0001660015,0.000011710455,0.00011675401,0.000006362059],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00067261735,0.0020536561,0.21273337,0.0018831317,0.00014161826,0.00004937418,0.007742738,0.66496557,0.01619468,0.03443732,0.0040055327,0.055120394],"study_design_scores_gemma":[0.0011143764,0.00036980494,0.70743227,0.0002447259,0.000007067457,0.000030608986,0.000053416414,0.20360339,0.084654,0.0011824213,0.00076517044,0.0005427272],"about_ca_topic_score_codex":0.00007166658,"about_ca_topic_score_gemma":0.00017655345,"teacher_disagreement_score":0.4946989,"about_ca_system_score_codex":0.00007097715,"about_ca_system_score_gemma":0.000013581402,"threshold_uncertainty_score":0.39418533},"labels":[],"label_agreement":null},{"id":"W2150928659","doi":"10.1109/mper.2001.4311101","title":"Capacity Expansion of Small Isolated Power Systems Using PV and Wind Energy","year":2001,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":89,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Renewable energy; Wind power; Offset (computer science); Reliability engineering; Photovoltaics; Environmental science; Reliability (semiconductor); Electric power system; Photovoltaic system; Intermittent energy source; Energy source; Nameplate capacity; Computer science; Electricity generation; Engineering; Distributed generation; Power (physics); Electrical engineering; Physics","score_opus":0.01611767008338263,"score_gpt":0.19955329045719256,"score_spread":0.18343562037380992,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2150928659","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4046364,0.2688654,0.32124552,0.000032742064,0.0033121195,0.00059339684,0.000022246579,0.0005197302,0.0007724081],"genre_scores_gemma":[0.9779688,0.021342102,0.0005117843,0.000036408794,0.000027489083,0.00001257936,0.0000018526632,0.000061003284,0.000037950456],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99850756,0.00003806646,0.00063365395,0.00026813213,0.00016848673,0.00038412446],"domain_scores_gemma":[0.99914706,0.0000600682,0.00008573,0.0004618956,0.00009777881,0.00014747989],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00037384505,0.00031763501,0.0007023689,0.000103942606,0.000026170846,0.000021925642,0.0001681259,0.00014115835,0.000019632238],"category_scores_gemma":[0.000058796242,0.00030003252,0.00011611862,0.0003430295,0.000031729916,0.0001461457,0.000026487216,0.00017878828,0.0000058958144],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004182606,0.00015674233,0.00083823234,0.059019614,0.00071880384,0.00018026005,0.0010733093,0.7130414,0.21740295,0.0023269444,0.0026010755,0.0025988473],"study_design_scores_gemma":[0.0010427217,0.00026814238,0.00088859024,0.059597973,0.00031863464,0.0014768629,0.000047272053,0.6409321,0.005240849,0.000027201611,0.28794047,0.0022192018],"about_ca_topic_score_codex":0.000086004344,"about_ca_topic_score_gemma":0.0000024307956,"teacher_disagreement_score":0.5733324,"about_ca_system_score_codex":0.000092528295,"about_ca_system_score_gemma":0.000016449427,"threshold_uncertainty_score":0.99994516},"labels":[],"label_agreement":null},{"id":"W2151062168","doi":"10.1109/pes.2007.385951","title":"Reliability Assessment Tools For Utilities in the De-regulated Electricity Market","year":2007,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Electricity market; Variety (cybernetics); Computer science; Electricity; Asset management; Asset (computer security); Mains electricity; Risk analysis (engineering); Engineering; Business; Computer security; Finance","score_opus":0.008978918216067258,"score_gpt":0.2375283999411915,"score_spread":0.22854948172512424,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2151062168","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6742514,0.00037339624,0.32140538,0.000093273185,0.0009948856,0.00063920853,0.000013143383,0.00038746014,0.0018418786],"genre_scores_gemma":[0.9726119,0.000035003923,0.026749782,0.0001344645,0.00020471818,0.00013133309,0.000005663674,0.000051213403,0.00007588775],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99779236,0.000067716785,0.00057687727,0.0003188912,0.00027082767,0.0009733464],"domain_scores_gemma":[0.998162,0.0012098001,0.000050470917,0.00040179794,0.00008986111,0.0000861116],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0061443592,0.00030112342,0.0003213646,0.000050043895,0.00010419637,0.000107420696,0.00035544718,0.00021588846,0.000007688416],"category_scores_gemma":[0.00041086253,0.00026281635,0.00030835767,0.00040350176,0.00003883925,0.00021973868,0.000021022493,0.00044511887,9.770082e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000438856,0.00013207151,0.0017995371,0.0013201318,0.00016845361,0.000010546157,0.0071167233,0.8538041,0.11837021,0.0010969291,0.013735876,0.0024014972],"study_design_scores_gemma":[0.00055447145,0.000056605968,0.024451751,0.00015107938,0.000022779843,0.000015755075,0.0008561168,0.94818723,0.011323076,0.00016887962,0.013691365,0.00052086415],"about_ca_topic_score_codex":0.000050213857,"about_ca_topic_score_gemma":0.000020672103,"teacher_disagreement_score":0.29836056,"about_ca_system_score_codex":0.0006251,"about_ca_system_score_gemma":0.000041203242,"threshold_uncertainty_score":0.9999824},"labels":[],"label_agreement":null},{"id":"W2151469760","doi":"10.1049/iet-rpg:20080036","title":"Adequacy assessment of generating systems containing wind power considering wind speed correlation","year":2009,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":120,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Wind speed; Monte Carlo method; Renewable energy; Electric power system; Environmental science; Reliability (semiconductor); Meteorology; Computer science; Power (physics); Mathematics; Engineering; Statistics; Physics; Electrical engineering","score_opus":0.01712590334463535,"score_gpt":0.2448132684524766,"score_spread":0.22768736510784127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2151469760","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7808239,0.001388012,0.19915396,0.00008126638,0.004363936,0.0007147253,0.000020672436,0.0003088051,0.013144742],"genre_scores_gemma":[0.9963765,0.000031603933,0.0028641212,0.00006967799,0.00023902817,0.000004214183,0.000065564855,0.000038024467,0.00031122557],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99777913,0.000117539945,0.0009090842,0.0003749796,0.000399107,0.00042015515],"domain_scores_gemma":[0.99889666,0.00007110213,0.0002390284,0.00044652133,0.00023067213,0.00011601962],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00074752566,0.00030717428,0.00047626125,0.0001534373,0.00015204384,0.00016029773,0.00013993915,0.00021022453,0.000054488835],"category_scores_gemma":[0.00009028514,0.0003227175,0.00010184667,0.00024774676,0.00003450912,0.0005115547,0.000021162483,0.00019562076,0.00000855795],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000063571592,0.000025132096,0.00071897474,0.000035594203,0.00003430342,0.000004432944,0.0004566227,0.75711906,0.23942754,0.00095246494,0.0011299592,0.00008958457],"study_design_scores_gemma":[0.0007985193,0.00030110314,0.001516101,0.0002481163,0.00003364034,0.000032895532,0.00047221725,0.9758006,0.016995069,0.00006265566,0.0032918055,0.00044732037],"about_ca_topic_score_codex":0.00014200872,"about_ca_topic_score_gemma":0.000039744322,"teacher_disagreement_score":0.22243246,"about_ca_system_score_codex":0.00023263594,"about_ca_system_score_gemma":0.00011326502,"threshold_uncertainty_score":0.9999225},"labels":[],"label_agreement":null},{"id":"W2151614463","doi":"","title":"Assessment of Transmission System Component Criticality in the De-Regulated Electricity Market","year":2008,"lang":"en","type":"article","venue":"Proceedings of the 10th International Conference on Probablistic Methods Applied to Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Reliability engineering; Component (thermodynamics); Transmission system; Probabilistic logic; Reliability (semiconductor); Electric power system; Criticality; Transmission (telecommunications); Computer science; Ranking (information retrieval); Electric power transmission; Generator (circuit theory); Power transmission; Engineering; Power (physics); Telecommunications; Machine learning; Electrical engineering","score_opus":0.03311919225839367,"score_gpt":0.30889631109080157,"score_spread":0.2757771188324079,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2151614463","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08062951,0.000082374565,0.5754885,0.0005940979,0.0013005101,0.0027844608,0.00004946178,0.00014575917,0.33892533],"genre_scores_gemma":[0.9854629,0.000009630775,0.014109884,0.00003945327,0.000020970152,0.0002519767,0.0000014331672,0.000017998944,0.00008576835],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99752504,0.0001614319,0.0009299382,0.0003164239,0.0007446777,0.00032249102],"domain_scores_gemma":[0.9986307,0.00030724003,0.00022623429,0.00025696118,0.00048822502,0.00009062682],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003828444,0.00024065348,0.00052119023,0.00017421805,0.000071267095,0.00005373257,0.0011342174,0.00012445841,0.000022471793],"category_scores_gemma":[0.00024332019,0.00015485316,0.000105151375,0.00046126673,0.000111093854,0.000065707616,0.000066269466,0.00033439606,0.000001463739],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013484656,0.0002053766,0.00063696556,0.0017172118,0.00008851431,0.0000017723912,0.001177352,0.0029110434,0.06992053,0.9219984,0.00091898843,0.0002890297],"study_design_scores_gemma":[0.0016818588,0.00036405743,0.05435581,0.0043606013,0.000101630736,0.00025699424,0.003140686,0.8940936,0.02817511,0.007906659,0.0046804994,0.0008825247],"about_ca_topic_score_codex":0.00007335853,"about_ca_topic_score_gemma":0.0000010953808,"teacher_disagreement_score":0.9140917,"about_ca_system_score_codex":0.00038647844,"about_ca_system_score_gemma":0.00007954734,"threshold_uncertainty_score":0.6314728},"labels":[],"label_agreement":null},{"id":"W2151888366","doi":"10.1109/ccece.1999.804885","title":"Reliability-based impact analysis of independent power producers for power system operations under deregulation","year":2003,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Electric power system; Deregulation; Electricity; Power (physics); Computer science; Constraint (computer-aided design); Transmission system; Electricity generation; Mains electricity; Electricity market; Electric power industry; Power transmission; Electric power transmission; Transmission (telecommunications); Engineering; Economics; Telecommunications; Electrical engineering","score_opus":0.008404312636430525,"score_gpt":0.2382491036943756,"score_spread":0.22984479105794509,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2151888366","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4532446,0.000056162102,0.54192275,0.000036072608,0.0003221445,0.0007595597,0.00005632447,0.00018849716,0.0034139266],"genre_scores_gemma":[0.99678797,6.188817e-7,0.002907435,0.000021578464,0.0000056197464,0.00009131204,0.000030213338,0.00002395646,0.00013128265],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99863464,0.00007491366,0.00051517854,0.0002962134,0.00021600227,0.00026306452],"domain_scores_gemma":[0.9988451,0.00009995924,0.000046873934,0.0006149849,0.0003063004,0.00008678543],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007299341,0.00018361109,0.0004003452,0.00027762956,0.000058927748,0.000031646694,0.00010844819,0.00012044498,0.00015064843],"category_scores_gemma":[0.00012097653,0.0001479864,0.0003468002,0.00072654587,0.000032822518,0.00015881246,0.0000061738333,0.000070441485,0.000006043555],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014474992,0.000052338833,0.0013686564,0.0001536289,0.00044398592,1.586092e-7,0.00014082114,0.9825773,0.0029411798,0.012067948,0.00023150699,0.0000079541],"study_design_scores_gemma":[0.001377914,0.00023570975,0.05069401,0.0001118717,0.00096607406,0.0000040933237,0.0016996354,0.9176713,0.025098134,0.0001770582,0.0012831438,0.000681022],"about_ca_topic_score_codex":0.00007392976,"about_ca_topic_score_gemma":0.00014236064,"teacher_disagreement_score":0.5435434,"about_ca_system_score_codex":0.00045922832,"about_ca_system_score_gemma":0.00010580595,"threshold_uncertainty_score":0.60347104},"labels":[],"label_agreement":null},{"id":"W2153208593","doi":"10.1109/tpwrs.2005.846098","title":"Approximate Methods for Event-Based Customer Interruption Cost Evaluation","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Computer science; Event (particle physics); Electric utility; Duration (music); Customer base; Operations research; Engineering; Business","score_opus":0.04041944229119199,"score_gpt":0.34656751311562056,"score_spread":0.3061480708244286,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2153208593","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0007164409,0.00033495243,0.9882624,0.00009313144,0.0063460926,0.0023280177,0.00007811185,0.0004600906,0.0013807245],"genre_scores_gemma":[0.99169594,0.000009673927,0.005323681,0.000052437623,0.00004129622,0.0023957032,0.000011214385,0.000059813683,0.00041024317],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99827886,0.00023228176,0.0005483292,0.00031697753,0.0002658613,0.00035772292],"domain_scores_gemma":[0.9989823,0.00017534815,0.000077074634,0.00044559364,0.00021078873,0.00010888471],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0017356451,0.00025409873,0.00031175857,0.00021584428,0.00011714541,0.00006896223,0.00016106649,0.00017657167,0.000081385646],"category_scores_gemma":[0.000015092992,0.00024565592,0.00021199409,0.00021624792,0.000031151867,0.00025348127,4.7138158e-7,0.00019341394,0.00016568169],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056393572,0.000112229696,7.8354844e-7,0.00026831753,0.00007601709,1.8308003e-7,0.00031506253,0.96705234,0.0045642247,0.000092282986,0.0011231612,0.026338983],"study_design_scores_gemma":[0.0008959963,0.00007377773,0.0000041853614,0.00018805484,0.00007048573,0.000008261689,0.00012985572,0.8863936,0.019407963,0.000008053359,0.09256332,0.00025643787],"about_ca_topic_score_codex":0.000016746648,"about_ca_topic_score_gemma":0.000027610457,"teacher_disagreement_score":0.9909795,"about_ca_system_score_codex":0.00060687185,"about_ca_system_score_gemma":0.00004833371,"threshold_uncertainty_score":0.9999996},"labels":[],"label_agreement":null},{"id":"W2153556004","doi":"10.1109/wescan.1995.493966","title":"Reliability cost/reliability worth assessment of station configurations","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Transformer; Busbar; Minification; Circuit breaker; Electric power system; Engineering; Computer science; Capital cost; Power (physics); Voltage; Electrical engineering","score_opus":0.015684297437725654,"score_gpt":0.24590342520766342,"score_spread":0.23021912776993778,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2153556004","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5688583,0.00008688968,0.14751643,0.00023596689,0.00080209854,0.001130725,0.00007238893,0.00058404065,0.28071314],"genre_scores_gemma":[0.99574465,0.00004538743,0.003298506,0.00002119057,0.000016497168,0.000084253814,0.00001421254,0.000013319626,0.0007619847],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987122,0.00006654335,0.0005487196,0.00022647575,0.00022098364,0.00022506596],"domain_scores_gemma":[0.99892694,0.00015524287,0.00005864317,0.0005639176,0.00020819964,0.00008707384],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00047717278,0.00014170204,0.00024906042,0.00004646563,0.000044794255,0.000018063596,0.00013279513,0.0000812794,0.0013231486],"category_scores_gemma":[0.00015230979,0.00012693345,0.000085043066,0.00021914052,0.000072157796,0.0002393341,0.000012711309,0.00014782154,0.00004293842],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005773185,0.0026932117,0.07015499,0.0043821028,0.0002937128,0.000009778061,0.0047051357,0.65941703,0.03946436,0.12325648,0.046356596,0.04920886],"study_design_scores_gemma":[0.0007670332,0.00011683286,0.26326025,0.0000796507,0.00003436173,0.0000037362047,0.00038044038,0.6978818,0.0058747935,0.0020770621,0.029057698,0.0004663211],"about_ca_topic_score_codex":0.000050511357,"about_ca_topic_score_gemma":0.00008983711,"teacher_disagreement_score":0.42688635,"about_ca_system_score_codex":0.00017605393,"about_ca_system_score_gemma":0.00002015729,"threshold_uncertainty_score":0.9995898},"labels":[],"label_agreement":null},{"id":"W2153593905","doi":"10.1109/tpwrs.2003.818742","title":"Assessment of customer supply reliability in performance-based contracts","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Mains electricity; Quality (philosophy); Order (exchange); Computer science; Electricity; Service quality; Electricity market; Competition (biology); Risk analysis (engineering); Service provider; Electric power industry; Service (business); Business; Power (physics); Engineering; Marketing; Finance","score_opus":0.007546141501752266,"score_gpt":0.21751388225527146,"score_spread":0.2099677407535192,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2153593905","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4224208,0.00015110952,0.549207,0.000018881365,0.005014889,0.0009349169,0.00006834048,0.00021343592,0.021970656],"genre_scores_gemma":[0.9993605,0.000030750656,0.00020663737,0.000015972759,0.0000035608916,0.00018642966,0.0000011970227,0.000032984917,0.00016193732],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99815416,0.0001665592,0.0007073892,0.00027662757,0.00031993468,0.00037533767],"domain_scores_gemma":[0.99897736,0.00017082122,0.00007238274,0.0005721759,0.00010393156,0.00010332759],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008666445,0.00023630592,0.00046227273,0.00022992313,0.000046180783,0.000021197213,0.0001492216,0.00016773661,0.000079535654],"category_scores_gemma":[0.000011102989,0.00022331189,0.00012986951,0.00037538362,0.000064236636,0.00018229577,3.2095946e-7,0.00035356535,0.000041347314],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023932247,0.00034297685,0.0029406745,0.0006570465,0.00003543956,0.000004728068,0.00016737242,0.9932921,0.0020033233,0.0002884872,0.00015040148,0.00009354161],"study_design_scores_gemma":[0.010489059,0.0014404577,0.076302595,0.0043281815,0.00016682646,0.00009878174,0.0012763651,0.66318893,0.14694542,0.00003574174,0.09298497,0.00274265],"about_ca_topic_score_codex":0.00009666424,"about_ca_topic_score_gemma":0.000039926017,"teacher_disagreement_score":0.5769397,"about_ca_system_score_codex":0.00037102395,"about_ca_system_score_gemma":0.00011787299,"threshold_uncertainty_score":0.91063946},"labels":[],"label_agreement":null},{"id":"W2153618882","doi":"10.1109/tpwrs.2009.2039652","title":"Application of a Joint Deterministic-Probabilistic Criterion to Wind Integrated Bulk Power System Planning","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Probabilistic logic; Electric power system; Wind power; Reliability engineering; Reliability (semiconductor); Mathematical optimization; Computer science; Engineering; Operations research; Power (physics); Mathematics; Electrical engineering; Artificial intelligence","score_opus":0.009722167966965418,"score_gpt":0.22009989360580268,"score_spread":0.21037772563883725,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2153618882","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1916489,0.000042918324,0.7980722,0.000017611872,0.0068112975,0.0010670408,0.00014098383,0.00051119586,0.0016878477],"genre_scores_gemma":[0.9991789,8.7524586e-7,0.00032372403,0.00001558405,0.000022897151,0.0002777472,0.000004336611,0.00006957345,0.00010638209],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99783957,0.00007326306,0.0009104285,0.00044133002,0.00033159892,0.00040380834],"domain_scores_gemma":[0.99843407,0.000115135124,0.00012616329,0.0008531335,0.00023896575,0.0002325245],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000499896,0.00035071556,0.0005640755,0.000313048,0.00011209669,0.000091480404,0.00028697742,0.00026341784,0.0000216327],"category_scores_gemma":[0.000027570399,0.0003294867,0.00015399099,0.00042125228,0.00006891046,0.00016584939,0.000002346467,0.00047125728,0.00015451355],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015953257,0.0003316876,0.000049542803,0.0033720585,0.00022301683,0.000036696718,0.0051104543,0.5667027,0.4207554,0.0017261083,0.000638875,0.00089390227],"study_design_scores_gemma":[0.002559224,0.00175587,0.0018370815,0.0076088347,0.00034154838,0.0010746673,0.008028207,0.82693267,0.09664955,0.000052241594,0.049990483,0.003169614],"about_ca_topic_score_codex":0.00016627042,"about_ca_topic_score_gemma":0.000032826378,"teacher_disagreement_score":0.80753,"about_ca_system_score_codex":0.00023244975,"about_ca_system_score_gemma":0.000048321795,"threshold_uncertainty_score":0.9999157},"labels":[],"label_agreement":null},{"id":"W2153672555","doi":"10.1109/tec.2006.874233","title":"A Simplified Wind Power Generation Model for Reliability Evaluation","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Conversion","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":586,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Wind speed; Turbine; Renewable energy; Reliability (semiconductor); Electric power system; Reliability engineering; Monte Carlo method; Electricity generation; Computer science; Engineering; Marine engineering; Meteorology; Power (physics); Electrical engineering; Aerospace engineering","score_opus":0.017182822015046662,"score_gpt":0.22016162927217564,"score_spread":0.20297880725712897,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2153672555","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08355982,0.000035427634,0.9134817,0.00008741723,0.001346094,0.00033798735,0.000044975,0.00022088076,0.0008856933],"genre_scores_gemma":[0.99818486,0.000016296346,0.00077894836,0.00007136589,0.000060852417,0.000121464145,0.000037096932,0.00002894565,0.0007001461],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988839,0.000045691297,0.00028795254,0.0002985741,0.00025606062,0.00022780873],"domain_scores_gemma":[0.9993311,0.000061220155,0.000035806486,0.00032691145,0.00019075074,0.000054174914],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034685532,0.00017439664,0.00015920239,0.00010052651,0.00015673233,0.000022972878,0.00008699173,0.00016586346,0.000054051732],"category_scores_gemma":[0.0000059803424,0.00017886769,0.00014014699,0.00012706858,0.00003083982,0.00021851997,5.46873e-7,0.000091499416,0.000013322078],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004299168,0.000069503425,0.0000013440003,0.000024703797,0.000012075976,1.6348525e-7,0.00005437369,0.9811526,0.0143267,0.00038372664,0.0025088796,0.0014229685],"study_design_scores_gemma":[0.00075388484,0.000053069474,0.000012037139,0.000015399884,0.00004041968,0.000001231538,0.000013639542,0.92147857,0.07354865,0.0005609457,0.0033419735,0.00018020331],"about_ca_topic_score_codex":0.00007946245,"about_ca_topic_score_gemma":0.00011065768,"teacher_disagreement_score":0.91462505,"about_ca_system_score_codex":0.00034739656,"about_ca_system_score_gemma":0.000049032118,"threshold_uncertainty_score":0.7294013},"labels":[],"label_agreement":null},{"id":"W2153991772","doi":"10.1109/tec.2003.822293","title":"Cost-Effective Wind Energy Utilization for Reliable Power Supply","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Conversion","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":217,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Reliability engineering; Reliability (semiconductor); Electric power system; Probabilistic logic; Computer science; Engineering; Automotive engineering; Power (physics); Electrical engineering","score_opus":0.013500355849030605,"score_gpt":0.21858612553987442,"score_spread":0.2050857696908438,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2153991772","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004257302,0.000116207535,0.9907963,0.00010371754,0.0026546137,0.0004450988,0.00005549182,0.00034811214,0.0012231561],"genre_scores_gemma":[0.9979768,0.00025735042,0.00035540506,0.0001962169,0.00003508111,0.00030428247,0.000021138647,0.000048127786,0.0008055902],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99896705,0.000023508303,0.0002224209,0.00030111527,0.00016119242,0.00032470727],"domain_scores_gemma":[0.9993758,0.00008687383,0.000033976863,0.00028470551,0.00010617457,0.00011244615],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009847549,0.00022119496,0.0002110537,0.00015661198,0.00017134525,0.000022889883,0.0001239826,0.00019485706,0.00007604122],"category_scores_gemma":[0.00000409922,0.00022809126,0.00015663984,0.00024359362,0.00004606481,0.00025857295,9.610608e-7,0.00010807293,0.00002600304],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019654464,0.00016051221,0.0000026799762,0.000085550906,0.00008567649,0.000004320967,0.00023782806,0.9755775,0.0055289636,0.0028174177,0.0016207831,0.013682234],"study_design_scores_gemma":[0.0027168319,0.00043150058,0.00003499565,0.0002079566,0.00005797915,0.0000133919175,0.00013943459,0.033527363,0.6625638,0.00069761317,0.29915217,0.00045696928],"about_ca_topic_score_codex":0.00024538388,"about_ca_topic_score_gemma":0.000105737345,"teacher_disagreement_score":0.9937195,"about_ca_system_score_codex":0.0004190644,"about_ca_system_score_gemma":0.00003984738,"threshold_uncertainty_score":0.9301292},"labels":[],"label_agreement":null},{"id":"W2154162136","doi":"10.1109/empd.1995.500717","title":"Adequacy assessment and worth evaluation and its application to NUG planning in composite generation and transmission systems","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Monte Carlo method; Transmission system; Computer science; Transmission (telecommunications); Range (aeronautics); Engineering; Telecommunications; Mathematics","score_opus":0.02974379914580159,"score_gpt":0.28125643622511093,"score_spread":0.2515126370793093,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2154162136","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82127386,0.004112834,0.17258988,0.00013055559,0.00006823202,0.0008053899,0.0000014919623,0.000056769568,0.0009609816],"genre_scores_gemma":[0.9990103,0.00017059516,0.00061792764,0.000017764853,0.000023888388,0.00011317436,0.000006529375,0.000007449645,0.000032353033],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993913,0.000040488594,0.00018234615,0.00017085222,0.00011739912,0.00009760017],"domain_scores_gemma":[0.9998018,0.00002114792,0.00001599598,0.00006792828,0.000027961032,0.00006517773],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034514876,0.000081244914,0.00010976559,0.00006436716,0.00003885527,0.00004478665,0.000020750253,0.000046518595,0.000003990238],"category_scores_gemma":[0.0000042184806,0.000075012686,0.000005003328,0.00008051962,0.00000465656,0.00014700009,0.000007639912,0.000053302738,0.0000015777501],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019018858,0.000080320235,0.025464064,0.0013267841,0.000035330013,0.000003212511,0.006687644,0.4842819,0.29010347,0.0031527902,0.0006226452,0.18822281],"study_design_scores_gemma":[0.00029206974,0.00002138059,0.020772565,0.000113678645,0.0000069955486,0.0000063122416,0.000062312116,0.97734916,0.0004501539,0.000010214962,0.000823661,0.00009148957],"about_ca_topic_score_codex":0.000022441243,"about_ca_topic_score_gemma":0.000013072826,"teacher_disagreement_score":0.49306726,"about_ca_system_score_codex":0.000064585576,"about_ca_system_score_gemma":0.0000029741373,"threshold_uncertainty_score":0.30589285},"labels":[],"label_agreement":null},{"id":"W2154642422","doi":"10.1049/iet-rpg.2009.0031","title":"Probabilistic evaluation of transient stability of a power system incorporating wind farms","year":2010,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":73,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Transient (computer programming); Electric power system; Fault (geology); Control theory (sociology); Context (archaeology); Turbine; Wind power; Probabilistic logic; Time domain; Engineering; Stability (learning theory); Computer science; Power (physics); Reliability engineering; Electrical engineering; Physics","score_opus":0.021058300522468393,"score_gpt":0.22589781439898265,"score_spread":0.20483951387651425,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2154642422","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.975843,0.00015918858,0.01577074,0.000019664973,0.0019029147,0.000937765,0.00004679308,0.00011238908,0.005207532],"genre_scores_gemma":[0.9986893,0.0000016940577,0.0011136453,0.0000035148257,0.00005930565,0.000062997395,0.000032925396,0.000025717098,0.000010878024],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99785113,0.00016054725,0.0008378188,0.00030298912,0.00062709174,0.00022041921],"domain_scores_gemma":[0.99826735,0.00004814751,0.00021660449,0.0006012756,0.0007920475,0.00007458119],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025780161,0.00019831651,0.00035784364,0.00009057152,0.00005221851,0.00002469076,0.00015258149,0.00017585188,0.000078144025],"category_scores_gemma":[0.0002458607,0.00018635124,0.00010105633,0.0002764755,0.00009180924,0.00021945924,0.000017320446,0.0001483291,0.0000036410743],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015093169,0.00008196121,0.00069410796,0.0004411834,0.00003169949,3.2645733e-7,0.0012620881,0.2403894,0.75582635,0.0009207655,0.00013324781,0.00020374262],"study_design_scores_gemma":[0.0009432598,0.00018770671,0.0023204174,0.00018739964,0.000108968845,0.000011136864,0.00070328265,0.47628328,0.5181717,0.00030974948,0.00042261367,0.00035042284],"about_ca_topic_score_codex":0.00016030234,"about_ca_topic_score_gemma":0.0011023022,"teacher_disagreement_score":0.23765463,"about_ca_system_score_codex":0.00015471372,"about_ca_system_score_gemma":0.00018157983,"threshold_uncertainty_score":0.75991833},"labels":[],"label_agreement":null},{"id":"W2154860395","doi":"10.1109/tpwrs.2009.2030282","title":"Supply Adequacy Assessment of Distribution System Including Wind-Based DG During Different Modes of Operation","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":94,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Islanding; Reliability engineering; Wind power; Monte Carlo method; Distributed generation; Reliability (semiconductor); Electric power system; Computer science; Engineering; Power (physics); Renewable energy; Electrical engineering; Mathematics; Statistics","score_opus":0.010383875971778839,"score_gpt":0.23441464658531802,"score_spread":0.22403077061353918,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2154860395","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33336234,0.000107821914,0.6641965,0.00002139583,0.0010292805,0.00048346652,0.00022304276,0.00019128392,0.00038486486],"genre_scores_gemma":[0.9997632,0.000014483765,0.00007123634,0.0000028522486,0.000013251934,0.000053304706,0.000018486988,0.000024479403,0.000038692142],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99805087,0.00011931948,0.0008512344,0.0002589355,0.00043521097,0.00028445703],"domain_scores_gemma":[0.99911284,0.00006767699,0.00015190811,0.00044905316,0.00012983508,0.00008869535],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003021384,0.0002662613,0.0005416639,0.00016387302,0.00011844789,0.00003875681,0.0001893272,0.00015058472,0.000008487349],"category_scores_gemma":[0.0000034314974,0.00024441627,0.00018357935,0.00021367782,0.000033269796,0.00021134247,0.0000010765705,0.00020576616,0.0000034504287],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040313233,0.00020601602,0.00009902522,0.0016579491,0.000069137925,0.000002487378,0.00019409074,0.8956911,0.10082199,0.0011358134,0.000021746802,0.00006032254],"study_design_scores_gemma":[0.0013227819,0.00040069906,0.004633999,0.0030156623,0.000080885555,0.000018672441,0.00067109946,0.63709784,0.35229486,0.0000051597226,0.00006279074,0.00039553936],"about_ca_topic_score_codex":0.000045800833,"about_ca_topic_score_gemma":0.000007946763,"teacher_disagreement_score":0.66640085,"about_ca_system_score_codex":0.00063978136,"about_ca_system_score_gemma":0.00004320213,"threshold_uncertainty_score":0.99670064},"labels":[],"label_agreement":null},{"id":"W2155167726","doi":"","title":"Assessment of component criticality in customer delivery systems","year":2004,"lang":"en","type":"article","venue":"IEEE International Conference on Probabilistic Methods Applied to Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Component (thermodynamics); Reliability engineering; Transmission system; Criticality; Computer science; Redundancy (engineering); Electric power system; Electricity; Reliability (semiconductor); Transformer; Transmission (telecommunications); Risk analysis (engineering); Business; Telecommunications; Engineering; Power (physics); Electrical engineering; Voltage","score_opus":0.05734504417850268,"score_gpt":0.3600110470297265,"score_spread":0.30266600285122386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2155167726","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05191101,0.00007047429,0.8020184,0.00014703066,0.00886473,0.0020308373,0.0001358042,0.0002012315,0.13462049],"genre_scores_gemma":[0.98476946,0.000011792629,0.014321527,0.000046438185,0.000057850175,0.0006856225,0.000009677275,0.000036603877,0.000061013412],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.996666,0.00027818812,0.0013277612,0.0005715035,0.00071824336,0.0004383023],"domain_scores_gemma":[0.9981784,0.00040680697,0.00015041039,0.0006126135,0.0004372218,0.000214505],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0023552806,0.0003599222,0.00079566275,0.00032679198,0.000032457585,0.00011284954,0.00064696436,0.00018282025,0.000045127694],"category_scores_gemma":[0.00016831531,0.00033962165,0.000098447956,0.00027626296,0.000114290764,0.0000916734,0.00006304992,0.000367884,0.00007536214],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003378353,0.00018611577,0.00005788194,0.00046616854,0.00006333157,0.000008522433,0.00020854795,0.30687925,0.021271406,0.67059916,0.000083038554,0.00014280721],"study_design_scores_gemma":[0.011931763,0.0017063353,0.01847643,0.015254014,0.00023955487,0.00025066748,0.0070317173,0.8231032,0.020766106,0.061651334,0.033004045,0.006584863],"about_ca_topic_score_codex":0.0004091153,"about_ca_topic_score_gemma":0.000021871725,"teacher_disagreement_score":0.93285847,"about_ca_system_score_codex":0.0010461337,"about_ca_system_score_gemma":0.00016525158,"threshold_uncertainty_score":0.9999056},"labels":[],"label_agreement":null},{"id":"W2155246104","doi":"10.1109/pess.2001.970334","title":"A customer value-added reliability approach to transmission system reinforcement planning","year":2001,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Computer science; Deregulation; Reinforcement learning; Electricity market; Transmission system; Electric power system; Investment (military); Electricity; Service (business); Transmission (telecommunications); Risk analysis (engineering); Power (physics); Engineering; Business; Telecommunications; Economics; Marketing","score_opus":0.012061210455591975,"score_gpt":0.21596602593389225,"score_spread":0.20390481547830028,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2155246104","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013159528,0.000083810635,0.6219121,0.00007208767,0.0003383895,0.0006028467,0.0000015366965,0.00095020374,0.36287948],"genre_scores_gemma":[0.9906268,0.000009584358,0.006536885,0.00008394588,0.00006142674,0.000121959245,0.000005830183,0.000031097636,0.0025224546],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99838996,0.000042712993,0.00046580416,0.00034118388,0.00029393757,0.00046641324],"domain_scores_gemma":[0.9991097,0.000035805064,0.000023437355,0.00051558204,0.000051261995,0.00026421132],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005917561,0.00022946611,0.0003080458,0.000093431634,0.0000790599,0.000034757402,0.00023263984,0.00012002527,0.000038388047],"category_scores_gemma":[0.000021646289,0.0001643723,0.00010298713,0.000334116,0.000018077444,0.00014253493,0.000030264455,0.00015968681,0.00020861803],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000668896,0.00005000316,0.00017155721,0.0009440853,0.000031899483,0.000009354357,0.0015139456,0.97903454,0.0011751157,0.004936839,0.0103134345,0.0017523118],"study_design_scores_gemma":[0.0005814105,0.00006423844,0.0004026222,0.0004479567,0.000023709326,0.000060085444,0.0009345284,0.5741692,0.0016300775,0.00003106785,0.42114496,0.0005101223],"about_ca_topic_score_codex":0.00011742259,"about_ca_topic_score_gemma":5.4216844e-7,"teacher_disagreement_score":0.9774673,"about_ca_system_score_codex":0.00032297548,"about_ca_system_score_gemma":0.000017498398,"threshold_uncertainty_score":0.6702907},"labels":[],"label_agreement":null},{"id":"W2155517779","doi":"10.1109/ccece.1999.804922","title":"Evaluating delivery point reliability performance for network configurations","year":2003,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Computer science; Point (geometry); Failure rate; Bayes' theorem; Electric network; Measure (data warehouse); Component (thermodynamics); Network element; Power (physics); Engineering; Computer network; Data mining; Voltage; Electrical engineering; Mathematics; Artificial intelligence; Bayesian probability","score_opus":0.025770587488245414,"score_gpt":0.25853391739298076,"score_spread":0.23276332990473536,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2155517779","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5212775,0.00042277825,0.37756532,0.00011887838,0.0019644795,0.001315345,0.000012280349,0.00068769907,0.096635714],"genre_scores_gemma":[0.9771173,0.000029237211,0.021961058,0.000081453196,0.00006547263,0.00016907173,0.0000049182718,0.000017193743,0.00055431714],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99903846,0.00004386316,0.00031143345,0.00018106039,0.00010185099,0.0003233364],"domain_scores_gemma":[0.9992565,0.00020685095,0.000025264218,0.00030929572,0.00014210335,0.00005999259],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011373899,0.00011937474,0.00015664358,0.00001659195,0.0001292046,0.000023586086,0.0000843624,0.00006341603,0.00012687009],"category_scores_gemma":[0.0002904491,0.0001079364,0.00007173297,0.000114164905,0.000027289605,0.00017472524,0.000007397784,0.000087169545,0.000042020423],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018588453,0.000030572304,0.0010512867,0.0004728575,0.000032885906,2.8227512e-7,0.00021651703,0.95506394,0.0017060922,0.02140935,0.015869247,0.0041283956],"study_design_scores_gemma":[0.0006346879,0.00016246033,0.0016104014,0.00010210546,0.00002614383,0.000009990359,0.00013558644,0.9096807,0.005764418,0.0029291895,0.07855761,0.00038667372],"about_ca_topic_score_codex":0.000005255556,"about_ca_topic_score_gemma":0.000011359736,"teacher_disagreement_score":0.45583978,"about_ca_system_score_codex":0.00008862984,"about_ca_system_score_gemma":0.00003897815,"threshold_uncertainty_score":0.44015187},"labels":[],"label_agreement":null},{"id":"W2156471568","doi":"10.1109/ccece.2007.145","title":"Life Cycle Analysis Methodology for Distribution Feeder Reclosers","year":2007,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Recloser; Engineering; Risk analysis (engineering); Reliability engineering; Investment (military); Return on investment; Cost–benefit analysis; Asset management; Life-cycle assessment; Environmental economics; Computer science; Production (economics); Business; Economics","score_opus":0.02936468064200043,"score_gpt":0.2838414146684507,"score_spread":0.25447673402645027,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2156471568","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.037019726,0.000099675985,0.9578816,0.00019959839,0.00039656713,0.00014594529,0.00002571036,0.00022565041,0.004005525],"genre_scores_gemma":[0.98461795,0.000009480409,0.014841419,0.00012182004,0.000054023178,0.00001623446,0.00005101821,0.000008722984,0.0002793159],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993036,0.000025767113,0.0002214449,0.00013400924,0.000055498953,0.00025968038],"domain_scores_gemma":[0.9993134,0.00032262233,0.000019256078,0.00017768305,0.000049214363,0.00011783172],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012107069,0.00007907728,0.00020578118,0.000059275335,0.000035043915,0.000009390805,0.00007583362,0.000090409514,0.000049810245],"category_scores_gemma":[0.00048499292,0.0000702177,0.00014601607,0.00033557496,0.00001907474,0.00005267355,0.000009235393,0.00005072433,0.000014863998],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007008936,0.00031108552,0.017747868,0.0015302879,0.009821763,0.000017076525,0.002117809,0.46497732,0.020720359,0.22044604,0.18994822,0.07166128],"study_design_scores_gemma":[0.0018591546,0.00019345434,0.06642095,0.00003273743,0.0015102485,0.000010693955,0.0018212395,0.37386328,0.04294313,0.008441157,0.5015849,0.0013190993],"about_ca_topic_score_codex":0.00006162263,"about_ca_topic_score_gemma":0.00023508184,"teacher_disagreement_score":0.9475982,"about_ca_system_score_codex":0.000070747614,"about_ca_system_score_gemma":0.000009047399,"threshold_uncertainty_score":0.28633946},"labels":[],"label_agreement":null},{"id":"W2156553131","doi":"10.1109/pcicon.2011.6085866","title":"PWM drive overvoltage trips in electrochemical plants","year":2011,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Andritz (Canada)","funders":"","keywords":"Overvoltage; Tripping; Voltage; TRIPS architecture; Transient (computer programming); Resilience (materials science); Reliability engineering; Computer science; Electrical engineering; Engineering; Materials science; Circuit breaker","score_opus":0.010984454722782252,"score_gpt":0.17343076156938173,"score_spread":0.16244630684659947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2156553131","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7384251,0.00023974213,0.015853316,0.000011327685,0.00033614528,0.00018503291,0.000003951424,0.00037682639,0.24456857],"genre_scores_gemma":[0.99908847,0.00003619035,0.00039466616,0.000038093192,0.000017852195,0.000013202706,0.0000017122868,0.000010123669,0.0003996809],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99941945,0.000008134268,0.00015386754,0.00011461367,0.000059780756,0.00024417584],"domain_scores_gemma":[0.99976856,0.000019785803,0.0000079306255,0.00014830517,0.000006942266,0.000048496026],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000085286956,0.00008468568,0.00012619147,0.00003834299,0.00000660454,0.0000040072405,0.00010885898,0.00007227881,0.0001661886],"category_scores_gemma":[0.00001841867,0.000075183525,0.000029629166,0.00007032935,0.00001321141,0.00006872827,0.000014063443,0.00012582027,0.00011281501],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004311333,0.0007671376,0.049054507,0.00096202904,0.00023929305,0.00038010586,0.0144374315,0.00022486602,0.8178708,0.051808085,0.05779049,0.0060341405],"study_design_scores_gemma":[0.002084232,0.00014780722,0.03911631,0.00021858541,0.000010875431,0.00007052922,0.0005207104,0.015907034,0.8937283,0.005568751,0.041624818,0.0010020044],"about_ca_topic_score_codex":0.00005770936,"about_ca_topic_score_gemma":0.00010941189,"teacher_disagreement_score":0.2606634,"about_ca_system_score_codex":0.000057268837,"about_ca_system_score_gemma":0.0000072630464,"threshold_uncertainty_score":0.3065895},"labels":[],"label_agreement":null},{"id":"W2157310455","doi":"10.1109/ccece.2002.1015176","title":"A comparison of North American Generating Unit Outage parameters and unavailability indices","year":2003,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"Canadian Electricity Association","keywords":"Derating; Unavailability; Reliability (semiconductor); Reliability engineering; Unit (ring theory); State (computer science); Computer science; Electricity; Engineering; Electrical engineering; Mathematics; Power (physics); Algorithm","score_opus":0.021978516839151453,"score_gpt":0.25810362721131297,"score_spread":0.23612511037216152,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2157310455","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99009836,0.00012292276,0.006733675,0.0000063484727,0.00008738029,0.00012589392,0.000006405519,0.0000919062,0.0027271372],"genre_scores_gemma":[0.99302197,0.000012640292,0.006895811,0.000018504963,0.0000036126917,0.000007193139,0.0000015157497,0.000008875429,0.00002989908],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99925065,0.00005781876,0.00029069616,0.00014364051,0.00008660937,0.00017059447],"domain_scores_gemma":[0.999553,0.00009753392,0.000058369,0.00019869291,0.000026698859,0.00006566105],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020097126,0.00010542239,0.0002811189,0.000035402158,0.000029447187,0.000014402178,0.00006611073,0.000019937741,0.000010134472],"category_scores_gemma":[0.00010067849,0.00009203455,0.000027889457,0.0001982557,0.00013251395,0.00006457581,0.000013027211,0.000092553055,0.0000036508166],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002251781,0.000026514299,0.9860316,0.00015652807,0.000019084857,4.4596203e-7,0.0006011985,0.009264959,0.00030668036,0.00019046896,0.00006732772,0.0033329765],"study_design_scores_gemma":[0.0005764903,0.0003240551,0.8424025,0.000069504684,0.000048544316,0.000008632115,0.002755928,0.119275555,0.02587941,0.00006119979,0.007894375,0.0007037911],"about_ca_topic_score_codex":0.00016179604,"about_ca_topic_score_gemma":0.0013460284,"teacher_disagreement_score":0.14362906,"about_ca_system_score_codex":0.000018723258,"about_ca_system_score_gemma":0.000010018889,"threshold_uncertainty_score":0.37530598},"labels":[],"label_agreement":null},{"id":"W2157717363","doi":"10.1109/59.867155","title":"Cost related reliability measures for power system equipment","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Markov chain; Component (thermodynamics); Electric power system; Markov model; Computer science; Markov process; Reliability theory; Mathematical optimization; Power (physics); Operations research; Engineering; Failure rate; Mathematics; Statistics","score_opus":0.01456962781671844,"score_gpt":0.22217478816886446,"score_spread":0.20760516035214602,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2157717363","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01614848,0.00066738494,0.9363819,0.000091007096,0.012373258,0.0036406072,0.00041808022,0.0021026605,0.028176617],"genre_scores_gemma":[0.99378085,0.000041696538,0.00011368416,0.000025777917,0.000018588298,0.0012627032,0.0000053952417,0.00010361363,0.004647682],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99701846,0.00015981359,0.001030532,0.00060217205,0.00047700937,0.00071199826],"domain_scores_gemma":[0.998255,0.0001998043,0.000075472206,0.0010240447,0.00018339026,0.00026225668],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0010192244,0.00045651954,0.00063392706,0.00015203611,0.00025946565,0.00010680393,0.00034209204,0.0003559147,0.00028808528],"category_scores_gemma":[0.000010328503,0.0004242933,0.00037077317,0.00033307087,0.00008068038,0.00025268443,8.8462696e-7,0.00037064755,0.00080483267],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003809276,0.00041716924,0.000013331581,0.0017907264,0.0005278342,0.00002067587,0.0021603121,0.97786194,0.0012562993,0.0007947651,0.012176068,0.0025999765],"study_design_scores_gemma":[0.004674664,0.0010196451,0.00013749003,0.0027275265,0.00027942832,0.0003576398,0.0026132562,0.13581966,0.009829671,0.000067235436,0.8401404,0.0023333712],"about_ca_topic_score_codex":0.00008657126,"about_ca_topic_score_gemma":0.000018206614,"teacher_disagreement_score":0.9776324,"about_ca_system_score_codex":0.0008648722,"about_ca_system_score_gemma":0.000052741725,"threshold_uncertainty_score":0.9999732},"labels":[],"label_agreement":null},{"id":"W2158028795","doi":"10.1109/psce.2009.4840179","title":"Proposition for a novel locational reliability index in power systems","year":2009,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Electric power system; Computer science; Electricity; Index (typography); Power (physics); Mains electricity; Generator (circuit theory); Engineering; Electrical engineering","score_opus":0.006464142205109538,"score_gpt":0.2102956365713909,"score_spread":0.20383149436628134,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2158028795","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05684107,0.0001213745,0.93055445,0.00042601474,0.0005809017,0.0011058074,0.00001815293,0.00026425856,0.010087977],"genre_scores_gemma":[0.99858356,0.00000141393,0.0010087155,0.000059663675,0.000021415239,0.00010381725,0.000008295682,0.0000075125686,0.00020558467],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992707,0.000009132176,0.0002671182,0.000162003,0.00010316705,0.00018789874],"domain_scores_gemma":[0.99963367,0.000038732764,0.000017242384,0.00018946476,0.000082711515,0.000038176608],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033759204,0.000092095994,0.00013466687,0.00005281132,0.00001892644,0.000021440457,0.00008005022,0.00008369907,0.000007823162],"category_scores_gemma":[0.000054973854,0.00008184144,0.00003691061,0.00012597261,0.000014035453,0.00014211965,0.0000043115015,0.00007179019,0.0000101203],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024301637,0.0010287183,0.0058226683,0.0017757203,0.00003470374,0.0000032397086,0.0009812666,0.74244905,0.01799838,0.21740077,0.010530485,0.0017320039],"study_design_scores_gemma":[0.0017931063,0.00022686126,0.106053196,0.00026747998,0.0000073799715,0.000023664968,0.00022600748,0.86933935,0.0011682775,0.0042230934,0.016145851,0.00052573526],"about_ca_topic_score_codex":0.000035511715,"about_ca_topic_score_gemma":0.000018022292,"teacher_disagreement_score":0.9417425,"about_ca_system_score_codex":0.00018920703,"about_ca_system_score_gemma":0.000024106435,"threshold_uncertainty_score":0.3337397},"labels":[],"label_agreement":null},{"id":"W2158115858","doi":"10.2139/ssrn.898127","title":"The Opportunity Cost of Electricity Outages and Privatization of Substations in Nepal","year":2006,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Electricity; Business; Natural resource economics; Environmental economics; Operations management; Economics; Engineering; Electrical engineering","score_opus":0.00485641336348014,"score_gpt":0.19848320562234878,"score_spread":0.19362679225886864,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2158115858","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94499063,0.0028052835,0.051057182,0.00012895494,0.00007281663,0.00016159115,0.0000040826317,0.00001489234,0.00076455896],"genre_scores_gemma":[0.99694496,0.0029236067,0.00003301854,0.0000022521774,0.0000172172,0.000003394084,0.0000019548777,0.0000062931617,0.00006729723],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9989984,0.000046441906,0.000313488,0.00004861397,0.00009888785,0.0004941664],"domain_scores_gemma":[0.99965113,0.000090049674,0.00009329683,0.00007730447,0.00006683116,0.000021394892],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009784264,0.000059512335,0.000113485155,0.000062065345,0.000052774172,0.00000952274,0.000087883454,0.00003385219,0.0000010703321],"category_scores_gemma":[0.00010487708,0.000046040906,0.000025205143,0.00019300156,0.000043710916,0.000083994004,0.00000641104,0.00039378923,1.7433553e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008274972,0.00018097326,0.12289024,0.0001823776,0.00014033254,0.000002417051,0.0006456161,0.027104344,0.012929494,0.7951989,0.00026896514,0.040373597],"study_design_scores_gemma":[0.0027060243,0.00052609894,0.37190887,0.00023422464,0.0000743227,0.000297273,0.002870977,0.05026248,0.01327116,0.55227536,0.005007179,0.0005660304],"about_ca_topic_score_codex":0.00014912317,"about_ca_topic_score_gemma":0.0040028165,"teacher_disagreement_score":0.24901862,"about_ca_system_score_codex":0.00020582875,"about_ca_system_score_gemma":0.00029214425,"threshold_uncertainty_score":0.22336656},"labels":[],"label_agreement":null},{"id":"W2159264770","doi":"10.1080/15325000490446601","title":"Maintenance Scheduling Optimization Using a Genetic Algorithm (GA) with a Probabilistic Fitness Function","year":2004,"lang":"en","type":"article","venue":"Electric Power Components and Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Probabilistic logic; Preventive maintenance; Reliability engineering; Scheduling (production processes); Genetic algorithm; Electric power system; Reliability (semiconductor); Fitness function; Computer science; Mathematical optimization; Engineering; Power (physics); Mathematics; Machine learning","score_opus":0.00989532743521837,"score_gpt":0.18774563617751622,"score_spread":0.17785030874229785,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2159264770","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26664636,0.0019786092,0.7296522,0.000007582028,0.0008263493,0.00053306227,0.0000044375643,0.00018978333,0.00016159793],"genre_scores_gemma":[0.9895639,0.00006058947,0.010127134,0.000013965325,0.00009055362,0.000058952442,0.000006367952,0.00004650053,0.000032061027],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99847215,0.00006149535,0.00038727527,0.00035478795,0.0002616333,0.00046266714],"domain_scores_gemma":[0.99932474,0.000031055803,0.0000914444,0.00025504516,0.00017355286,0.00012417453],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024914046,0.0002638037,0.00034383664,0.00013187484,0.00016884142,0.00011860933,0.00011187729,0.00010314061,0.0000028027218],"category_scores_gemma":[0.00003516397,0.0002191737,0.000038755676,0.00042677042,0.000038530987,0.00018373826,0.000018473755,0.0002015175,0.000004972112],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027866638,0.000031797965,0.00010595981,0.00020385715,0.000056447363,0.0000139244075,0.00014454425,0.9975859,0.0012140361,0.00021227161,0.0000063664966,0.000397055],"study_design_scores_gemma":[0.0010902676,0.00016514999,0.001153119,0.0005230874,0.000041192234,0.00022841689,0.000069650145,0.99584085,0.0000423457,0.00010047205,0.0004093861,0.0003360405],"about_ca_topic_score_codex":0.00014627872,"about_ca_topic_score_gemma":0.0000023848468,"teacher_disagreement_score":0.7229175,"about_ca_system_score_codex":0.00030162517,"about_ca_system_score_gemma":0.00005002418,"threshold_uncertainty_score":0.89376444},"labels":[],"label_agreement":null},{"id":"W2159812029","doi":"10.1109/ptc.2003.1304718","title":"Probabilistic evaluation of voltage sag in transmission systems","year":2004,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Voltage sag; Reliability (semiconductor); Monte Carlo method; Probabilistic logic; Electric power system; Voltage; Transmission system; MATLAB; Context (archaeology); Reliability engineering; Computer science; Transmission (telecommunications); Power transmission; Electronic engineering; Power (physics); Engineering; Power quality; Electrical engineering; Mathematics; Telecommunications; Statistics","score_opus":0.01655294125921828,"score_gpt":0.23047348835298348,"score_spread":0.2139205470937652,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2159812029","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7095809,0.0020556776,0.25558946,0.000041955318,0.0006512056,0.0013927543,0.0000045858133,0.0002139087,0.030469561],"genre_scores_gemma":[0.99972904,0.00001517565,0.00014929593,0.000001932127,0.000008888915,0.000043506592,0.0000015912532,0.0000075386874,0.000043009757],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992826,0.00002613917,0.00026408752,0.00009290999,0.00022049327,0.00011375219],"domain_scores_gemma":[0.99972945,0.000018433166,0.000015923346,0.00014233775,0.000065388675,0.00002847958],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000772852,0.00006603153,0.00013349993,0.000050565104,0.0000064098576,0.000005225366,0.00006105753,0.00005232004,0.00002029609],"category_scores_gemma":[0.000047591147,0.00005489647,0.000025037463,0.0001335333,0.000013618904,0.0000688431,0.0000032814555,0.000050762934,0.000009602937],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003885151,0.000035907266,0.00007979835,0.0006511478,0.0000047877734,7.3271167e-7,0.00039886622,0.9843691,0.007688776,0.0038026732,0.00003396085,0.0029303816],"study_design_scores_gemma":[0.0022182101,0.00007189503,0.0053213043,0.0012774573,0.00003402647,0.000008863895,0.00032507605,0.97438574,0.0070562465,0.006903921,0.0021293904,0.0002678469],"about_ca_topic_score_codex":0.00020673667,"about_ca_topic_score_gemma":0.00007596883,"teacher_disagreement_score":0.29014817,"about_ca_system_score_codex":0.00019981523,"about_ca_system_score_gemma":0.000040222407,"threshold_uncertainty_score":0.2238613},"labels":[],"label_agreement":null},{"id":"W2160587035","doi":"10.1109/naps.2008.5307339","title":"Load carrying capability of wind integrated power systems","year":2008,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Electric power system; Renewable energy; Reliability engineering; Probabilistic logic; Base load power plant; Wind speed; Computer science; Automotive engineering; Power (physics); Power system simulation; Environmental science; Engineering; Marine engineering; Distributed generation; Electrical engineering; Meteorology","score_opus":0.01000032455736166,"score_gpt":0.18476016514384838,"score_spread":0.17475984058648672,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2160587035","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9260938,0.00080299063,0.010950617,0.000012232516,0.0010961,0.0002626276,0.00001733343,0.00034433606,0.06041993],"genre_scores_gemma":[0.99908847,0.000020602156,0.00014651436,0.00000707923,0.00001111134,0.000006704616,0.0000015830633,0.000015514475,0.00070241897],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989945,0.000034408444,0.00038328438,0.00016273739,0.00019668147,0.0002283828],"domain_scores_gemma":[0.99927926,0.000053307365,0.000031978034,0.00038534502,0.00017807151,0.00007201331],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028647482,0.00013805671,0.0003008529,0.00003704871,0.000032234355,0.0000068962177,0.00014267272,0.00009525492,0.00007126998],"category_scores_gemma":[0.00009378757,0.00011194834,0.00007497219,0.00018578403,0.00009163447,0.000105495164,0.000017763074,0.00012654827,0.000040813047],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002881905,0.0010175438,0.16404901,0.01077494,0.0013901272,0.00030440453,0.038791183,0.42512843,0.22553794,0.022988675,0.10815891,0.001570659],"study_design_scores_gemma":[0.006036001,0.0008618765,0.10179483,0.0028065355,0.00015105375,0.0014050625,0.014357889,0.250685,0.14283901,0.00048806902,0.4736758,0.004898867],"about_ca_topic_score_codex":0.0008925125,"about_ca_topic_score_gemma":0.00003870994,"teacher_disagreement_score":0.3655169,"about_ca_system_score_codex":0.00019644614,"about_ca_system_score_gemma":0.00006415658,"threshold_uncertainty_score":0.4565121},"labels":[],"label_agreement":null},{"id":"W2161083353","doi":"10.1109/pess.2001.970035","title":"Transmission system reliability evaluation incorporating HVDC links and FACTS devices","year":2001,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Transmission system; Transmission (telecommunications); Reliability engineering; Computer science; Electrical impedance; Point (geometry); Electronic engineering; Range (aeronautics); Electric power transmission; Engineering; Electrical engineering; Telecommunications; Power (physics); Mathematics; Physics","score_opus":0.014571496491878517,"score_gpt":0.23154748612186085,"score_spread":0.21697598962998232,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2161083353","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8676887,0.0009023242,0.09821965,0.00030459644,0.00039470597,0.0006392443,0.0000022600009,0.00073700945,0.031111484],"genre_scores_gemma":[0.9982361,0.000034939127,0.0015314431,0.000023353665,0.000041859497,0.00003215901,0.00000482492,0.000014364371,0.00008091427],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989447,0.00010969508,0.00029264318,0.00023142013,0.00023538232,0.0001861665],"domain_scores_gemma":[0.9994298,0.0000915646,0.000038789225,0.00022599378,0.0001096829,0.00010413491],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001432866,0.00014015374,0.00018534496,0.00004105089,0.00009471969,0.00004208848,0.00007825793,0.00017955546,0.000022917699],"category_scores_gemma":[0.000068633526,0.00011344133,0.00003414592,0.00014152445,0.000025521373,0.00025333348,0.000014079462,0.00021729113,0.000019895659],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016593245,0.00021855468,0.08465423,0.015088055,0.0001871308,0.00004964639,0.0056546316,0.18778738,0.030703988,0.009270383,0.0029263552,0.6632937],"study_design_scores_gemma":[0.000504314,0.0000459484,0.013698204,0.00047938255,0.000035727782,0.000042883017,0.0007227613,0.9714385,0.0015824183,0.00038910293,0.010766888,0.0002938233],"about_ca_topic_score_codex":0.000047579444,"about_ca_topic_score_gemma":0.000045762354,"teacher_disagreement_score":0.7836512,"about_ca_system_score_codex":0.00014518558,"about_ca_system_score_gemma":0.000023920944,"threshold_uncertainty_score":0.46260032},"labels":[],"label_agreement":null},{"id":"W2161244159","doi":"10.1109/pes.2003.1270441","title":"Application of the value-based approach to the planning of customer delivery systems","year":2004,"lang":"en","type":"article","venue":"2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Margin (machine learning); Reliability (semiconductor); Electricity; Electricity market; Computer science; Order (exchange); Cover (algebra); Electric power system; Function (biology); Transmission system; Reliability engineering; Operations research; Environmental economics; Transmission (telecommunications); Business; Engineering; Telecommunications; Economics; Finance; Power (physics)","score_opus":0.006444946268651704,"score_gpt":0.19004868246003026,"score_spread":0.18360373619137857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2161244159","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5019286,0.0007664895,0.4890841,0.00007795642,0.0052278372,0.0013534426,0.00006146087,0.00037267493,0.0011274158],"genre_scores_gemma":[0.9778614,0.000021663947,0.021185977,0.00013491123,0.00033723054,0.00024321159,0.000007888488,0.00010796667,0.000099728764],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99747515,0.00007409843,0.00079907285,0.00043146856,0.0005740673,0.0006461159],"domain_scores_gemma":[0.9981649,0.00011467806,0.00020821783,0.0009645474,0.00040840203,0.00013923495],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0011090665,0.00043833515,0.0005297207,0.00007199532,0.00014507804,0.000041393974,0.0008067448,0.0002519046,9.157144e-7],"category_scores_gemma":[0.00014161103,0.00033043657,0.00037422753,0.0010306066,0.00009300945,0.00010101738,0.000051413495,0.00038142793,0.000022270826],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000052623636,0.00004213709,0.00012978615,0.0006050237,0.00009646917,3.3204816e-7,0.0012221031,0.8467112,0.14758883,0.00030555847,0.0032744582,0.000018799139],"study_design_scores_gemma":[0.00053729524,0.000035634206,0.0003464461,0.0006594149,0.00006952412,0.000011846696,0.0002526765,0.94016075,0.04997092,0.0000039651586,0.00745371,0.00049782405],"about_ca_topic_score_codex":0.0002938749,"about_ca_topic_score_gemma":0.0000015824796,"teacher_disagreement_score":0.47593278,"about_ca_system_score_codex":0.0004207588,"about_ca_system_score_gemma":0.00012826393,"threshold_uncertainty_score":0.99991477},"labels":[],"label_agreement":null},{"id":"W2161735191","doi":"10.1109/naps.2008.5307311","title":"Stochastic modeling of future wind generation scenarios","year":2008,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Wind power; Computer science; Environmental science; Meteorology; Wind speed; Engineering; Geography","score_opus":0.017496548692012504,"score_gpt":0.19015328731303346,"score_spread":0.17265673862102096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2161735191","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4329077,0.00026774098,0.56463486,0.000028246377,0.0004637519,0.00007943703,0.0000017410821,0.000092112314,0.0015243848],"genre_scores_gemma":[0.9985817,0.000023658424,0.0010434301,0.000013938524,0.00019561875,0.0000023876567,0.0000024957037,0.000008679588,0.00012807433],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959064,0.000005569314,0.00015097248,0.00007393644,0.00007962158,0.00009925183],"domain_scores_gemma":[0.99978495,0.0000051370653,0.000009776964,0.00013265818,0.000039417322,0.000028088556],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000053145683,0.00006196989,0.00009950655,0.000026217956,0.000027327816,0.0000026445823,0.000050455117,0.000048547372,0.000022899841],"category_scores_gemma":[0.0000086047785,0.00005392543,0.000029953497,0.00005807864,0.000011045083,0.00007201212,0.0000065609265,0.000053440614,0.000012952658],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000011776848,0.000005516083,0.0000106524785,0.000027202184,0.0000061683354,7.2381835e-7,0.0003035898,0.99508107,0.0035610804,0.0003177213,0.00057717576,0.00010793376],"study_design_scores_gemma":[0.00009185708,0.000008636222,0.000022893844,0.00001261804,0.000002634772,0.000012143736,0.000051714218,0.9988717,0.0006556742,0.000017153063,0.00018994136,0.00006305116],"about_ca_topic_score_codex":0.000016074768,"about_ca_topic_score_gemma":0.000016189353,"teacher_disagreement_score":0.565674,"about_ca_system_score_codex":0.000022366092,"about_ca_system_score_gemma":0.000011992246,"threshold_uncertainty_score":0.21990152},"labels":[],"label_agreement":null},{"id":"W2161972553","doi":"","title":"Reliability assesment of distribution systems with distributed generation based on Bayesian networks","year":2014,"lang":"en","type":"article","venue":"Hrčak Portal of scientific journals of Croatia (University Computing Centre)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Waterloo","keywords":"Reliability (semiconductor); Reliability engineering; Distributed generation; Component (thermodynamics); Bayesian network; Computer science; Bayesian probability; Engineering; Power (physics)","score_opus":0.007844657886160657,"score_gpt":0.18809321586854286,"score_spread":0.1802485579823822,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2161972553","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47388956,0.00002859021,0.5250704,0.000029006305,0.00054999546,0.00014395197,0.00009357246,0.000028738898,0.00016618615],"genre_scores_gemma":[0.9990682,0.0000036373774,0.00067880505,0.000001656033,0.000035628316,4.628327e-8,0.00018274711,0.000008881208,0.000020414085],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981936,0.00016069884,0.0005533169,0.00027444202,0.0005370799,0.00028085898],"domain_scores_gemma":[0.99812424,0.0001240866,0.00060000434,0.00042016341,0.0005995856,0.00013191394],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001640609,0.0001647249,0.00042713177,0.00014464988,0.00016145188,0.000045182656,0.00026886337,0.000092588016,0.000017074515],"category_scores_gemma":[0.00007634757,0.00015722729,0.00013335263,0.0005692079,0.00024551371,0.00020127012,0.00003436406,0.00016621753,7.1688487e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040785373,0.0001486312,0.0062838336,0.00025254415,0.00004096136,0.0000040242303,0.00012237774,0.9892307,0.0017732434,0.0007387992,0.0009820419,0.00038204453],"study_design_scores_gemma":[0.00053790456,0.00008886052,0.023031713,0.0006338752,0.00004963702,0.000004053942,0.00029493467,0.973273,0.0016359732,0.0000087654735,0.00029794042,0.00014335655],"about_ca_topic_score_codex":0.000068582696,"about_ca_topic_score_gemma":0.00003130808,"teacher_disagreement_score":0.5251786,"about_ca_system_score_codex":0.00013889429,"about_ca_system_score_gemma":0.000072142924,"threshold_uncertainty_score":0.6411543},"labels":[],"label_agreement":null},{"id":"W2162558293","doi":"10.1109/mper.2001.4311229","title":"Reliability/Cost Implications of PV and Wind Energy Utilization in Small Isolated Power Systems","year":2001,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":206,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Wind power; Reliability (semiconductor); Photovoltaic system; Power (physics); Environmental science; Computer science; Engineering; Electrical engineering; Physics","score_opus":0.016542384256491533,"score_gpt":0.22547322791784039,"score_spread":0.20893084366134884,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2162558293","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13675554,0.3956528,0.45664477,0.00034217443,0.002976369,0.0025600768,0.00006590518,0.0009222495,0.0040800837],"genre_scores_gemma":[0.9594379,0.040195294,0.00011583333,0.00004221911,0.000012103432,0.000091332615,0.000007855411,0.00004473616,0.000052692245],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985158,0.000040783143,0.00073725655,0.00028727393,0.00009394905,0.00032493085],"domain_scores_gemma":[0.9990601,0.000099809535,0.00007427669,0.00054746954,0.00011134751,0.000107029635],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004392005,0.00024908522,0.00054864987,0.00014085245,0.00001707329,0.000018531966,0.00017908851,0.00012615007,0.00001934408],"category_scores_gemma":[0.00013976985,0.00024603168,0.00007701832,0.0006478898,0.000026746504,0.00014157401,0.000021850572,0.00015793687,0.000006931363],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004946608,0.0004969876,0.009138631,0.050067008,0.00033228018,0.000055279113,0.0011757199,0.87817395,0.029780803,0.014520907,0.006018078,0.0101909],"study_design_scores_gemma":[0.0012446821,0.00022888536,0.03097973,0.03135469,0.00015907355,0.00041447498,0.00005082383,0.17348054,0.00088338874,0.00016327485,0.7591873,0.0018531543],"about_ca_topic_score_codex":0.00005407863,"about_ca_topic_score_gemma":0.000016936527,"teacher_disagreement_score":0.8226824,"about_ca_system_score_codex":0.00012093975,"about_ca_system_score_gemma":0.000019147754,"threshold_uncertainty_score":0.99999917},"labels":[],"label_agreement":null},{"id":"W2162673969","doi":"10.1109/59.867185","title":"Impact of load management on composite system reliability evaluation short-term operating benefits","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":81,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Probabilistic logic; Load management; Electric power system; Computer science; Term (time); Operating cost; Operations research; Engineering; Power (physics)","score_opus":0.013673095999470735,"score_gpt":0.24900084234993464,"score_spread":0.2353277463504639,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2162673969","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86537343,0.00034153802,0.103507586,0.0000073166266,0.002814979,0.0020275733,0.00020425639,0.00050657446,0.025216745],"genre_scores_gemma":[0.9992699,0.00004390031,0.000058989797,0.00000436508,0.000017461833,0.0002986671,0.0000059532813,0.000052036372,0.00024872622],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972093,0.00021842068,0.0008813942,0.00046835368,0.0008197195,0.00040280895],"domain_scores_gemma":[0.99858344,0.000083846724,0.00006475962,0.00088636955,0.00023914511,0.00014241823],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010618792,0.00037391603,0.00052791886,0.00015635653,0.00014968484,0.00007240868,0.0002569023,0.00016793887,0.0001369536],"category_scores_gemma":[0.0000028522259,0.00032993683,0.00031746578,0.0003225297,0.00004102639,0.00021390413,0.0000012123452,0.00025873707,0.00016614175],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000077292185,0.000193802,0.00011962309,0.000711166,0.00023418064,0.0000044127564,0.00043235207,0.9930789,0.00090165547,0.00007847982,0.00011972572,0.00404842],"study_design_scores_gemma":[0.0032158694,0.0017330848,0.020775309,0.008192716,0.0005307063,0.00015655856,0.0007850616,0.95198345,0.010204322,0.0000058307764,0.0007588518,0.0016582658],"about_ca_topic_score_codex":0.0001965421,"about_ca_topic_score_gemma":0.00001618656,"teacher_disagreement_score":0.13389647,"about_ca_system_score_codex":0.0016629113,"about_ca_system_score_gemma":0.00004704734,"threshold_uncertainty_score":0.99991524},"labels":[],"label_agreement":null},{"id":"W2163064379","doi":"10.1115/1.4000892","title":"Integration of Degradation Models Into Generation Risk Assessment: Challenges and Modeling Approaches","year":2010,"lang":"en","type":"article","venue":"Journal of Engineering for Gas Turbines and Power","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; University Network of Excellence in Nuclear Engineering; Electric Power Research Institute","keywords":"Unavailability; Fault tree analysis; Reliability engineering; Component (thermodynamics); Reliability (semiconductor); Computer science; Degradation (telecommunications); Event tree analysis; Fault (geology); Tree (set theory); Risk analysis (engineering); Engineering; Power (physics); Mathematics","score_opus":0.038789988784208085,"score_gpt":0.23141360250114087,"score_spread":0.1926236137169328,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2163064379","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.57081383,0.0025072794,0.42604414,0.00005193137,0.00044558494,0.00007511313,0.000003379207,0.000012789998,0.00004596119],"genre_scores_gemma":[0.95977527,0.001977607,0.038092203,0.000001549695,0.00012570924,0.0000052798396,0.0000031427753,0.000015916294,0.0000033197966],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994052,0.000007729505,0.00032913435,0.00007993664,0.00008680776,0.00009119695],"domain_scores_gemma":[0.999593,0.000044246994,0.000097575,0.00008095865,0.00013501603,0.000049188937],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044889384,0.000112190384,0.00020248162,0.000102995364,0.000025466501,0.00002457779,0.00004855804,0.00008386133,6.292377e-7],"category_scores_gemma":[0.000068558744,0.000090755144,0.00005211212,0.00003253567,0.000011929922,0.00038889563,0.0000083405075,0.00018872647,2.4783912e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001560937,0.000021651687,0.000024703793,0.00036934947,0.000069088666,3.5627937e-7,0.0017491268,0.87871903,0.09157684,0.011652972,0.000027286898,0.015773993],"study_design_scores_gemma":[0.00023856242,0.000081247475,0.00015714626,0.00007726094,0.00002882509,0.00002139688,0.00013038894,0.9956292,0.0018101094,0.001538663,0.00019670495,0.00009048612],"about_ca_topic_score_codex":0.000005130935,"about_ca_topic_score_gemma":0.000016422007,"teacher_disagreement_score":0.38896143,"about_ca_system_score_codex":0.000014712905,"about_ca_system_score_gemma":0.000009063158,"threshold_uncertainty_score":0.37008873},"labels":[],"label_agreement":null},{"id":"W2164543178","doi":"10.1109/tpwrs.2002.800957","title":"Stochastic evaluation of turbine-generator shaft torsional torques in a HVAC/DC power system","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Torque; Turbine; Control theory (sociology); Engineering; Steam turbine; Generator (circuit theory); Power (physics); Context (archaeology); Monte Carlo method; Automotive engineering; Computer science; Mechanical engineering; Mathematics; Physics","score_opus":0.019272370444886423,"score_gpt":0.2226356769088527,"score_spread":0.20336330646396628,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2164543178","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3725587,0.0037338275,0.5985436,0.00004546622,0.015292505,0.002065937,0.00028803348,0.00062835467,0.006843574],"genre_scores_gemma":[0.99921227,0.000009836549,0.000035079545,0.000008850384,0.000029375098,0.00034239216,0.000002473967,0.000053711632,0.00030602803],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972669,0.00024718168,0.0008649053,0.00037649614,0.0008510829,0.00039343486],"domain_scores_gemma":[0.9988156,0.00011809555,0.000081331316,0.0005619119,0.00028779253,0.00013527933],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00096368924,0.0003219589,0.00052438845,0.00035545364,0.00006835641,0.000041255546,0.00023201545,0.0002274869,0.00023721941],"category_scores_gemma":[0.000018506682,0.0003088115,0.00017343905,0.00043582366,0.000044907298,0.00024888775,0.0000015294033,0.000273768,0.00015483175],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042751366,0.00029903348,0.000022855556,0.0006435861,0.00015343919,0.000009087151,0.0021853822,0.9869079,0.00743138,0.00035833873,0.001794305,0.00015191661],"study_design_scores_gemma":[0.0020745727,0.00031014284,0.00019854965,0.0021092957,0.00013229183,0.000105526844,0.0014697334,0.9831223,0.008251834,0.000010521775,0.0014794217,0.0007358396],"about_ca_topic_score_codex":0.00012505862,"about_ca_topic_score_gemma":0.000061330335,"teacher_disagreement_score":0.62665355,"about_ca_system_score_codex":0.0007801866,"about_ca_system_score_gemma":0.0000453418,"threshold_uncertainty_score":0.9999364},"labels":[],"label_agreement":null},{"id":"W2164940782","doi":"10.1109/tdc.1991.169583","title":"Reliability and quality comparisons of electric power distribution systems","year":2002,"lang":"en","type":"article","venue":"Proceedings of the 1991 IEEE Power Engineering Society Transmission and Distribution Conference","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"TECO-Westinghouse (Canada)","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Quality (philosophy); Power (physics); Computer science; Field (mathematics); Reliability theory; Power quality; Duration (music); Engineering; Failure rate; Mathematics; Electrical engineering; Voltage","score_opus":0.01410760974223565,"score_gpt":0.20769003602088684,"score_spread":0.1935824262786512,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2164940782","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88352704,0.0021326642,0.112475246,0.00020340993,0.0003981758,0.00044665765,0.00032843355,0.00021351008,0.00027487075],"genre_scores_gemma":[0.999083,0.0006603247,0.00016032178,0.0000050695908,0.000009636712,0.000018356468,0.000012930393,0.000013265746,0.000037083893],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99853194,0.000013507004,0.0005864256,0.00027574055,0.00029404135,0.00029832177],"domain_scores_gemma":[0.9991686,0.00008410576,0.00014089835,0.00015706928,0.00030633053,0.0001430431],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00051104143,0.00024492468,0.00042888982,0.00001738336,0.00009755235,0.000044974906,0.00020340038,0.00019017042,0.000009672418],"category_scores_gemma":[0.00010435448,0.00019390334,0.00016821129,0.00032814164,0.00014317577,0.00019656896,0.000029188417,0.00029401225,5.6007997e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012073082,0.0006677758,0.008843142,0.015263918,0.0003854387,3.6380425e-7,0.0055420124,0.013848051,0.86179006,0.056249715,0.03580279,0.0014859923],"study_design_scores_gemma":[0.0015857964,0.00020290219,0.06166877,0.0016782298,0.0001450445,0.000027696846,0.000941095,0.823492,0.070646614,0.00016225637,0.03846421,0.0009854092],"about_ca_topic_score_codex":0.000029712039,"about_ca_topic_score_gemma":1.2308118e-7,"teacher_disagreement_score":0.8096439,"about_ca_system_score_codex":0.00008969386,"about_ca_system_score_gemma":0.000010436704,"threshold_uncertainty_score":0.79071486},"labels":[],"label_agreement":null},{"id":"W2165778560","doi":"","title":"Comparison of two methods for evaluating the effects of maintenance on component and system reliability","year":2004,"lang":"en","type":"article","venue":"IEEE International Conference on Probabilistic Methods Applied to Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Component (thermodynamics); Maintenance engineering; Computer science; Failure rate; Preventive maintenance; Electric power system; Power (physics); Engineering","score_opus":0.08121259883730025,"score_gpt":0.4314207670487235,"score_spread":0.35020816821142325,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2165778560","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.053658385,0.000120723875,0.93104166,0.000126207,0.005243271,0.0038279204,0.000053831045,0.00011761127,0.0058104186],"genre_scores_gemma":[0.8451954,0.0000038334815,0.15354073,0.000025639245,0.00003941878,0.0011280372,0.0000035333949,0.000033847762,0.000029576006],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99651515,0.00063285633,0.0013803991,0.00059947616,0.00051450357,0.00035758447],"domain_scores_gemma":[0.99380744,0.00418893,0.0004541245,0.0007719066,0.00064281054,0.00013481229],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0057758586,0.00037690927,0.0010221367,0.00014493433,0.00008215196,0.000059918497,0.00065478944,0.00012979626,0.0000034897078],"category_scores_gemma":[0.0017918828,0.00027432552,0.00014007888,0.00018657254,0.00020114546,0.000046496738,0.00006776295,0.00028131402,0.0000051716383],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034258098,0.00015919919,0.00002052284,0.0034463608,0.00014111285,4.7820015e-7,0.0013320848,0.16169317,0.12690607,0.7010591,0.00005901258,0.0048403307],"study_design_scores_gemma":[0.005290823,0.0040379423,0.0004627165,0.009342792,0.00023699067,0.000030660718,0.0024249095,0.7286766,0.20069487,0.046086505,0.0015167899,0.0011983725],"about_ca_topic_score_codex":0.00008380411,"about_ca_topic_score_gemma":0.0000041292083,"teacher_disagreement_score":0.791537,"about_ca_system_score_codex":0.00048343829,"about_ca_system_score_gemma":0.000086766035,"threshold_uncertainty_score":0.9999709},"labels":[],"label_agreement":null},{"id":"W2166418605","doi":"10.1109/tpwrs.2007.901741","title":"Generation and Transmission Expansion Under Risk Using Stochastic Programming","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":154,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Mathematical optimization; Probabilistic logic; Stochastic programming; Linear programming; Nonlinear programming; Variance (accounting); Transmission (telecommunications); Node (physics); Computer science; Expected value; Stochastic process; Random variable; Stochastic optimization; Nonlinear system; Mathematics; Engineering; Statistics; Telecommunications; Artificial intelligence; Economics","score_opus":0.02205254868347343,"score_gpt":0.24096117456514077,"score_spread":0.21890862588166735,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166418605","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1846426,0.0006441717,0.8113676,0.000006528867,0.0024926693,0.00047576,0.000010600713,0.0002848201,0.00007530551],"genre_scores_gemma":[0.99870294,0.000033175384,0.0010720736,0.000007825051,0.00003395148,0.000027644477,0.0000014510856,0.00004711183,0.000073813455],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986137,0.0000615742,0.00042925563,0.00029186078,0.0002446797,0.0003588886],"domain_scores_gemma":[0.99939805,0.00007574561,0.000054878536,0.00025082193,0.000056450677,0.0001640341],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00059442985,0.00022983181,0.00023533136,0.00017855917,0.0002396957,0.00007374609,0.000069758935,0.0001792635,0.000008550324],"category_scores_gemma":[0.0000027744545,0.00021334532,0.00007697903,0.0002117402,0.000041022573,0.00020903982,5.179573e-7,0.0002653632,0.000011047093],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000315206,0.00006475004,0.000005039633,0.00015266404,0.000056843575,0.000006357376,0.0010551944,0.9536453,0.035825342,0.000045630608,0.000031530417,0.009079854],"study_design_scores_gemma":[0.0008662006,0.000208182,0.00009941167,0.00058820465,0.00011332688,0.00020406254,0.0011690477,0.9773012,0.016321212,0.000016480753,0.0024928565,0.00061984727],"about_ca_topic_score_codex":0.00013719837,"about_ca_topic_score_gemma":0.00004376502,"teacher_disagreement_score":0.81406033,"about_ca_system_score_codex":0.00017685443,"about_ca_system_score_gemma":0.00001910177,"threshold_uncertainty_score":0.86999696},"labels":[],"label_agreement":null},{"id":"W2166446783","doi":"10.1109/pes.2009.5275723","title":"Probabilistic reliability evaluation of power systems including wind turbine generators using a simplified multi-state model: A case study","year":2009,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":47,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Utah Agricultural Experiment Station","keywords":"Wind power; Turbine; Randomness; Reliability (semiconductor); Electric power system; Steam turbine; Reliability engineering; Renewable energy; Wind speed; Computer science; Power (physics); Probabilistic logic; Engineering; Electrical engineering; Aerospace engineering; Meteorology; Mechanical engineering","score_opus":0.0871614131516247,"score_gpt":0.3227203354039269,"score_spread":0.2355589222523022,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166446783","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93355197,0.00019397256,0.062850356,0.000006797364,0.0003339379,0.002545451,0.000017565968,0.00025143768,0.00024851479],"genre_scores_gemma":[0.998254,0.0000015095034,0.0016289455,0.000009331586,0.000015335152,0.00003787277,0.0000020616562,0.00003091111,0.000020011928],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973973,0.00027675423,0.0009389027,0.000447283,0.0005621165,0.0003776177],"domain_scores_gemma":[0.99830914,0.00007201456,0.00013089654,0.000713896,0.00064707204,0.00012695776],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0031323612,0.00030020898,0.0005157215,0.00013312275,0.000100804056,0.00004765967,0.0001545768,0.00010362214,0.000007484031],"category_scores_gemma":[0.00039919998,0.0002611145,0.00009014911,0.00037102713,0.000040850056,0.00025889772,0.00004474653,0.00017492911,0.0000023060265],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015260926,0.00032137914,0.00045523603,0.00016829217,0.000038142796,0.000038306127,0.0025212606,0.99317294,0.0030480025,0.000040987732,0.000018407838,0.00016179074],"study_design_scores_gemma":[0.0011433891,0.00013674234,0.0003820041,0.000085886415,0.00011274129,0.00014809951,0.0015040948,0.99561644,0.00037468062,0.00021230163,0.0000036845395,0.00027991214],"about_ca_topic_score_codex":0.00053041,"about_ca_topic_score_gemma":0.00014863159,"teacher_disagreement_score":0.06470206,"about_ca_system_score_codex":0.00061570934,"about_ca_system_score_gemma":0.00012458145,"threshold_uncertainty_score":0.9999841},"labels":[],"label_agreement":null},{"id":"W2166986552","doi":"10.1109/icps.1998.692525","title":"Value-based power system reliability planning","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Reliability (semiconductor); Electricity market; Electric power industry; Electric power; Purchasing; Electric utility; Electric power system; Competition (biology); Computer science; Energy market; Electricity; Service (business); Business; Risk analysis (engineering); Environmental economics; Reliability engineering; Industrial organization; Power (physics); Economics; Marketing; Engineering; Electrical engineering","score_opus":0.009900954031812329,"score_gpt":0.18428896608993964,"score_spread":0.17438801205812732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166986552","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12230479,0.0010385098,0.16028549,0.0002524182,0.0024291745,0.00050036534,0.00001405996,0.004124728,0.7090505],"genre_scores_gemma":[0.99798524,0.0000016002014,0.001304893,0.000081558435,0.00003425682,0.000025722813,0.0000011131152,0.000025614638,0.0005400052],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99892306,0.000039112994,0.00029807477,0.0002277882,0.00017847077,0.0003334684],"domain_scores_gemma":[0.9992321,0.000089627065,0.000021092257,0.00050996715,0.000039822946,0.00010738959],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003110577,0.00016432407,0.00021592776,0.000048531114,0.000053169,0.000030177198,0.00017152987,0.000101698744,0.0003512851],"category_scores_gemma":[0.00005168068,0.00014147689,0.00009084562,0.00015270407,0.000032682245,0.00010578139,0.000015398406,0.00014396179,0.00047947204],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028989303,0.00020047152,0.0068285866,0.0032042847,0.000094220515,0.00011079285,0.0014729501,0.8487095,0.0016435953,0.021023188,0.11543299,0.0012504217],"study_design_scores_gemma":[0.000524702,0.00005735333,0.0015797213,0.00033763057,0.000012929277,0.000018804196,0.00029372118,0.9306136,0.0020524287,0.0000459293,0.064020194,0.00044302514],"about_ca_topic_score_codex":0.000015368345,"about_ca_topic_score_gemma":7.177115e-7,"teacher_disagreement_score":0.87568045,"about_ca_system_score_codex":0.00019812708,"about_ca_system_score_gemma":0.000005602588,"threshold_uncertainty_score":0.6162803},"labels":[],"label_agreement":null},{"id":"W2167293790","doi":"10.1109/61.847287","title":"Subtransmission system reliability enhancement using a thyristor controlled series capacitor","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Thyristor; Reliability (semiconductor); Engineering; Capacitor; Transmission system; Electric power transmission; Context (archaeology); Point (geometry); Electric power system; Electronic engineering; Transmission (telecommunications); Reliability engineering; Electrical engineering; Voltage; Power (physics)","score_opus":0.007047831388514865,"score_gpt":0.1878631828836407,"score_spread":0.18081535149512584,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167293790","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49406007,0.00034920528,0.49731004,0.000042234904,0.0029472369,0.00082295627,0.00007716478,0.0006786866,0.003712405],"genre_scores_gemma":[0.9971758,0.00020408178,0.0008722472,0.00003934558,0.000044886863,0.00014101346,0.0000016175,0.00005208723,0.0014689164],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979561,0.00012779619,0.0006549112,0.00042648942,0.00036107723,0.0004736384],"domain_scores_gemma":[0.9989648,0.00009062177,0.000047616966,0.0005998958,0.000106110754,0.00019095234],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003482995,0.00037175094,0.00057939114,0.00011795977,0.00026636504,0.000048787748,0.00019613309,0.000204713,0.00090081606],"category_scores_gemma":[0.0000032866333,0.00033652916,0.00033807845,0.00022172154,0.000099045275,0.00039506398,6.045051e-7,0.00033448293,0.00022968587],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.010564904,0.0017030757,0.000021371516,0.0031537043,0.0012091146,0.00015538218,0.0066629103,0.7541235,0.1967512,0.00016347304,0.0035611826,0.021930184],"study_design_scores_gemma":[0.020438,0.001998427,0.00013335339,0.0039375536,0.0009796468,0.00045352872,0.0023900815,0.48002642,0.38266832,0.000110981666,0.1026902,0.0041735065],"about_ca_topic_score_codex":0.000115385075,"about_ca_topic_score_gemma":0.00001796788,"teacher_disagreement_score":0.5031157,"about_ca_system_score_codex":0.00072773575,"about_ca_system_score_gemma":0.000060631955,"threshold_uncertainty_score":0.9999087},"labels":[],"label_agreement":null},{"id":"W2167636568","doi":"10.1109/ccece.2005.1557002","title":"Incorporating maintenance outage effects in substation and switching station reliability studies","year":2006,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Component (thermodynamics); Maintenance engineering; Sensitivity (control systems); Computer science; Markov process; Markov model; Engineering; Power station; Markov chain; Power (physics); Electronic engineering; Electrical engineering","score_opus":0.005933901004764837,"score_gpt":0.21826310752342745,"score_spread":0.2123292065186626,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167636568","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91182953,0.00056181353,0.08523029,0.0000815869,0.00026867664,0.00033080784,0.0000020455377,0.00021570815,0.0014795255],"genre_scores_gemma":[0.9957397,0.000034319186,0.0040514143,0.000022716093,0.000023634086,0.000043882712,0.0000043791774,0.000013294076,0.00006667882],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99908745,0.00005444914,0.00034715232,0.0002065495,0.00010069186,0.00020368323],"domain_scores_gemma":[0.9994737,0.00026088866,0.00004722055,0.00013774342,0.000055909073,0.000024566854],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00060737797,0.00013143188,0.00020812011,0.00006752909,0.000042831998,0.000026765389,0.00004387952,0.00004770171,7.634027e-7],"category_scores_gemma":[0.00023923078,0.00011497957,0.000019112276,0.00016808731,0.0000332061,0.00031149096,0.000019349698,0.00011787686,0.0000041962526],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000090702146,0.00019458144,0.48373613,0.011723815,0.000077810706,0.00010336115,0.010457208,0.3221276,0.046964183,0.098866716,0.0024800622,0.023177836],"study_design_scores_gemma":[0.0018204667,0.00009679906,0.5640485,0.0010524399,0.000019137433,0.00001199266,0.0026302012,0.32490042,0.005344123,0.09895684,0.00038250638,0.00073653157],"about_ca_topic_score_codex":0.0003867285,"about_ca_topic_score_gemma":0.001744939,"teacher_disagreement_score":0.08391014,"about_ca_system_score_codex":0.00017083324,"about_ca_system_score_gemma":0.000007808197,"threshold_uncertainty_score":0.46887308},"labels":[],"label_agreement":null},{"id":"W2167885813","doi":"10.1109/tpwrs.2003.818587","title":"An Electricity Market With a Probabilistic Spinning Reserve Criterion","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":269,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Probabilistic logic; Clearing; Reliability (semiconductor); Mathematical optimization; Electricity market; Market clearing; Electric power system; Power system simulation; Computation; Computer science; Electricity; Reliability engineering; Mathematics; Engineering; Power (physics); Algorithm; Economics","score_opus":0.007810291990077612,"score_gpt":0.20961303717999286,"score_spread":0.20180274518991526,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167885813","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09276207,0.00016853081,0.89966786,0.000034093926,0.0021970023,0.00076879165,0.000037692953,0.0007851508,0.0035788156],"genre_scores_gemma":[0.99912626,0.000013259603,0.0002857644,0.000025480385,0.000025813993,0.00023346575,0.000001805449,0.000064550295,0.00022357932],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983049,0.00009779085,0.00040134354,0.00039725113,0.00032259081,0.00047613808],"domain_scores_gemma":[0.99889225,0.000046335084,0.000049241717,0.00065961556,0.0001697278,0.00018281343],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00039246684,0.00029510687,0.0003381445,0.0001831606,0.0001557172,0.00012351452,0.00023866963,0.00014919092,0.000032295735],"category_scores_gemma":[0.000010842747,0.00025441102,0.000083638384,0.00046773875,0.00005625603,0.00038956577,5.4804696e-7,0.0003577,0.000044466746],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022677467,0.00033109123,0.000025444564,0.0007194709,0.000118085714,0.000048250324,0.0013503716,0.9928009,0.0035013675,0.00029008705,0.00043359978,0.00015455377],"study_design_scores_gemma":[0.019293487,0.019699382,0.004237692,0.01719929,0.00080409495,0.0026638878,0.0051443595,0.7430811,0.10214708,0.0011162972,0.074262716,0.010350615],"about_ca_topic_score_codex":0.00038836815,"about_ca_topic_score_gemma":0.00025535104,"teacher_disagreement_score":0.9063642,"about_ca_system_score_codex":0.00044863377,"about_ca_system_score_gemma":0.00006592809,"threshold_uncertainty_score":0.9999908},"labels":[],"label_agreement":null},{"id":"W2168062099","doi":"10.1109/5.823995","title":"Probabilistic assessment of power systems","year":2000,"lang":"en","type":"article","venue":"Proceedings of the IEEE","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":294,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Probabilistic logic; Reliability (semiconductor); Computer science; Quality (philosophy); Electricity; Mains electricity; Reliability engineering; Risk analysis (engineering); Electric power system; Operations research; Electric power industry; Range (aeronautics); Power (physics); Business; Engineering","score_opus":0.005623405441678421,"score_gpt":0.20163103246353803,"score_spread":0.19600762702185962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168062099","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91377014,0.00014595542,0.00006122768,0.000039841,0.000657703,0.00038157584,0.000009137766,0.00007829408,0.08485614],"genre_scores_gemma":[0.99906284,0.00001607609,0.00011143334,0.0000052119626,0.000017555436,0.000027874417,8.208896e-8,0.000013972448,0.0007449581],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99922645,0.0000033277684,0.00030712987,0.000104798535,0.00020347246,0.00015482648],"domain_scores_gemma":[0.999632,0.00002105271,0.000068686546,0.00012912524,0.00011955418,0.000029580993],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026286102,0.00009721978,0.00021402005,0.000022671495,0.000020327196,0.000012483394,0.000304789,0.00005012902,0.00003111175],"category_scores_gemma":[0.000027471215,0.0000670185,0.00007440742,0.00015081614,0.000063174906,0.000088579574,0.000014131509,0.000093597955,0.000004944678],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013740484,0.0009212152,0.025786307,0.0351603,0.00082013075,0.0000020485702,0.00642053,0.28911763,0.46704885,0.09222517,0.0794274,0.0029330084],"study_design_scores_gemma":[0.004360887,0.0012462717,0.12634052,0.01348803,0.0005759241,0.0002547854,0.0027183695,0.411503,0.27037495,0.01289727,0.15311258,0.0031274252],"about_ca_topic_score_codex":0.000016346896,"about_ca_topic_score_gemma":5.448469e-7,"teacher_disagreement_score":0.19667388,"about_ca_system_score_codex":0.000058096353,"about_ca_system_score_gemma":0.000014791459,"threshold_uncertainty_score":0.27329352},"labels":[],"label_agreement":null},{"id":"W2168454608","doi":"10.1109/naps.2008.5307315","title":"Residential customer outage cost valuation for urban areas in Nepal","year":2008,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Developing country; Willingness to pay; Environmental economics; Restructuring; Business; Electricity; Computer science; Finance; Economics; Engineering; Economic growth","score_opus":0.023551982195879922,"score_gpt":0.23905143137430745,"score_spread":0.21549944917842753,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168454608","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.57762295,0.00038900776,0.35235125,0.000252782,0.0027131136,0.0022101062,0.000035417816,0.0006836722,0.06374172],"genre_scores_gemma":[0.99716586,0.000014272084,0.0005088655,0.00004362883,0.00008904794,0.00009986744,0.000009563632,0.000013722917,0.00205515],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993828,0.000015010722,0.0001925176,0.00011747041,0.00010233758,0.0001898871],"domain_scores_gemma":[0.99973136,0.000042737916,0.000012929212,0.00014033419,0.000034273417,0.000038351853],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020680644,0.000077432494,0.000116776326,0.00006233431,0.000030436353,0.000009241282,0.000070934875,0.00005924695,0.000045439978],"category_scores_gemma":[0.00006468406,0.00007393367,0.00004483873,0.00009117517,0.000018437862,0.000122285,0.000008944768,0.000058756934,0.000091114875],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036575677,0.00033508855,0.09728632,0.001093375,0.00015257351,0.000104845705,0.009935513,0.09536279,0.009990312,0.02580807,0.7516053,0.007960087],"study_design_scores_gemma":[0.005252183,0.00012232614,0.16303606,0.00019665521,0.000037587848,0.000073084804,0.00046790944,0.34637117,0.010829254,0.001522992,0.47100452,0.0010862817],"about_ca_topic_score_codex":0.00009786563,"about_ca_topic_score_gemma":0.00033331898,"teacher_disagreement_score":0.41954297,"about_ca_system_score_codex":0.00008962517,"about_ca_system_score_gemma":0.000018755798,"threshold_uncertainty_score":0.30149275},"labels":[],"label_agreement":null},{"id":"W2170110838","doi":"10.1109/pesw.2000.847618","title":"Incorporating a DC link in composite system reliability evaluation","year":2002,"lang":"en","type":"article","venue":"2000 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.00CH37077)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Electric power system; Link (geometry); Transmission system; Computer science; Range (aeronautics); Transmission (telecommunications); Power (physics); Engineering; Telecommunications; Physics; Computer network","score_opus":0.011791343198995063,"score_gpt":0.20030659310341037,"score_spread":0.18851524990441532,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2170110838","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9608775,0.00034588217,0.009182132,0.00040472223,0.0034100667,0.0018087259,0.00003081097,0.0024686137,0.021471567],"genre_scores_gemma":[0.9817761,0.00007717408,0.016822213,0.00008460359,0.00040642364,0.00041369235,0.000013416164,0.00016225643,0.00024413016],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9951343,0.000058459216,0.0015102387,0.0011057988,0.00093709334,0.0012541214],"domain_scores_gemma":[0.9975216,0.00016735424,0.0003052287,0.0005678036,0.0011111613,0.00032687926],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.002694323,0.0008914949,0.0009688243,0.00022294848,0.0001643999,0.00036763123,0.0008138087,0.0005631818,0.00010058871],"category_scores_gemma":[0.00041013453,0.00096474844,0.00042953953,0.00086900097,0.000141502,0.0009220588,0.00014010705,0.00087330287,0.00029352063],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014997563,0.00069782976,0.021764798,0.016679363,0.0008320357,0.00004191878,0.0850253,0.19830629,0.6435938,0.0014150691,0.02707015,0.0044235038],"study_design_scores_gemma":[0.00094269903,0.00009358243,0.0009956621,0.002911486,0.000062375526,0.000034137105,0.0012097735,0.98653644,0.004907854,0.00003898179,0.0012603324,0.0010066892],"about_ca_topic_score_codex":0.0000794961,"about_ca_topic_score_gemma":0.00000872736,"teacher_disagreement_score":0.7882301,"about_ca_system_score_codex":0.0021525226,"about_ca_system_score_gemma":0.000089861875,"threshold_uncertainty_score":0.9992803},"labels":[],"label_agreement":null},{"id":"W2170320502","doi":"10.1109/tpwrs.2005.862000","title":"Bulk Electric System Well-Being Analysis Using Sequential Monte Carlo Simulation","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":79,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Monte Carlo method; Electric power system; Probabilistic logic; Computer science; Reliability engineering; Transmission system; Transmission (telecommunications); Engineering; Power (physics); Statistics; Mathematics; Artificial intelligence","score_opus":0.00725077268151302,"score_gpt":0.21083928226572365,"score_spread":0.20358850958421063,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2170320502","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16086581,0.00031075088,0.8308706,0.000004724082,0.0037937143,0.0004904382,0.000030047906,0.00080220064,0.0028316563],"genre_scores_gemma":[0.99922657,0.0000050969957,0.00007559164,0.0000051879665,0.000069755006,0.000060589584,0.0000022637266,0.00006937178,0.00048560018],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99760884,0.00014490684,0.0008168318,0.00044110508,0.00044542845,0.00054291094],"domain_scores_gemma":[0.99894005,0.000103527134,0.000121595,0.00057862746,0.00014515188,0.000111077214],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00037297563,0.00036579487,0.0005985828,0.0007287985,0.00023970168,0.00015380977,0.00019307232,0.00024220634,0.000018969384],"category_scores_gemma":[0.000002061876,0.0003784485,0.00041900633,0.0015547003,0.000031891068,0.00028622983,0.0000010039182,0.00028591414,0.00008181939],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016996439,0.000039098173,0.000045517587,0.00025491702,0.00045024042,0.000015717607,0.00019070179,0.99663746,0.0021602276,0.00012989316,0.000040940697,0.000018310173],"study_design_scores_gemma":[0.0003007365,0.00003533119,0.00004593561,0.00017195543,0.00054846867,0.000031841937,0.0002259552,0.9945885,0.002796777,0.000002306395,0.0008717259,0.00038044376],"about_ca_topic_score_codex":0.0027014043,"about_ca_topic_score_gemma":0.00021670043,"teacher_disagreement_score":0.8383607,"about_ca_system_score_codex":0.0010568574,"about_ca_system_score_gemma":0.000036812056,"threshold_uncertainty_score":0.9998667},"labels":[],"label_agreement":null},{"id":"W2170601638","doi":"10.1109/ccece.1999.804928","title":"Determination and use of sector and composite customer damage functions","year":2003,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Weighting; Computer science; Function (biology); Customer satisfaction; Order (exchange); Voice of the customer; Service (business); Customer retention; Power (physics); Engineering; Service quality; Business; Marketing","score_opus":0.011681330041877354,"score_gpt":0.19455988847512926,"score_spread":0.1828785584332519,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2170601638","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97291327,0.000076201424,0.020163808,0.0000070771225,0.00012489484,0.00007431572,0.0000074425197,0.000050875937,0.0065821023],"genre_scores_gemma":[0.9981875,0.000019317413,0.0011152369,0.000009513733,0.0000029915016,0.000002856477,9.308922e-7,0.0000045403835,0.00065711036],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.9997752,0.000011972186,0.00007606703,0.000054338037,0.000028113405,0.00005435972],"domain_scores_gemma":[0.9998407,0.00003851663,0.000008088014,0.00006842731,0.000018761082,0.000025510979],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004901387,0.000041095253,0.00006340802,0.000028929906,0.000015642932,0.000011394734,0.0000098185565,0.000024067727,0.000020011767],"category_scores_gemma":[0.000017176577,0.000036307985,0.000008297194,0.000042523363,0.00002290014,0.000120169214,0.0000046590544,0.000026553318,0.000004312667],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005859372,0.00028264112,0.2824304,0.0039813532,0.00027093745,0.000019981842,0.0044473414,0.015578689,0.6161353,0.033177756,0.019341616,0.024275359],"study_design_scores_gemma":[0.0018741663,0.00016931865,0.37516016,0.00025019184,0.0001115051,0.00014175428,0.0005020013,0.18691972,0.06255817,0.0002551141,0.37116787,0.00089002366],"about_ca_topic_score_codex":0.000014394826,"about_ca_topic_score_gemma":0.000027425986,"teacher_disagreement_score":0.5535771,"about_ca_system_score_codex":0.000007737215,"about_ca_system_score_gemma":0.0000018200209,"threshold_uncertainty_score":0.14805967},"labels":[],"label_agreement":null},{"id":"W2171081361","doi":"10.1109/tpwrs.2004.840449","title":"Composite System Maintenance Coordination in a Deregulated Environment","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Preventive maintenance; Scheduling (production processes); Reliability engineering; Predictive maintenance; Maintenance engineering; Electric power system; Planned maintenance; Computer science; Load management; Operator (biology); Operations research; Engineering; Operations management","score_opus":0.005014470319177335,"score_gpt":0.17541768267007096,"score_spread":0.17040321235089362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2171081361","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.061598472,0.0004605094,0.93042165,0.00015925532,0.0024565696,0.00080229325,0.000049487426,0.0006302035,0.0034215797],"genre_scores_gemma":[0.9984193,0.000021231663,0.00015250724,0.000020200614,0.000016531576,0.0002272287,0.000002516333,0.000049067527,0.0010914333],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99825627,0.000097468626,0.00061249855,0.0003313272,0.00027470727,0.00042773248],"domain_scores_gemma":[0.9992863,0.00005393404,0.000061356965,0.00045138138,0.000034115994,0.00011289386],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00032671983,0.00027563432,0.00036682587,0.00023042467,0.00008015684,0.00004989973,0.00018585256,0.0001721352,0.000025695428],"category_scores_gemma":[0.0000012819148,0.00027380392,0.000105434316,0.0002471678,0.000040588275,0.0002311326,9.899985e-7,0.000270462,0.00045062043],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033183158,0.0001264348,0.000023399443,0.0003134786,0.00005770355,0.000015485462,0.00063470117,0.99265003,0.0044235955,0.0003655656,0.0007464021,0.0006100393],"study_design_scores_gemma":[0.0023190912,0.00014420952,0.00068653055,0.0018607862,0.00004151698,0.00024022732,0.0012834084,0.92293346,0.012295043,0.000005674745,0.057303865,0.00088618643],"about_ca_topic_score_codex":0.00009288119,"about_ca_topic_score_gemma":0.000051178948,"teacher_disagreement_score":0.9368208,"about_ca_system_score_codex":0.0011348304,"about_ca_system_score_gemma":0.000013647123,"threshold_uncertainty_score":0.9999714},"labels":[],"label_agreement":null},{"id":"W2172550131","doi":"10.1115/icone17-75086","title":"Integration of Degradation Models Into Generation Risk Assessment (GRA): Challenges and Modeling Approaches","year":2009,"lang":"en","type":"article","venue":"Volume 1: Plant Operations, Maintenance, Engineering, Modifications and Life Cycle; Component Reliability and Materials Issues; Next Generation Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; University Network of Excellence in Nuclear Engineering","keywords":"Unavailability; Fault tree analysis; Reliability engineering; Component (thermodynamics); Computer science; Reliability (semiconductor); Degradation (telecommunications); Event tree analysis; Fault (geology); Tree (set theory); Engineering; Power (physics); Mathematics","score_opus":0.07463476582993972,"score_gpt":0.23805173054527218,"score_spread":0.16341696471533246,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2172550131","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.58665925,0.0066298177,0.4044017,0.00040471443,0.0005466576,0.0009758919,0.00015875314,0.00017700811,0.000046187954],"genre_scores_gemma":[0.9644486,0.0193872,0.014725846,0.000017638726,0.00031232936,0.0003210652,0.0007079012,0.000036282017,0.00004318216],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9970215,0.00025561132,0.0013594192,0.00071559084,0.00031618398,0.0003317008],"domain_scores_gemma":[0.99867535,0.000049133665,0.0001961251,0.0005719752,0.00030339815,0.00020402859],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0013901502,0.00046724375,0.00071475515,0.00026600223,0.00036795047,0.00048335906,0.00015119583,0.00026718914,0.0000040584964],"category_scores_gemma":[0.00013056678,0.00043768756,0.0000567691,0.00014830723,0.000087541084,0.0011912304,0.00004143445,0.00021275468,0.0000019922259],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012288588,0.00008496903,0.000007282595,0.0003191155,0.00004032055,3.1685133e-7,0.0012944901,0.7865723,0.14674072,0.0636261,0.00014167915,0.0011604461],"study_design_scores_gemma":[0.00041496547,0.00009233924,0.0006692663,0.00019167124,0.000062428786,0.000019487792,0.0006989521,0.9944305,0.0020113648,0.00027562675,0.0006890262,0.00044440562],"about_ca_topic_score_codex":0.0005439252,"about_ca_topic_score_gemma":0.00007561165,"teacher_disagreement_score":0.38967586,"about_ca_system_score_codex":0.00013748875,"about_ca_system_score_gemma":0.000048493795,"threshold_uncertainty_score":0.9998075},"labels":[],"label_agreement":null},{"id":"W2181068478","doi":"10.1109/pesc.2001.954021","title":"Multi-terminal LVDC system for optimal acquisition of power in wind-farm using induction generators","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Wind power; Wind speed; Turbine; Power optimizer; Induction generator; Automotive engineering; Voltage; Electrical engineering; AC power; Engineering; Control theory (sociology); Power (physics); Maximum power point tracking; Marine engineering; Computer science; Meteorology; Physics; Mechanical engineering","score_opus":0.02345158858486251,"score_gpt":0.2291584928894758,"score_spread":0.20570690430461328,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2181068478","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89550614,0.00016486018,0.10275451,0.0000061755554,0.00077715225,0.0003088792,0.000010904896,0.000101318525,0.00037004068],"genre_scores_gemma":[0.9866759,0.000003269386,0.013177878,0.0000057559946,0.000055022523,0.000015500642,0.0000021610347,0.000018264467,0.000046249927],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992157,0.0000199121,0.00032905187,0.00014878092,0.00008580869,0.00020073025],"domain_scores_gemma":[0.99970526,0.000015099294,0.000042092397,0.00014743718,0.000053747033,0.00003634053],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018394977,0.00011335196,0.00019432274,0.00010939257,0.000025076519,0.000011878907,0.0000657057,0.00010897431,0.000025549552],"category_scores_gemma":[0.000009648982,0.00010968935,0.0000603354,0.0001350398,0.00001878578,0.00013968295,0.000010717159,0.00006378949,0.0000050762405],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007978028,0.00033477214,0.0034056266,0.0031837276,0.000103986145,0.000028847167,0.0030079058,0.5684385,0.41644034,0.001553565,0.00038540605,0.0030375575],"study_design_scores_gemma":[0.00087629975,0.00006880525,0.001195292,0.00027200265,0.000014104657,0.000058586236,0.00076526875,0.95098037,0.045269184,0.0000023821901,0.00028184237,0.00021588926],"about_ca_topic_score_codex":0.000041063755,"about_ca_topic_score_gemma":0.000013962889,"teacher_disagreement_score":0.38254184,"about_ca_system_score_codex":0.00020585269,"about_ca_system_score_gemma":0.000005814553,"threshold_uncertainty_score":0.44730017},"labels":[],"label_agreement":null},{"id":"W2181466015","doi":"","title":"Reliability Assessment of Reconfigurable Split-Bus Substation Topology for Adding Power Transformers Without Increasing Fault Current","year":2006,"lang":"en","type":"other","venue":"PolyPublie (École Polytechnique de Montréal)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transformer; Reliability engineering; Switchgear; Topology (electrical circuits); Engineering; Current transformer; Reliability (semiconductor); Electrical engineering; Power (physics); Voltage","score_opus":0.007915218668993959,"score_gpt":0.24820658265274342,"score_spread":0.24029136398374945,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2181466015","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00627702,0.004255699,0.85877514,0.00014023064,0.0014272847,0.0036264765,0.0011352431,0.0016191566,0.12274375],"genre_scores_gemma":[0.8866047,0.0011116847,0.09536715,0.00008591295,0.0002522402,0.0021422515,0.0005383905,0.00095542124,0.012942236],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9968264,0.00017958992,0.0010799231,0.0006542419,0.00034559538,0.0009142409],"domain_scores_gemma":[0.9981167,0.00024282707,0.00044861756,0.00081888324,0.0001757776,0.00019720176],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0013361656,0.00065322104,0.0011121812,0.00059587276,0.000095292766,0.000058150392,0.00040834912,0.0007808509,0.00009222566],"category_scores_gemma":[0.00018393752,0.00067672215,0.00038220192,0.00032887823,0.00015777734,0.00018468613,0.000026013624,0.0006149157,0.0000032427317],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010707706,0.0023606778,0.03808952,0.027698081,0.0016652431,0.000041610274,0.0014948845,0.074510545,0.036964748,0.083242774,0.6015349,0.13132624],"study_design_scores_gemma":[0.002949567,0.00054053933,0.01605715,0.0039774184,0.00044177708,0.000093682385,0.00030287408,0.19937444,0.0067053526,0.002538911,0.76413244,0.0028858357],"about_ca_topic_score_codex":0.012296288,"about_ca_topic_score_gemma":0.0075868727,"teacher_disagreement_score":0.8803277,"about_ca_system_score_codex":0.0011264909,"about_ca_system_score_gemma":0.00027531883,"threshold_uncertainty_score":0.9995684},"labels":[],"label_agreement":null},{"id":"W2191617553","doi":"10.1016/j.epsr.2015.10.019","title":"A new analytical technique for incorporating base loaded energy limited hydro units in reliability evaluation","year":2015,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Manitoba Hydro","funders":"","keywords":"Unavailability; Reliability engineering; Reliability (semiconductor); Hydroelectricity; Energy (signal processing); Computer science; Electricity generation; Resource (disambiguation); Engineering; Power (physics); Mathematics; Statistics","score_opus":0.08798835928478527,"score_gpt":0.33286437931025914,"score_spread":0.24487602002547387,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2191617553","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06780346,0.00579944,0.8975979,0.00046696205,0.0015306394,0.007988715,0.000028762097,0.00067052245,0.01811359],"genre_scores_gemma":[0.9972223,0.000011497428,0.00043997896,0.000009537584,0.00011638091,0.0015108596,0.000025746134,0.00005619618,0.0006075204],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99489516,0.0012488398,0.0008690252,0.0005891426,0.0013844268,0.0010133841],"domain_scores_gemma":[0.99604076,0.0008483369,0.00007972514,0.00078778097,0.0017682122,0.00047520545],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.015441299,0.0002635691,0.0005059387,0.0009783644,0.000086262866,0.00011738757,0.0004641647,0.0003584489,0.00000866014],"category_scores_gemma":[0.0066846767,0.0002530992,0.00007041966,0.005085613,0.000048884587,0.00027447264,0.000075056116,0.00066744105,0.000022077396],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00225744,0.0011892082,0.006125331,0.0041710082,0.0004860252,0.0002412586,0.004700573,0.28353024,0.17125836,0.057669275,0.44919118,0.019180091],"study_design_scores_gemma":[0.0014444102,0.00048012863,0.00009276365,0.0003089479,0.0000127092335,0.000032023774,0.00023333811,0.9680635,0.012261943,0.0026032247,0.014100843,0.00036619016],"about_ca_topic_score_codex":0.0022078073,"about_ca_topic_score_gemma":0.00017733128,"teacher_disagreement_score":0.9294188,"about_ca_system_score_codex":0.0022122925,"about_ca_system_score_gemma":0.0015897608,"threshold_uncertainty_score":0.99999213},"labels":[],"label_agreement":null},{"id":"W2231928583","doi":"10.1016/j.rser.2015.12.070","title":"A comprehensive review on uncertainty modeling techniques in power system studies","year":2016,"lang":"en","type":"review","venue":"Renewable and Sustainable Energy Reviews","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":409,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Probabilistic logic; Electric power system; Context (archaeology); Computer science; Restructuring; Probability density function; Uncertainty quantification; Work (physics); Power (physics); Mathematical optimization; Engineering; Machine learning; Artificial intelligence; Mathematics","score_opus":0.03734299939859377,"score_gpt":0.2988336187393824,"score_spread":0.26149061934078865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2231928583","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[1.8132837e-7,0.99017125,0.0010410276,0.000023747918,0.00027758232,0.002144048,0.0000138768155,0.00033754593,0.005990743],"genre_scores_gemma":[0.000012408174,0.9941975,0.0000695243,0.00015718024,0.00010292259,0.0024672905,0.000019691575,0.00011904732,0.0028544422],"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","domain_scores_codex":[0.9951536,0.00064074283,0.0020311228,0.00084172183,0.00023868923,0.0010941442],"domain_scores_gemma":[0.9978767,0.00028398534,0.0003361484,0.0010686036,0.00026389144,0.0001706448],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0015598187,0.0010731093,0.00609864,0.00041045967,0.00013231422,0.00005062463,0.0004346415,0.0004193956,0.0000086041555],"category_scores_gemma":[0.00022888648,0.0006710974,0.00062046753,0.0007520964,0.000073139374,0.0001984087,0.00022389596,0.0003505278,0.000021826916],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000310295,0.0000140313,2.8804147e-8,0.6159775,0.00012826864,0.00009262928,0.000027170501,0.00070975925,1.7812361e-7,0.002662124,0.007571018,0.37281418],"study_design_scores_gemma":[0.000068325164,0.000037934296,1.1823809e-9,0.356937,0.00013358904,0.000044302476,0.00019700042,0.00018299518,6.1895616e-7,0.0000992841,0.6418284,0.00047057128],"about_ca_topic_score_codex":0.0002941098,"about_ca_topic_score_gemma":0.000028161734,"teacher_disagreement_score":0.6342574,"about_ca_system_score_codex":0.001516556,"about_ca_system_score_gemma":0.00017140346,"threshold_uncertainty_score":0.999574},"labels":[],"label_agreement":null},{"id":"W2255310460","doi":"10.1007/978-3-642-21747-0_66","title":"Reliability Evaluation of Wind Energy Conversion Systems Incorporating Well-Being Model","year":2011,"lang":"en","type":"book-chapter","venue":"Lecture notes in electrical engineering","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Manitoba Hydro","funders":"National Natural Science Foundation of China","keywords":"Reliability engineering; Reliability (semiconductor); Wind power; Environmental science; Computer science; Engineering; Physics; Electrical engineering","score_opus":0.009802122911979048,"score_gpt":0.191657290656338,"score_spread":0.18185516774435895,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2255310460","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0018727648,0.0058303364,0.9206014,0.000008531454,0.0011961459,0.0008046267,0.000012560866,0.00043434298,0.06923924],"genre_scores_gemma":[0.9982222,0.00016509906,0.0009400868,0.00001070194,0.00013778522,0.000029737452,0.00002698567,0.00013845571,0.0003289733],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972751,0.000047314275,0.0009780548,0.0005291445,0.000689573,0.00048079947],"domain_scores_gemma":[0.9984632,0.00034818627,0.00020366586,0.00058016303,0.00029173912,0.00011301247],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010748327,0.00057539326,0.0008909435,0.00044322322,0.000030535273,0.000020078132,0.0003049149,0.00092676317,0.000024075227],"category_scores_gemma":[0.0004860764,0.0005912013,0.00019313695,0.00023105028,0.00004357628,0.00013316824,0.000058328682,0.0009667693,0.000006669683],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001361832,0.000012211732,0.0000119140395,0.0006820691,0.000049779504,0.0000045612896,0.000103391096,0.97948563,0.0014339938,0.015596666,0.000015733653,0.0025904127],"study_design_scores_gemma":[0.00031521675,0.000051540595,0.000009667684,0.00084726175,0.0001001203,0.000010252042,4.815041e-7,0.9762958,0.0029703176,0.018144561,0.0007263822,0.0005283946],"about_ca_topic_score_codex":0.00009634644,"about_ca_topic_score_gemma":0.000013499515,"teacher_disagreement_score":0.9963494,"about_ca_system_score_codex":0.0010349487,"about_ca_system_score_gemma":0.00013163549,"threshold_uncertainty_score":0.99965394},"labels":[],"label_agreement":null},{"id":"W2255893130","doi":"10.1049/iet-gtd.2015.0162","title":"Reliability benefit of energy storage in wind integrated power system operation","year":2015,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Wind power; Energy storage; Electric power system; Computer science; Power (physics); Automotive engineering; Environmental science; Electrical engineering; Engineering","score_opus":0.011731306938183073,"score_gpt":0.20532678274633406,"score_spread":0.19359547580815098,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2255893130","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4182914,0.00040594212,0.57955056,0.000073515694,0.00064017926,0.00023542116,0.00017334033,0.0001693317,0.00046032062],"genre_scores_gemma":[0.9982489,0.00003662107,0.0003193008,0.000009412457,0.000049611495,0.000029913885,0.0012249453,0.000017908369,0.00006339721],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983327,0.00013463208,0.0007083921,0.00028943093,0.00031129873,0.00022353952],"domain_scores_gemma":[0.99913317,0.000019139712,0.0000717115,0.0003021496,0.0003178574,0.00015598304],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00070730294,0.00020348243,0.0002990495,0.00007628057,0.000048571157,0.000033896024,0.00012076494,0.00022606886,0.000027643004],"category_scores_gemma":[0.000048002195,0.00018468352,0.000076383534,0.00036323577,0.000035043508,0.00034355407,0.000008217679,0.00013830207,0.000007928572],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016355472,0.00023367486,0.00051972066,0.000348546,0.000024863397,0.0000071703885,0.00094594056,0.8504011,0.12444324,0.0107115945,0.00705951,0.005141067],"study_design_scores_gemma":[0.001560646,0.00018172455,0.0027243844,0.00033137406,0.000022914026,0.000011821037,0.00046060243,0.83938104,0.11493464,0.000161968,0.039806116,0.000422744],"about_ca_topic_score_codex":0.00017715375,"about_ca_topic_score_gemma":0.000059260045,"teacher_disagreement_score":0.5799575,"about_ca_system_score_codex":0.00068703917,"about_ca_system_score_gemma":0.00009854829,"threshold_uncertainty_score":0.75311756},"labels":[],"label_agreement":null},{"id":"W2276034344","doi":"10.1109/tpwrs.2015.2431820","title":"One Markov Model for Spare Analysis of Distribution Power Transformers","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Spare part; Transformer; Reliability engineering; Probabilistic logic; Markov chain; Distribution transformer; Computer science; Engineering; Electrical engineering; Voltage; Artificial intelligence; Machine learning; Mechanical engineering","score_opus":0.023649470207298687,"score_gpt":0.23101574265030483,"score_spread":0.20736627244300615,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2276034344","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010033134,0.00020883177,0.9831586,0.000039506365,0.0019161549,0.0007130642,0.0024014714,0.00021280683,0.0013164204],"genre_scores_gemma":[0.99903965,0.000020166592,0.0002103111,0.000009779274,0.000005570028,0.00021956055,0.00005058438,0.000036016558,0.00040833527],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983696,0.00004065368,0.00061416056,0.00027774193,0.00034502367,0.00035283034],"domain_scores_gemma":[0.99902153,0.0000723911,0.00007336002,0.0003990521,0.00024024364,0.00019342985],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046298368,0.00022878604,0.0006020867,0.00025517042,0.000057880105,0.000027347614,0.00016477091,0.00018322251,0.000014638027],"category_scores_gemma":[0.000008012104,0.0002363106,0.0004067771,0.0006724302,0.000049304595,0.00019269832,4.5568476e-7,0.00014383004,0.000011053689],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012172936,0.0001457715,0.000008832038,0.00022401004,0.0011055876,4.885024e-7,0.0010739331,0.9954081,0.0004434831,0.00016270224,0.001091622,0.00021373776],"study_design_scores_gemma":[0.00074310706,0.00017426492,0.000045615034,0.00012382271,0.0007224252,0.000002569033,0.000638872,0.9925282,0.0021834695,0.000017005688,0.0025072384,0.00031343603],"about_ca_topic_score_codex":0.000072683,"about_ca_topic_score_gemma":0.00010859239,"teacher_disagreement_score":0.9890065,"about_ca_system_score_codex":0.00031509966,"about_ca_system_score_gemma":0.000055176584,"threshold_uncertainty_score":0.9636467},"labels":[],"label_agreement":null},{"id":"W2294657436","doi":"10.1109/icpst.1998.729045","title":"Thyristor aging","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Thyristor; Reliability (semiconductor); Integrated gate-commutated thyristor; Life expectancy; Reliability engineering; MOS-controlled thyristor; Electrical engineering; Power (physics); Computer science; Engineering; Voltage; Medicine","score_opus":0.008718768654962291,"score_gpt":0.15683412047650988,"score_spread":0.1481153518215476,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2294657436","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017821632,0.001525286,0.032717478,0.00025996816,0.0009658912,0.00007332703,0.0000011893933,0.0010316999,0.94560355],"genre_scores_gemma":[0.9927671,0.00003740523,0.0003840425,0.000063269705,0.000038248607,0.0000040538443,1.2875036e-7,0.0000070822894,0.006698649],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997303,0.0000031778552,0.00006491092,0.000051885603,0.000039979303,0.000109767876],"domain_scores_gemma":[0.9998342,0.000009895087,0.0000029685489,0.00011796222,0.00000613945,0.00002886198],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00003700461,0.000041857664,0.00005020007,0.000014167265,0.000013739916,0.0000078327475,0.00005280518,0.000018137074,0.0005941198],"category_scores_gemma":[0.000006877518,0.00003615445,0.000020689657,0.00004249469,0.0000074265795,0.000050039554,0.0000056028334,0.000038435213,0.0006835108],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000010176825,0.00004834143,0.001199041,0.00032808605,0.00005077598,0.000025536963,0.0018915265,0.005804721,0.0044845175,0.01475781,0.93695194,0.03445669],"study_design_scores_gemma":[0.00012409221,0.000007834463,0.0003257296,0.000021342512,0.000002590538,0.000010535697,0.0000516764,0.10527522,0.0017743872,0.00014965411,0.89209646,0.00016045054],"about_ca_topic_score_codex":0.0000051463676,"about_ca_topic_score_gemma":0.0000048213724,"teacher_disagreement_score":0.9749455,"about_ca_system_score_codex":0.000025652289,"about_ca_system_score_gemma":4.2624603e-7,"threshold_uncertainty_score":0.8785376},"labels":[],"label_agreement":null},{"id":"W2315225505","doi":"10.1109/tpwrd.2014.2321409","title":"A Novel Approach to Investigate the Effect of Maintenance on the Replacement Time for Transformers","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Reliability engineering; Optimal maintenance; Transformer; Maintenance engineering; Predictive maintenance; Preventive maintenance; Schedule; Planned maintenance; Engineering; Proactive maintenance; Reliability (semiconductor); Condition-based maintenance; Computer science; Power (physics); Voltage; Electrical engineering","score_opus":0.007912917914766024,"score_gpt":0.187494984954783,"score_spread":0.17958206704001697,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2315225505","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06540892,0.000015137298,0.92704356,0.00058725226,0.0006311139,0.0015181582,0.00009624099,0.000110566,0.0045890715],"genre_scores_gemma":[0.99798644,0.000008820525,0.00038657206,0.00048755115,0.000014480172,0.0005568126,0.0000013379624,0.00003529536,0.0005226943],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99884546,0.00007801902,0.00029450952,0.0002531998,0.0002115732,0.00031725684],"domain_scores_gemma":[0.9986878,0.0006623275,0.000035805573,0.000483585,0.00004807837,0.00008237481],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009210504,0.00022731829,0.00026102978,0.000071507944,0.00013977739,0.000019066953,0.000280916,0.00007467662,0.000014363931],"category_scores_gemma":[0.000026963264,0.00012788243,0.00022318593,0.00020171521,0.00010096357,0.00006132446,9.436896e-7,0.00021576436,0.00004943321],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022116564,0.0003495289,0.000003636785,0.00080256694,0.00061843515,4.1470736e-7,0.0033240353,0.87622684,0.0783039,0.0015301377,0.02739164,0.009237216],"study_design_scores_gemma":[0.0043028067,0.0058425814,0.0000908252,0.00091516954,0.00030016562,0.000029881996,0.00038405185,0.38233432,0.52663416,0.00012362604,0.07802587,0.0010165112],"about_ca_topic_score_codex":0.000021798745,"about_ca_topic_score_gemma":0.00000704346,"teacher_disagreement_score":0.9325775,"about_ca_system_score_codex":0.00009162257,"about_ca_system_score_gemma":0.000013983092,"threshold_uncertainty_score":0.52148944},"labels":[],"label_agreement":null},{"id":"W2320486458","doi":"10.1109/intlec.2006.251618","title":"Balancing Power Availability With Energy Efficiency","year":2006,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Telus (Canada)","funders":"","keywords":"Vendor; Capital cost; Power (physics); Computer science; Standby power; Capital expenditure; Operational costs; Risk analysis (engineering); Reliability engineering; Operating expense; Generator (circuit theory); Environmental economics; Electric power system; Business; Operations management; Finance; Engineering; Economics; Electrical engineering; Marketing","score_opus":0.0019382049964414758,"score_gpt":0.14969868718458115,"score_spread":0.14776048218813967,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2320486458","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25421304,0.00029210164,0.27901116,0.000051924515,0.00038016634,0.00009622523,0.0000034340032,0.0008217629,0.46513018],"genre_scores_gemma":[0.9974774,0.0000021730768,0.00057416334,0.000037940525,0.000028668112,0.000010507821,0.0000016060433,0.000014585603,0.0018529346],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99926263,0.000011709847,0.00017254744,0.00017048008,0.00012231301,0.0002602948],"domain_scores_gemma":[0.9995953,0.00003084959,0.0000124911485,0.00028450237,0.000036036516,0.00004082114],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013229957,0.000115675815,0.00013129055,0.000026777778,0.000031937707,0.00001930839,0.000097601245,0.000045145265,0.00016899416],"category_scores_gemma":[0.00000833231,0.000083574196,0.00003209863,0.00014544024,0.000039209528,0.0000815024,0.000012187461,0.00005626628,0.000051692434],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014783074,0.001033542,0.100771494,0.0012175792,0.00017923683,0.000157546,0.0009771468,0.34421,0.046018403,0.33153096,0.16844243,0.0053138547],"study_design_scores_gemma":[0.0024880185,0.0005069722,0.08208289,0.00032738468,0.000044420944,0.00017609674,0.00040394627,0.12340397,0.07536033,0.0038962387,0.70874715,0.0025625818],"about_ca_topic_score_codex":0.00033867633,"about_ca_topic_score_gemma":0.0003350381,"teacher_disagreement_score":0.7432644,"about_ca_system_score_codex":0.00006946787,"about_ca_system_score_gemma":0.000013431846,"threshold_uncertainty_score":0.34080568},"labels":[],"label_agreement":null},{"id":"W2341892032","doi":"10.3166/ejee.17.233-266","title":"Répartitions de charges possibiliste et probabiliste pour l’analyse des incertitudes","year":2014,"lang":"fr","type":"article","venue":"European Journal of Electrical Engineering","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Humanities; Physics; Philosophy","score_opus":0.013553496285530249,"score_gpt":0.22238892934945348,"score_spread":0.20883543306392324,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2341892032","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16149963,0.017707288,0.8066247,0.0026884694,0.0016749712,0.00020591414,0.0000113695705,0.00021204761,0.009375603],"genre_scores_gemma":[0.96553165,0.00070603087,0.03194517,0.000101235986,0.0010312996,0.0000030907504,0.0000015453743,0.00010889961,0.0005710684],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99685854,0.00068989716,0.0010854799,0.00024174235,0.00029400177,0.0008303472],"domain_scores_gemma":[0.998211,0.00042800014,0.00024689225,0.0003158005,0.00029651946,0.0005017499],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0035319421,0.0003663931,0.00057048857,0.0002755559,0.00009171863,0.00015024385,0.000480696,0.00008638277,0.00006751542],"category_scores_gemma":[0.002443343,0.00035512997,0.00038954124,0.0005762503,0.00009593254,0.00045863702,0.000059761853,0.001007887,0.000096410826],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056294077,0.0003463169,0.0010594088,0.0013174609,0.000498574,0.00039820696,0.0016535883,0.8965433,0.047637057,0.02619698,0.0045521753,0.019740615],"study_design_scores_gemma":[0.003216736,0.0022975788,0.03320533,0.0066065346,0.0008428733,0.0045226645,0.00013540204,0.7603576,0.011972469,0.0057150098,0.16909155,0.0020362325],"about_ca_topic_score_codex":0.000024720863,"about_ca_topic_score_gemma":0.000011201806,"teacher_disagreement_score":0.804032,"about_ca_system_score_codex":0.00070833776,"about_ca_system_score_gemma":0.00014854246,"threshold_uncertainty_score":0.9998901},"labels":[],"label_agreement":null},{"id":"W2343408626","doi":"10.1109/tpwrs.2015.2507061","title":"Clustering Technique Applied to Nodal Reliability Indices for Optimal Planning of Energy Resources","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Taibah University","keywords":"Cluster analysis; Reliability (semiconductor); Computer science; Reliability engineering; Energy (signal processing); Mathematical optimization; Engineering; Power (physics); Mathematics; Artificial intelligence; Physics; Statistics","score_opus":0.008743887332442454,"score_gpt":0.21497829083315806,"score_spread":0.2062344035007156,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2343408626","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026206408,0.00006808428,0.9692184,0.000034243363,0.0016706405,0.0008643574,0.00016227945,0.00038391555,0.001391681],"genre_scores_gemma":[0.99619037,0.0000052106416,0.00223828,0.00001596365,0.000025484178,0.0011958928,7.1338235e-7,0.000053821117,0.00027429336],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9983786,0.00004407644,0.0006020425,0.0003667698,0.00022583475,0.0003826946],"domain_scores_gemma":[0.9989057,0.00028110392,0.00008679089,0.0005093488,0.000081562306,0.00013549453],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005191887,0.00024980292,0.00042893548,0.00024065016,0.00008957207,0.000027558934,0.00027926412,0.00019849879,0.000011060122],"category_scores_gemma":[0.000009500185,0.00019454911,0.00013893744,0.00021429856,0.00005669947,0.00012039931,0.000002878359,0.00010881592,0.000009380488],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047238838,0.00009761098,0.000019312412,0.0008612969,0.000118741395,0.0000023255718,0.0015436524,0.8996778,0.095287114,0.00015477407,0.00071492133,0.0010500643],"study_design_scores_gemma":[0.0030527783,0.0016354775,0.0003196852,0.005509258,0.00012745238,0.00009143622,0.002394894,0.025308339,0.81877494,0.000060399154,0.14064494,0.0020804002],"about_ca_topic_score_codex":0.00006155489,"about_ca_topic_score_gemma":0.0000173292,"teacher_disagreement_score":0.96998394,"about_ca_system_score_codex":0.00017453374,"about_ca_system_score_gemma":0.000020537584,"threshold_uncertainty_score":0.79334825},"labels":[],"label_agreement":null},{"id":"W2347370730","doi":"","title":"Non-coherence Phenomenon in Combinative Transmission Line and Substation Configurations","year":2006,"lang":"en","type":"article","venue":"Proceedings of the CSEE","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Coherence (philosophical gambling strategy); Transmission system; Reliability (semiconductor); Transmission line; Computer science; Reliability engineering; Intuition; Transmission (telecommunications); Electric power transmission; Power transmission; Electric power system; Engineering; Power (physics); Telecommunications; Electrical engineering; Mathematics; Physics","score_opus":0.004421061617345663,"score_gpt":0.18059307857211088,"score_spread":0.17617201695476523,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2347370730","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9820059,0.00019106662,0.0012599183,0.00025141917,0.00006989674,0.00030352673,0.0000037968093,0.000034208508,0.015880298],"genre_scores_gemma":[0.9996117,0.00001964037,0.00017216105,0.0000057958873,0.000009338393,0.00001987182,9.677844e-7,0.000006289989,0.00015424869],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995818,0.0000017299191,0.0001711424,0.0000818331,0.00007208444,0.00009139967],"domain_scores_gemma":[0.9998247,0.000017619795,0.000039852675,0.000032772095,0.00007044574,0.00001463149],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011972417,0.00006567201,0.00010051925,0.0000347083,0.000027067039,0.00001256878,0.00008297128,0.000033404416,0.0000031225165],"category_scores_gemma":[0.000012770411,0.000050035163,0.000016342427,0.00015236535,0.00004178192,0.00013460602,0.00000812401,0.00007414504,8.289742e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046221485,0.00017789946,0.010475942,0.0015749238,0.000020099995,4.0302658e-7,0.008873199,0.0041788095,0.94180256,0.026365679,0.001374112,0.0051101577],"study_design_scores_gemma":[0.0020218065,0.0001480534,0.22919257,0.0011928248,0.00002969623,0.0000073601113,0.0012561344,0.08110183,0.6410827,0.04123468,0.0023143028,0.00041803802],"about_ca_topic_score_codex":0.000045023706,"about_ca_topic_score_gemma":0.000012837185,"teacher_disagreement_score":0.30071983,"about_ca_system_score_codex":0.000030731422,"about_ca_system_score_gemma":0.0000053685585,"threshold_uncertainty_score":0.20403747},"labels":[],"label_agreement":null},{"id":"W2371988171","doi":"","title":"Appendix 1: The Electricity Market","year":2008,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Geography; Engineering; Electrical engineering","score_opus":0.007564144707170085,"score_gpt":0.17575531949077725,"score_spread":0.16819117478360715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2371988171","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.089556135,0.0005759344,0.044911277,0.00032597274,0.00056995964,0.00022903788,0.0000028386805,0.0006772054,0.8631516],"genre_scores_gemma":[0.9930007,0.000103950704,0.000103578925,0.000107059575,0.000035676127,0.000009399235,5.303159e-7,0.000006907607,0.0066322363],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99960184,0.0000147912715,0.000085673826,0.00006427097,0.0000717474,0.00016166894],"domain_scores_gemma":[0.9997193,0.00004503248,0.0000054818197,0.00019335192,0.000010862431,0.000025952346],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001302068,0.000057507834,0.000065873195,0.000012405859,0.00006058673,0.0000054364305,0.0001272612,0.000026536722,0.00047819508],"category_scores_gemma":[0.000020463956,0.000034347584,0.000033395703,0.000105625964,0.000026333712,0.000041055933,0.000010905448,0.00008183524,0.00045633948],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000056324834,0.000014761073,0.0013940636,0.00003581385,0.000024903571,0.000011927512,0.00021408337,0.0005757984,0.00042698105,0.0029556858,0.9930735,0.0012668197],"study_design_scores_gemma":[0.00016800825,0.000018603103,0.012028169,0.000009017557,0.0000043873374,0.00016066247,0.000035663386,0.035847954,0.003944782,0.00039025617,0.9472002,0.00019231057],"about_ca_topic_score_codex":0.000025638023,"about_ca_topic_score_gemma":0.000015465743,"teacher_disagreement_score":0.9034445,"about_ca_system_score_codex":0.000025126516,"about_ca_system_score_gemma":0.0000068505924,"threshold_uncertainty_score":0.5865473},"labels":[],"label_agreement":null},{"id":"W2382576098","doi":"","title":"Models and methods applied to risk assessment of power systems","year":2006,"lang":"en","type":"article","venue":"Electric Power","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability engineering; Component (thermodynamics); Risk analysis (engineering); Electric power system; Computer science; Engineering; Power (physics); Systems engineering; Operations research","score_opus":0.005041462635206553,"score_gpt":0.2504770058341652,"score_spread":0.24543554319895866,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2382576098","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07328087,0.0019073645,0.8381225,0.000015954201,0.00045937844,0.00049559755,0.0000140422835,0.00017734537,0.085526966],"genre_scores_gemma":[0.98958814,0.00004079141,0.010029187,0.000017375318,0.000017347895,0.000067064844,0.0000014628915,0.000029311568,0.00020934084],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99876976,0.000074775875,0.00037826126,0.00024045569,0.00018433617,0.0003524401],"domain_scores_gemma":[0.99934167,0.00012120032,0.00006373554,0.00032698657,0.00006118782,0.00008520731],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00075841986,0.00017723981,0.00036420338,0.00014975425,0.00003456943,0.000028814728,0.00013274432,0.00009815546,0.000010400313],"category_scores_gemma":[0.000023273382,0.00016114215,0.000049502083,0.00038895736,0.000015120978,0.000080476406,0.000028563578,0.00016763815,0.000006572308],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053846772,0.00025652215,0.001168483,0.0005336233,0.000312447,0.000009508474,0.00078242936,0.6822016,0.13763827,0.14653014,0.025641728,0.0048713735],"study_design_scores_gemma":[0.0019145198,0.00061727705,0.03124107,0.00022923405,0.00016275328,0.00005991222,0.00022829817,0.8378434,0.02370899,0.014540983,0.08759968,0.0018538951],"about_ca_topic_score_codex":0.00013491053,"about_ca_topic_score_gemma":0.000004055657,"teacher_disagreement_score":0.9163073,"about_ca_system_score_codex":0.00011342443,"about_ca_system_score_gemma":0.000026107142,"threshold_uncertainty_score":0.6571186},"labels":[],"label_agreement":null},{"id":"W2393105121","doi":"","title":"Reliability Based Method for Spare Planning of Power System Equipment","year":2006,"lang":"en","type":"article","venue":"Proceedings of the CSEE","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Spare part; Reliability engineering; Reliability (semiconductor); Probabilistic logic; Term (time); Engineering; Computer science; Operations research; Power (physics); Operations management","score_opus":0.008152119526067954,"score_gpt":0.22291808962121407,"score_spread":0.2147659700951461,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2393105121","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.81465006,0.0006623963,0.14081177,0.00029237283,0.0016428354,0.0024095168,0.00014500544,0.0005365913,0.038849432],"genre_scores_gemma":[0.9824015,3.1799325e-7,0.017367624,0.000010047121,0.000033925688,0.00007367186,9.100523e-7,0.000021992088,0.000090025664],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99892443,0.000006418568,0.00045287993,0.00018171633,0.00020255905,0.00023199388],"domain_scores_gemma":[0.9992609,0.0001071911,0.00016552489,0.00017471834,0.00026248296,0.000029192426],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008829827,0.00014054278,0.00031629522,0.000042931715,0.00004090537,0.000011523315,0.00032666585,0.00008087441,0.000002780085],"category_scores_gemma":[0.00012630524,0.00010226886,0.00016740285,0.00015141851,0.000042425985,0.00008287464,0.00004797195,0.00008181105,7.689555e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004918977,0.0003613516,0.030693332,0.05118343,0.00021752254,8.2659574e-7,0.0019400144,0.22436592,0.58246315,0.065225795,0.042471718,0.0005850797],"study_design_scores_gemma":[0.0013920435,0.00018292473,0.012921133,0.0031186286,0.000121650264,0.000009110869,0.0013188021,0.16959998,0.79433185,0.0027445992,0.013763103,0.0004961951],"about_ca_topic_score_codex":0.000031220807,"about_ca_topic_score_gemma":7.883179e-7,"teacher_disagreement_score":0.2118687,"about_ca_system_score_codex":0.00014043089,"about_ca_system_score_gemma":0.00001638971,"threshold_uncertainty_score":0.4170403},"labels":[],"label_agreement":null},{"id":"W2406664540","doi":"10.1061/9780784479827.163","title":"Risk Asset Management of Power Grids","year":2016,"lang":"en","type":"article","venue":"Construction Research Congress 2016","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Reliability (semiconductor); Extreme weather; Reliability engineering; Electric power system; Electric power industry; Power (physics); Electric power; Asset (computer security); Computer science; Revenue; Engineering; Operations research; Electrical engineering; Electricity; Business; Computer security; Finance; Climate change","score_opus":0.01635589768163786,"score_gpt":0.28202915114425503,"score_spread":0.26567325346261716,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2406664540","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7674708,0.0019892105,0.053562034,0.0006037463,0.010870501,0.0015410609,0.0005376721,0.0007214337,0.16270354],"genre_scores_gemma":[0.99500424,0.0016561571,0.00075882673,0.0000017499844,0.00004312857,0.000054518736,0.000001018104,0.000019013345,0.0024613352],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984512,0.00015912464,0.00030066518,0.00022748297,0.0004558746,0.00040568542],"domain_scores_gemma":[0.99876213,0.0002050155,0.00004963082,0.00050991855,0.00035710452,0.00011619537],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010741012,0.00011284165,0.00018083704,0.00018414555,0.00007369752,0.000021511503,0.00026420364,0.00008793178,0.00049391005],"category_scores_gemma":[0.00011491011,0.0000753187,0.000064685686,0.0002367923,0.00056368706,0.0001926428,0.00009389435,0.00017075216,0.0003034275],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023876638,0.00012349457,0.04039703,0.0014571772,0.0010191789,0.000086882355,0.00017452819,0.00012995239,0.019739801,0.099633045,0.19723266,0.63976747],"study_design_scores_gemma":[0.00515633,0.0003516993,0.05791747,0.00465651,0.000064716114,0.00013241019,0.0015335614,0.00067382964,0.07008845,0.01642786,0.8419367,0.0010604364],"about_ca_topic_score_codex":0.000015314614,"about_ca_topic_score_gemma":0.0000042896677,"teacher_disagreement_score":0.64470404,"about_ca_system_score_codex":0.00011968955,"about_ca_system_score_gemma":0.000033931752,"threshold_uncertainty_score":0.5407969},"labels":[],"label_agreement":null},{"id":"W2416370075","doi":"10.1007/s40903-016-0047-8","title":"Unified Reliability Index Development for Utility Performance Assessment","year":2016,"lang":"en","type":"article","venue":"Intelligent Industrial Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"King Abdulaziz University","keywords":"Reliability engineering; Reliability (semiconductor); Index (typography); Computer science; Engineering; Physics","score_opus":0.056901103967842856,"score_gpt":0.25798099969902133,"score_spread":0.20107989573117846,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2416370075","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.50498676,0.00019753935,0.47262314,0.00021615106,0.012235393,0.0034979768,0.000099172794,0.00076580845,0.005378094],"genre_scores_gemma":[0.99719226,0.00003774074,0.00018878123,0.000008736315,0.00045758922,0.0006143144,0.000010815814,0.00004039073,0.0014493712],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9972298,0.000116778385,0.0011381214,0.00048036664,0.0003982642,0.0006366717],"domain_scores_gemma":[0.99843615,0.00031493485,0.00013543316,0.0006714497,0.00023017265,0.00021185321],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021105378,0.00033822775,0.00050568464,0.00009455052,0.00013357366,0.000067221226,0.00041701653,0.00039045027,0.00005624182],"category_scores_gemma":[0.00024221769,0.00023601986,0.00012953134,0.00019858312,0.000081516475,0.00022188284,0.000061858314,0.00024111557,0.000089459616],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011105799,0.00081183907,0.21042316,0.004265633,0.0009623053,0.000011166323,0.0013776617,0.029269816,0.003745067,0.007203914,0.06306006,0.6777588],"study_design_scores_gemma":[0.0012978703,0.00014554874,0.004169387,0.0008949846,0.000019916477,0.000007798,0.00017767357,0.02191351,0.012932577,0.00009315507,0.9577223,0.0006252993],"about_ca_topic_score_codex":0.000071471026,"about_ca_topic_score_gemma":0.000015574624,"teacher_disagreement_score":0.8946622,"about_ca_system_score_codex":0.0010016214,"about_ca_system_score_gemma":0.00025271426,"threshold_uncertainty_score":0.962461},"labels":[],"label_agreement":null},{"id":"W2466734724","doi":"10.2316/journal.203.2009.1.203-4374","title":"DISTRIBUTIONS OF LARGE-SCALE POWER OUTAGES: EXTREME VALUES AND THE EFFECT OF TRUNCATION","year":2009,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Truncation (statistics); Scale (ratio); Extreme value theory; Statistics; Power (physics); Environmental science; Mathematics; Physics; Thermodynamics","score_opus":0.003500590247835934,"score_gpt":0.2125594145480887,"score_spread":0.20905882430025274,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2466734724","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8561622,0.01375788,0.12054119,0.0005808028,0.004155944,0.00013105103,0.00011636453,0.00002797742,0.0045265737],"genre_scores_gemma":[0.99952704,0.00025302675,0.000029402927,0.000010757862,0.00007070565,0.000002225863,0.0000031609227,0.000005070746,0.00009860541],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99896854,0.000093619405,0.0005115798,0.000066238244,0.00026760346,0.000092419934],"domain_scores_gemma":[0.9992473,0.00016371718,0.00021577349,0.00009875809,0.00023089095,0.000043546635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00074549293,0.00009622059,0.00029728687,0.0000815772,0.000022794113,0.000025771487,0.00016273116,0.0000509751,0.0000053375825],"category_scores_gemma":[0.00008637723,0.00005944012,0.000102766746,0.00005372581,0.000075527154,0.00014016683,0.00001540799,0.000074572934,2.512215e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.009233717,0.0015167344,0.062262274,0.0026067563,0.010187701,0.0002056761,0.066973865,0.110855065,0.091991514,0.57061833,0.03510746,0.038440924],"study_design_scores_gemma":[0.06643151,0.010822242,0.25463542,0.0150370775,0.0015939921,0.0068763946,0.01650231,0.17566697,0.07687405,0.020633215,0.35174105,0.003185785],"about_ca_topic_score_codex":0.000032005388,"about_ca_topic_score_gemma":0.000003184357,"teacher_disagreement_score":0.5499851,"about_ca_system_score_codex":0.000033517143,"about_ca_system_score_gemma":0.000010024853,"threshold_uncertainty_score":0.24238977},"labels":[],"label_agreement":null},{"id":"W2467726502","doi":"","title":"Asset Risk Management of Electric Power Grids","year":2015,"lang":"en","type":"dissertation","venue":"Spectrum Research Repository (Concordia University)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Electric power; Electric power system; Order (exchange); Asset (computer security); Critical infrastructure; Engineering; Asset management; Power (physics); Revenue; Electric power industry; Business; Computer science; Finance; Electricity; Electrical engineering; Computer security","score_opus":0.013195205637150315,"score_gpt":0.25082274262120685,"score_spread":0.23762753698405653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2467726502","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.55280185,0.001022055,0.000068864945,0.000008507568,0.0016367366,0.0005215308,0.0000316024,0.00018386786,0.44372496],"genre_scores_gemma":[0.95831656,0.0013458028,0.000026961021,5.2784384e-7,0.000095601295,0.000006830716,0.0000680805,0.00006777467,0.040071875],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9968175,0.00038846096,0.00040129846,0.00056339387,0.0010137368,0.00081556727],"domain_scores_gemma":[0.9980748,0.00011627988,0.00017121197,0.00089701096,0.0004319772,0.00030870843],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009787041,0.0003493145,0.0005573752,0.0011864193,0.00020885323,0.00005779566,0.00092910684,0.0004139583,0.000033501416],"category_scores_gemma":[0.000041536307,0.00039868674,0.00025048057,0.0016320752,0.000102198464,0.00021804249,0.000106675536,0.0012885809,0.00006612725],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.012443596,0.0034400288,0.098365925,0.05549386,0.02747615,0.03145332,0.013793086,0.013668919,0.06146885,0.107189946,0.54570395,0.029502375],"study_design_scores_gemma":[0.004890468,0.0026600524,0.17538935,0.0035032972,0.0011513546,0.00009570358,0.020477219,0.002960945,0.099108644,0.008025846,0.677925,0.0038121457],"about_ca_topic_score_codex":0.0026789631,"about_ca_topic_score_gemma":0.0015694983,"teacher_disagreement_score":0.4055147,"about_ca_system_score_codex":0.0013213528,"about_ca_system_score_gemma":0.00040279215,"threshold_uncertainty_score":0.9998465},"labels":[],"label_agreement":null},{"id":"W2473880400","doi":"10.2172/1128556","title":"ARM Operations Quarterly Report October 1-December 31, 2013","year":2013,"lang":"en","type":"report","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Computer science; National laboratory; Database; Environmental science; Geography; Engineering","score_opus":0.01656249575976225,"score_gpt":0.24874060648028082,"score_spread":0.23217811072051858,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2473880400","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023401477,0.0016484144,0.011272828,0.00022877542,0.01019726,0.0010761784,0.000071480616,0.0011835579,0.97198135],"genre_scores_gemma":[0.07529379,0.0018597568,0.0027654974,0.00010811876,0.0017158585,0.001028383,0.0007031845,0.00027912468,0.9162463],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9969968,0.000026416023,0.0011766489,0.0005789637,0.0006711113,0.00055003015],"domain_scores_gemma":[0.9974847,0.00004552005,0.00009897382,0.0014209191,0.0007261042,0.00022381605],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00059377245,0.000531666,0.0007589489,0.00014378101,0.00007805364,0.0001836725,0.0003092406,0.00064680347,0.0030873467],"category_scores_gemma":[0.000099473924,0.00044794194,0.0002952954,0.00015798103,0.00005416099,0.0003191403,0.000036209833,0.00058201666,0.0025710524],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[4.0763058e-7,0.000038413564,0.000045899684,0.00037537183,0.00014395836,0.000112404334,0.00009932679,0.0014413687,0.000042729975,0.00013619095,0.9968153,0.0007486053],"study_design_scores_gemma":[0.00009815852,0.00003718189,0.00022206469,0.00020936836,0.00005582453,0.0011094769,0.00006073392,0.0028561358,0.000042787924,0.00007064565,0.99462646,0.0006111334],"about_ca_topic_score_codex":0.004821513,"about_ca_topic_score_gemma":0.002942594,"teacher_disagreement_score":0.072953634,"about_ca_system_score_codex":0.0004872843,"about_ca_system_score_gemma":0.0005505201,"threshold_uncertainty_score":0.9997972},"labels":[],"label_agreement":null},{"id":"W2484694923","doi":"10.1002/9781118849972.ch11","title":"Application of Risk Evaluation to Composite Systems with Renewable Sources","year":2014,"lang":"en","type":"other","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Renewable energy; Computer science; Transmission (telecommunications); Wind power; Reliability engineering; Renewable resource; Electric power system; Environmental science; Environmental economics; Mathematical optimization; Power (physics); Engineering; Mathematics; Telecommunications; Electrical engineering","score_opus":0.004216410621015961,"score_gpt":0.1954046114147191,"score_spread":0.19118820079370313,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2484694923","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0001901598,0.0006590591,0.6133845,0.0000032069215,0.00020167399,0.0007844555,0.000026391179,0.0002769644,0.3844736],"genre_scores_gemma":[0.871283,0.0000693932,0.0031622893,0.000012329509,0.00028343932,0.0004920594,0.0000733145,0.0004204034,0.12420379],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99920756,0.000048978538,0.00019716096,0.00017670823,0.00024064913,0.00012894375],"domain_scores_gemma":[0.99931556,0.000029491941,0.00011733568,0.00042438536,0.0000677962,0.000045415567],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042740448,0.00014438933,0.0002904468,0.00011065447,0.0000123564305,0.0000130334865,0.00012476534,0.00012507565,0.000050337294],"category_scores_gemma":[0.000012491787,0.000111197754,0.00002471944,0.000113865986,0.000014328161,0.000018781911,0.000011576693,0.00005104884,0.000111779475],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000110393,0.000015857748,0.0005345769,0.0015087337,0.00012312781,7.9012544e-8,0.00017306097,0.81018054,0.00044087018,0.00031475507,0.18481438,0.0018829667],"study_design_scores_gemma":[0.00029214294,0.000046305315,0.00019167284,0.00091835146,0.00011323801,0.0000021645585,0.00007572977,0.24165557,0.00041474588,0.000019273073,0.75596714,0.0003036541],"about_ca_topic_score_codex":0.0045705372,"about_ca_topic_score_gemma":0.001240298,"teacher_disagreement_score":0.8710928,"about_ca_system_score_codex":0.00005268607,"about_ca_system_score_gemma":0.000010597971,"threshold_uncertainty_score":0.6909316},"labels":[],"label_agreement":null},{"id":"W2488660179","doi":"10.1007/s13198-016-0521-4","title":"Reliability/environmental impacts of wind energy curtailment due to ramping constraints","year":2016,"lang":"en","type":"article","venue":"International Journal of Systems Assurance Engineering and Management","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Renewable energy; Reliability (semiconductor); Wind speed; Environmental science; Reliability engineering; Electric power system; Engineering; Marine engineering; Power (physics); Meteorology; Electrical engineering","score_opus":0.0030597179405941065,"score_gpt":0.18131757201339074,"score_spread":0.17825785407279662,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2488660179","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5868678,0.001825406,0.40337935,0.00037466586,0.0063432297,0.00032301265,0.00006681448,0.000067062545,0.00075265043],"genre_scores_gemma":[0.99818933,0.000818067,0.0007367204,0.000013920139,0.0001348729,0.000008258376,6.0089764e-7,0.00001762344,0.000080587706],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986369,0.000017988408,0.00063006865,0.00013139221,0.0003950317,0.00018862376],"domain_scores_gemma":[0.9994272,0.00008116796,0.00014403234,0.00014529322,0.000075517,0.00012680153],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043587366,0.00015447267,0.00031407026,0.00020530977,0.00001162792,0.000029728539,0.00024145248,0.0000407102,0.000008967259],"category_scores_gemma":[0.000043955224,0.00011665482,0.000075367825,0.000055404467,0.00003565488,0.000197037,0.000052710868,0.00005651301,0.0000031258612],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020691447,0.00023542711,0.004863098,0.0025004426,0.002741877,0.00058772374,0.0009215146,0.75456274,0.15333703,0.013157374,0.004517239,0.06236862],"study_design_scores_gemma":[0.013193332,0.0011989012,0.21540557,0.043307144,0.0003487423,0.0035951275,0.00218258,0.04301841,0.038875863,0.00035675132,0.63545126,0.0030662965],"about_ca_topic_score_codex":0.000011991704,"about_ca_topic_score_gemma":0.0000011830293,"teacher_disagreement_score":0.71154433,"about_ca_system_score_codex":0.00023801089,"about_ca_system_score_gemma":0.00000873857,"threshold_uncertainty_score":0.47570452},"labels":[],"label_agreement":null},{"id":"W2497303639","doi":"10.1002/9781118849972.ch9","title":"Application of Risk Evaluation to Selecting Substation Configurations","year":2014,"lang":"en","type":"other","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Reliability engineering; Flexibility (engineering); Reliability (semiconductor); Electric power system; Electric power transmission; Transmission (telecommunications); Transmission line; Engineering; Transmission network; Power transmission; Computer science; Power (physics); Electrical engineering","score_opus":0.005845119614939102,"score_gpt":0.2320282637379385,"score_spread":0.2261831441229994,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2497303639","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00009843105,0.00007654484,0.64062655,0.000006713907,0.00019664898,0.00055624626,0.0000223735,0.00024615118,0.35817033],"genre_scores_gemma":[0.9756707,0.00003554262,0.0040450217,0.000016521697,0.00018358053,0.00032036746,0.00015910329,0.00022697811,0.019342177],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992908,0.000050683524,0.00023189145,0.00014538613,0.00017415688,0.00010707272],"domain_scores_gemma":[0.9994331,0.000058761838,0.000112369315,0.00024765267,0.00011567092,0.000032428183],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005007735,0.00010775037,0.00016693384,0.00014214178,0.000017085735,0.000007839469,0.00007177627,0.00012372762,0.00030701893],"category_scores_gemma":[0.00016184502,0.00010806818,0.000030150744,0.00017294087,0.00000785333,0.00002749325,0.000004816719,0.00006931934,0.00020759519],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000080133095,0.00004502611,0.00036295794,0.0012381301,0.00019262878,6.557267e-8,0.001492785,0.13852927,0.008224622,0.013721189,0.6601805,0.17600481],"study_design_scores_gemma":[0.000327698,0.000029191737,0.0013505646,0.00026895877,0.0001297441,0.0000010061294,0.00012002932,0.46968606,0.0028133637,0.000509492,0.52434933,0.00041454352],"about_ca_topic_score_codex":0.00035880043,"about_ca_topic_score_gemma":0.0013806394,"teacher_disagreement_score":0.9755723,"about_ca_system_score_codex":0.00006449131,"about_ca_system_score_gemma":0.000016843784,"threshold_uncertainty_score":0.44068927},"labels":[],"label_agreement":null},{"id":"W2533848003","doi":"10.1109/sge.2012.6463960","title":"Evaluation of expected energy generation in multi-area interconnected systems with renewable energy generating units","year":2012,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Mohawk College","funders":"","keywords":"Renewable energy; Computer science; Fossil fuel; Electricity generation; Wind power; Generator (circuit theory); Automotive engineering; Reliability engineering; Electrical engineering; Engineering; Power (physics); Waste management","score_opus":0.061587581592584026,"score_gpt":0.2369475909588454,"score_spread":0.1753600093662614,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2533848003","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4559064,0.0025612735,0.5370944,0.000004126679,0.00071263086,0.00021466224,0.000005945718,0.00018686862,0.0033136804],"genre_scores_gemma":[0.99816126,0.000024718065,0.0011986245,0.000009986963,0.00009696204,0.00017631456,0.00006564296,0.000028766966,0.00023772662],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99841815,0.0002772433,0.00045879366,0.00017195306,0.00036572834,0.00030812592],"domain_scores_gemma":[0.9989418,0.000040700095,0.00007966411,0.00027345296,0.00059161434,0.00007278457],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00093967,0.00017492606,0.0002579375,0.0001664107,0.000029913159,0.000023314587,0.00009166037,0.0001111421,0.000034570054],"category_scores_gemma":[0.00014317552,0.00014616438,0.000020434918,0.00051752303,0.00001760664,0.0003488864,0.000017450686,0.000053197025,9.862906e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005674609,0.00005365452,0.0007099202,0.00004812764,0.00004783207,4.801109e-7,0.0006790448,0.92356426,0.072978385,0.0006512732,0.00053972704,0.00072161184],"study_design_scores_gemma":[0.0006987808,0.000030403788,0.00016478504,0.00011660007,0.000028148683,0.000008527,0.00056484813,0.9417749,0.055968177,0.000003093518,0.00045935152,0.00018240296],"about_ca_topic_score_codex":0.0069759744,"about_ca_topic_score_gemma":0.015595868,"teacher_disagreement_score":0.54225487,"about_ca_system_score_codex":0.00028441334,"about_ca_system_score_gemma":0.00006683767,"threshold_uncertainty_score":0.99963665},"labels":[],"label_agreement":null},{"id":"W2535508589","doi":"10.1109/tdcllm.2006.340747","title":"Predicting Future Asset Condition Based on Current Health Index and Maintenance Level","year":2006,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":61,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kinectrics (Canada)","funders":"","keywords":"Asset (computer security); Asset management; Index (typography); Risk analysis (engineering); Current asset; Business; Maintenance engineering; Investment (military); Restructuring; Environmental economics; Actuarial science; Computer science; Finance; Reliability engineering; Economics; Working capital; Engineering; Computer security","score_opus":0.009689333525117904,"score_gpt":0.23061254350802357,"score_spread":0.22092320998290566,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2535508589","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14955816,0.0023375505,0.812221,0.00385986,0.005011863,0.0012120389,0.00052723044,0.001651115,0.023621192],"genre_scores_gemma":[0.99903435,0.000037965685,0.0002995053,0.0002132319,0.00022597377,0.000021568176,0.00004040067,0.000015331898,0.00011165568],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991414,0.000026998247,0.00022972123,0.00018719613,0.0001400513,0.00027464703],"domain_scores_gemma":[0.9996542,0.000039521194,0.00003999435,0.00016700882,0.00003004633,0.00006923248],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023623861,0.0001342096,0.00016061812,0.000052625015,0.00006493719,0.000026390757,0.000056930876,0.000056535857,0.000016615724],"category_scores_gemma":[0.000014023397,0.000113814654,0.00003020744,0.00008971129,0.000022864093,0.00008655458,0.000009091546,0.00018239305,0.000009083009],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013227719,0.00050894957,0.14445108,0.0053542936,0.000046304332,0.000021643864,0.00053469493,0.20238347,0.00057713233,0.049763337,0.5244475,0.07177934],"study_design_scores_gemma":[0.0013789703,0.00013101722,0.23270796,0.00068260316,0.000005503733,0.0000131004035,0.00015760104,0.6586137,0.00026520964,0.00080267194,0.10484625,0.00039543284],"about_ca_topic_score_codex":0.00012352024,"about_ca_topic_score_gemma":0.00027948068,"teacher_disagreement_score":0.8494762,"about_ca_system_score_codex":0.00013129295,"about_ca_system_score_gemma":0.000028422393,"threshold_uncertainty_score":0.46412268},"labels":[],"label_agreement":null},{"id":"W2538040492","doi":"","title":"Feasibility study of maintenance cost reduction in redundant customer delivery systems","year":2005,"lang":"en","type":"article","venue":"Probabilistic Methods Applied to Power Systems, 2004 International Conference on","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Corrective maintenance; Reliability engineering; Predictive maintenance; Preventive maintenance; Cost reduction; Reliability (semiconductor); Planned maintenance; Redundancy (engineering); Proactive maintenance; Operational maintenance; Operations management; Maintenance engineering; Risk analysis (engineering); Engineering; Business; Computerized maintenance management system; Marketing","score_opus":0.059704330300030306,"score_gpt":0.33703707632100993,"score_spread":0.2773327460209796,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2538040492","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4272816,0.00065353466,0.347444,0.00040045177,0.016228465,0.019580284,0.00031938037,0.000782913,0.18730938],"genre_scores_gemma":[0.9922446,0.000019067451,0.005760853,0.000018365525,0.00011832244,0.0013396267,0.000012040216,0.000049978393,0.0004371181],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9957619,0.00048249794,0.001657532,0.00084899104,0.0007212736,0.00052780914],"domain_scores_gemma":[0.9977817,0.0002354564,0.00030051515,0.0008637962,0.000614768,0.00020374454],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0032976782,0.00044956926,0.0008817833,0.00043029297,0.000053261094,0.00012023598,0.00070973416,0.00018691628,0.00006884767],"category_scores_gemma":[0.0003840255,0.00042048757,0.00008317882,0.0004498476,0.000095273164,0.00017762405,0.00009781646,0.00042728535,0.00013392407],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008956755,0.0020970677,0.0004896148,0.00096750766,0.00025181813,0.000013447624,0.0041416623,0.75374985,0.014220247,0.21437,0.0024759404,0.0063271993],"study_design_scores_gemma":[0.01705778,0.0031351068,0.0101742055,0.008759041,0.0003297308,0.00042003806,0.05111592,0.7906421,0.00539992,0.005279452,0.10110814,0.0065785884],"about_ca_topic_score_codex":0.00042603095,"about_ca_topic_score_gemma":0.00010916583,"teacher_disagreement_score":0.56496304,"about_ca_system_score_codex":0.0016108835,"about_ca_system_score_gemma":0.00012037328,"threshold_uncertainty_score":0.9998247},"labels":[],"label_agreement":null},{"id":"W2544611310","doi":"10.1109/epc.2007.4520301","title":"Reliability Based Analysis for Optimum Allocation of DG","year":2007,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Computer science; Process (computing); Relation (database); Engineering; Data mining","score_opus":0.009004666031595098,"score_gpt":0.2294413605463559,"score_spread":0.22043669451476078,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2544611310","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08328485,0.000027625327,0.910728,0.000029980052,0.00012907248,0.00020373028,0.000008324593,0.00011687158,0.0054715755],"genre_scores_gemma":[0.9752025,0.0000012668721,0.024602683,0.00002119585,0.000013032977,0.000014089025,0.000011454883,0.0000066642997,0.0001270836],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99935794,0.000007788403,0.00028984275,0.000118854216,0.00008308353,0.00014246884],"domain_scores_gemma":[0.9993436,0.00015864646,0.0000273405,0.00030182727,0.0001278633,0.000040759533],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009029712,0.00006700209,0.00017686783,0.00009730476,0.00001323812,0.0000039089064,0.00008293401,0.000057201432,0.000030063578],"category_scores_gemma":[0.00008554666,0.000059190792,0.00014448164,0.00036968384,0.000021717236,0.000052218264,0.000004782032,0.000030446618,0.000003081077],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007715673,0.00011882347,0.010267012,0.00082862796,0.00030613114,3.6158045e-7,0.00012484078,0.96407694,0.016070362,0.004974181,0.0011087002,0.0020468868],"study_design_scores_gemma":[0.00037639096,0.00005070617,0.035493817,0.000016276128,0.00015873795,1.6591505e-7,0.000077053344,0.88218653,0.07694535,0.00031471654,0.00421046,0.00016976513],"about_ca_topic_score_codex":0.000046472298,"about_ca_topic_score_gemma":0.00012371052,"teacher_disagreement_score":0.8919177,"about_ca_system_score_codex":0.000057058878,"about_ca_system_score_gemma":0.0000105712015,"threshold_uncertainty_score":0.24137305},"labels":[],"label_agreement":null},{"id":"W2545158629","doi":"10.1109/ptc.1999.826582","title":"Impact of thyristor controlled series capacitor on power system reliability","year":2003,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Thyristor; Reliability (semiconductor); Capacitor; Reliability engineering; Electric power transmission; Integrated gate-commutated thyristor; Series (stratigraphy); Electric power system; Power transmission; Computer science; Power (physics); Transmission system; Transmission (telecommunications); Series and parallel circuits; Engineering; Electrical engineering; Voltage; Physics","score_opus":0.004299458635440876,"score_gpt":0.19823064466516974,"score_spread":0.19393118602972886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2545158629","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8038408,0.00019874774,0.004764213,0.000015223375,0.0016845778,0.0007086091,0.000038960738,0.00048226776,0.18826656],"genre_scores_gemma":[0.998794,0.000005542573,0.00027256986,0.00000561719,0.000017934944,0.00004598867,7.7875933e-7,0.00002308952,0.0008344726],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987401,0.00010960244,0.00047705774,0.00019892288,0.00018731417,0.00028703143],"domain_scores_gemma":[0.9990018,0.00013603238,0.00006230833,0.0005734896,0.00012235779,0.000104027895],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005445495,0.00021543015,0.0006024259,0.000056037887,0.000033584805,0.0000135517685,0.00012051847,0.000114956616,0.00015006767],"category_scores_gemma":[0.00032596994,0.00014666402,0.00031766345,0.00012422385,0.000065455904,0.0001227186,0.0000063686266,0.00012398229,0.000062065876],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.008138414,0.0021204767,0.043791004,0.008912345,0.0035208394,0.00009049407,0.007807361,0.106550895,0.06984825,0.6242754,0.12455377,0.00039077995],"study_design_scores_gemma":[0.1265287,0.028256163,0.19536811,0.007162993,0.0011523296,0.0011407116,0.018423028,0.06889792,0.23806238,0.006638224,0.29311833,0.015251115],"about_ca_topic_score_codex":0.0000673796,"about_ca_topic_score_gemma":0.000007841491,"teacher_disagreement_score":0.61763716,"about_ca_system_score_codex":0.00043100867,"about_ca_system_score_gemma":0.00004838752,"threshold_uncertainty_score":0.59807855},"labels":[],"label_agreement":null},{"id":"W2556623440","doi":"10.1109/pesgm.2016.7741985","title":"Adequacy assessment of power systems with PEV charging loads considering customer behaviour","year":2016,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Electric power system; Computer science; Electricity; Range (aeronautics); Power (physics); Automotive engineering; Set (abstract data type); Engineering; Electrical engineering","score_opus":0.008212605833557282,"score_gpt":0.22184141590656392,"score_spread":0.21362881007300663,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2556623440","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.528162,0.00039995366,0.39252153,0.0001612605,0.0013855728,0.0006574038,0.000030770785,0.00069937285,0.075982116],"genre_scores_gemma":[0.99811554,0.00001917803,0.0008331324,0.0000101465175,0.000016188385,0.000040136325,5.8753216e-7,0.000032750144,0.0009323219],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99889743,0.000025758254,0.00034031313,0.00019365715,0.00022662627,0.0003161854],"domain_scores_gemma":[0.99932206,0.00007995991,0.000059822763,0.00035861877,0.000089474874,0.00009005147],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026525126,0.00017273844,0.00030790915,0.00008045025,0.0000258857,0.000021019865,0.00012555656,0.0000647938,0.00015073722],"category_scores_gemma":[0.000013295144,0.00010264178,0.00005116182,0.00010060078,0.000055108943,0.00020037586,0.00002861673,0.00008432362,0.000041866304],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009548226,0.0005109344,0.546125,0.004842446,0.0012004352,0.0002677942,0.0028191565,0.03143834,0.24631704,0.14995094,0.013061265,0.0033711472],"study_design_scores_gemma":[0.023524186,0.00236545,0.44011283,0.030071072,0.00080527045,0.0018323561,0.013813772,0.08595507,0.20068528,0.0003353352,0.19007702,0.010422361],"about_ca_topic_score_codex":0.000072188835,"about_ca_topic_score_gemma":0.000013479182,"teacher_disagreement_score":0.46995354,"about_ca_system_score_codex":0.00013020179,"about_ca_system_score_gemma":0.000039017363,"threshold_uncertainty_score":0.41856104},"labels":[],"label_agreement":null},{"id":"W2557943417","doi":"10.1139/cjce-2015-0411","title":"Hierarchical seismic vulnerability assessment of power transmission systems: sensitivity analysis of fragility curves and clustering algorithms","year":2016,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Fragility; Cluster analysis; Sensitivity (control systems); Vulnerability assessment; Algorithm; Computer science; Robustness (evolution); Context (archaeology); Data mining; Hierarchical clustering; Vulnerability (computing); Identification (biology); Mathematics; Engineering; Machine learning; Geology; Physics","score_opus":0.006814323945972186,"score_gpt":0.2137888566949677,"score_spread":0.20697453274899552,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2557943417","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28558156,0.002227374,0.71127105,0.00011960736,0.00041100135,0.00011701766,0.00009546857,0.00001881041,0.0001581402],"genre_scores_gemma":[0.9992274,0.00019314236,0.00052036555,0.000007444385,0.000024562967,0.000002203165,0.0000010669315,0.000018251987,0.0000055701466],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983646,0.00011415331,0.0008127773,0.0001604074,0.00024079072,0.00030723138],"domain_scores_gemma":[0.9985788,0.00031970334,0.00014892455,0.00026726467,0.00021170343,0.00047363035],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001690295,0.00018743136,0.0007864865,0.00048787126,0.00002787559,0.00001329991,0.00013016355,0.00010609397,0.000030599203],"category_scores_gemma":[0.00019262962,0.00014654426,0.00021493435,0.00039515735,0.0000930947,0.00020265779,0.000012820472,0.0002476533,9.95934e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010130446,0.000022382674,0.01384988,0.0026366883,0.0009603791,0.000055881315,0.00041363377,0.96603304,0.0136879925,0.00010840076,0.000109572735,0.002112037],"study_design_scores_gemma":[0.00040344038,0.000089869056,0.13386655,0.0029551676,0.00031783205,0.00009197743,0.000047224,0.86009663,0.0007518991,0.000017967783,0.0010975593,0.00026390312],"about_ca_topic_score_codex":0.000752131,"about_ca_topic_score_gemma":0.0052199448,"teacher_disagreement_score":0.7136458,"about_ca_system_score_codex":0.000261945,"about_ca_system_score_gemma":0.00021162926,"threshold_uncertainty_score":0.59759015},"labels":[],"label_agreement":null},{"id":"W2560037553","doi":"10.1109/pmaps.2016.7764058","title":"Resource strength and location impact of wind power on bulk electric system reliability","year":2016,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Reliability (semiconductor); Electric power system; Reliability engineering; Wind speed; Grid; Electricity generation; Computer science; Environmental science; Automotive engineering; Engineering; Power (physics); Electrical engineering; Meteorology","score_opus":0.003718091783482314,"score_gpt":0.195424129860532,"score_spread":0.1917060380770497,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2560037553","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9781599,0.00015830541,0.003818698,0.000053453958,0.00009994629,0.0002261762,0.000011110666,0.00021919362,0.017253218],"genre_scores_gemma":[0.9996733,0.000012160798,0.000037237314,0.000004192429,0.000017189599,0.0000045666693,6.8113843e-7,0.000014731778,0.00023595766],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.9991483,0.00004240572,0.00027300048,0.00019610408,0.0001314567,0.00020874986],"domain_scores_gemma":[0.9992061,0.00017763332,0.0000423211,0.00040317432,0.00009289567,0.00007787756],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034562932,0.00013330705,0.00020677845,0.000071107104,0.00001974296,0.000008532671,0.00008873592,0.000084085754,0.000022527505],"category_scores_gemma":[0.00016882582,0.00007762401,0.000050920775,0.00023244726,0.00003086125,0.00008567319,0.000013647269,0.00006327913,0.000022718257],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00247148,0.0019326339,0.13037795,0.014949498,0.0016522473,0.000038166298,0.0053833327,0.11413256,0.4218131,0.1225035,0.08610802,0.09863752],"study_design_scores_gemma":[0.0072417264,0.00563272,0.7058967,0.0062596416,0.00015539934,0.00016206354,0.00097390066,0.068025336,0.17241433,0.00084164494,0.029513517,0.0028830385],"about_ca_topic_score_codex":0.00006314083,"about_ca_topic_score_gemma":0.0000035815056,"teacher_disagreement_score":0.5755187,"about_ca_system_score_codex":0.00034072556,"about_ca_system_score_gemma":0.00003080561,"threshold_uncertainty_score":0.31654155},"labels":[],"label_agreement":null},{"id":"W2563341582","doi":"10.1049/iet-gtd.2016.0693","title":"Probabilistic evaluation and planning of power transmission system reliability","year":2016,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Probabilistic logic; Reliability engineering; Contingency; Reliability (semiconductor); Transmission (telecommunications); Transmission system; Electric power system; Computer science; Context (archaeology); Power transmission; Business system planning; Plan (archaeology); Risk analysis (engineering); Process (computing); Operations research; Engineering; Power (physics); Systems engineering; Telecommunications; Business","score_opus":0.015143030193566066,"score_gpt":0.23538103151276382,"score_spread":0.22023800131919777,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2563341582","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35872358,0.00076370896,0.63888377,0.00017784582,0.00034480134,0.00057936687,0.00009916601,0.00018924601,0.00023849623],"genre_scores_gemma":[0.9991382,0.000080374986,0.00045389726,0.000003966121,0.000055334556,0.000079491816,0.00014862868,0.000017904853,0.000022244887],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99817944,0.00019386077,0.0006219512,0.0003490729,0.00042738084,0.00022829135],"domain_scores_gemma":[0.9990671,0.00007627615,0.00008686051,0.00027532617,0.0003512695,0.00014316819],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011612856,0.0002044867,0.00026399313,0.000048415557,0.00011107804,0.000022215112,0.00008567195,0.00018791277,0.00005655015],"category_scores_gemma":[0.0001154856,0.00014321085,0.00008158692,0.0001693711,0.000072457886,0.00027707056,0.000006669079,0.0000839248,0.0000049245473],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019425277,0.00014749514,0.00054660684,0.0019150127,0.000048803166,0.0000027027386,0.0011197887,0.039605323,0.76919806,0.0032627804,0.0037081758,0.18025099],"study_design_scores_gemma":[0.003099365,0.000294279,0.010459768,0.0025778466,0.00018814627,0.000031996187,0.0002489244,0.68315405,0.27114025,0.0009167178,0.027140247,0.0007484178],"about_ca_topic_score_codex":0.0000059610193,"about_ca_topic_score_gemma":7.428012e-7,"teacher_disagreement_score":0.6435487,"about_ca_system_score_codex":0.00030901184,"about_ca_system_score_gemma":0.000060725848,"threshold_uncertainty_score":0.5839969},"labels":[],"label_agreement":null},{"id":"W2588252986","doi":"10.3390/app7020176","title":"Development of Probabilistic Reliability Models of Photovoltaic System Topologies for System Adequacy Evaluation","year":2017,"lang":"en","type":"article","venue":"Applied Sciences","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Taibah University","keywords":"Photovoltaic system; Grid-connected photovoltaic power system; Network topology; Maximum power point tracking; Electric power system; Reliability (semiconductor); Reliability engineering; Engineering; Computer science; Electronic engineering; Electrical engineering; Topology (electrical circuits); Inverter; Power (physics); Voltage","score_opus":0.06468795760306281,"score_gpt":0.2840442502205778,"score_spread":0.21935629261751496,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2588252986","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8845122,0.000161652,0.08445412,0.000011621506,0.00076995126,0.0024531542,0.000022740876,0.00019994356,0.027414646],"genre_scores_gemma":[0.980046,0.0000013543213,0.019400904,7.576292e-7,0.0000141541395,0.00052212714,0.0000014845212,0.0000067435426,0.0000065061845],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984265,0.000023961602,0.0005902978,0.0002948534,0.00042422678,0.00024016335],"domain_scores_gemma":[0.9987595,0.00015868561,0.0002812442,0.00055096793,0.00021289586,0.000036672354],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036187111,0.00012996868,0.00035987442,0.000054253032,0.0003261222,0.00003705503,0.0006187775,0.00007323468,0.0000013027926],"category_scores_gemma":[0.0002382037,0.00010318907,0.000056615077,0.000091194044,0.00043997786,0.00018844429,0.00006687554,0.000042009666,0.0000020293385],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008902139,0.00010616667,0.00040501333,0.024110245,0.000084586376,3.1677345e-7,0.005958746,0.44351682,0.08663606,0.42853865,0.00011779176,0.010436561],"study_design_scores_gemma":[0.0005086713,0.000057698147,0.00093741255,0.00064552267,0.00004688216,0.0000018214866,0.006438506,0.8853646,0.10074289,0.0048185135,0.00017560803,0.0002619032],"about_ca_topic_score_codex":0.000039796756,"about_ca_topic_score_gemma":0.000034651748,"teacher_disagreement_score":0.44184774,"about_ca_system_score_codex":0.00023403125,"about_ca_system_score_gemma":0.00020302147,"threshold_uncertainty_score":0.42079282},"labels":[],"label_agreement":null},{"id":"W2600692770","doi":"","title":"COMPREHENSIVE RISK ASSESSMENT FOR RELIABLE POWER SYSTEM OPERATION","year":2017,"lang":"en","type":"dissertation","venue":"University Library - University of Saskatchewan (University of Saskatchewan)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Reliability engineering; Computer science; Risk assessment; Risk analysis (engineering); Electric power system; Engineering; Systems engineering; Power (physics); Business; Computer security","score_opus":0.0056390740363998675,"score_gpt":0.17749508312732495,"score_spread":0.17185600909092508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2600692770","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8863745,0.0010379411,0.028364338,0.00034403132,0.0038940813,0.004363462,0.011580782,0.0019119132,0.062128972],"genre_scores_gemma":[0.91693074,0.0007994828,0.013171375,0.0000072815483,0.000055259097,1.7206274e-7,0.0022639753,0.000104182815,0.06666756],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9971426,0.00018749126,0.00042989486,0.0009810365,0.00057262543,0.00068631634],"domain_scores_gemma":[0.9962436,0.0002410651,0.0011571513,0.0013869837,0.00059088826,0.00038029748],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00026731292,0.00076814805,0.0016382711,0.00068810326,0.0012432052,0.000064837455,0.0021999911,0.0011256193,0.00058368105],"category_scores_gemma":[0.00001064823,0.0011652097,0.0009598503,0.0003717641,0.00044513645,0.0026003118,0.00027726655,0.0008357602,0.000058076188],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0122317765,0.0017354403,0.006407641,0.045991506,0.010583168,0.0016588297,0.7944416,0.025097046,0.012039261,0.0015369155,0.07654044,0.0117364],"study_design_scores_gemma":[0.003013996,0.00034182414,0.0026526954,0.0015241981,0.00092829304,0.0000061640458,0.9040992,0.002825111,0.00093089853,0.00011243596,0.08243735,0.0011278281],"about_ca_topic_score_codex":0.014907566,"about_ca_topic_score_gemma":0.008638689,"teacher_disagreement_score":0.10965763,"about_ca_system_score_codex":0.00066672044,"about_ca_system_score_gemma":0.0013834925,"threshold_uncertainty_score":0.99907976},"labels":[],"label_agreement":null},{"id":"W2604320602","doi":"10.1016/b978-0-12-409548-9.10147-2","title":"Reliability of Renewable Power Systems","year":2017,"lang":"en","type":"book-chapter","venue":"Elsevier eBooks","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Renewable energy; Reliability (semiconductor); Wind power; Photovoltaic system; Reliability engineering; Variable renewable energy; Electricity generation; Electric power system; Engineering; Environmental economics; Environmental science; Computer science; Power (physics); Electrical engineering; Economics","score_opus":0.009953179678170342,"score_gpt":0.2060536633393393,"score_spread":0.19610048366116897,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2604320602","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000047241643,0.0037309502,0.00008921458,0.0000063037774,0.003149248,0.0007496763,0.00013791565,0.00024394058,0.9918455],"genre_scores_gemma":[0.08845461,0.00016880533,0.00007416208,0.0000086810605,0.00009923594,0.00004337061,0.000008713628,0.00012028349,0.9110221],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99792707,0.000024506704,0.0008476182,0.00045607056,0.00036647698,0.00037826595],"domain_scores_gemma":[0.9969244,0.00007324762,0.00034504398,0.0022796579,0.00023265538,0.00014496934],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00063550594,0.00050010096,0.0010965072,0.00010088142,0.00008204371,0.000052928535,0.00065893383,0.00060259236,0.000080705155],"category_scores_gemma":[0.00007860294,0.00046043508,0.00035248784,0.000005341762,0.0002440682,0.00008041293,0.000116820476,0.0004372823,0.00014669838],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027663336,0.00015424514,0.00013220395,0.05511751,0.0029158266,0.0004059519,0.003710316,0.018128017,0.0031286571,0.079106495,0.054196324,0.78272784],"study_design_scores_gemma":[0.00015817315,0.00004272626,0.000013208171,0.001991563,0.00006207332,0.000014282759,0.000005923133,0.00014013995,0.00011640046,0.003560593,0.9934471,0.00044781578],"about_ca_topic_score_codex":0.000011479183,"about_ca_topic_score_gemma":0.00003171554,"teacher_disagreement_score":0.93925077,"about_ca_system_score_codex":0.00019607619,"about_ca_system_score_gemma":0.00009356382,"threshold_uncertainty_score":0.9997847},"labels":[],"label_agreement":null},{"id":"W2607009598","doi":"","title":"Reduction of Cascading Outage Risk Based on Risk Gradient and Markovian Tree Search.","year":2017,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reduction (mathematics); Cascading failure; Computer science; Electric power system; Mathematical optimization; Computation; Cascade; Reliability engineering; Power (physics); Algorithm; Mathematics; Engineering","score_opus":0.03415659183247228,"score_gpt":0.1708606754637791,"score_spread":0.13670408363130682,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2607009598","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95717126,0.00010556326,0.03422683,0.000014067772,0.0009799798,0.00038558603,0.00020918674,0.00015914945,0.006748396],"genre_scores_gemma":[0.9984148,0.000918106,0.00012955979,0.000001887514,0.000054570584,0.0000011482548,0.0000110523515,0.000030478725,0.00043839047],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986615,0.00016624987,0.00020268634,0.00059165386,0.000085845255,0.0002920668],"domain_scores_gemma":[0.9984027,0.0000885289,0.00022667718,0.0010559531,0.0000722414,0.00015385523],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005750658,0.0002789485,0.00039464582,0.00025949965,0.00017066991,0.00003774908,0.00039044084,0.0002728155,0.000010403202],"category_scores_gemma":[0.00010030219,0.00031254487,0.00018602151,0.00010167092,0.00018240605,0.0001106202,0.00019988835,0.0007323408,0.0000100098905],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013311915,0.000057958685,0.014512932,0.0008326458,0.00015924222,0.00007911528,0.00047552845,0.98012406,0.000092125054,0.0011242442,0.00020502535,0.0022040023],"study_design_scores_gemma":[0.00080779183,0.00011551025,0.019364413,0.0007456773,0.00022925084,0.0000046252285,0.0002614289,0.9745262,0.0007649174,0.0020727688,0.00060945353,0.0004979651],"about_ca_topic_score_codex":0.0010843463,"about_ca_topic_score_gemma":0.0001910019,"teacher_disagreement_score":0.041243568,"about_ca_system_score_codex":0.00028526445,"about_ca_system_score_gemma":0.00004457466,"threshold_uncertainty_score":0.99993265},"labels":[],"label_agreement":null},{"id":"W2613614250","doi":"10.1289/ehp2154","title":"Health Impacts of Citywide and Localized Power Outages in New York City","year":2018,"lang":"en","type":"article","venue":"Environmental Health Perspectives","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"New York State Energy Research and Development Authority; New York City Department of Health and Mental Hygiene","keywords":"Environmental science","score_opus":0.009987850225915518,"score_gpt":0.25415237934095314,"score_spread":0.2441645291150376,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2613614250","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9759242,0.01849292,0.0023188505,0.0015522261,0.00022967967,0.00050773576,0.00004739983,0.000079667385,0.0008473177],"genre_scores_gemma":[0.9974307,0.001285148,0.0009220777,0.00019907803,0.000047797268,0.0000041515855,0.0000020097489,0.000019477164,0.000089599926],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.99873513,0.0000844579,0.00036181638,0.00026472835,0.00014585591,0.00040803052],"domain_scores_gemma":[0.9993863,0.000041975283,0.000080370235,0.00021428542,0.0000030436033,0.00027402502],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036862312,0.00016175404,0.00038983952,0.00008135918,0.00006382677,0.0000075110433,0.00008639227,0.000058090347,0.0001113663],"category_scores_gemma":[0.000022662425,0.0001599004,0.000038762908,0.00009910729,0.00026482856,0.00010227766,0.000040079547,0.00016071026,0.000013746647],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006765396,0.0019421873,0.37092105,0.0028583505,0.00025066713,0.000017341728,0.54815197,0.00041990966,0.005204585,0.004353843,0.025275126,0.039928444],"study_design_scores_gemma":[0.002314028,0.0017014265,0.9481799,0.0006192756,0.0000041410353,0.000027618109,0.02850149,0.00049636397,0.0013862231,0.000733693,0.015561424,0.00047439217],"about_ca_topic_score_codex":0.002340798,"about_ca_topic_score_gemma":0.0012543938,"teacher_disagreement_score":0.5772589,"about_ca_system_score_codex":0.0006856789,"about_ca_system_score_gemma":0.00008197058,"threshold_uncertainty_score":0.6520549},"labels":[],"label_agreement":null},{"id":"W2613952124","doi":"10.1109/icit.2017.7913275","title":"Probabilistic reliability evaluation for power systems with high penetration of renewable power generation","year":2017,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Renewable energy; Reliability engineering; Probabilistic logic; Wind power; Electric power system; Photovoltaic system; Computer science; Intermittency; Reliability (semiconductor); Distributed generation; Electricity generation; Power (physics); Engineering; Electrical engineering","score_opus":0.02273168355506848,"score_gpt":0.24278386912611238,"score_spread":0.2200521855710439,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2613952124","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7550677,0.00016039936,0.222462,0.00013747258,0.0019842994,0.0034638108,0.000043335476,0.0001768351,0.016504161],"genre_scores_gemma":[0.9973886,0.000004372063,0.001685657,0.0000047533676,0.000041469535,0.0003988314,0.00003142371,0.000021992559,0.00042289993],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99876785,0.00004969519,0.00039934702,0.00027381175,0.00031373915,0.00019554599],"domain_scores_gemma":[0.99815583,0.000057868114,0.0001643847,0.0008961488,0.0006771322,0.00004862716],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013567468,0.00014956189,0.00024841883,0.000037018297,0.00015476657,0.000108103704,0.00018265148,0.00010733468,0.000040887306],"category_scores_gemma":[0.00048178932,0.00011659798,0.000046900732,0.00004353582,0.00006652816,0.0004166061,0.000014082759,0.000048851583,0.000004348419],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000094093746,0.000097932985,0.0009557495,0.00072655105,0.00006158627,3.3721884e-7,0.00027059743,0.96256363,0.016396571,0.014309321,0.0043843645,0.00013923254],"study_design_scores_gemma":[0.001873671,0.0006646223,0.013504424,0.0002487508,0.000115460774,0.0000068388704,0.0001469637,0.95840085,0.019105002,0.0019404559,0.0034976848,0.0004952895],"about_ca_topic_score_codex":0.00048911123,"about_ca_topic_score_gemma":0.00043265423,"teacher_disagreement_score":0.24232091,"about_ca_system_score_codex":0.00018276922,"about_ca_system_score_gemma":0.00008051265,"threshold_uncertainty_score":0.47547275},"labels":[],"label_agreement":null},{"id":"W2620849698","doi":"10.4050/f-0072-2016-11555","title":"The 525 Transmission Development Test Stand","year":2016,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Bell Helicopter Textron (Canada)","funders":"","keywords":"Test (biology); Computer science; Transmission (telecommunications); Telecommunications; Geology","score_opus":0.004192541700432579,"score_gpt":0.16624027800245134,"score_spread":0.16204773630201877,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2620849698","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010826839,0.0014548171,0.9050468,0.0014541941,0.0005121856,0.00021250328,0.000002604537,0.00048093844,0.080009095],"genre_scores_gemma":[0.98399043,0.00024030733,0.0010811499,0.000013835605,0.000016073907,0.0000139589165,9.799377e-8,0.0000085478605,0.014635568],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99960804,0.0000051691572,0.00011333758,0.00006110943,0.00006949447,0.00014287904],"domain_scores_gemma":[0.99966735,0.00015605554,0.0000049084447,0.000116350806,0.000014497322,0.000040841216],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016023229,0.00005398242,0.000046231322,0.000006707193,0.00006164217,0.000011838034,0.00008470954,0.000022819151,0.000038061327],"category_scores_gemma":[0.000024647356,0.000021440697,0.00001509087,0.000029329347,0.000017038536,0.00003951019,0.000006300091,0.000022427024,0.000098477605],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011746739,0.000026451915,0.0008199596,0.0001342056,0.00003058671,0.0000033608305,0.00058246223,0.00008558064,0.037882384,0.0023875413,0.053519975,0.90451574],"study_design_scores_gemma":[0.00011775737,0.0000066085513,0.00094470655,0.0000717443,7.391346e-7,0.0000014803086,0.000018030372,0.00022216047,0.02879544,0.000111168534,0.9696494,0.000060800667],"about_ca_topic_score_codex":9.251089e-7,"about_ca_topic_score_gemma":0.0000074586815,"teacher_disagreement_score":0.9731636,"about_ca_system_score_codex":0.000048081638,"about_ca_system_score_gemma":0.000018562927,"threshold_uncertainty_score":0.12657632},"labels":[],"label_agreement":null},{"id":"W2625482364","doi":"10.1109/icps.2017.7945125","title":"Probabilistic generation and transmission planning with renewable energy integration","year":2017,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Schneider Electric (Canada); Memorial University of Newfoundland","funders":"","keywords":"Renewable energy; Wind power; Photovoltaic system; Electric power system; Grid parity; Intermittent energy source; Probabilistic logic; Grid; Computer science; Distributed generation; Reliability engineering; Software deployment; Solar power; Environmental economics; Engineering; Electrical engineering; Power (physics); Economics","score_opus":0.01586942525059204,"score_gpt":0.2111745243502309,"score_spread":0.19530509909963886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2625482364","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0822727,0.0002519079,0.89243245,0.00010991775,0.00016192553,0.00010948388,9.904911e-7,0.00016667735,0.024493918],"genre_scores_gemma":[0.99672127,0.000027635971,0.0021451619,0.000012153811,0.000043235756,0.000017536398,0.0000047874564,0.00000901347,0.0010192215],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99964094,0.0000076748875,0.00008811709,0.000112513604,0.000057053952,0.00009370071],"domain_scores_gemma":[0.99971676,0.000010979762,0.000019430667,0.00018905604,0.000023435914,0.000040342326],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008022446,0.0000744134,0.000079685604,0.000017403452,0.0001471194,0.00009745702,0.00005763669,0.000040623385,0.000008422668],"category_scores_gemma":[0.000019554062,0.00005141079,0.000008743364,0.000013926475,0.000027446777,0.00022440456,0.0000059353915,0.000032991094,7.1929696e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013161996,0.00007809373,0.0029672522,0.0007808929,0.00009711577,0.000032216303,0.0030086203,0.5826433,0.2065104,0.026464086,0.018386353,0.1589001],"study_design_scores_gemma":[0.00037456557,0.00009178137,0.0018084559,0.00025929726,0.000013395503,0.00002012631,0.000059429527,0.9377262,0.040503055,0.00065669406,0.018263653,0.00022335963],"about_ca_topic_score_codex":0.0003663871,"about_ca_topic_score_gemma":0.00051384856,"teacher_disagreement_score":0.91444856,"about_ca_system_score_codex":0.000021104737,"about_ca_system_score_gemma":0.00000789435,"threshold_uncertainty_score":0.2096471},"labels":[],"label_agreement":null},{"id":"W2626270956","doi":"10.1109/icps.2017.7945126","title":"An analytical method for wind energy potential, reliability, and cost assessment for wind generation systems","year":2017,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Weibull distribution; Wind power; Reliability engineering; Reliability (semiconductor); Turbine; Wind speed; Renewable energy; Fault tree analysis; Electricity generation; Electric power system; Engineering; Computer science; Power (physics); Meteorology; Electrical engineering; Statistics; Mathematics; Aerospace engineering","score_opus":0.02842273718311111,"score_gpt":0.3291886618158968,"score_spread":0.3007659246327857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2626270956","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013819481,0.00008498615,0.9820661,0.00026846447,0.0012609129,0.00096931367,0.00007802346,0.00010373825,0.0013490003],"genre_scores_gemma":[0.9549853,0.000024536512,0.04370179,0.000036351925,0.00040012193,0.0001480124,0.00004514359,0.000031491018,0.00062721793],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987424,0.000059455862,0.00035976415,0.00039282537,0.00013817851,0.0003073839],"domain_scores_gemma":[0.9987434,0.00011760396,0.00007143828,0.00073642854,0.00017392427,0.00015721328],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011767892,0.00018026035,0.0003349121,0.000042420535,0.0003111284,0.00040716788,0.00022173945,0.00015789297,0.0000066776965],"category_scores_gemma":[0.000114606315,0.00015634278,0.00008727852,0.000022683253,0.000053515687,0.00038501117,0.00003527969,0.00006315742,7.159782e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014695006,0.0003678231,0.0013271772,0.0024419287,0.00044914096,0.000006695218,0.00019242072,0.6476887,0.055333864,0.23010463,0.032588508,0.029352173],"study_design_scores_gemma":[0.00064449885,0.00013908786,0.00072251103,0.000025490364,0.000056348243,0.000008346791,0.00005027159,0.9652612,0.0010561777,0.0005133822,0.03131692,0.00020576816],"about_ca_topic_score_codex":0.00028435877,"about_ca_topic_score_gemma":0.00013114893,"teacher_disagreement_score":0.94116586,"about_ca_system_score_codex":0.00011416565,"about_ca_system_score_gemma":0.000037145437,"threshold_uncertainty_score":0.6375473},"labels":[],"label_agreement":null},{"id":"W2725039215","doi":"","title":"Development of non-intrusive monitoring for reactive switching of high voltage circuit breaker","year":2014,"lang":"en","type":"article","venue":"Science & Engineering Faculty","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Circuit breaker; Waveform; Overvoltage; High voltage; Disconnector; Electrical engineering; Voltage; Transient recovery voltage; Capacitor; Engineering; Automotive engineering; Power factor; Constant power circuit","score_opus":0.012307128867656737,"score_gpt":0.23447652578788325,"score_spread":0.22216939692022653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2725039215","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5647019,0.000010175636,0.43424213,0.0000023990253,0.00062959763,0.00016058708,0.0000088980405,0.00007260536,0.00017170909],"genre_scores_gemma":[0.9702712,0.0000012291758,0.029589767,0.0000013734979,0.000057684952,0.000043014952,0.000002292494,0.00002123467,0.000012162424],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9985884,0.0000030183994,0.0004063751,0.00026538997,0.00032385025,0.0004129985],"domain_scores_gemma":[0.99925417,0.000077378114,0.000085569525,0.00027111682,0.00021075942,0.000101028694],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008080342,0.00017925502,0.00031889096,0.00015294946,0.00007674148,0.000019548135,0.0003726521,0.00006060488,0.0000012528017],"category_scores_gemma":[0.0002838642,0.0001713541,0.00006429481,0.00038396247,0.000051373354,0.0002892808,0.00005671276,0.000116764146,0.000002889115],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000034423974,0.000012538659,0.00027138455,0.00030269034,0.00002047602,2.3434634e-7,0.0027382283,0.064894415,0.92388314,0.0015166707,0.0000064817004,0.0063503184],"study_design_scores_gemma":[0.00030059216,0.00003103062,0.023662206,0.0003845357,0.0000104868395,0.0000028331701,0.00021792707,0.059563078,0.91346735,0.00008755494,0.0020072323,0.00026517978],"about_ca_topic_score_codex":0.000030395695,"about_ca_topic_score_gemma":0.000002507587,"teacher_disagreement_score":0.40556934,"about_ca_system_score_codex":0.00019898929,"about_ca_system_score_gemma":0.00007592632,"threshold_uncertainty_score":0.6987617},"labels":[],"label_agreement":null},{"id":"W2748074644","doi":"","title":"Fault location in distribution systems using mathematical analysis and support vector machine / Sophi Shilpa Gururajapathy","year":2017,"lang":"en","type":"dissertation","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Fault (geology); Fault indicator; Support vector machine; Euclidean distance; Engineering; Fault coverage; Stuck-at fault; Voltage sag; Data mining; Electric power system; Reliability engineering; Ranking (information retrieval); Fault detection and isolation; Computer science; Power (physics); Voltage; Real-time computing; Artificial intelligence; Electrical engineering","score_opus":0.009880171248966424,"score_gpt":0.2511767443775641,"score_spread":0.24129657312859767,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2748074644","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7335203,0.003396116,0.24070308,0.00004654736,0.003474858,0.0020328378,0.0006799057,0.0005693761,0.0155769745],"genre_scores_gemma":[0.9948395,0.000080790225,0.000086839704,0.000001618969,0.00005772362,0.000056189816,0.002931849,0.0000337615,0.0019117262],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99845994,0.000041419888,0.0006321763,0.0003413617,0.000243144,0.00028195838],"domain_scores_gemma":[0.9990754,0.000045543584,0.00017257001,0.000493454,0.0001234277,0.00008960779],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004357168,0.00031099177,0.0007104173,0.00022816133,0.000082394756,0.00015649934,0.00017845425,0.00038045863,0.00004647049],"category_scores_gemma":[0.00013891973,0.0002867118,0.00011523777,0.0003052881,0.000027206295,0.0002006871,0.000012236301,0.00025460747,0.000022850381],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001137679,0.0022384485,0.05408713,0.20196298,0.017230542,0.00069966295,0.028219465,0.5291491,0.02219313,0.09663358,0.0061602653,0.04028803],"study_design_scores_gemma":[0.00040363352,0.0000416151,0.02353506,0.0010574398,0.00092450524,0.00002464036,0.00069702126,0.97115713,0.0004937966,0.0003028963,0.0006115868,0.00075069594],"about_ca_topic_score_codex":0.0006706515,"about_ca_topic_score_gemma":0.0014832702,"teacher_disagreement_score":0.44200802,"about_ca_system_score_codex":0.00029037776,"about_ca_system_score_gemma":0.000046354337,"threshold_uncertainty_score":0.9999585},"labels":[],"label_agreement":null},{"id":"W2759493482","doi":"10.1109/sege.2017.8052790","title":"Fault diagnosis of micro energy grids using Bayesian belief network and adaptive neuro-fuzzy interference system","year":2017,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Computer science; Bayesian network; Fault (geology); Data mining; Adaptive neuro fuzzy inference system; Artificial intelligence; Expert system; Fuzzy logic; Machine learning; Reliability engineering; Fuzzy control system; Engineering","score_opus":0.01406871323050322,"score_gpt":0.21041988868076034,"score_spread":0.19635117545025713,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2759493482","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36202508,0.0031324548,0.58435345,0.00013753372,0.004190848,0.0005169164,0.00006608133,0.00055327243,0.045024376],"genre_scores_gemma":[0.99762285,0.0001490285,0.0019671475,0.000024501182,0.00011545917,0.000021168556,7.623825e-7,0.000024064955,0.00007503768],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999011,0.00003913162,0.0003194221,0.0002418856,0.00009071422,0.00029785727],"domain_scores_gemma":[0.9990875,0.000106766754,0.00010763055,0.00053702656,0.000066578315,0.00009450546],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015868199,0.00018727854,0.00034526258,0.00003654052,0.0001472785,0.00006847838,0.00030968152,0.00009794038,0.0000066911552],"category_scores_gemma":[0.000047426594,0.00016755935,0.00006102698,0.00005172552,0.00010866254,0.0001952983,0.00014548986,0.000099009376,0.0000019373063],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005279473,0.00044613425,0.24201635,0.0112670325,0.0019033056,0.0003847523,0.0046123364,0.2595376,0.041135773,0.33134222,0.040815964,0.06601056],"study_design_scores_gemma":[0.0016121088,0.0005315852,0.020467069,0.006776474,0.0002119469,0.00021235592,0.0011387978,0.9096092,0.04604796,0.0013243988,0.010330111,0.0017379802],"about_ca_topic_score_codex":0.0011729317,"about_ca_topic_score_gemma":0.0003125071,"teacher_disagreement_score":0.6500716,"about_ca_system_score_codex":0.00006089943,"about_ca_system_score_gemma":0.0000135812925,"threshold_uncertainty_score":0.6832872},"labels":[],"label_agreement":null},{"id":"W2762841328","doi":"10.1049/iet-gtd.2017.0617","title":"Moving beyond the optimal transmission switching: stochastic linearised SCUC for the integration of wind power generation and equipment failures uncertainties","year":2017,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Etobicoke General Hospital","funders":"","keywords":"Transmission (telecommunications); Wind power; Power (physics); Control theory (sociology); Electric power system; Computer science; Engineering; Electrical engineering; Telecommunications; Physics; Control (management)","score_opus":0.022811263940076945,"score_gpt":0.25483372420574235,"score_spread":0.23202246026566542,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2762841328","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1146761,0.0011437255,0.87996894,0.0025960165,0.0005557289,0.0008913775,0.00008752227,0.00005584968,0.00002472271],"genre_scores_gemma":[0.9976972,0.0002084993,0.0013232505,0.000029906967,0.00022064915,0.00009882883,0.00033284503,0.000021822754,0.00006700121],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985735,0.0000762388,0.0005175739,0.00028394666,0.00030709777,0.00024164055],"domain_scores_gemma":[0.99899,0.000115351395,0.0001761581,0.0004238848,0.00021470811,0.00007989673],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00081537775,0.00024170551,0.00022435166,0.000034907698,0.0012537903,0.00030406,0.00025461958,0.00016034069,0.000019357209],"category_scores_gemma":[0.00011322125,0.0001477208,0.00013032182,0.00006482638,0.00011911774,0.00040281515,0.000017966739,0.00018844944,8.575708e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010732518,0.000044856963,0.000009046353,0.00010058106,0.0000634881,2.8525295e-7,0.0022276843,0.27684712,0.6531032,0.0037741011,0.0026039733,0.061118346],"study_design_scores_gemma":[0.0006679447,0.00010974223,0.0005274051,0.00010585254,0.00008393056,0.000003774504,0.0002964622,0.8817947,0.10571413,0.00018043896,0.010325416,0.00019020609],"about_ca_topic_score_codex":0.00005448948,"about_ca_topic_score_gemma":0.000030065754,"teacher_disagreement_score":0.8830211,"about_ca_system_score_codex":0.000089416804,"about_ca_system_score_gemma":0.000056998604,"threshold_uncertainty_score":0.96432686},"labels":[],"label_agreement":null},{"id":"W2764722704","doi":"10.1109/pes.2003.1267180","title":"Incorporating aging failures in power system reliability evaluation","year":2004,"lang":"en","type":"article","venue":"2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Unavailability; Reliability engineering; Reliability (semiconductor); Weibull distribution; Computer science; Mean time between failures; Electric power system; Power (physics); Engineering; Failure rate; Statistics; Mathematics","score_opus":0.006576888739217438,"score_gpt":0.2095280484095046,"score_spread":0.20295115967028715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2764722704","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9450294,0.00064807665,0.038109574,0.00015838565,0.010711757,0.0014344746,0.000037100333,0.0018565344,0.0020147504],"genre_scores_gemma":[0.94901305,0.00004266379,0.04963284,0.0001021601,0.0005420433,0.0003252586,0.000026049887,0.00022069358,0.00009523949],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9946824,0.00020111403,0.0015246803,0.0010837679,0.0010519265,0.0014561333],"domain_scores_gemma":[0.99732786,0.0001709237,0.00025918317,0.0010797472,0.0008240418,0.0003382394],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0045047924,0.0009151587,0.0009265153,0.00021268614,0.00023438301,0.00019256666,0.00062194094,0.00056545954,0.00001736189],"category_scores_gemma":[0.00080037327,0.0010019854,0.0004361131,0.0014338966,0.000107207255,0.0006128145,0.00007685133,0.00091332966,0.00012562313],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000069264047,0.00005689403,0.00060305576,0.00084015075,0.00008689776,0.000018716015,0.0019895157,0.9034042,0.09076268,0.0003144235,0.0018509055,0.00006563543],"study_design_scores_gemma":[0.002202246,0.00009540441,0.0011667924,0.0023967747,0.00008434164,0.0000718685,0.0009347534,0.96624696,0.022731625,0.000084996704,0.0021958542,0.0017883697],"about_ca_topic_score_codex":0.0004835159,"about_ca_topic_score_gemma":0.00005244256,"teacher_disagreement_score":0.06803106,"about_ca_system_score_codex":0.0035747315,"about_ca_system_score_gemma":0.0003258859,"threshold_uncertainty_score":0.9992431},"labels":[],"label_agreement":null},{"id":"W2769825892","doi":"10.1049/oap-cired.2017.0066","title":"Using voltage sag measurements for advanced fault location and condition-based maintenance","year":2017,"lang":"en","type":"article","venue":"CIRED - Open Access Proceedings Journal","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Fault (geology); Overhead (engineering); Voltage; Voltage sag; Reliability engineering; Voltage drop; Computer science; Fault indicator; Engineering; Electrical engineering; Real-time computing; Fault detection and isolation; Geology; Seismology; Power quality","score_opus":0.1250676989404562,"score_gpt":0.3887272846019767,"score_spread":0.2636595856615205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2769825892","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.53641057,0.0006751988,0.44930017,0.00061735685,0.002507107,0.0027587633,0.000051045063,0.00016847053,0.0075113205],"genre_scores_gemma":[0.9968838,0.000053577078,0.0026036983,0.000092909555,0.00013974012,0.000099353325,0.000003474654,0.000040632192,0.00008280165],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986818,0.000005722753,0.00041078858,0.00027623613,0.00023639524,0.00038910122],"domain_scores_gemma":[0.99832755,0.000025663834,0.0004260609,0.00019168541,0.0008534764,0.00017555372],"candidate_categories":["scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.00089951686,0.00020783066,0.0003077138,0.00008634865,0.001010498,0.0037862866,0.0014291684,0.00009034819,0.00001517806],"category_scores_gemma":[0.00073939207,0.00019714289,0.000054291057,0.00008705564,0.000102323516,0.005002592,0.00017292137,0.00021168991,0.00000220264],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020673592,0.0005316734,0.1456123,0.011575943,0.0010572941,0.000046412297,0.0024943121,0.050156932,0.6193689,0.010084492,0.045492996,0.1115114],"study_design_scores_gemma":[0.029399484,0.0004309048,0.13205875,0.015328589,0.00048476286,0.0006751794,0.0017305285,0.61333674,0.1362672,0.03441609,0.032080173,0.0037915974],"about_ca_topic_score_codex":0.000031078802,"about_ca_topic_score_gemma":0.00001532229,"teacher_disagreement_score":0.5631798,"about_ca_system_score_codex":0.00025724038,"about_ca_system_score_gemma":0.00010402023,"threshold_uncertainty_score":0.9972479},"labels":[],"label_agreement":null},{"id":"W2782414499","doi":"10.2316/journal.203.2017.2.203-6360","title":"ONLINE CONDITION MONITORING OF HIGH-VOLTAGE BUSHINGS THROUGH LEAKAGE CURRENT MEASUREMENT","year":2017,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Leakage (economics); Electrical engineering; Voltage; Forensic engineering; Materials science; Engineering; Automotive engineering","score_opus":0.02303670916547353,"score_gpt":0.2666862685263094,"score_spread":0.24364955936083585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2782414499","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83512,0.012794138,0.10817567,0.00021346747,0.041382715,0.000073732546,0.00010089121,0.000043194366,0.0020961424],"genre_scores_gemma":[0.9982996,0.0009224573,0.000078420046,0.000004779603,0.0006313297,0.0000024967342,0.0000026830076,0.000013172404,0.00004507201],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985838,0.000023031233,0.00056977285,0.00009275446,0.0006093798,0.00012128609],"domain_scores_gemma":[0.998686,0.000025144036,0.0004276496,0.00017332367,0.0006277178,0.000060131424],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004012415,0.00012186642,0.00027537238,0.00007963294,0.0000534629,0.000112459726,0.0003919657,0.000052720818,0.0000051220345],"category_scores_gemma":[0.00009565847,0.00010326646,0.00008829976,0.000017752238,0.00005152962,0.0005244752,0.00004328751,0.00013215306,8.910717e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013614047,0.0037887564,0.10600013,0.0056614075,0.012682559,0.0012596432,0.021705441,0.20369306,0.25025815,0.22605114,0.034703743,0.13283457],"study_design_scores_gemma":[0.008576238,0.0008026012,0.2127966,0.020453516,0.00027514898,0.0013446229,0.0033382222,0.0076383166,0.045757424,0.005074748,0.6923406,0.0016019242],"about_ca_topic_score_codex":0.0003902272,"about_ca_topic_score_gemma":0.000014211478,"teacher_disagreement_score":0.6576369,"about_ca_system_score_codex":0.00014637652,"about_ca_system_score_gemma":0.000025472431,"threshold_uncertainty_score":0.4211084},"labels":[],"label_agreement":null},{"id":"W2784426641","doi":"","title":"Fault Identification in an Unbalanced Distribution System Using Support Vector Machine","year":2016,"lang":"en","type":"article","venue":"The University of Malaya Research Repository (University of Malaya)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Identification (biology); Support vector machine; Fault (geology); Distribution (mathematics); Computer science; Reliability engineering; Engineering; Mathematics; Artificial intelligence; Geology; Biology; Seismology","score_opus":0.021901453515320742,"score_gpt":0.2298809130075659,"score_spread":0.20797945949224517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2784426641","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98323315,0.00006607914,0.014593833,0.00017839849,0.00019275089,0.00036554033,0.00012470777,0.00010032124,0.0011451915],"genre_scores_gemma":[0.99875104,0.000058336747,0.00011171428,5.4109876e-7,0.000020169631,1.2848426e-7,0.00001623375,0.000011307395,0.0010305427],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99807346,0.0004924251,0.00020890411,0.00029949503,0.00055297057,0.0003727512],"domain_scores_gemma":[0.9985489,0.00015321231,0.0001362099,0.0006484601,0.00038885948,0.00012433974],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014684268,0.00013195396,0.00028816494,0.00017453119,0.0003515502,0.00001485855,0.00089897536,0.00014503779,0.000035467925],"category_scores_gemma":[0.000034964203,0.00012573361,0.00010496555,0.00045984518,0.00057356956,0.00056261895,0.00018931877,0.00024357415,0.000023326667],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017050972,0.0004263901,0.059005752,0.002278879,0.0002623048,0.00051807374,0.0059408853,0.01302393,0.9038875,0.007837987,0.0025839184,0.0025292656],"study_design_scores_gemma":[0.0061135716,0.00080180337,0.6495025,0.0024673708,0.0002096566,0.00016588556,0.04457713,0.24625845,0.041599866,0.00012257448,0.0070918044,0.0010893499],"about_ca_topic_score_codex":0.0013015734,"about_ca_topic_score_gemma":0.00030934365,"teacher_disagreement_score":0.86228764,"about_ca_system_score_codex":0.0008724225,"about_ca_system_score_gemma":0.000104851184,"threshold_uncertainty_score":0.51272684},"labels":[],"label_agreement":null},{"id":"W2785460528","doi":"10.1109/epec.2017.8286162","title":"Reliability assessment of hydro dominant systems with diurnal energy management","year":2017,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Environmental science; Hydroelectricity; Energy storage; Inflow; Water storage; Pumped-storage hydroelectricity; Energy (signal processing); Electricity generation; Computer science; Energy management; Power (physics); Engineering; Meteorology; Statistics","score_opus":0.005700055311600183,"score_gpt":0.220051610117831,"score_spread":0.21435155480623083,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2785460528","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1188219,0.0002059671,0.44288772,0.00009453317,0.0017458318,0.00053019833,0.0000148201325,0.00019589039,0.43550315],"genre_scores_gemma":[0.9963929,0.000087684755,0.0017074622,0.0000052837618,0.00002985595,0.000059059133,0.00000108746,0.000016049768,0.0017006295],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989464,0.000025269765,0.00033306848,0.00020419108,0.00025233495,0.00023869978],"domain_scores_gemma":[0.99863225,0.000025055222,0.00011026755,0.0010935699,0.00006382172,0.00007504141],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004325427,0.00014876411,0.00031372654,0.000036815985,0.00010208903,0.00006426713,0.00037377773,0.00004880781,0.000016073847],"category_scores_gemma":[0.000009258752,0.000100870384,0.00005721064,0.000033469092,0.000091574235,0.00017510212,0.00007774853,0.00007363655,0.0000032491903],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021782285,0.0008772408,0.053407002,0.012127135,0.0014310636,0.00030386384,0.0003434325,0.3480967,0.0073103546,0.5528179,0.011808898,0.01125865],"study_design_scores_gemma":[0.0038932632,0.0005177184,0.25454545,0.0021572798,0.00020347658,0.00009218137,0.0005163193,0.59608096,0.009709667,0.0010625602,0.12991343,0.0013077],"about_ca_topic_score_codex":0.0004406768,"about_ca_topic_score_gemma":0.000068597714,"teacher_disagreement_score":0.877571,"about_ca_system_score_codex":0.00011805639,"about_ca_system_score_gemma":0.000015667021,"threshold_uncertainty_score":0.4113375},"labels":[],"label_agreement":null},{"id":"W2786156085","doi":"10.1109/epec.2017.8286171","title":"Impact of the penetration levels of PV and synchronous machine based DG sources on the reliability of a microgrid","year":2017,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Microgrid; Reliability engineering; Photovoltaic system; Reliability (semiconductor); Failure mode and effects analysis; Distributed generation; Computer science; Automotive engineering; Context (archaeology); Engineering; Renewable energy; Electrical engineering; Power (physics)","score_opus":0.011394280344740153,"score_gpt":0.2317806853533809,"score_spread":0.22038640500864073,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2786156085","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99644786,0.00013833908,0.0012518069,0.00018017733,0.00008316759,0.00026053633,0.000074112686,0.000013897594,0.0015501126],"genre_scores_gemma":[0.99984133,0.00000944036,0.00010004836,0.000009225573,0.000008091171,0.0000041059907,4.0282816e-7,0.0000062953195,0.0000210282],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9994091,0.00004909204,0.00024322604,0.00009541572,0.00010715905,0.000096051976],"domain_scores_gemma":[0.9988702,0.00016963993,0.0001401226,0.00073967426,0.000060635426,0.000019722585],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004837958,0.00009119069,0.00018765133,0.000015667869,0.000063931344,0.000012824495,0.0002595532,0.00004495856,0.000044429984],"category_scores_gemma":[0.00026315564,0.00004324968,0.00010983226,0.00003246996,0.00020350382,0.000053938416,0.000033908207,0.00007567088,5.5072013e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024734138,0.0004581128,0.5412055,0.0025026705,0.00027072668,7.0599395e-7,0.002143736,0.083978176,0.35914633,0.0017486805,0.0010022527,0.0072957296],"study_design_scores_gemma":[0.0002633351,0.00014933666,0.8534834,0.00013518185,0.000015255597,0.0000012419072,0.000030661653,0.031078892,0.11457528,0.00013640264,0.000063309795,0.000067708126],"about_ca_topic_score_codex":0.00083351065,"about_ca_topic_score_gemma":0.00014785644,"teacher_disagreement_score":0.31227785,"about_ca_system_score_codex":0.000030183834,"about_ca_system_score_gemma":0.000032286705,"threshold_uncertainty_score":0.17636709},"labels":[],"label_agreement":null},{"id":"W2786185844","doi":"10.1109/pesgm.2017.8274456","title":"Determining an optimal number of spares for hydro one 230/115 kv auto-transformers","year":2017,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Spare part; Reliability engineering; Transformer; Probabilistic logic; Computer science; Power transmission; Markov chain; Engineering; Electrical engineering; Voltage; Power (physics); Mechanical engineering; Artificial intelligence","score_opus":0.02551991994786051,"score_gpt":0.27978225836808057,"score_spread":0.25426233842022006,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2786185844","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79863024,0.000031142827,0.14623477,0.000074343356,0.00060242804,0.0003640729,0.000035695462,0.00021949671,0.053807814],"genre_scores_gemma":[0.98947173,0.0000128652255,0.009886285,0.000013074173,0.000052920226,0.000026824106,0.0000037707455,0.000025129739,0.00050739245],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991975,0.0000068388563,0.00025068043,0.00016057122,0.00010149534,0.00028293784],"domain_scores_gemma":[0.9993805,0.000039785806,0.000048687427,0.00040586907,0.000040587565,0.00008453103],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021460005,0.00012533543,0.00024614594,0.000021369377,0.00009121351,0.000043744854,0.0002695101,0.00008204368,0.000095028154],"category_scores_gemma":[0.00005127244,0.000117790085,0.00008583206,0.000017092052,0.0000689411,0.00037518764,0.000018751554,0.00006343097,0.00002083373],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014981877,0.0017237859,0.08309554,0.020507203,0.0026430304,0.00008830259,0.03601057,0.09146619,0.2570548,0.027094426,0.017424583,0.4613934],"study_design_scores_gemma":[0.0027507562,0.00042502154,0.015204395,0.0006433029,0.00011614748,0.000040122828,0.0008028391,0.7679311,0.17117646,0.0006268845,0.039136782,0.0011462063],"about_ca_topic_score_codex":0.000066659304,"about_ca_topic_score_gemma":0.00009854245,"teacher_disagreement_score":0.6764649,"about_ca_system_score_codex":0.000028169088,"about_ca_system_score_gemma":0.000016977361,"threshold_uncertainty_score":0.48033404},"labels":[],"label_agreement":null},{"id":"W2787652360","doi":"10.1109/epec.2017.8286212","title":"Seasonal reservoir management in hydro dominant power systems to enhance availability","year":2017,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Spillage; Inflow; Reliability (semiconductor); Environmental science; Water storage; Reliability engineering; Hydroelectricity; Dry season; Energy storage; Water supply; Computer science; Environmental engineering; Engineering; Power (physics); Meteorology","score_opus":0.00941561895674801,"score_gpt":0.2520194769830187,"score_spread":0.24260385802627069,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2787652360","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7350778,0.00028732934,0.012026349,0.00059584517,0.0021339967,0.0011390509,0.00001681255,0.00019816878,0.24852468],"genre_scores_gemma":[0.9921801,0.00002616105,0.00044206562,0.000035990503,0.00002282209,0.00016691368,8.144959e-7,0.00001883449,0.007106303],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99856365,0.000036248002,0.00035385005,0.00037152076,0.00023284365,0.00044190805],"domain_scores_gemma":[0.99837947,0.00003523945,0.000038640144,0.0013634874,0.000040597926,0.00014255568],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008796782,0.00017825191,0.00027702283,0.000058966074,0.000099874014,0.0001317098,0.0006167147,0.00007401507,0.00007939952],"category_scores_gemma":[0.000102063976,0.00015550884,0.000056202927,0.00007654575,0.000044799566,0.00023056382,0.00020289769,0.0001318624,0.0005277761],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013557139,0.0019652057,0.09694344,0.017981889,0.0011140556,0.0018551226,0.0078873625,0.24725582,0.02756984,0.11821734,0.45444572,0.0234085],"study_design_scores_gemma":[0.0017793693,0.00021259171,0.1855575,0.0021053585,0.000030745665,0.00002806251,0.0010442495,0.09926423,0.01535423,0.0011342743,0.6914489,0.0020404519],"about_ca_topic_score_codex":0.00030237052,"about_ca_topic_score_gemma":0.00042879136,"teacher_disagreement_score":0.2571023,"about_ca_system_score_codex":0.00024856805,"about_ca_system_score_gemma":0.000010539145,"threshold_uncertainty_score":0.67836696},"labels":[],"label_agreement":null},{"id":"W2794352985","doi":"10.1109/tpwrs.2018.2811707","title":"A Cumulant-Tensor-Based Probabilistic Load Flow Method","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Probabilistic logic; Reliability (semiconductor); Monte Carlo method; Electric power system; Mathematical optimization; Computer science; Wind power; Grid; Random variable; Reliability engineering; Tensor (intrinsic definition); Power (physics); Engineering; Mathematics; Electrical engineering; Statistics","score_opus":0.013635294617494569,"score_gpt":0.24062256037396546,"score_spread":0.22698726575647088,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2794352985","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019547874,0.00014746572,0.9810913,0.00005892052,0.008934624,0.0007894892,0.00012639046,0.0009782205,0.0059187636],"genre_scores_gemma":[0.9950842,0.000004979183,0.0034163191,0.0000737339,0.00006333984,0.00026135927,0.0000017588068,0.00007535524,0.0010189132],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978649,0.00016949857,0.0005430069,0.00045416135,0.00043250332,0.0005359285],"domain_scores_gemma":[0.9984408,0.00020289092,0.000055594734,0.00082062377,0.00028416686,0.00019591741],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00062553794,0.00035276255,0.0004550037,0.00015802844,0.00016671786,0.000085583495,0.00027926217,0.00021925021,0.00014813896],"category_scores_gemma":[0.00002136654,0.00032117986,0.00020118743,0.00037453306,0.000109211345,0.00013796556,8.3606403e-7,0.0003029758,0.00091121864],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011871696,0.0002255556,0.000005919044,0.0007342962,0.00018465279,0.00002345568,0.0010184794,0.98864746,0.0029717823,0.0001949948,0.004939499,0.0009352035],"study_design_scores_gemma":[0.0008566055,0.00037277272,0.000016702394,0.0004993388,0.00006720938,0.000081844206,0.00013707596,0.92957795,0.008772476,0.00003555168,0.05901157,0.000570893],"about_ca_topic_score_codex":0.00013970076,"about_ca_topic_score_gemma":0.00010601496,"teacher_disagreement_score":0.99312943,"about_ca_system_score_codex":0.00042946523,"about_ca_system_score_gemma":0.00010730408,"threshold_uncertainty_score":0.999924},"labels":[],"label_agreement":null},{"id":"W2796886579","doi":"10.1109/sustech.2017.8333506","title":"Adequacy considerations in concentrated solar thermal integrated electric power system","year":2017,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Renewable energy; Fossil fuel; Electric power system; Reliability (semiconductor); Environmental science; Automotive engineering; Solar power; Electric power; Reliability engineering; Electricity generation; Computer science; Power (physics); Engineering; Electrical engineering; Waste management","score_opus":0.00916857948472903,"score_gpt":0.20720372714017962,"score_spread":0.1980351476554506,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2796886579","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8526319,0.0004764826,0.010585073,0.00032776035,0.0014668022,0.0007235553,0.000017900666,0.0010311928,0.13273929],"genre_scores_gemma":[0.9995565,0.000008178492,0.00011782991,0.000036250796,0.000018454415,0.000029468172,0.0000029752166,0.000018836,0.00021152988],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99902403,0.000048680755,0.00031735044,0.00017428321,0.0000930755,0.00034259103],"domain_scores_gemma":[0.9992565,0.000058516183,0.00004761533,0.000486851,0.000079669044,0.000070866394],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023159057,0.00015277846,0.0002322048,0.000062440755,0.00015244338,0.00017034406,0.00018747081,0.00011026186,0.00013787484],"category_scores_gemma":[0.0001620535,0.0001282104,0.0000440557,0.00008591824,0.000040064508,0.00028882187,0.000019013536,0.00021538198,0.00013020502],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016498198,0.00057913794,0.059090834,0.0017967302,0.000820755,0.0013529452,0.006468747,0.059258167,0.415287,0.4102885,0.04096537,0.0039268183],"study_design_scores_gemma":[0.0057192664,0.00023814128,0.10759924,0.0014245706,0.000064245825,0.00022093579,0.0029080105,0.72940826,0.13259348,0.0006910631,0.016908718,0.002224048],"about_ca_topic_score_codex":0.0003043838,"about_ca_topic_score_gemma":0.00016426443,"teacher_disagreement_score":0.6701501,"about_ca_system_score_codex":0.00018519751,"about_ca_system_score_gemma":0.0000678724,"threshold_uncertainty_score":0.52282685},"labels":[],"label_agreement":null},{"id":"W2797933117","doi":"10.1016/j.applthermaleng.2018.04.042","title":"New procedure for determination of availability and reliability of complex cogeneration systems by improving the approximated Markov method","year":2018,"lang":"en","type":"article","venue":"Applied Thermal Engineering","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ontario Institute of Technology","funders":"","keywords":"State space; Markov chain; Reliability (semiconductor); State (computer science); Mathematical optimization; Steam turbine; Markov process; Reliability engineering; Unavailability; Computer science; Engineering; Algorithm; Mathematics; Mechanical engineering; Statistics","score_opus":0.006992461446252811,"score_gpt":0.20836526776978428,"score_spread":0.20137280632353147,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2797933117","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16679193,0.00014289923,0.8315108,0.000010677693,0.00016431526,0.0010047298,0.0000345345,0.00011564824,0.00022447853],"genre_scores_gemma":[0.96113956,0.0000029256212,0.038607303,0.0000038887433,0.00007089964,0.00012001127,0.000011754623,0.000028266539,0.000015379885],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999019,0.00002127552,0.00043624768,0.00021031492,0.00011901256,0.00019414333],"domain_scores_gemma":[0.99925804,0.0001880298,0.000101985526,0.000288583,0.00011675149,0.00004659795],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007927343,0.00016273312,0.0002818826,0.000031967244,0.000043397395,0.000017412618,0.00014020709,0.00010028664,0.000004127553],"category_scores_gemma":[0.00010326345,0.00012998696,0.00004059394,0.0001284743,0.00005426325,0.00008000245,0.000030414116,0.00007966817,4.4715247e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041731102,0.000016356047,0.000042352585,0.0022891925,0.00001897118,2.584706e-8,0.00043424338,0.01363648,0.9729411,0.001005743,0.00013684492,0.009436971],"study_design_scores_gemma":[0.00034933153,0.000044493005,0.00046054338,0.00004052027,0.000024833496,0.0000022241825,0.000060617407,0.80760586,0.19063039,0.000036132635,0.00061392476,0.0001311491],"about_ca_topic_score_codex":0.000050756254,"about_ca_topic_score_gemma":0.0000025162356,"teacher_disagreement_score":0.79434764,"about_ca_system_score_codex":0.000049877435,"about_ca_system_score_gemma":0.000020019605,"threshold_uncertainty_score":0.53007144},"labels":[],"label_agreement":null},{"id":"W2798649356","doi":"","title":"Residential Transformer Overloading Risk Assessment Using Clustering Analysis.","year":2018,"lang":"en","type":"article","venue":"arXiv (Cornell University)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transformer; Asset management; Portfolio; Reliability engineering; Cluster analysis; Population; Computer science; Engineering; Risk analysis (engineering); Business; Electrical engineering; Finance","score_opus":0.03260253779219432,"score_gpt":0.19123388214824405,"score_spread":0.15863134435604972,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2798649356","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.498468,0.000012799378,0.49664104,0.0000024710555,0.0002983372,0.00006975067,0.000007964576,0.00012603725,0.0043735737],"genre_scores_gemma":[0.9989629,0.000055184653,0.0006045373,0.000011088315,0.000100849946,2.6063586e-7,0.0000024197302,0.0000184574,0.00024434444],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989969,0.0000606851,0.00018760707,0.00033938553,0.00006803467,0.00034735198],"domain_scores_gemma":[0.999376,0.00003591777,0.000054332097,0.00035253307,0.00007208188,0.000109157765],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028151093,0.00016511287,0.00024755372,0.00024098378,0.00019319176,0.00004387821,0.00021977905,0.00009155043,0.00012760723],"category_scores_gemma":[0.000011510818,0.0001893036,0.00020021651,0.00092842063,0.00008900463,0.00041280274,0.000032971217,0.000170324,0.000037220863],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039333045,0.000026474467,0.026534172,0.00007494392,0.00087812246,0.00005647014,0.00036803976,0.96470094,0.0041944757,0.0028381245,0.00011917773,0.00016974074],"study_design_scores_gemma":[0.0003728896,0.0000316295,0.010419487,0.000034025557,0.00056401134,0.0000031103377,0.0001676412,0.9863883,0.0006499021,0.00036897822,0.00074496336,0.00025500997],"about_ca_topic_score_codex":0.00036297328,"about_ca_topic_score_gemma":0.0008804891,"teacher_disagreement_score":0.50049484,"about_ca_system_score_codex":0.00030327638,"about_ca_system_score_gemma":0.000026419015,"threshold_uncertainty_score":0.77195764},"labels":[],"label_agreement":null},{"id":"W2803743380","doi":"10.17485/ijst/2018/v11i19/121112","title":"The Role of Preventive Major Maintenance in the Costs of Electric Energy Distribution Companies","year":2018,"lang":"en","type":"article","venue":"Indian Journal of Science and Technology","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Micropharma (Canada)","funders":"","keywords":"Preventive maintenance; Reliability engineering; Fault (geology); Energy (signal processing); Computer science; Power (physics); Trustworthiness; Electric power; Business; Function (biology); Distribution (mathematics); Electric power system; Risk analysis (engineering); Computer security; Engineering; Statistics; Mathematics","score_opus":0.0021230128831889283,"score_gpt":0.1883470536445691,"score_spread":0.1862240407613802,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2803743380","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9962569,0.0017970445,0.0010106871,0.0004184426,0.00012581323,0.000055658635,0.0000039274823,0.0000057514467,0.00032580242],"genre_scores_gemma":[0.99972045,0.00022905561,0.000026647584,0.000005741168,0.000011726167,0.0000020514688,6.5453655e-8,0.0000015551001,0.0000027051406],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9993286,0.000021790573,0.00025576638,0.000056461795,0.00015949992,0.00017784817],"domain_scores_gemma":[0.9993464,0.00006402567,0.00014860957,0.00012091446,0.00030308374,0.00001698192],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010407188,0.000046275196,0.00012248341,0.00017643235,0.00008208396,0.000010250787,0.0004800437,0.00004315678,4.775366e-7],"category_scores_gemma":[0.0002521141,0.000025557578,0.000017563894,0.0011100774,0.001597436,0.00010852668,0.0000254729,0.00012287628,2.5860962e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001169483,0.00016905849,0.017016388,0.00008456617,0.00008499812,0.00004525257,0.0055753165,0.00007410433,0.20879844,0.4404559,0.0008771961,0.32670182],"study_design_scores_gemma":[0.0009701057,0.0019287314,0.031062445,0.00085263286,0.000028455823,0.0014953025,0.020435726,0.003949763,0.80111057,0.1151469,0.022760764,0.00025858212],"about_ca_topic_score_codex":0.000016656071,"about_ca_topic_score_gemma":0.00006841328,"teacher_disagreement_score":0.59231216,"about_ca_system_score_codex":0.00005940534,"about_ca_system_score_gemma":0.00007559195,"threshold_uncertainty_score":0.5885819},"labels":[],"label_agreement":null},{"id":"W2807828564","doi":"10.3934/energy.2018.3.505","title":"Bulk system reliability impacts of forced wind energy curtailment","year":2018,"lang":"en","type":"article","venue":"AIMS energy","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Reliability (semiconductor); Wind speed; Electric power system; Reliability engineering; Spillage; Environmental science; Marine engineering; Automotive engineering; Engineering; Computer science; Meteorology; Power (physics); Electrical engineering","score_opus":0.003929335539314077,"score_gpt":0.1835014852070937,"score_spread":0.17957214966777962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2807828564","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83790797,0.0017164776,0.05934735,0.00019160096,0.006048833,0.00030503215,0.00007370946,0.0013470348,0.093062006],"genre_scores_gemma":[0.99891055,0.000054967997,0.00020493318,0.000053655527,0.00024014994,0.000020690264,0.000008297121,0.000039355327,0.0004674001],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984154,0.000056230958,0.00053079316,0.00029779933,0.0002489877,0.0004507795],"domain_scores_gemma":[0.99872786,0.000068115354,0.00009184364,0.00077323936,0.00017239596,0.00016656179],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029579643,0.00023453815,0.0003963591,0.00007807655,0.000054026477,0.000016051928,0.00027891557,0.0001588324,0.0000405548],"category_scores_gemma":[0.000049108738,0.00020837979,0.00013237605,0.00023371926,0.00018523487,0.00013623369,0.00006437782,0.000067736146,0.000020665131],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040893786,0.0004431909,0.00246331,0.0046466654,0.0008288612,0.000055000957,0.0026173315,0.06746755,0.14938664,0.71548533,0.040526446,0.015670758],"study_design_scores_gemma":[0.0017015667,0.00085431134,0.0023501574,0.0011493672,0.00008898313,0.000067313966,0.0005874299,0.089910135,0.43809834,0.0014179879,0.4625825,0.0011919178],"about_ca_topic_score_codex":0.002826877,"about_ca_topic_score_gemma":0.00047129754,"teacher_disagreement_score":0.71406734,"about_ca_system_score_codex":0.0002531028,"about_ca_system_score_gemma":0.00004325869,"threshold_uncertainty_score":0.84974813},"labels":[],"label_agreement":null},{"id":"W2809864056","doi":"","title":"Multiple contingency analysis of power systems","year":2017,"lang":"en","type":"dissertation","venue":"Memorial University Research Repository (Memorial University)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Memorial University of Newfoundland","keywords":"Electric power system; Reliability engineering; Contingency; Power (physics); Power-flow study; Reliability (semiconductor); Engineering; Line (geometry); Power flow; Contingency management; Computer science; Mathematics","score_opus":0.0181431304185656,"score_gpt":0.24531699275488283,"score_spread":0.22717386233631723,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2809864056","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47425017,0.00043464324,0.00028895488,0.000007671578,0.04181957,0.0013777195,0.00040636922,0.0003852766,0.48102963],"genre_scores_gemma":[0.8766232,0.00026005454,0.000021456834,3.0056705e-7,0.0008280731,9.077098e-7,0.00028893034,0.000054775624,0.12192227],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.9955808,0.00077152264,0.0005469998,0.00089813495,0.0013269888,0.0008755847],"domain_scores_gemma":[0.9953125,0.00052609714,0.00048645388,0.0016172727,0.0016615692,0.000396077],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0011699726,0.0005120808,0.0015011034,0.0031437844,0.0011128155,0.00019445819,0.002379705,0.0010388005,0.000060260416],"category_scores_gemma":[0.0004526923,0.0006429551,0.00085480185,0.0021807358,0.000394468,0.00066209555,0.00020423441,0.0012219726,0.000031251653],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.06138436,0.0041499487,0.024697352,0.026697395,0.1235138,0.033860102,0.0429506,0.10086594,0.32255462,0.079964265,0.1750808,0.004280799],"study_design_scores_gemma":[0.006394504,0.000680297,0.0065232418,0.0014995364,0.0065161595,0.00001362537,0.026331201,0.010058825,0.013540199,0.00003664725,0.9259253,0.0024804268],"about_ca_topic_score_codex":0.0054730903,"about_ca_topic_score_gemma":0.0023463115,"teacher_disagreement_score":0.75084454,"about_ca_system_score_codex":0.0014034535,"about_ca_system_score_gemma":0.0007093362,"threshold_uncertainty_score":0.9996022},"labels":[],"label_agreement":null},{"id":"W2883787170","doi":"10.1115/1.2004-aug-3","title":"Lessons of the Blackout","year":2004,"lang":"en","type":"article","venue":"Mechanical Engineering","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Blackout; Reliability (semiconductor); Electricity; Electric power industry; Engineering; Electricity generation; Electric power; Order (exchange); Electric utility; Reliability engineering; Power (physics); Electric power system; Electrical engineering; Business; Finance","score_opus":0.00667138234144216,"score_gpt":0.18392294657611183,"score_spread":0.17725156423466967,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2883787170","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2754284,0.00045884948,0.7162461,0.0008522755,0.0032996351,0.00037536855,0.000017397102,0.0008372424,0.0024846538],"genre_scores_gemma":[0.9990266,0.000010653905,0.00086465344,0.0000144340365,0.000034339122,0.00000544438,2.4677558e-7,0.000019431973,0.000024227857],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994231,0.000004550366,0.0001815409,0.00008937255,0.00011497737,0.00018645191],"domain_scores_gemma":[0.99961644,0.000023611567,0.000013389468,0.00028520424,0.000015844313,0.000045480865],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011901017,0.00009462395,0.00014045314,0.000020681813,0.000015369264,0.000005586588,0.00021898923,0.00006368552,0.0000075941907],"category_scores_gemma":[0.00008350359,0.00007045583,0.00009052593,0.00015862183,0.000012506513,0.000040027244,0.000043660875,0.00015153979,0.000013418599],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000010986591,0.000012399364,0.0000030607875,0.00014534286,0.00001910223,0.0000013830763,0.0000770282,0.83061546,0.0714388,0.097344585,0.000042373817,0.00029939297],"study_design_scores_gemma":[0.0011045989,0.000056639128,0.00095288706,0.0008307343,0.00003611198,0.00004277557,0.000058495356,0.22423829,0.7461135,0.0062206276,0.019760495,0.0005848506],"about_ca_topic_score_codex":0.000008017291,"about_ca_topic_score_gemma":0.000004378539,"teacher_disagreement_score":0.7235981,"about_ca_system_score_codex":0.0000671083,"about_ca_system_score_gemma":0.000011255928,"threshold_uncertainty_score":0.28731054},"labels":[],"label_agreement":null},{"id":"W2887033362","doi":"10.1109/pmaps.2018.8440506","title":"Spare Assessment of Distribution Power Transformers using Three Markov Models","year":2018,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan; Hydro One (Canada)","funders":"","keywords":"Spare part; Reliability engineering; Transformer; Computer science; Markov chain; Probabilistic logic; Markov model; Distribution transformer; Spare time; Markov process; Engineering; Mathematics; Electrical engineering; Artificial intelligence; Statistics; Machine learning; Voltage","score_opus":0.017274290540090463,"score_gpt":0.24837845231734992,"score_spread":0.23110416177725945,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2887033362","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14606245,0.000034845983,0.8190426,0.000018778464,0.00032641948,0.00013318782,0.000046692923,0.000082983854,0.034252007],"genre_scores_gemma":[0.99667907,0.0000072981534,0.0032342486,0.00000764691,0.000020422845,0.000004114585,0.0000085929505,0.000010473648,0.00002811981],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99935937,0.000008238273,0.00020975992,0.000105693536,0.00012863013,0.00018831507],"domain_scores_gemma":[0.9997014,0.000011457208,0.000018646104,0.00015425617,0.000071473514,0.000042778123],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001621765,0.00009273367,0.0001447296,0.000019535013,0.000028616705,0.000008081074,0.00007546662,0.000056758767,0.000118338605],"category_scores_gemma":[0.000003808601,0.000080052654,0.000071872535,0.000097266464,0.00005596924,0.0001741879,0.000009584556,0.000054255433,0.000003347938],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022626173,0.00082890166,0.017308583,0.004568421,0.0016350216,0.000021820364,0.0035861528,0.50557244,0.08112513,0.32079268,0.019076664,0.045257945],"study_design_scores_gemma":[0.0002322738,0.00006742576,0.0033991875,0.000093572155,0.000018791925,0.000004368647,0.0001156713,0.98942304,0.0037653276,0.0011744878,0.0015388582,0.00016700274],"about_ca_topic_score_codex":0.000059930553,"about_ca_topic_score_gemma":0.00009435645,"teacher_disagreement_score":0.85061663,"about_ca_system_score_codex":0.00012413497,"about_ca_system_score_gemma":0.000022794398,"threshold_uncertainty_score":0.32644525},"labels":[],"label_agreement":null},{"id":"W2887641715","doi":"10.1109/pmaps.2018.8440546","title":"Performance Analysis of North American AC Circuits on Common Structures using TADS and CEA Outage Statistics","year":2018,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Computer science; Duration (music); Electricity; Statistics; Operations research; Engineering; Electrical engineering; Mathematics; Power (physics)","score_opus":0.01139570386818065,"score_gpt":0.23475046751477294,"score_spread":0.2233547636465923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2887641715","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97318953,0.000011080811,0.025370065,0.0000020641035,0.00009598855,0.00006162828,0.00012411228,0.00004937049,0.001096132],"genre_scores_gemma":[0.99859303,0.000028048255,0.0012797164,0.000029885716,0.000021886772,9.527464e-7,0.000012861438,0.000010433537,0.000023180739],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993704,0.000016217924,0.00020707764,0.00012651442,0.00011593411,0.00016386174],"domain_scores_gemma":[0.9995632,0.000042089232,0.000055568085,0.00023363649,0.00005380703,0.000051693693],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000703107,0.00010796848,0.00029954888,0.00012695717,0.000041185056,0.000012375092,0.00008533626,0.000019332636,0.000016166574],"category_scores_gemma":[0.000013337485,0.000091516,0.000028188224,0.00044680035,0.0001636757,0.000052811487,0.000019815587,0.000064757725,0.000001902836],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014418648,0.000020174837,0.8920086,0.00031254356,0.00057976536,0.0000023114737,0.0008563613,0.07156181,0.0007834876,0.0005374023,0.00019995467,0.033123177],"study_design_scores_gemma":[0.000052865147,0.00008474445,0.6330014,0.000010284901,0.000112933376,8.866087e-7,0.00003365733,0.3657093,0.0007207363,0.000007881058,0.00016581692,0.00009950405],"about_ca_topic_score_codex":0.00026474523,"about_ca_topic_score_gemma":0.0020718407,"teacher_disagreement_score":0.2941475,"about_ca_system_score_codex":0.00003519413,"about_ca_system_score_gemma":0.000006840308,"threshold_uncertainty_score":0.37319142},"labels":[],"label_agreement":null},{"id":"W2888794118","doi":"10.1109/ccece.2018.8447841","title":"Solar Power Capacity Value Evaluation-A Review","year":2018,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Renewable energy; Reliability (semiconductor); Value (mathematics); Environmental economics; Computer science; Solar power; Capacity planning; Affect (linguistics); Work (physics); Reliability engineering; Risk analysis (engineering); Power (physics); Engineering; Business; Electrical engineering; Economics; Physics","score_opus":0.01878128492549123,"score_gpt":0.24529504495171522,"score_spread":0.226513760026224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2888794118","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033296105,0.016953165,0.051262416,0.0008010635,0.003784336,0.001357428,0.000012237879,0.0008838398,0.8916494],"genre_scores_gemma":[0.99720144,0.00050911115,0.0009505916,0.00083609234,0.00008391016,0.00003716596,0.0000017103126,0.000013455711,0.00036650064],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99924576,0.000049094935,0.0001921302,0.00012930803,0.00020740033,0.00017632045],"domain_scores_gemma":[0.99938273,0.000021809725,0.000014982587,0.000348289,0.0001764262,0.00005575617],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0009730237,0.000091558715,0.0001457716,0.000017267708,0.000035444224,0.000010680686,0.00011661261,0.000043548116,0.0016842387],"category_scores_gemma":[0.00018709002,0.000074754484,0.00005184235,0.00011476859,0.000044682845,0.00010622226,0.000014458556,0.00006928477,0.0011155655],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006761902,0.00009262438,0.00045672274,0.0045544277,0.00019781811,0.0000028823054,0.0013725852,0.00088718894,0.0027884627,0.025147766,0.95185757,0.012635204],"study_design_scores_gemma":[0.0003975078,0.00009991245,0.0019616378,0.002131887,0.00008822887,0.000027304748,0.000035855017,0.05026752,0.007145074,0.0032657194,0.93403125,0.0005481287],"about_ca_topic_score_codex":0.000021603122,"about_ca_topic_score_gemma":0.000021161188,"teacher_disagreement_score":0.96390533,"about_ca_system_score_codex":0.000074253934,"about_ca_system_score_gemma":0.000020371312,"threshold_uncertainty_score":0.99966216},"labels":[],"label_agreement":null},{"id":"W2888915296","doi":"10.1109/ccece.2018.8447786","title":"Regression Models of Critical Parameters Affecting Peak Load Demand Forecasting","year":2018,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Economic shortage; Residual; MATLAB; Regression analysis; Demand forecasting; Regression; Computer science; Goodness of fit; Power demand; Time series; Curve fitting; Linear regression; Data modeling; Statistics; Power (physics); Econometrics; Mathematics; Operations research; Algorithm; Power consumption","score_opus":0.030702782677018994,"score_gpt":0.25409219624606105,"score_spread":0.22338941356904207,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2888915296","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5524985,0.00019759111,0.39927116,0.000038897302,0.00063408253,0.00012479164,0.0000019964066,0.00022021194,0.047012724],"genre_scores_gemma":[0.9906522,0.000003895064,0.009189811,0.000014430685,0.00005260377,0.0000046233836,2.9101332e-7,0.000014794099,0.00006736643],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992033,0.000026797456,0.00023110706,0.00014540424,0.00014391328,0.0002494575],"domain_scores_gemma":[0.99935496,0.0002507788,0.000022233358,0.00019760546,0.00011086129,0.00006355674],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040419993,0.000104764644,0.0001798651,0.000030699568,0.000048096903,0.000012921175,0.000092706076,0.00006999439,0.000019940611],"category_scores_gemma":[0.00043128812,0.0000815073,0.000054015567,0.00008979691,0.000109302426,0.00017541001,0.00003583834,0.00008536176,0.000010614823],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006167808,0.0008739631,0.0050870585,0.025057293,0.0006333938,0.00015766735,0.050169673,0.4380531,0.21159731,0.08649246,0.037631143,0.14363016],"study_design_scores_gemma":[0.00017374507,0.00008788457,0.00005561024,0.00054657395,0.000012201647,0.000023116663,0.00031392302,0.95858806,0.03676768,0.0031560662,0.00012040593,0.00015475348],"about_ca_topic_score_codex":0.000032239124,"about_ca_topic_score_gemma":0.00002915583,"teacher_disagreement_score":0.52053493,"about_ca_system_score_codex":0.00004986194,"about_ca_system_score_gemma":0.000011544983,"threshold_uncertainty_score":0.3323771},"labels":[],"label_agreement":null},{"id":"W2889293508","doi":"10.1109/ccece.2018.8447889","title":"Generation Adequacy Evaluation Using Fuzzy C-Means Method-A Case Study","year":2018,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Fuzzy logic; Table (database); Computation; Computer science; Reliability engineering; Data mining; Wind power; Evaluation methods; Mathematical optimization; Algorithm; Mathematics; Engineering; Artificial intelligence","score_opus":0.12210317493702359,"score_gpt":0.37052253905324306,"score_spread":0.24841936411621945,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889293508","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5559178,0.00003884241,0.4375505,0.0000089803625,0.0007611577,0.0004494106,0.0000011590505,0.00014305687,0.0051291194],"genre_scores_gemma":[0.97862244,9.177153e-7,0.020825176,0.000024968173,0.00038425147,0.000030340372,0.0000020279863,0.000016615284,0.00009324764],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99902767,0.00018055066,0.00023746997,0.00018799533,0.00020079853,0.00016553196],"domain_scores_gemma":[0.9994146,0.000032832097,0.000022761798,0.00028903055,0.00019335577,0.000047372225],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015129981,0.000106591724,0.00012652349,0.000058156984,0.00010387192,0.000039161878,0.00005811071,0.000049422302,0.00012503743],"category_scores_gemma":[0.00008027251,0.00009562317,0.000031536252,0.00016095488,0.000015399726,0.00020214656,0.000016692828,0.000059669914,0.00005226707],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030966414,0.00068742177,0.0030134995,0.00027719507,0.0005354551,0.0005352222,0.040199652,0.62176836,0.16186069,0.0029740972,0.008336903,0.15978055],"study_design_scores_gemma":[0.00031126704,0.000077467725,0.00006408162,0.000007831091,0.000051985884,0.00029408783,0.0019137086,0.99337065,0.0030716492,0.0000683621,0.0006361995,0.00013267847],"about_ca_topic_score_codex":0.00059400307,"about_ca_topic_score_gemma":0.0013707159,"teacher_disagreement_score":0.42270467,"about_ca_system_score_codex":0.00015613087,"about_ca_system_score_gemma":0.000026620035,"threshold_uncertainty_score":0.38993996},"labels":[],"label_agreement":null},{"id":"W2895367870","doi":"10.1051/e3sconf/20185703007","title":"A New Distribution System Performance Approach to the Switch Allocation Problem Under Smart Grid Framework","year":2018,"lang":"en","type":"article","venue":"E3S Web of Conferences","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Reliability (semiconductor); Computer science; Set (abstract data type); Mathematical optimization; Grid; Genetic algorithm; Vulnerability (computing); Integer (computer science); Reliability engineering; Index (typography); Mathematics; Engineering","score_opus":0.012714888001216585,"score_gpt":0.2068378304891185,"score_spread":0.1941229424879019,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2895367870","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07640409,0.0001928868,0.87290716,0.0005594999,0.0013951982,0.0006113503,0.000021672673,0.00023467795,0.04767349],"genre_scores_gemma":[0.9976565,0.000020093139,0.0017742629,0.000023522134,0.0003083531,0.000055908262,0.00001629493,0.000008529821,0.00013651617],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99906844,0.000033720764,0.00028291994,0.0001726457,0.00022708422,0.00021521754],"domain_scores_gemma":[0.99935263,0.00004601104,0.00005949824,0.00031727843,0.00015449493,0.000070100396],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039797774,0.00012971691,0.00018423461,0.000027812279,0.00008069034,0.00005075427,0.00034252083,0.000093203875,0.000015985068],"category_scores_gemma":[0.000028609202,0.000088454595,0.000036948844,0.0002585105,0.00005823104,0.00010939109,0.00003321916,0.00012373955,0.000073847674],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011622497,0.00011256262,0.009399232,0.0029833803,0.00025296217,3.5950887e-7,0.004558582,0.02035784,0.0012096005,0.8797328,0.058196127,0.023080338],"study_design_scores_gemma":[0.0008091541,0.00075424113,0.061240666,0.0041207513,0.00012702873,0.000035872334,0.005366745,0.39798245,0.017630773,0.002994717,0.5077304,0.0012071826],"about_ca_topic_score_codex":0.00012213676,"about_ca_topic_score_gemma":0.000066458255,"teacher_disagreement_score":0.9212524,"about_ca_system_score_codex":0.000064130094,"about_ca_system_score_gemma":0.0002577435,"threshold_uncertainty_score":0.36070737},"labels":[],"label_agreement":null},{"id":"W2900400407","doi":"","title":"Understanding the cost of power interruptions to U.S. electricity consumers","year":2004,"lang":"en","type":"article","venue":"Lawrence Berkeley National Laboratory","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":72,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Blackout; Electricity; Reliability (semiconductor); Electric power industry; Reliability engineering; Quality (philosophy); Computer science; Environmental economics; Electricity market; Electric power system; Power (physics); Electricity generation; Business; Risk analysis (engineering); Economics; Engineering; Electrical engineering","score_opus":0.03548939390424717,"score_gpt":0.25123208371372296,"score_spread":0.2157426898094758,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2900400407","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26877743,0.0013238146,0.66084373,0.0042842263,0.0027773213,0.0020477786,0.0014995454,0.0007550652,0.057691053],"genre_scores_gemma":[0.99920565,0.000019450072,0.00039099576,0.00028531405,0.000017844188,0.000044008102,0.0000061589767,0.00001199405,0.000018591556],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990588,0.00002991621,0.0002459958,0.0001379439,0.00032666334,0.00020071592],"domain_scores_gemma":[0.99929047,0.00013673202,0.00004233596,0.00015809004,0.00029866534,0.00007369172],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039171465,0.00010856261,0.00012783284,0.00009208629,0.00008738572,0.000020645626,0.00021433216,0.00005744101,0.0000277593],"category_scores_gemma":[0.00022962381,0.00009115846,0.000040542145,0.00069520896,0.00011146322,0.00014818116,0.00002174432,0.00015393716,0.00004461214],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023048753,0.000081235856,0.0009956916,0.00007062485,0.00010155076,0.0000026202044,0.0011619376,0.08820307,0.012646514,0.8896873,0.0069251647,0.00010123075],"study_design_scores_gemma":[0.0069959573,0.000912977,0.09072787,0.0024818317,0.00021860065,0.000087181776,0.006873128,0.009766343,0.11943177,0.17861731,0.5794449,0.0044421228],"about_ca_topic_score_codex":0.00002037667,"about_ca_topic_score_gemma":0.00013851738,"teacher_disagreement_score":0.7304282,"about_ca_system_score_codex":0.0006346094,"about_ca_system_score_gemma":0.00021714227,"threshold_uncertainty_score":0.3717334},"labels":[],"label_agreement":null},{"id":"W2901553932","doi":"10.1109/tpwrs.2018.2881250","title":"A Hybrid Framework for Short-Term Risk Assessment of Wind-Integrated Composite Power Systems","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Reliability engineering; Electric power system; Reliability (semiconductor); Wind power; Monte Carlo method; Computer science; Transmission system; Term (time); Cross entropy; Power system simulation; Entropy (arrow of time); Mathematical optimization; Engineering; Transmission (telecommunications); Principle of maximum entropy; Power (physics)","score_opus":0.011495083249243393,"score_gpt":0.2568713865858105,"score_spread":0.2453763033365671,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2901553932","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06937539,0.00033769186,0.9092289,0.000013420338,0.015569571,0.0017528785,0.0011943677,0.0005278209,0.001999962],"genre_scores_gemma":[0.99787104,0.00003828178,0.0012835742,0.000013970299,0.000047756534,0.00033402315,0.000010519219,0.0001132745,0.00028756418],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99708956,0.00019326179,0.001095362,0.0005357788,0.00046605815,0.0006200028],"domain_scores_gemma":[0.9977203,0.00036429847,0.000192561,0.0010104001,0.00049636787,0.00021606844],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007127027,0.0004885739,0.0008724116,0.0002718141,0.00023245212,0.00014076753,0.00041302954,0.0003022813,0.000043859167],"category_scores_gemma":[0.000014752556,0.00044364203,0.00036159393,0.0003246719,0.00016010742,0.0002355138,0.000002341306,0.0005436536,0.00005249266],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011442521,0.0029436562,0.0035966006,0.008437588,0.00643372,0.000084819534,0.006769967,0.88924253,0.052401915,0.012785763,0.015309902,0.00084928656],"study_design_scores_gemma":[0.004126469,0.005240663,0.0031879658,0.012283875,0.001017897,0.0004928518,0.00293674,0.82382256,0.06747543,0.0003207184,0.07518783,0.0039070016],"about_ca_topic_score_codex":0.00014925642,"about_ca_topic_score_gemma":0.000018911052,"teacher_disagreement_score":0.92849565,"about_ca_system_score_codex":0.00038010353,"about_ca_system_score_gemma":0.00008191425,"threshold_uncertainty_score":0.9998015},"labels":[],"label_agreement":null},{"id":"W2906229731","doi":"10.1109/pesgm.2018.8586222","title":"Quantifying Reliability Contribution of an Energy Storage System to a Distribution System","year":2018,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Monte Carlo method; Computer science; Renewable energy; Range (aeronautics); Deferral; Photovoltaic system; Energy storage; Point (geometry); Distributed generation; Engineering; Electrical engineering; Power (physics); Statistics","score_opus":0.009255664870335077,"score_gpt":0.22333768624049782,"score_spread":0.21408202137016275,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2906229731","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.43307474,0.000042381576,0.5632554,0.00001539506,0.0010720361,0.00024544384,0.00010081183,0.00062667456,0.0015670721],"genre_scores_gemma":[0.9993489,0.0000012124151,0.0003529113,0.0000084236035,0.0001419191,0.00004658655,0.000053440486,0.000018407229,0.000028206527],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99843556,0.00012272871,0.00055312994,0.00030209566,0.00024374138,0.0003427201],"domain_scores_gemma":[0.9986484,0.000050534876,0.000070268325,0.00062419777,0.0004318229,0.000174748],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009782417,0.00017571959,0.00037304315,0.00005394297,0.00008720188,0.000028971868,0.00021771913,0.00013846502,0.0000071850272],"category_scores_gemma":[0.00011349703,0.00015772486,0.0000772973,0.00032534348,0.00005715786,0.0002127531,0.0000414068,0.0000661013,0.000042824973],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005280322,0.00030317105,0.0022406448,0.008212936,0.0001939355,0.000029767023,0.0011881529,0.035348,0.08861812,0.85426897,0.005762139,0.0033061043],"study_design_scores_gemma":[0.00087788445,0.0006418314,0.0049052914,0.0014755141,0.000057617835,0.00006620521,0.002018636,0.80510694,0.15672775,0.00003370618,0.027390663,0.00069796765],"about_ca_topic_score_codex":0.00054658775,"about_ca_topic_score_gemma":0.00030327233,"teacher_disagreement_score":0.8542353,"about_ca_system_score_codex":0.0007584854,"about_ca_system_score_gemma":0.000024204435,"threshold_uncertainty_score":0.64318335},"labels":[],"label_agreement":null},{"id":"W2921760002","doi":"10.1109/tpwrs.2019.2905782","title":"Recovery Risk Mitigation of Wind Integrated Bulk Power System With Flywheel Energy Storage","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Reliability engineering; Electric power system; Wind power; Energy storage; Renewable energy; Flywheel; Engineering; Automotive engineering; Computer science; Environmental science; Power (physics); Electrical engineering","score_opus":0.0029453780592711707,"score_gpt":0.15928985400553827,"score_spread":0.1563444759462671,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2921760002","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20796935,0.0002913752,0.7770655,0.000006622681,0.0063545005,0.0005672093,0.0002692426,0.00045285106,0.0070233406],"genre_scores_gemma":[0.99814266,0.00003348259,0.00009043108,0.00000899755,0.000012578603,0.00007105469,0.000008023173,0.00008629675,0.0015465007],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978513,0.00018642044,0.0007138095,0.00042465923,0.00043553722,0.00038824498],"domain_scores_gemma":[0.998468,0.0001417266,0.00021778066,0.00080713176,0.00022710337,0.00013830462],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00040511304,0.00038370176,0.0006283676,0.00029323893,0.00008039442,0.0000706575,0.00023978254,0.00026845236,0.00006970925],"category_scores_gemma":[0.0000045713973,0.00032207,0.0001898556,0.000494453,0.000058924914,0.00040723354,0.0000011465227,0.00035622923,0.00015328596],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020651716,0.00014986162,0.00011587714,0.0011008894,0.00055722357,0.000015824584,0.0008738321,0.9896489,0.00568365,0.0007451096,0.000690536,0.0002117876],"study_design_scores_gemma":[0.014031861,0.007987297,0.002430499,0.026483912,0.0010669521,0.0012814853,0.030167608,0.6439864,0.14694177,0.00005568095,0.11827668,0.0072898865],"about_ca_topic_score_codex":0.0007020069,"about_ca_topic_score_gemma":0.00008596543,"teacher_disagreement_score":0.7901733,"about_ca_system_score_codex":0.0004484074,"about_ca_system_score_gemma":0.00007618976,"threshold_uncertainty_score":0.9999231},"labels":[],"label_agreement":null},{"id":"W2937246245","doi":"10.1049/iet-gtd.2019.0133","title":"Enhanced probabilistic approach for substation reliability assessment","year":2019,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Manitoba Hydro","funders":"","keywords":"Reliability engineering; Probabilistic logic; Reliability (semiconductor); Contingency; Power flow; Electric power system; Computer science; Probabilistic method; Engineering; Power (physics); Artificial intelligence","score_opus":0.01142333794033186,"score_gpt":0.23566107793317942,"score_spread":0.22423773999284757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937246245","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1484683,0.000067739624,0.84810024,0.00009815061,0.0005430283,0.0015771717,0.00018220961,0.00025519473,0.00070797035],"genre_scores_gemma":[0.9852917,0.00003476559,0.009374855,0.000016817145,0.000095827876,0.0004663131,0.0045287036,0.000022252078,0.00016876834],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985318,0.00007632268,0.00046642686,0.00040235813,0.00024814348,0.0002749482],"domain_scores_gemma":[0.99923867,0.000051376614,0.00006078354,0.00031888153,0.00023139866,0.00009887401],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00057693094,0.00019805833,0.00022924572,0.000028392353,0.00011369943,0.000056875837,0.00010570647,0.00016117745,0.000059900984],"category_scores_gemma":[0.00003932866,0.00018339219,0.00012151415,0.00017749716,0.000024595467,0.00026362043,0.000004658295,0.0001271343,0.00001558694],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000072365576,0.0002274065,0.00009899483,0.0013205403,0.000026482425,1.3606501e-7,0.00029144174,0.5837131,0.39037457,0.006356025,0.004147397,0.013371551],"study_design_scores_gemma":[0.000829341,0.0001040845,0.0012402975,0.000038242706,0.000025152336,0.0000012114638,0.00004467605,0.91876656,0.066062644,0.00047973607,0.01213915,0.0002689296],"about_ca_topic_score_codex":0.0000045683405,"about_ca_topic_score_gemma":0.0000017591557,"teacher_disagreement_score":0.8387254,"about_ca_system_score_codex":0.00037175135,"about_ca_system_score_gemma":0.000065503984,"threshold_uncertainty_score":0.7478516},"labels":[],"label_agreement":null},{"id":"W2946190306","doi":"10.1109/tr.2019.2911880","title":"Spare Assessment of Distribution Power Transformers Considering the Issues of Redundancy and MUS Capability","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Reliability","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan; Hydro One (Canada)","funders":"","keywords":"Spare part; Reliability engineering; Transformer; Redundancy (engineering); Computer science; Probabilistic logic; Engineering; Markov chain; Electrical engineering; Operations management; Voltage","score_opus":0.006522095324369194,"score_gpt":0.2328382076369571,"score_spread":0.22631611231258789,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2946190306","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8228796,0.000145195,0.17377599,0.00022715915,0.00072910317,0.00074012147,0.000295069,0.000085907595,0.0011218376],"genre_scores_gemma":[0.99942696,0.0001241554,0.00035751262,0.000007509559,0.000004671831,0.000038144794,0.0000031762575,0.00001196176,0.000025901678],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9985793,0.0001037737,0.00055891334,0.00028592566,0.00024860678,0.00022343978],"domain_scores_gemma":[0.9988812,0.00027835113,0.000067948495,0.0005843372,0.00012646384,0.00006167884],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007233512,0.00018761704,0.00039118584,0.000034134075,0.000065509295,0.000010378524,0.00012291335,0.00011465692,0.000094251416],"category_scores_gemma":[0.00002136712,0.00014503014,0.00019565906,0.00018604434,0.00030976365,0.00014358555,0.0000012247866,0.00029118342,0.0000026192035],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007093442,0.002772784,0.036084287,0.016581824,0.0011391295,0.0000044613516,0.010310902,0.8179831,0.06822473,0.003262212,0.0006151421,0.042312093],"study_design_scores_gemma":[0.0049109426,0.002316296,0.36958227,0.0018895988,0.00058488705,0.000055769793,0.0071668867,0.14208248,0.45251414,0.0042227143,0.012584428,0.002089579],"about_ca_topic_score_codex":0.00020357252,"about_ca_topic_score_gemma":0.00006320163,"teacher_disagreement_score":0.6759006,"about_ca_system_score_codex":0.00015513378,"about_ca_system_score_gemma":0.000049746504,"threshold_uncertainty_score":0.59141576},"labels":[],"label_agreement":null},{"id":"W2946286752","doi":"10.1109/tste.2019.2917374","title":"Probabilistic Modeling of Energy Storage to Quantify Market Constrained Reliability Value to Active Distribution Systems","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Probabilistic logic; Reliability engineering; Reliability (semiconductor); Computer science; Energy storage; Energy market; Grid; Markov chain; Mathematical optimization; Engineering; Renewable energy; Power (physics)","score_opus":0.005939595676407735,"score_gpt":0.19980995695956105,"score_spread":0.19387036128315333,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2946286752","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08746815,0.00004667393,0.90655136,0.00007433277,0.0012780244,0.00069982815,0.00026102224,0.00028114003,0.0033394448],"genre_scores_gemma":[0.9955813,0.000018133063,0.00014768317,0.00003607245,0.000032626092,0.00038662265,0.000016146016,0.000055124467,0.0037262538],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975232,0.00016440505,0.0006566149,0.0005707579,0.00037149512,0.0007135171],"domain_scores_gemma":[0.9980858,0.00022794782,0.00006671561,0.00080611237,0.0005290115,0.00028440577],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005456556,0.00035426152,0.0005829498,0.00024291013,0.00011829629,0.000047885376,0.00028100717,0.00021755071,0.00005753121],"category_scores_gemma":[0.000071831615,0.00036589932,0.00017650651,0.000800089,0.000050318507,0.00025224255,0.000006137088,0.00020583053,0.000013733165],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027540306,0.00013291478,0.0000016207096,0.0007467914,0.00006117905,0.0000071848535,0.00017402244,0.98001814,0.00078875385,0.017011855,0.00029412255,0.00048799577],"study_design_scores_gemma":[0.00050475827,0.00036633934,0.000016719934,0.000284603,0.000046147168,0.0000102337335,0.0021036803,0.97532666,0.0076731807,0.00051745324,0.012639043,0.0005112062],"about_ca_topic_score_codex":0.002672471,"about_ca_topic_score_gemma":0.000080369304,"teacher_disagreement_score":0.9081132,"about_ca_system_score_codex":0.0012250629,"about_ca_system_score_gemma":0.00017559658,"threshold_uncertainty_score":0.9998793},"labels":[],"label_agreement":null},{"id":"W2957795859","doi":"10.3390/app9142777","title":"Quantifying Power System Operational Reliability","year":2019,"lang":"en","type":"article","venue":"Applied Sciences","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Electric power system; Reliability (semiconductor); Probabilistic logic; Power system simulation; Margin (machine learning); Computer science; Economic dispatch; Index (typography); Monte Carlo method; Power (physics); Engineering; Statistics","score_opus":0.014446961144783796,"score_gpt":0.2234373617982233,"score_spread":0.2089904006534395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2957795859","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.80318344,0.00009251199,0.0038729936,0.000053517655,0.0013064813,0.0003207176,0.0000040485825,0.00036995715,0.19079635],"genre_scores_gemma":[0.9983499,0.0000018208985,0.0014563568,0.000045915374,0.00002258983,0.000027150976,0.0000010056799,0.0000071305453,0.00008809865],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989518,0.000014476797,0.00021410495,0.00028530898,0.0002797601,0.0002545482],"domain_scores_gemma":[0.9995773,0.00007707428,0.000021417778,0.00024646518,0.000028305432,0.000049467795],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00086729456,0.000104472405,0.00015278417,0.000041614192,0.000120976176,0.00007683834,0.0002819599,0.00005130041,0.00008414137],"category_scores_gemma":[0.000014829608,0.000083432074,0.000035336845,0.000258683,0.0001106021,0.00017053942,0.000032438325,0.00008688115,0.00076426566],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016701026,0.0000497508,0.032556653,0.00090389594,0.000028128872,0.000002665547,0.0013033161,0.1769088,0.059751496,0.7243177,0.003374389,0.00078647706],"study_design_scores_gemma":[0.0019445318,0.0003357393,0.05906848,0.00074757996,0.00003257379,0.000087463595,0.015047881,0.74352956,0.050640713,0.0024035545,0.12328534,0.0028765684],"about_ca_topic_score_codex":0.000010785143,"about_ca_topic_score_gemma":0.0000048223646,"teacher_disagreement_score":0.7219142,"about_ca_system_score_codex":0.000076924116,"about_ca_system_score_gemma":0.00003700984,"threshold_uncertainty_score":0.9823344},"labels":[],"label_agreement":null},{"id":"W2963990558","doi":"10.1109/igesc.2016.7790067","title":"Reliability assessment of microgrid with renewable generation and prioritized loads","year":2016,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Microgrid; Islanding; Distributed generation; Reliability engineering; Renewable energy; Reliability (semiconductor); Smart grid; Computer science; Grid; Distributed computing; Monte Carlo method; Energy storage; Engineering; Power (physics); Electrical engineering","score_opus":0.006261094524264452,"score_gpt":0.20702417016987693,"score_spread":0.20076307564561247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2963990558","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8251875,0.00016404047,0.16832213,0.00015910919,0.00017212755,0.0002394514,0.000009209739,0.00013364526,0.005612765],"genre_scores_gemma":[0.9875751,0.00013537888,0.011817099,0.000009395591,0.000025045298,0.000015909449,0.0000010802269,0.000008286455,0.0004126828],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994518,0.000020097128,0.00018092195,0.00014112925,0.000085568514,0.000120457],"domain_scores_gemma":[0.99960494,0.00003869895,0.000022186392,0.00022650258,0.000066914254,0.00004076432],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002459258,0.00007879419,0.0001500385,0.000019910232,0.00001622865,0.000009052329,0.000043715965,0.0000401782,0.000027462627],"category_scores_gemma":[0.000018018673,0.000044191183,0.000017499939,0.00005116004,0.00005161127,0.000115419185,0.000013490316,0.000025572926,0.000001360618],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020937452,0.000046485784,0.01949946,0.00034753946,0.00003731416,0.0000014781674,0.0000683998,0.00142247,0.9695407,0.001195961,0.0027813416,0.0050378814],"study_design_scores_gemma":[0.006429851,0.0006911904,0.1207006,0.0008168245,0.000083030114,0.000056345027,0.00014526345,0.047360457,0.74924946,0.00093789137,0.07244056,0.001088558],"about_ca_topic_score_codex":0.0000757971,"about_ca_topic_score_gemma":0.00010885681,"teacher_disagreement_score":0.2202913,"about_ca_system_score_codex":0.000056396933,"about_ca_system_score_gemma":0.000024396673,"threshold_uncertainty_score":0.1802064},"labels":[],"label_agreement":null},{"id":"W2965955284","doi":"10.1109/tste.2018.2862351","title":"Integrated Disturbance Response Modeling of Wind-Integrated Power Systems to Quantify the Operational Reliability Benefits of Flywheel Energy Storage","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Reliability engineering; Electric power system; Wind power; Energy storage; Engineering; Renewable energy; Flywheel; Probabilistic logic; Automotive engineering; Computer science; Power (physics); Electrical engineering","score_opus":0.009474493280562333,"score_gpt":0.20950962949402518,"score_spread":0.20003513621346286,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2965955284","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16701706,0.00032493897,0.8302733,0.00013159032,0.001059468,0.00025870802,0.00014694486,0.00015483065,0.00063321285],"genre_scores_gemma":[0.99592423,0.000039289684,0.00029403056,0.000059783553,0.00003106142,0.00012614601,0.000007915231,0.000055681823,0.003461875],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974588,0.00031470772,0.00083701336,0.00043768573,0.00042281018,0.00052896567],"domain_scores_gemma":[0.99702734,0.00030452452,0.00009680751,0.00090084586,0.0015327284,0.00013775671],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010090887,0.0003476957,0.0005090445,0.0002884771,0.00025055427,0.000051594674,0.00045088172,0.00021336389,0.000057726185],"category_scores_gemma":[0.00011852358,0.0002665793,0.00017011285,0.001142579,0.00019590883,0.00026779075,0.0000061683013,0.00025074076,0.000004520947],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009002009,0.00013797132,0.000003262449,0.000117323,0.0000768265,0.000003283428,0.00063564634,0.9854915,0.0024459895,0.009466892,0.00040895393,0.0003121473],"study_design_scores_gemma":[0.00050490425,0.00056508125,0.00007255836,0.00029446316,0.00004074596,0.000011771325,0.003894584,0.9265795,0.04064882,0.0001295757,0.02683658,0.00042142585],"about_ca_topic_score_codex":0.0053254445,"about_ca_topic_score_gemma":0.0003086199,"teacher_disagreement_score":0.82997924,"about_ca_system_score_codex":0.0005179527,"about_ca_system_score_gemma":0.00028800612,"threshold_uncertainty_score":0.99997866},"labels":[],"label_agreement":null},{"id":"W2969370817","doi":"10.1049/iet-gtd.2019.0179","title":"Reliability modelling of compressed air energy storage for adequacy assessment of wind integrated power system","year":2019,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Compressed air energy storage; Wind power; Energy storage; Computer science; Electric power system; Power (physics); Automotive engineering; Environmental science; Engineering; Electrical engineering","score_opus":0.013215566408002243,"score_gpt":0.22075041431685152,"score_spread":0.20753484790884927,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2969370817","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22017881,0.00015955177,0.7779066,0.000023963974,0.00047620793,0.00047368128,0.0005398629,0.00010238552,0.0001389604],"genre_scores_gemma":[0.9956991,0.00002803334,0.0028359266,0.0000045819465,0.000029957053,0.000038972234,0.0012962761,0.000020770834,0.00004638276],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983597,0.000106968335,0.00076875807,0.00028528707,0.0002757666,0.00020354582],"domain_scores_gemma":[0.9988986,0.000067692345,0.00015902595,0.00035940533,0.00043549805,0.000079761194],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005014721,0.00019652107,0.00041302844,0.000049725306,0.0000535085,0.00001234785,0.00013514984,0.00018729463,0.000028276316],"category_scores_gemma":[0.0000115366065,0.00017595144,0.00017342092,0.00019449642,0.00003099471,0.0001944071,0.0000070953056,0.00010559515,0.0000011029447],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000443248,0.000071669245,0.000029085046,0.0007827528,0.000023221093,1.3504922e-7,0.00007269012,0.7719035,0.22219424,0.00406945,0.00042899497,0.00037989227],"study_design_scores_gemma":[0.00063765736,0.0001102605,0.0002697543,0.0002668899,0.000024489209,8.055404e-7,0.00008054935,0.8381249,0.15104188,0.00003532167,0.009260801,0.00014672238],"about_ca_topic_score_codex":0.000053654832,"about_ca_topic_score_gemma":0.0000019674537,"teacher_disagreement_score":0.77552027,"about_ca_system_score_codex":0.00027493652,"about_ca_system_score_gemma":0.00009074678,"threshold_uncertainty_score":0.71750915},"labels":[],"label_agreement":null},{"id":"W2972497666","doi":"10.1109/tpwrs.2019.2940379","title":"Availability Assessment Based Case-Sensitive Power System Restoration Strategy","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada; National Renewable Energy Laboratory; U.S. Department of Energy","keywords":"Blackout; Reliability engineering; Electric power system; Fault (geology); Renewable energy; Computer science; Risk analysis (engineering); Power (physics); Engineering; Operations research; Electrical engineering","score_opus":0.010087250400512079,"score_gpt":0.22218118507396645,"score_spread":0.21209393467345436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2972497666","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1582889,0.00007985251,0.80732924,0.000025533995,0.010322882,0.0016294802,0.00023852578,0.0010017621,0.021083832],"genre_scores_gemma":[0.99885744,0.0000022556858,0.00011540776,0.000023670143,0.00001679563,0.00018870493,0.000006430514,0.00007216119,0.0007171503],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973627,0.00033436593,0.00076679554,0.0005767624,0.0004728072,0.00048659198],"domain_scores_gemma":[0.9981817,0.00021831866,0.0001154745,0.0010420051,0.00024998598,0.00019249709],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008564455,0.00041247095,0.0005526695,0.00020685325,0.00016257702,0.00014477142,0.00016797292,0.0002922195,0.00012505834],"category_scores_gemma":[0.0000041312023,0.00039719942,0.00021695874,0.0003463396,0.000053089487,0.00035134572,0.0000011458676,0.00047838787,0.00077645667],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000095715,0.00024551674,0.00008296516,0.0015154002,0.00021796503,0.0003980458,0.00058915565,0.98920673,0.005247464,0.0010806123,0.001217428,0.000103021266],"study_design_scores_gemma":[0.0028781414,0.0013698831,0.00075752573,0.0017768797,0.00015777264,0.0021191884,0.010505021,0.9548564,0.012026817,0.0000068015843,0.011620861,0.0019247046],"about_ca_topic_score_codex":0.00028130243,"about_ca_topic_score_gemma":0.0000992022,"teacher_disagreement_score":0.84056854,"about_ca_system_score_codex":0.0011888371,"about_ca_system_score_gemma":0.00013741227,"threshold_uncertainty_score":0.999848},"labels":[],"label_agreement":null},{"id":"W2978188580","doi":"10.1002/9781118445112.stat03649","title":"Quantitative Reliability Assessment of Electricity Supply","year":2014,"lang":"en","type":"other","venue":"Wiley StatsRef: Statistics Reference Online","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Mains electricity; Electricity; Computer science; Electric power system; Electric power transmission; Power (physics); Engineering; Electrical engineering","score_opus":0.01863947443233845,"score_gpt":0.2977601248741361,"score_spread":0.2791206504417977,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2978188580","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00026864192,0.0012832322,0.8402417,0.00002674851,0.0010508563,0.0009215752,0.04885774,0.00066085864,0.106688656],"genre_scores_gemma":[0.07930049,0.012283392,0.8170154,0.00008876732,0.00033743383,0.00017462585,0.009606322,0.0015328133,0.07966073],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9967544,0.00022808695,0.0010656458,0.00065881875,0.000651082,0.00064193277],"domain_scores_gemma":[0.9973442,0.0005261173,0.000502888,0.00106386,0.0003543269,0.00020861362],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00050370215,0.0006591579,0.0013296853,0.0003106246,0.000040271327,0.000028345916,0.0005630919,0.00046783782,0.0010098428],"category_scores_gemma":[0.00044743204,0.00061463803,0.00010291623,0.00035115672,0.00029419147,0.000055784665,0.00008564194,0.0008280769,0.000074352516],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005107938,0.00056215323,0.0008179976,0.005764875,0.0003887607,0.000020234116,0.00012603377,0.002262935,0.00036812603,0.08594821,0.89737386,0.00631572],"study_design_scores_gemma":[0.0013103237,0.0013418237,0.003740071,0.0032873945,0.00029922242,0.000008176206,0.00012616068,0.12700866,0.00011532416,0.010171376,0.85057634,0.0020151422],"about_ca_topic_score_codex":0.00061318744,"about_ca_topic_score_gemma":0.001555859,"teacher_disagreement_score":0.12474572,"about_ca_system_score_codex":0.00029948444,"about_ca_system_score_gemma":0.00029129907,"threshold_uncertainty_score":0.9999034},"labels":[],"label_agreement":null},{"id":"W2978888093","doi":"10.1080/23789689.2019.1666340","title":"Robustness of Ontario power network under systemic risks","year":2019,"lang":"en","type":"article","venue":"Sustainable and Resilient Infrastructure","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; McMaster University","funders":"","keywords":"Robustness (evolution); Systemic risk; Reliability engineering; Computer science; Environmental science; Risk analysis (engineering); Medicine; Engineering; Economics; Biology","score_opus":0.003498354607335733,"score_gpt":0.18828042063308484,"score_spread":0.1847820660257491,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2978888093","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98014796,0.0019991787,0.007030102,0.000014689142,0.0010395028,0.00053615426,0.000004093199,0.00008737473,0.009140967],"genre_scores_gemma":[0.99246305,0.00004217527,0.00017562397,0.000020024805,0.000049643375,0.000009425922,0.0000042697134,0.00002325256,0.0072125443],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9987557,0.000029162877,0.00030728534,0.00023164012,0.00016709219,0.000509148],"domain_scores_gemma":[0.99930733,0.000032127806,0.00006554586,0.0003786256,0.00012833806,0.000088042405],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019528878,0.00020396331,0.0003513553,0.00006564949,0.00006079731,0.000029006736,0.00015780167,0.00020129429,0.00016919915],"category_scores_gemma":[0.0000102696595,0.00016492998,0.00006415253,0.00019679233,0.000057202313,0.00014162935,0.000080821876,0.0002718499,0.000004175258],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029625648,0.0000055607165,0.020609815,0.0012005487,0.00004612726,0.0000066866724,0.0005150393,0.96872616,0.00011623772,0.0050986013,0.0035836454,0.000061929975],"study_design_scores_gemma":[0.0072199656,0.0011723957,0.44781682,0.0039033792,0.0003369738,0.0008458574,0.053590745,0.063176416,0.0021814571,0.024149608,0.39163762,0.003968772],"about_ca_topic_score_codex":0.0010772623,"about_ca_topic_score_gemma":0.00029893237,"teacher_disagreement_score":0.90554976,"about_ca_system_score_codex":0.0003974699,"about_ca_system_score_gemma":0.0001746068,"threshold_uncertainty_score":0.6725649},"labels":[],"label_agreement":null},{"id":"W2980519294","doi":"10.3390/app9204392","title":"Utilizing Energy Storage for Reliability Solutions in Active Distribution Systems","year":2019,"lang":"en","type":"article","venue":"Applied Sciences","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Reliability engineering; Reliability (semiconductor); Probabilistic logic; Energy storage; Computer science; Range (aeronautics); Context (archaeology); Engineering; Power (physics)","score_opus":0.015182859405519515,"score_gpt":0.21741982858064507,"score_spread":0.20223696917512554,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2980519294","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5800568,0.00083112443,0.36648646,0.00016199685,0.0033494262,0.0019408246,0.00027320866,0.00047541392,0.04642478],"genre_scores_gemma":[0.9995131,0.000012458819,0.00012954246,0.000008862034,0.00002755337,0.00023700073,0.000014612762,0.000005857335,0.000051008425],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988626,0.000038208153,0.00029407567,0.0002871831,0.00015621095,0.00036172036],"domain_scores_gemma":[0.9993615,0.00032132398,0.000047769976,0.00019612319,0.000031153017,0.000042095235],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017882449,0.000104439205,0.00025012353,0.00004887892,0.00011459293,0.000043384327,0.00020019607,0.000070837596,0.0000047997087],"category_scores_gemma":[0.00009144491,0.00008952359,0.00005127363,0.0003451496,0.00011031736,0.00017106155,0.000028154904,0.00007736645,0.000013649794],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002346135,0.000065257416,0.0006244984,0.00040826394,0.000016802727,4.5613902e-7,0.0005498738,0.4292002,0.013759419,0.55015504,0.0016347881,0.0035619219],"study_design_scores_gemma":[0.00065448263,0.000097931406,0.0050932155,0.00019516693,0.000015258359,0.0000035079365,0.0049427035,0.8951681,0.005466618,0.0073332875,0.08044161,0.00058810186],"about_ca_topic_score_codex":0.00011901598,"about_ca_topic_score_gemma":0.00006539514,"teacher_disagreement_score":0.54282176,"about_ca_system_score_codex":0.00022180789,"about_ca_system_score_gemma":0.00004258653,"threshold_uncertainty_score":0.36506662},"labels":[],"label_agreement":null},{"id":"W2995457065","doi":"10.1049/iet-gtd.2018.6071","title":"Reliability evaluation of power system considering wind generators coordinated with multi‐energy storage systems","year":2019,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Ministry of Trade, Industry and Energy","keywords":"Reliability (semiconductor); Reliability engineering; Wind power; Electric power system; Energy storage; Computer science; Computer data storage; Power (physics); Automotive engineering; Electrical engineering; Engineering; Physics","score_opus":0.013241971408045025,"score_gpt":0.21216741281991858,"score_spread":0.19892544141187354,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2995457065","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5392318,0.0007673936,0.45784718,0.000015797434,0.00090839627,0.00067077694,0.00014325546,0.00022137057,0.00019404077],"genre_scores_gemma":[0.9987745,0.000023933979,0.00033319977,0.0000049545633,0.00005195213,0.000073224786,0.0006528388,0.000036713907,0.000048667982],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997432,0.00036787317,0.0007477096,0.00044724744,0.00070100994,0.00030418247],"domain_scores_gemma":[0.9982221,0.000037715272,0.00017462268,0.00050387735,0.00091611285,0.00014556291],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0013602995,0.000301262,0.0004354082,0.000077324476,0.00011257814,0.000060615053,0.00012455386,0.0002452759,0.000057572794],"category_scores_gemma":[0.0000353118,0.00025642238,0.000097300086,0.0003723161,0.00005086132,0.00033726977,0.000009454178,0.00014647726,0.000013360458],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046376535,0.00006560816,0.0003406707,0.0005157035,0.000053375104,0.0000015755858,0.00014569839,0.85215646,0.14417678,0.0010746499,0.0006853086,0.0007378171],"study_design_scores_gemma":[0.0015654187,0.000105315434,0.0010470448,0.00037722316,0.00008782572,0.00001710126,0.00025672882,0.91539806,0.07659832,0.000005180903,0.004222158,0.00031963762],"about_ca_topic_score_codex":0.00009072871,"about_ca_topic_score_gemma":0.000011009637,"teacher_disagreement_score":0.45954272,"about_ca_system_score_codex":0.0006969158,"about_ca_system_score_gemma":0.00015845758,"threshold_uncertainty_score":0.9999888},"labels":[],"label_agreement":null},{"id":"W2998052572","doi":"10.1109/tpwrs.2019.2962177","title":"Development and Integration of Momentary Event Models in Active Distribution System Reliability Assessment","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Context (archaeology); Engineering; Computer science; Event (particle physics); Distributed generation; Power (physics); Renewable energy","score_opus":0.008426361500621904,"score_gpt":0.21677616787102041,"score_spread":0.20834980637039852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2998052572","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.421566,0.000049296512,0.57543045,0.000008787564,0.0014087631,0.0007320323,0.00009221952,0.00008497194,0.00062747655],"genre_scores_gemma":[0.9994045,0.000015477839,0.0002448815,0.0000026309428,0.00000286437,0.00022887289,0.000015228354,0.000018798712,0.000066755114],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983961,0.00010014978,0.0006775776,0.00029949663,0.00030274986,0.00022392602],"domain_scores_gemma":[0.99936587,0.000068706046,0.00008652068,0.0003328071,0.00007737953,0.00006871745],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005670343,0.00020803811,0.00038061792,0.00011985372,0.000040069717,0.000021752388,0.000104772145,0.000106857195,0.00000612572],"category_scores_gemma":[0.0000014921078,0.00019311935,0.00005748604,0.00019958094,0.000025720326,0.0003027849,0.0000018816925,0.00023130132,0.000010899969],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014502018,0.00037004627,0.000135057,0.0020054604,0.00011867795,0.0000031341376,0.0028120996,0.98461664,0.006323044,0.0019910403,0.000050598457,0.0014292137],"study_design_scores_gemma":[0.0019321217,0.00046185876,0.0046417173,0.0033237753,0.000043436776,0.00003179478,0.010042698,0.9377229,0.039611507,0.00004507946,0.0014384472,0.0007046479],"about_ca_topic_score_codex":0.00022338144,"about_ca_topic_score_gemma":0.000074237134,"teacher_disagreement_score":0.5778385,"about_ca_system_score_codex":0.0013275425,"about_ca_system_score_gemma":0.000056419845,"threshold_uncertainty_score":0.7875179},"labels":[],"label_agreement":null},{"id":"W3004271926","doi":"10.1109/pesgm40551.2019.8974064","title":"A Reliability Model for Incorporating Equipment Aging Failures in Reliability Assessment of Customer Delivery Systems","year":2019,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Reliability (semiconductor); Component (thermodynamics); Reliability engineering; Reliability theory; Computer science; Engineering; Failure rate","score_opus":0.011633336547376754,"score_gpt":0.24679040818069406,"score_spread":0.2351570716333173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3004271926","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7850727,0.00012993548,0.20428686,0.000065771055,0.00077043904,0.0022739428,0.00004090039,0.00023720355,0.0071222493],"genre_scores_gemma":[0.98512024,0.000011591903,0.014181232,0.00001755483,0.000021452895,0.00029689897,0.000008898853,0.000033232434,0.00030889834],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976547,0.00008346746,0.0010426007,0.00046923818,0.00031580252,0.0004342235],"domain_scores_gemma":[0.9984809,0.0003157767,0.00014459205,0.0007424958,0.00023348433,0.00008273584],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022156602,0.00025733846,0.0006185026,0.00013460101,0.000031182135,0.000031692078,0.00026857632,0.00015030004,0.000012341423],"category_scores_gemma":[0.000106179556,0.00022870016,0.00014844642,0.0002311955,0.000052350733,0.00034789904,0.000097547985,0.00022309368,0.0000098657665],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001611697,0.000079385216,0.02041874,0.0028735644,0.000017351857,4.7238996e-7,0.00023362074,0.965807,0.004801334,0.0054189293,0.00021716654,0.00011631958],"study_design_scores_gemma":[0.00062668946,0.00004661546,0.0027089715,0.0003350916,0.00001022268,0.0000010652598,0.00037080052,0.9941888,0.00044526768,0.00055337435,0.0004540231,0.00025909892],"about_ca_topic_score_codex":0.0005293897,"about_ca_topic_score_gemma":0.000116135714,"teacher_disagreement_score":0.20004754,"about_ca_system_score_codex":0.0006338912,"about_ca_system_score_gemma":0.0001317159,"threshold_uncertainty_score":0.9326121},"labels":[],"label_agreement":null},{"id":"W3004887747","doi":"10.1142/s0218539320400100","title":"Development of an Operational Adequacy Evaluation Framework for Operational Planning of Bulk Electric Power Systems","year":2020,"lang":"en","type":"article","venue":"International Journal of Reliability Quality and Safety Engineering","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Operational planning; Time horizon; Electric power system; Operational risk; Operational costs; Computer science; Reliability engineering; Operational efficiency; Probabilistic logic; Operations research; Systems engineering; Risk analysis (engineering); Engineering; Power (physics); Risk management","score_opus":0.03697942691283389,"score_gpt":0.3156163450507817,"score_spread":0.2786369181379478,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3004887747","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44211137,0.00055741717,0.55596906,0.00030486422,0.0007040991,0.0002536795,0.0000446895,0.00002037631,0.000034408604],"genre_scores_gemma":[0.94336975,0.000029906554,0.056360286,0.000036666966,0.00014603345,0.00001573657,0.000024478271,0.000015580894,0.0000015873794],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99716216,0.00007837355,0.001595835,0.00017953575,0.0008342745,0.00014981104],"domain_scores_gemma":[0.9974247,0.00063002645,0.00031301222,0.00012428795,0.001379034,0.00012894357],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031568124,0.00016371607,0.00044059003,0.000120979974,0.00004151182,0.0000379392,0.000299898,0.00013472658,0.000018177105],"category_scores_gemma":[0.0021923753,0.00015860717,0.00011550583,0.00012902245,0.00002853804,0.00043002132,0.000030410547,0.00025822388,4.4980467e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003112472,0.00006970305,0.0003191784,0.00056019775,0.0002190481,9.38706e-7,0.0034119238,0.9662503,0.013196368,0.014684293,0.000018746174,0.0009580848],"study_design_scores_gemma":[0.0016446018,0.00028274953,0.011877784,0.0008359352,0.00005006783,0.000036253336,0.0007385011,0.9670273,0.011506684,0.0011254706,0.00450555,0.00036911148],"about_ca_topic_score_codex":0.000004832652,"about_ca_topic_score_gemma":5.2090655e-7,"teacher_disagreement_score":0.5012584,"about_ca_system_score_codex":0.00022398646,"about_ca_system_score_gemma":0.00026293556,"threshold_uncertainty_score":0.64678127},"labels":[],"label_agreement":null},{"id":"W3010869207","doi":"10.1016/j.epsr.2020.106298","title":"Optimization of maintenance scheduling for offshore wind turbines considering the wake effect of arbitrary wind direction","year":2020,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"National Natural Science Foundation of China","keywords":"Offshore wind power; Wake; Turbine; Integer programming; Wind power; Scheduling (production processes); Marine engineering; Nonlinear programming; Mathematical optimization; Computer science; Linear programming; Wind speed; Engineering; Nonlinear system; Control theory (sociology); Meteorology; Mathematics; Aerospace engineering; Electrical engineering; Geography","score_opus":0.024099467668745694,"score_gpt":0.2716678391687095,"score_spread":0.24756837149996383,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3010869207","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.74873,0.021308914,0.21502204,0.0007513899,0.0021305098,0.0064559155,0.00006282921,0.0004095144,0.0051288903],"genre_scores_gemma":[0.9992733,0.00014257336,0.00023800074,0.0000085624915,0.00011811864,0.00008668969,0.0000051397155,0.000049688908,0.00007793847],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974888,0.00039610305,0.0006491082,0.00032548414,0.00055595767,0.00058457576],"domain_scores_gemma":[0.997677,0.0012599451,0.00012616892,0.00036880467,0.00045881793,0.00010922265],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025886525,0.00021029639,0.0005522198,0.00020223824,0.00012740475,0.00004512018,0.00035847552,0.00015225865,0.000006788556],"category_scores_gemma":[0.0015055804,0.00015193799,0.00014565104,0.0012231589,0.000106330925,0.00015902362,0.000048734528,0.00045233173,0.0000041402236],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046123913,0.000039366354,0.0012636359,0.0061903517,0.0003000412,0.000009748254,0.0014966179,0.92093354,0.06427677,0.0006722563,0.0037171126,0.00063933193],"study_design_scores_gemma":[0.000951983,0.0009031425,0.0002501383,0.0007830998,0.00003058923,0.00003755559,0.0003269603,0.9189493,0.073111564,0.000030287274,0.004372929,0.00025242002],"about_ca_topic_score_codex":0.0000640613,"about_ca_topic_score_gemma":0.000002775081,"teacher_disagreement_score":0.2505433,"about_ca_system_score_codex":0.00012786237,"about_ca_system_score_gemma":0.000099744335,"threshold_uncertainty_score":0.61958516},"labels":[],"label_agreement":null},{"id":"W3014534194","doi":"10.1109/ccece43985.2019.9052393","title":"A Multi-Objective Optimization Model for the Planning of Power Distribution Networks Considering System Reliability","year":2019,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Reliability (semiconductor); Computer science; Monte Carlo method; Pareto principle; Mathematical optimization; Reliability engineering; Minification; Multi-objective optimization; Renewable energy; Electric power system; Power (physics); Engineering; Mathematics","score_opus":0.011114449230896575,"score_gpt":0.21501964742189167,"score_spread":0.2039051981909951,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3014534194","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012600067,0.00019896,0.9848851,0.000014681554,0.0005572063,0.0009739767,0.000042588275,0.00021644811,0.0005109834],"genre_scores_gemma":[0.98934907,0.0000050898725,0.010440092,0.0000071994305,0.000012476428,0.00007913487,0.000014236307,0.00001671409,0.000076014185],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920577,0.000022055916,0.00031078033,0.00017373092,0.00008449891,0.00020317614],"domain_scores_gemma":[0.9991555,0.0002911407,0.0000613056,0.0003161163,0.00014703501,0.000028908242],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047548363,0.00011913667,0.00021166098,0.00001528109,0.000052715724,0.000015979786,0.00010349903,0.00009465123,0.000004522523],"category_scores_gemma":[0.00009121014,0.00008566785,0.00008454762,0.00009041973,0.000030370185,0.00012096199,0.00002594899,0.00009608919,0.000001768715],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023131815,0.00000868744,0.0005037251,0.0002502849,0.000025350007,8.208294e-8,0.00029218962,0.9978312,0.0000728773,0.0008485123,0.00012699526,0.000016968397],"study_design_scores_gemma":[0.00034586524,0.000018668603,0.00032242356,0.00015387108,0.000014943843,0.0000021528665,0.00064672244,0.99816436,0.00016086605,0.00000989687,0.00005785542,0.00010237412],"about_ca_topic_score_codex":0.000019709425,"about_ca_topic_score_gemma":0.0000036474964,"teacher_disagreement_score":0.976749,"about_ca_system_score_codex":0.00016562571,"about_ca_system_score_gemma":0.000017820415,"threshold_uncertainty_score":0.3493434},"labels":[],"label_agreement":null},{"id":"W3021465953","doi":"10.3390/su12093663","title":"Probabilistic Reliability Enhancement Strategies of Hydro Dominant Power Systems under Energy Uncertainty","year":2020,"lang":"en","type":"article","venue":"Sustainability","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Hydropower; Reliability (semiconductor); Environmental science; Reliability engineering; Hydroelectricity; Probabilistic logic; Electric power system; Water resource management; Computer science; Engineering; Power (physics)","score_opus":0.0069343682314988225,"score_gpt":0.21287454229356875,"score_spread":0.20594017406206994,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3021465953","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7540535,0.0016335839,0.23023945,0.0018776469,0.0013986047,0.0024830252,0.00008731551,0.0006734887,0.0075534317],"genre_scores_gemma":[0.9994565,0.000027804892,0.000064959306,0.000046995992,0.000040802995,0.00022543252,0.000010664536,0.00003740154,0.00008942332],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9967772,0.00027383503,0.0010932429,0.00069642527,0.0004541385,0.0007051761],"domain_scores_gemma":[0.9973217,0.00025772245,0.00015526821,0.0010126871,0.0009684675,0.00028414675],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00094927254,0.00041663044,0.0007922728,0.000053569853,0.00008042053,0.000062634856,0.000449466,0.00020502928,0.00007057674],"category_scores_gemma":[0.0009515486,0.00036398196,0.00022374862,0.00046724055,0.0004325106,0.0003055324,0.0001349963,0.00026421252,0.000007774786],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024374254,0.00033439556,0.00045489072,0.008696129,0.00010777996,0.00001531938,0.0021299156,0.84583545,0.0022418373,0.13836099,0.0012695418,0.00031000125],"study_design_scores_gemma":[0.004548495,0.0032820213,0.0071905646,0.00074387033,0.00032222824,0.000029621151,0.05966995,0.5629264,0.018245155,0.22904623,0.11016221,0.0038332632],"about_ca_topic_score_codex":0.0007239509,"about_ca_topic_score_gemma":0.000046656172,"teacher_disagreement_score":0.28290907,"about_ca_system_score_codex":0.0014835222,"about_ca_system_score_gemma":0.0006172747,"threshold_uncertainty_score":0.9998812},"labels":[],"label_agreement":null},{"id":"W3026212220","doi":"10.1109/tpwrd.2020.2996026","title":"A New Reliability Strategy for Managing Assets of Customer Delivery Systems","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Probabilistic logic; Investment (military); Transmission (telecommunications); Rank (graph theory); Computer science; Simple (philosophy); Engineering; Risk analysis (engineering); Telecommunications; Business; Power (physics)","score_opus":0.019188314525523265,"score_gpt":0.2202078119650844,"score_spread":0.20101949743956113,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3026212220","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043190237,0.000538426,0.95045215,0.00016341868,0.0020195318,0.0008211768,0.00023455477,0.0004479211,0.0021325585],"genre_scores_gemma":[0.9985385,0.00015157134,0.0008012184,0.00008756301,0.000049261245,0.00007144826,0.0000035578614,0.000056034267,0.00024086852],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99828994,0.00005237103,0.00059552205,0.00040731806,0.000264538,0.00039033065],"domain_scores_gemma":[0.9988729,0.0001967442,0.000074587195,0.00042803749,0.00016841319,0.0002593317],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00021945704,0.00028956254,0.00046123075,0.000120717115,0.00007746466,0.00004021301,0.00026992708,0.00017357431,0.0000779932],"category_scores_gemma":[0.00000981217,0.00029831612,0.00029175417,0.00031363685,0.00004769091,0.0003167905,0.0000020316593,0.0002876792,0.000091223905],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002849645,0.000097406686,0.000014640201,0.0012288338,0.00022300263,0.000008599233,0.00064103963,0.9752321,0.0058767702,0.00020600927,0.010833448,0.005353188],"study_design_scores_gemma":[0.007368461,0.0026425745,0.00047797497,0.0017226336,0.0008433907,0.00006963578,0.0030769529,0.78756344,0.09292943,0.00051430415,0.09940049,0.0033906922],"about_ca_topic_score_codex":0.00018586314,"about_ca_topic_score_gemma":0.000016638201,"teacher_disagreement_score":0.95534825,"about_ca_system_score_codex":0.00014353494,"about_ca_system_score_gemma":0.00009352645,"threshold_uncertainty_score":0.9999469},"labels":[],"label_agreement":null},{"id":"W3026273933","doi":"10.35833/mpce.2019.000163","title":"Data-driven Operation Risk Assessment of Wind-integrated Power Systems via Mixture Models and Importance Sampling","year":2020,"lang":"en","type":"article","venue":"Journal of Modern Power Systems and Clean Energy","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada; SaskPower","keywords":"Wind power; Reliability engineering; Electric power system; Monte Carlo method; Computer science; Reliability (semiconductor); Wind speed; Computation; Cross entropy; Cluster analysis; Entropy (arrow of time); Engineering; Power (physics); Principle of maximum entropy; Statistics; Algorithm; Meteorology","score_opus":0.02302556683721001,"score_gpt":0.24078742286096724,"score_spread":0.21776185602375722,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3026273933","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10379546,0.009867508,0.8844939,0.00007102617,0.00092980324,0.00016113916,0.00019763235,0.00004462545,0.00043889254],"genre_scores_gemma":[0.9981214,0.0009996124,0.00066637475,0.000039379414,0.00008855149,0.0000029998898,0.000016612083,0.000044714292,0.00002034949],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99775773,0.00014308553,0.0011444334,0.00031276603,0.0003926481,0.00024933476],"domain_scores_gemma":[0.9984321,0.00006167313,0.0005752882,0.00039735774,0.00028119978,0.0002524088],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006539001,0.00027665703,0.00077547366,0.00008192093,0.00007025591,0.00014057056,0.00032594916,0.00017686412,0.000004201553],"category_scores_gemma":[0.000032961158,0.00021755518,0.00007997598,0.00011370373,0.000045384415,0.0007165065,0.000082185325,0.00033954318,2.7356324e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005575018,0.000041219675,0.0011434089,0.0004596315,0.00039023825,0.000029062152,0.001037214,0.988146,0.0040813456,0.0025541058,0.0013291968,0.00073284196],"study_design_scores_gemma":[0.000587173,0.00022133501,0.00042801563,0.00047891063,0.000070185226,0.00017936119,0.0008523343,0.9903777,0.000059033522,0.000103902225,0.0064050406,0.00023697183],"about_ca_topic_score_codex":0.0001744034,"about_ca_topic_score_gemma":0.000051297302,"teacher_disagreement_score":0.894326,"about_ca_system_score_codex":0.00008172949,"about_ca_system_score_gemma":0.000073065654,"threshold_uncertainty_score":0.8871643},"labels":[],"label_agreement":null},{"id":"W3033883105","doi":"10.1016/j.ijepes.2020.106130","title":"Contingency set partition-based impact transfer approach for the reliability assessment of composite generation and transmission systems","year":2020,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Natural Science Foundation of Tianjin City; National Natural Science Foundation of China","keywords":"Reliability (semiconductor); Monte Carlo method; Reliability engineering; Partition (number theory); Computer science; Contingency; Contingency table; Set (abstract data type); Computation; Mathematical optimization; Mathematics; Algorithm; Statistics; Engineering; Machine learning","score_opus":0.017830345641006204,"score_gpt":0.26231187976460985,"score_spread":0.24448153412360363,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3033883105","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03926559,0.003198778,0.95569533,0.0003561752,0.0009317664,0.00029541794,0.00007206916,0.000025308675,0.00015958754],"genre_scores_gemma":[0.998974,0.00013051163,0.0004258481,0.00005056831,0.00033515767,0.00003600665,0.000021801874,0.000019095087,0.0000069700845],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980497,0.0001582826,0.0009301927,0.00016423131,0.00051805435,0.00017956962],"domain_scores_gemma":[0.99861145,0.00032524773,0.00018244454,0.00011196227,0.0006272174,0.00014165089],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007089512,0.00016927198,0.00040676797,0.00008118354,0.00004819956,0.00008345037,0.0002885999,0.00009874889,0.000004149649],"category_scores_gemma":[0.000064238695,0.00011038372,0.00023956498,0.00014284745,0.00003969308,0.0001525529,0.000006417265,0.00018255043,1.1457471e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018815763,0.000101061814,0.00080415176,0.0001567837,0.0003852313,0.0000037111283,0.00019274042,0.9607316,0.032721326,0.0027073233,0.0014911301,0.00051677227],"study_design_scores_gemma":[0.0008572388,0.00037253817,0.00048652387,0.00009061675,0.000055197394,0.000038484104,0.00003378831,0.9896359,0.0019949966,0.000013381819,0.006302443,0.00011889159],"about_ca_topic_score_codex":0.0000867475,"about_ca_topic_score_gemma":8.363037e-7,"teacher_disagreement_score":0.95970845,"about_ca_system_score_codex":0.00017802809,"about_ca_system_score_gemma":0.000099338366,"threshold_uncertainty_score":0.45013174},"labels":[],"label_agreement":null},{"id":"W3036904979","doi":"10.1007/s13198-020-00998-5","title":"Need-based reliability investment in industrial/commercial power distribution systems","year":2020,"lang":"en","type":"article","venue":"International Journal of Systems Assurance Engineering and Management","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Investment (military); Power (physics); Distribution (mathematics); Environmental science; Engineering; Mathematics; Thermodynamics","score_opus":0.011269238278940984,"score_gpt":0.19973820699878092,"score_spread":0.18846896871983992,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3036904979","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6648463,0.005578442,0.30011907,0.003500798,0.022368202,0.0015412134,0.00016944614,0.00032862465,0.0015479164],"genre_scores_gemma":[0.9992704,0.00018014347,0.00013817371,0.000057933452,0.00028553142,0.00003149748,0.0000071692666,0.000018460152,0.0000107258875],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983539,0.000046195728,0.0007901875,0.00016147086,0.00044481305,0.00020342405],"domain_scores_gemma":[0.99937356,0.000069221795,0.00015322355,0.00012259127,0.0001421478,0.00013925215],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00063925004,0.00018637118,0.00037493094,0.00013530844,0.000015153651,0.00010747725,0.00027873597,0.000084725056,0.0000018132312],"category_scores_gemma":[0.00011291094,0.00017623018,0.00007398441,0.0001768395,0.000018720373,0.00021863556,0.00003721282,0.00025202567,0.0000032526277],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052584724,0.000034947803,0.0029236784,0.00055916194,0.00014510016,0.000091773465,0.00013181445,0.9895875,0.00014443495,0.002346454,0.003684783,0.0002977571],"study_design_scores_gemma":[0.004192261,0.00022093166,0.028619332,0.003562996,0.000057449517,0.00006697215,0.0006152705,0.6025078,0.00017089117,0.00001615683,0.35935315,0.0006167431],"about_ca_topic_score_codex":0.00003748031,"about_ca_topic_score_gemma":0.0000015385059,"teacher_disagreement_score":0.3870797,"about_ca_system_score_codex":0.00034690392,"about_ca_system_score_gemma":0.000021123187,"threshold_uncertainty_score":0.7186459},"labels":[],"label_agreement":null},{"id":"W3044758249","doi":"10.1109/tpwrs.2020.3010529","title":"A Novel Methodology to Incorporate Circuit Breaker Active Failure in Reliability Evaluation of Electrical Distribution Networks","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Circuit breaker; Backup; Reliability engineering; Reliability (semiconductor); Engineering; Power-system protection; Incidence matrix; Computer science; Electric power system; Power (physics); Electrical engineering; Node (physics); Structural engineering; Mechanical engineering","score_opus":0.049779693832707424,"score_gpt":0.2623824209914357,"score_spread":0.2126027271587283,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3044758249","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.047590464,0.000065078835,0.94899565,0.00021091769,0.0013570283,0.0012554857,0.0002022654,0.00015254704,0.00017055248],"genre_scores_gemma":[0.999267,0.00000536331,0.0002983072,0.00004570635,0.0000209724,0.00031259842,0.00001269173,0.00002881317,0.000008574993],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975021,0.000551334,0.00071918307,0.00043909112,0.0004338858,0.00035439155],"domain_scores_gemma":[0.99870783,0.0002931531,0.00010709469,0.000372454,0.00033839355,0.00018105602],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017304767,0.00024019714,0.00054340455,0.00011838984,0.000042063235,0.00001923452,0.0001861737,0.00028422812,0.000020829852],"category_scores_gemma":[0.00013389511,0.00024185775,0.00012866523,0.0010739242,0.000041590312,0.00016603938,0.000001941108,0.0004674943,0.000022457829],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014699635,0.0001204834,0.000033797874,0.00010374368,0.000057264246,0.0000014064303,0.00093204714,0.9894268,0.007592679,0.00016759349,0.00023463796,0.0011825825],"study_design_scores_gemma":[0.0015131724,0.00043258432,0.0020576972,0.00022801332,0.000114462135,0.000029148234,0.00042396993,0.9844383,0.008816678,0.00007854163,0.0014045758,0.0004628567],"about_ca_topic_score_codex":0.00021402912,"about_ca_topic_score_gemma":0.00018208986,"teacher_disagreement_score":0.9516765,"about_ca_system_score_codex":0.00064867,"about_ca_system_score_gemma":0.000092959366,"threshold_uncertainty_score":0.98626727},"labels":[],"label_agreement":null},{"id":"W307694382","doi":"10.1007/978-3-319-06680-6_7","title":"Practical Issues for Implementation of Online Dynamic Security Assessment Systems","year":2014,"lang":"en","type":"book-chapter","venue":"Power electronics and power systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada); Powertech Labs (Canada)","funders":"","keywords":"Computer science; Dynamic assessment; Online assessment; Systems engineering; Computer security; Engineering management; Risk analysis (engineering); Engineering; Business; Formative assessment; Sociology","score_opus":0.009212473532152066,"score_gpt":0.3030634357550883,"score_spread":0.2938509622229363,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W307694382","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0063336883,0.26384395,0.4850801,0.0015633701,0.03002285,0.019034924,0.008515832,0.0015580595,0.1840472],"genre_scores_gemma":[0.9790408,0.003217968,0.00021734065,0.000018787636,0.00013864509,0.00017542655,0.00033870328,0.00019276187,0.016659541],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.997106,0.00006659087,0.0011905705,0.0005531073,0.00044677287,0.00063691294],"domain_scores_gemma":[0.9981845,0.00021457473,0.00048518257,0.00062586827,0.00033291386,0.0001569829],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009532793,0.00059641147,0.0012053524,0.00016658223,0.00007390416,0.000120978955,0.00021592951,0.00052242016,0.000035395125],"category_scores_gemma":[0.000017974427,0.0005745085,0.00022371647,0.000041013045,0.00006822256,0.00011175484,0.00005508959,0.00053338683,0.0000073720503],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042487594,0.000053324013,0.00003643208,0.0057917973,0.0010003714,0.0000066190073,0.0005100058,0.0003039215,0.00023399659,0.9710134,0.020740245,0.00026736216],"study_design_scores_gemma":[0.00070621294,0.0007977772,0.000026271293,0.0007518308,0.00019276154,0.00008199787,0.0003314253,0.021384928,0.00002475429,0.0014529474,0.9735312,0.00071789516],"about_ca_topic_score_codex":0.000094877934,"about_ca_topic_score_gemma":0.00020939768,"teacher_disagreement_score":0.97270715,"about_ca_system_score_codex":0.00046229368,"about_ca_system_score_gemma":0.00023845893,"threshold_uncertainty_score":0.9996706},"labels":[],"label_agreement":null},{"id":"W3081749816","doi":"10.1109/pmaps47429.2020.9183702","title":"System Reliability Risk Model and Its Application to Station Breaker Replacement","year":2020,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Manitoba Hydro","funders":"","keywords":"Circuit breaker; Probabilistic logic; Reliability (semiconductor); Reliability engineering; Asset management; Asset (computer security); Process (computing); Computer science; Electric power system; Power transmission; Investment (military); Risk analysis (engineering); Transmission system; Business system planning; Operational planning; Prioritization; Risk management; Probabilistic risk assessment; Operations research; Transmission (telecommunications); Systems engineering; Engineering; Power (physics); Business; Telecommunications; Computer security","score_opus":0.007506985477287379,"score_gpt":0.20099640253779597,"score_spread":0.1934894170605086,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3081749816","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23403838,0.000058811216,0.76105344,0.00045320118,0.00006282026,0.00071423023,0.00003929317,0.00050115556,0.0030786754],"genre_scores_gemma":[0.99744546,0.000016440901,0.0021728117,0.00012787449,0.000021975018,0.00012520296,0.0000051282727,0.0000126623245,0.00007246302],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99925023,0.000022270167,0.00023210031,0.0002549375,0.00011074554,0.00012969539],"domain_scores_gemma":[0.99954504,0.000022398794,0.000024889205,0.00020324808,0.000059756036,0.00014465103],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002619512,0.00009462584,0.00012635588,0.0000149702655,0.000033744614,0.00001529339,0.00005974708,0.000043182015,0.0000038648996],"category_scores_gemma":[0.00005916213,0.000086328226,0.000018961327,0.00010212535,0.0000050117137,0.00009592767,0.000027311615,0.00006539133,0.00008641643],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004832203,0.00001050896,0.00041175794,0.00090673583,0.000013747557,2.4032562e-7,0.0013369452,0.9841619,0.003640881,0.0052298647,0.002981074,0.0012580324],"study_design_scores_gemma":[0.00014167781,0.000030245154,0.0005538242,0.000018017467,0.000008573958,8.438487e-7,0.00015631269,0.99471414,0.0013346041,0.000041186766,0.0028975778,0.00010301236],"about_ca_topic_score_codex":0.00004139498,"about_ca_topic_score_gemma":0.000016861379,"teacher_disagreement_score":0.76340705,"about_ca_system_score_codex":0.00010959684,"about_ca_system_score_gemma":0.0000081610315,"threshold_uncertainty_score":0.3520363},"labels":[],"label_agreement":null},{"id":"W3082189053","doi":"10.3390/app10175964","title":"Utilizing Energy Storage for Operational Adequacy of Wind-Integrated Bulk Power Systems","year":2020,"lang":"en","type":"article","venue":"Applied Sciences","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Reliability engineering; Wind power; Renewable energy; Operational planning; Energy storage; Reliability (semiconductor); Electric power system; Computer science; Engineering; Power (physics); Electrical engineering","score_opus":0.02235752367778343,"score_gpt":0.2201918712228104,"score_spread":0.19783434754502696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3082189053","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08492985,0.0021166413,0.83996665,0.0006477612,0.0017658165,0.0010156379,0.00014347216,0.0005087902,0.06890535],"genre_scores_gemma":[0.99881035,0.0000065646145,0.0009205916,0.00012118897,0.000039368464,0.00004676186,0.0000062485387,0.000009377309,0.000039550345],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989453,0.000022046735,0.00036732416,0.00022912284,0.00022499991,0.00021122064],"domain_scores_gemma":[0.99952596,0.00017566697,0.000061091814,0.0001011056,0.00006023129,0.00007593441],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00067740673,0.000115293056,0.0002880577,0.00004149311,0.000093118986,0.00006905196,0.0002765233,0.000053434585,0.00002511585],"category_scores_gemma":[0.00010134878,0.000090001835,0.000057597572,0.0003187486,0.00012422183,0.00014525134,0.00001996147,0.000057019068,0.0000071692893],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001593305,0.000026380612,0.000056544937,0.00032329993,0.00005321807,0.0000011981424,0.0015912544,0.34253085,0.1279126,0.52043337,0.006506759,0.0005486183],"study_design_scores_gemma":[0.0004816902,0.00016631446,0.00009521874,0.00012649939,0.000019876285,0.00000403671,0.00491215,0.76203823,0.038135115,0.00047095248,0.19310702,0.00044289234],"about_ca_topic_score_codex":0.0000298148,"about_ca_topic_score_gemma":0.0000033843796,"teacher_disagreement_score":0.91388047,"about_ca_system_score_codex":0.000026331025,"about_ca_system_score_gemma":0.000070327565,"threshold_uncertainty_score":0.36701682},"labels":[],"label_agreement":null},{"id":"W3082384432","doi":"10.1109/pmaps47429.2020.9183620","title":"Combining Historical Data and Domain Expert Knowledge Using Optimization to Model Electrical Equipment Reliability","year":2020,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Reliability (semiconductor); Computer science; Reliability engineering; Asset (computer security); Domain (mathematical analysis); Data modeling; Asset management; Black box; Expert system; Engineering; Artificial intelligence; Software engineering","score_opus":0.05719350354425663,"score_gpt":0.2709291005740166,"score_spread":0.21373559702975997,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3082384432","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0073654815,0.0005498304,0.9889637,0.00070984487,0.00019327493,0.00033352943,0.0000058742635,0.00024097553,0.0016374919],"genre_scores_gemma":[0.7601506,0.000026959677,0.23931174,0.0003263523,0.00007460442,0.000024695602,0.0000099765575,0.000028601286,0.000046421857],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99882203,0.00004605456,0.0003292206,0.0004104333,0.00013223919,0.00026004462],"domain_scores_gemma":[0.9992057,0.00005821138,0.000017389342,0.00041308667,0.000039815437,0.00026577988],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003500003,0.00014622287,0.0002465473,0.00003299527,0.00005730343,0.000029393286,0.00025649415,0.000076827775,0.000011496367],"category_scores_gemma":[0.00019911503,0.00013875646,0.00002268775,0.00022602362,0.000014488579,0.0001895223,0.00027347117,0.00012429692,0.0000066620273],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026041627,0.00004579134,0.00005090127,0.00009343568,0.00001126896,0.0000016594879,0.0019235056,0.9835275,0.004120237,0.00034370946,0.00929218,0.00056378334],"study_design_scores_gemma":[0.00019830922,0.000048626138,0.0000031221148,0.000022166036,0.000005709293,0.000003102782,0.00004548142,0.99032474,0.00018187432,0.000056998088,0.008935467,0.00017439558],"about_ca_topic_score_codex":0.000024095058,"about_ca_topic_score_gemma":0.0000029296314,"teacher_disagreement_score":0.75278515,"about_ca_system_score_codex":0.0005719635,"about_ca_system_score_gemma":0.000037941547,"threshold_uncertainty_score":0.5658324},"labels":[],"label_agreement":null},{"id":"W3083181974","doi":"10.1108/jqme-03-2020-0017","title":"Wind power system reliability and maintenance optimization considering turbine and wind uncertainty","year":2020,"lang":"en","type":"article","venue":"Journal of Quality in Maintenance Engineering","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Turbine; Wind power; Reliability (semiconductor); Reliability engineering; Wind speed; Engineering; Renewable energy; Electric power system; Marine engineering; Power (physics); Meteorology; Mechanical engineering; Electrical engineering","score_opus":0.01262036075807065,"score_gpt":0.22242886753198332,"score_spread":0.20980850677391266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3083181974","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.846999,0.0019350909,0.14697644,0.0019460863,0.00117333,0.00043201575,0.000027125436,0.00022014962,0.0002907486],"genre_scores_gemma":[0.99183357,0.00031385355,0.007501008,0.00014838451,0.00014474332,0.0000034027873,0.0000011214775,0.000046174948,0.000007773501],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972751,0.00011255887,0.0014133338,0.0003471519,0.0003273109,0.0005245487],"domain_scores_gemma":[0.99853116,0.00033774067,0.00028741657,0.00026558104,0.00024364566,0.00033444088],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0019944042,0.00036312122,0.00088409905,0.00014987506,0.000045502744,0.000078436045,0.00022266463,0.00017364023,0.0000070454303],"category_scores_gemma":[0.0015950262,0.00033040656,0.00011192322,0.0003614282,0.00011461137,0.0005248306,0.00008275732,0.00070747035,0.0000014702847],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000895738,0.000014866738,0.0015094149,0.0014647538,0.000042615648,0.00005675297,0.0015988022,0.99232894,0.0014825388,0.0010568054,0.00019144053,0.00016348375],"study_design_scores_gemma":[0.0026027642,0.00021347743,0.010884115,0.0025565764,0.000037150847,0.0005097382,0.003398779,0.97426564,0.00027886863,0.00010770602,0.004388464,0.0007567343],"about_ca_topic_score_codex":0.000024849516,"about_ca_topic_score_gemma":0.000005494194,"teacher_disagreement_score":0.14483453,"about_ca_system_score_codex":0.0003786452,"about_ca_system_score_gemma":0.000048067963,"threshold_uncertainty_score":0.9999148},"labels":[],"label_agreement":null},{"id":"W3089114470","doi":"10.1049/iet-gtd.2020.0164","title":"Methodology to incorporate stuck condition of the circuit breaker in reliability evaluation of electrical distribution networks","year":2020,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Circuit breaker; Reliability (semiconductor); Reliability engineering; Fuse (electrical); Computer science; Electrical engineering; Electronic engineering; Engineering; Physics; Power (physics)","score_opus":0.06263511838286377,"score_gpt":0.2777445737137718,"score_spread":0.21510945533090803,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3089114470","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32829252,0.0001554637,0.66972905,0.00057234283,0.00023688319,0.00069603865,0.00025538576,0.000040245766,0.000022091923],"genre_scores_gemma":[0.9980488,0.00003837587,0.00028546454,0.00005180458,0.00007506293,0.00007627155,0.0014105594,0.000011329074,0.0000023250839],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972038,0.0009282886,0.0008413091,0.000312087,0.0004928758,0.00022158606],"domain_scores_gemma":[0.99887335,0.00009586921,0.00016620642,0.0002662783,0.0004844056,0.000113886876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021826106,0.00017004379,0.0003366599,0.000032221767,0.000061196326,0.000011522162,0.00016113235,0.0002235974,0.000038793933],"category_scores_gemma":[0.0004666097,0.00014249976,0.0001215783,0.0009322205,0.000058593134,0.00014777853,0.000016227314,0.00022678133,0.000002806629],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000106051826,0.00010160467,0.0012017434,0.000119897195,0.000018355056,3.028727e-7,0.0003713282,0.8255533,0.1506847,0.0018634585,0.0028048023,0.017174432],"study_design_scores_gemma":[0.00080547656,0.00012457505,0.041893173,0.00007715413,0.00007300436,0.0000022091276,0.000024724546,0.8266216,0.12812658,0.00089220586,0.0011888562,0.00017044583],"about_ca_topic_score_codex":0.000036760197,"about_ca_topic_score_gemma":0.000022062486,"teacher_disagreement_score":0.6697563,"about_ca_system_score_codex":0.00035183955,"about_ca_system_score_gemma":0.00011199515,"threshold_uncertainty_score":0.5810971},"labels":[],"label_agreement":null},{"id":"W3101590272","doi":"10.1002/qre.2805","title":"Dynamic failure analysis of renewable energy systems in the remote offshore environments","year":2020,"lang":"en","type":"article","venue":"Quality and Reliability Engineering International","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Downtime; Turbine; Offshore wind power; Renewable energy; Submarine pipeline; Reliability engineering; Engineering; Catastrophic failure; Marine engineering; Environmental science","score_opus":0.010901429195784507,"score_gpt":0.22620209942951322,"score_spread":0.2153006702337287,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3101590272","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5029726,0.0014546763,0.48821273,0.003648361,0.0011603097,0.00045227134,0.00030397414,0.00023306988,0.0015619908],"genre_scores_gemma":[0.9991468,0.00014838505,0.0005054894,0.000072094546,0.000026636608,0.000011277413,0.00004514758,0.000011004541,0.00003315598],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99859196,0.00008144515,0.000582599,0.00025706558,0.00031497556,0.00017194281],"domain_scores_gemma":[0.99936146,0.00019928363,0.00006226737,0.0002876556,0.000026297605,0.00006306515],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000695084,0.00015563039,0.00035795622,0.00012133526,0.000018419365,0.000028866056,0.0003197399,0.00010711286,0.00001328697],"category_scores_gemma":[0.00019880288,0.00012753718,0.00012083,0.0004229209,0.00004463178,0.00010536136,0.000044619228,0.00017153153,0.0000012373281],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011253927,0.000026669364,0.0016953882,0.00022173405,0.0002059641,0.000001839267,0.000704717,0.99518996,0.00092640653,0.0007557622,0.00012557508,0.00013472237],"study_design_scores_gemma":[0.00017041978,0.000022336751,0.02797839,0.000042755968,0.000056356897,0.0000018169318,0.00023474058,0.955627,0.000076506134,0.000061134975,0.015588063,0.00014047374],"about_ca_topic_score_codex":0.0007251043,"about_ca_topic_score_gemma":0.00013608608,"teacher_disagreement_score":0.49617422,"about_ca_system_score_codex":0.00009581261,"about_ca_system_score_gemma":0.000008048728,"threshold_uncertainty_score":0.5200815},"labels":[],"label_agreement":null},{"id":"W3112533549","doi":"10.1109/smc42975.2020.9283223","title":"A Comparative Assessment of Dimensionality Reduction Techniques for Diagnosing Faults in Smart Grids","year":2020,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Dimensionality reduction; Computer science; Reduction (mathematics); Curse of dimensionality; Smart grid; Data mining; Fault (geology); Raw data; Sampling (signal processing); Machine learning; Task (project management); Artificial intelligence; Pattern recognition (psychology); Engineering; Filter (signal processing); Mathematics","score_opus":0.03390011543269274,"score_gpt":0.3078298234337621,"score_spread":0.27392970800106936,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3112533549","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.65956074,0.00012949508,0.3263085,0.0011815754,0.00043738788,0.0014806169,0.000039840543,0.0004423964,0.0104194395],"genre_scores_gemma":[0.9859607,0.000008905462,0.013857459,0.000026727654,0.000024703726,0.000100506084,0.0000060801676,0.0000053680383,0.000009540146],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994449,0.000022914608,0.00024213866,0.00012002275,0.00007254996,0.00009744946],"domain_scores_gemma":[0.9997393,0.000074749645,0.000026073467,0.00007862116,0.000049300495,0.000031986387],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018353673,0.00007104054,0.00021107765,0.000023574792,0.000013484771,0.0000035614464,0.000046940924,0.000037251528,0.0000058273995],"category_scores_gemma":[0.000027882075,0.00006384353,0.000039319784,0.00010751949,0.000022010745,0.00008498077,0.000014269185,0.000065403256,6.3161053e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043119318,0.0012457117,0.04609929,0.008305718,0.00040737158,0.000010926744,0.015141706,0.08164852,0.6726954,0.096374735,0.0679608,0.009678621],"study_design_scores_gemma":[0.0010775214,0.0004908826,0.05063471,0.00065048167,0.000025485006,0.000006034266,0.0016670238,0.36304757,0.5609921,0.0018000435,0.019073503,0.0005346397],"about_ca_topic_score_codex":0.000046644647,"about_ca_topic_score_gemma":0.000022026145,"teacher_disagreement_score":0.32639995,"about_ca_system_score_codex":0.00006918608,"about_ca_system_score_gemma":0.000015902137,"threshold_uncertainty_score":0.26034635},"labels":[],"label_agreement":null},{"id":"W3113410963","doi":"10.1109/pesgm41954.2020.9281452","title":"Short-Term Reliability Evaluation of Generating Systems Using Fixed-Effort Generalized Splitting","year":2020,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Term (time); Reliability engineering; Monte Carlo method; Computer science; Markov chain Monte Carlo; Markov chain; Markov process; Component (thermodynamics); Wind power; Mathematical optimization; Electric power system; Power (physics); Engineering; Mathematics; Machine learning; Statistics","score_opus":0.05785615579787636,"score_gpt":0.2794313269116709,"score_spread":0.22157517111379452,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3113410963","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9190081,0.00056110224,0.07689716,0.000027908722,0.0006930099,0.0006843164,0.0000099571,0.00027732982,0.0018411241],"genre_scores_gemma":[0.9926114,0.0000093217095,0.0070400345,0.000025164078,0.00022259082,0.00003741967,0.00001025967,0.00003182171,0.0000119785045],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99791974,0.00013814143,0.00081409013,0.00032082485,0.0005176167,0.00028957136],"domain_scores_gemma":[0.9990623,0.000048508755,0.00007995547,0.00036578838,0.00032100215,0.00012242285],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018236105,0.00019796337,0.0004110905,0.000036206002,0.0000618969,0.000041761326,0.00016747457,0.00011256942,0.00003993622],"category_scores_gemma":[0.00025803945,0.00018386498,0.00011444486,0.00022146567,0.00003303411,0.0001994285,0.00005073051,0.00013075348,0.000005713948],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006334383,0.000012074965,0.0056962883,0.0007983558,0.000038090555,9.769846e-7,0.0003520418,0.90125316,0.08989369,0.0002955692,0.00014829091,0.0015051459],"study_design_scores_gemma":[0.00028587866,0.000017772581,0.0008586644,0.00010838391,0.000064562846,0.0000051531683,0.00012954956,0.9873349,0.010789547,0.000014218009,0.00019596309,0.00019537573],"about_ca_topic_score_codex":0.00008837953,"about_ca_topic_score_gemma":0.0000061404808,"teacher_disagreement_score":0.086081795,"about_ca_system_score_codex":0.00020826283,"about_ca_system_score_gemma":0.000056585683,"threshold_uncertainty_score":0.7497796},"labels":[],"label_agreement":null},{"id":"W3114227586","doi":"10.1109/pesgm41954.2020.9281829","title":"Predicting Weather-related Power Outages in Distribution Grid","year":2020,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Electric power system; Grid; Reliability engineering; Model output statistics; Weather forecasting; Real-time computing; Data mining; Power (physics); Engineering; Meteorology","score_opus":0.005620186964606723,"score_gpt":0.17912586543818954,"score_spread":0.1735056784735828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3114227586","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9164903,0.000441289,0.03810075,0.0020534454,0.0013150423,0.0003669239,0.000087794004,0.001506792,0.039637666],"genre_scores_gemma":[0.99971485,0.000011376264,0.00004902318,0.000056568348,0.000029952727,0.0000076308825,0.000016457981,0.000010895253,0.00010322914],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999399,0.000015486168,0.00021077912,0.0001258991,0.00007171165,0.00017710478],"domain_scores_gemma":[0.9997967,0.000023369406,0.000012610224,0.000092955685,0.000012629095,0.00006177058],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011146349,0.00008442461,0.0001185978,0.000011771889,0.0000141165265,0.000013041306,0.00007789689,0.00006671986,0.00010514854],"category_scores_gemma":[0.0000893989,0.00007567774,0.0000338594,0.00016068741,0.000012209924,0.0000971596,0.000019134266,0.0001421636,0.00009878098],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016229686,0.00035585245,0.52167666,0.0020605407,0.00043518085,0.00029407328,0.033007484,0.25003806,0.033678748,0.028346973,0.118607014,0.011337098],"study_design_scores_gemma":[0.0027256634,0.0002889245,0.11216006,0.00050741393,0.000030533585,0.000028449464,0.0029020044,0.58510655,0.010817563,0.0006396672,0.28352058,0.0012726259],"about_ca_topic_score_codex":0.000024860734,"about_ca_topic_score_gemma":0.000017255987,"teacher_disagreement_score":0.4095166,"about_ca_system_score_codex":0.000054216678,"about_ca_system_score_gemma":0.0000053168405,"threshold_uncertainty_score":0.30860487},"labels":[],"label_agreement":null},{"id":"W3115299145","doi":"10.1109/pesgm41954.2020.9281868","title":"Development of Voltage Sag Metric for Large Meshed Transmission Systems and Stochastic Fault Data Sensitivity Analysis","year":2020,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Voltage sag; Metric (unit); Voltage; Fault (geology); Transformer; Sensitivity (control systems); Engineering; Electric power transmission; Electric power system; Transmission system; Performance metric; Computer science; Electronic engineering; Transmission (telecommunications); Reliability engineering; Electrical engineering; Power (physics); Power quality","score_opus":0.028734160207172958,"score_gpt":0.24545760249760576,"score_spread":0.2167234422904328,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3115299145","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017930292,0.0006452708,0.98054665,0.000028992763,0.0000702703,0.00037513932,0.00019774695,0.000109036315,0.00009657271],"genre_scores_gemma":[0.9924195,0.000011090852,0.0074065914,0.000014026527,0.000014120355,0.00001189779,0.00007895538,0.00001177916,0.000032065658],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990095,0.000022815624,0.00035381236,0.00027327347,0.00014859946,0.00019198508],"domain_scores_gemma":[0.9993745,0.00012740347,0.000039017286,0.00028172918,0.000053097192,0.00012425448],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00066571246,0.00012518119,0.00041488657,0.00011028896,0.000039764716,0.000016903981,0.00011934373,0.000060034163,0.000007313926],"category_scores_gemma":[0.00012590915,0.00010308637,0.00005149824,0.00058447814,0.000008739659,0.00010798676,0.000056051595,0.000054332333,0.0000018134002],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048748395,0.00055547326,0.0013447643,0.03231503,0.009781601,0.000036972215,0.021287607,0.5709935,0.25060505,0.0037628633,0.009300798,0.09952888],"study_design_scores_gemma":[0.00033316677,0.000013014905,0.0003290993,0.00003755652,0.0002103091,9.84388e-7,0.0003031121,0.986355,0.0011681372,0.0000016769359,0.011114244,0.00013371115],"about_ca_topic_score_codex":0.000023961024,"about_ca_topic_score_gemma":0.0000522836,"teacher_disagreement_score":0.97448915,"about_ca_system_score_codex":0.000026196609,"about_ca_system_score_gemma":0.000023340623,"threshold_uncertainty_score":0.42037404},"labels":[],"label_agreement":null},{"id":"W3117349595","doi":"10.1109/pesgm41954.2020.9281936","title":"Hydro-Québec’s new approach for asset management","year":2020,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Unavailability; Asset management; Computer science; Asset (computer security); Circuit breaker; Contingency; Reliability (semiconductor); Node (physics); Operations research; Reliability engineering; Risk analysis (engineering); Engineering; Business; Computer security; Electrical engineering","score_opus":0.019466467105592106,"score_gpt":0.20191081690910476,"score_spread":0.18244434980351265,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3117349595","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00016940045,0.00009086857,0.80019015,0.0009771576,0.000110410554,0.00034372858,0.0000039771426,0.00036384806,0.19775043],"genre_scores_gemma":[0.90200037,0.00002934324,0.07930198,0.0012255051,0.00022881699,0.00012836872,0.000019726314,0.000043365704,0.017022539],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99950886,0.0000037348882,0.00011979451,0.00014800573,0.00006014296,0.00015943604],"domain_scores_gemma":[0.9997198,0.0000134080365,0.0000073329843,0.00014426504,0.00000695796,0.00010824532],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000059542712,0.00008182381,0.00011505718,0.000011595025,0.000015682772,0.000016812766,0.00013247177,0.000029602996,0.00007320472],"category_scores_gemma":[0.000011131818,0.00007210297,0.000053519467,0.00006485004,0.000005643357,0.000050957613,0.000023240806,0.000040171824,0.00011841895],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000122984675,0.00001633567,0.000052905714,0.0009620116,0.000089197354,0.0000018624253,0.00030509455,0.024954997,0.00017972516,0.009253138,0.95783603,0.006336402],"study_design_scores_gemma":[0.00033240803,0.000018153753,0.00004336259,0.0000070522237,0.000013361691,0.000001101457,0.000106224164,0.23839132,0.000445409,0.00012337434,0.76038516,0.00013310128],"about_ca_topic_score_codex":0.00009745384,"about_ca_topic_score_gemma":0.000033026357,"teacher_disagreement_score":0.901831,"about_ca_system_score_codex":0.000035608777,"about_ca_system_score_gemma":0.000010565546,"threshold_uncertainty_score":0.2940274},"labels":[],"label_agreement":null},{"id":"W3117623401","doi":"10.1109/pesgm41954.2020.9281872","title":"Operational Adequacy Planning: Practices and Challenges","year":2020,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Operational planning; Time horizon; Computer science; Risk analysis (engineering); Reliability (semiconductor); Operational costs; Operations research; Systems engineering; Engineering; Power (physics); Business","score_opus":0.09833702107626695,"score_gpt":0.261900203207112,"score_spread":0.16356318213084503,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3117623401","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16946153,0.09155083,0.036865268,0.14803907,0.0010214754,0.0006678583,0.000016163249,0.002231122,0.5501467],"genre_scores_gemma":[0.99797547,0.00082916406,0.000703331,0.00032201965,0.00008300411,0.0000064312007,9.626322e-7,0.0000059110857,0.00007370714],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997023,0.0000087090975,0.00007309673,0.00009182347,0.000051890634,0.000072194765],"domain_scores_gemma":[0.99982107,0.00004781388,0.00001405358,0.0000469541,0.000011437765,0.000058669597],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000058872112,0.00005002691,0.00006390471,0.0000069570065,0.000017700213,0.000022071676,0.000042197647,0.000025661086,0.000048313224],"category_scores_gemma":[0.000106345906,0.00004211723,0.000008362969,0.000021448763,0.000010079918,0.00017505334,0.000013857846,0.00005358036,0.000037706126],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021239894,0.00019923688,0.010847243,0.010218865,0.000733012,0.00019726346,0.07791571,0.07562266,0.02495226,0.546342,0.19581749,0.05694187],"study_design_scores_gemma":[0.00021674836,0.000057037494,0.00257852,0.00003074939,0.0000057607563,0.000014677334,0.0011030621,0.074525826,0.00094879983,0.00012632179,0.9202269,0.00016562037],"about_ca_topic_score_codex":0.0000026892021,"about_ca_topic_score_gemma":0.0000020051432,"teacher_disagreement_score":0.8285139,"about_ca_system_score_codex":0.0000046770774,"about_ca_system_score_gemma":0.0000055293376,"threshold_uncertainty_score":0.17174909},"labels":[],"label_agreement":null},{"id":"W3121066106","doi":"10.5897/jmer.9000040","title":"Reliability assessment of WRPC gas turbine power station","year":2011,"lang":"en","type":"article","venue":"Mechanical Engineering Research","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Gas turbines; Failure rate; Turbine; Mean time between failures; Environmental science; Statistics; Reliability engineering; Mathematics; Power (physics); Engineering; Physics; Aerospace engineering; Mechanical engineering; Thermodynamics","score_opus":0.039973608538850625,"score_gpt":0.30388852293264845,"score_spread":0.26391491439379783,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3121066106","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6483596,0.00019868293,0.3368711,0.00006788668,0.0012250113,0.0008428925,0.000038001257,0.00068391,0.011712958],"genre_scores_gemma":[0.99018526,0.000038906655,0.00957228,0.0000030914334,0.000027756456,0.000069218826,0.0000043478494,0.000039313556,0.000059846425],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99802375,0.00008637299,0.00045460425,0.00028122985,0.0006078642,0.00054615905],"domain_scores_gemma":[0.9986543,0.00025531361,0.000023232838,0.0005961668,0.0002976761,0.00017329743],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025472436,0.00015969807,0.00029081953,0.00018027192,0.000033769815,0.000014119832,0.00033564414,0.00014490649,0.00024816243],"category_scores_gemma":[0.0006104256,0.00014828934,0.00008780472,0.00047767514,0.00005036745,0.0001398067,0.00010326956,0.0006091751,0.000029786761],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017898009,0.0011678757,0.00088843604,0.0050943946,0.0003172598,0.000089510104,0.0026847161,0.12184788,0.60164225,0.25607172,0.004063067,0.0059539094],"study_design_scores_gemma":[0.00096985215,0.0008542172,0.022887373,0.00047324176,0.000018888795,0.000014846985,0.00023082322,0.83275104,0.12765925,0.0059206793,0.007545231,0.00067455135],"about_ca_topic_score_codex":0.000075514705,"about_ca_topic_score_gemma":0.000005053863,"teacher_disagreement_score":0.71090317,"about_ca_system_score_codex":0.0002346354,"about_ca_system_score_gemma":0.000048109625,"threshold_uncertainty_score":0.6047064},"labels":[],"label_agreement":null},{"id":"W3129544273","doi":"10.1109/tpwrs.2021.3060427","title":"A Framework for Power System Operational Planning Under Uncertainty Using Coherent Risk Measures","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada; SaskPower","keywords":"Electric power system; Reliability engineering; Reliability (semiconductor); Risk management; Computer science; Wind power; Mathematical optimization; Conic section; Operations research; Risk analysis (engineering); Engineering; Power (physics); Mathematics; Economics","score_opus":0.03224672642030193,"score_gpt":0.26534322055050663,"score_spread":0.2330964941302047,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3129544273","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021836955,0.0013801216,0.9633413,0.000035281533,0.011082265,0.00081410294,0.00043272297,0.00050948554,0.0005677749],"genre_scores_gemma":[0.99716073,0.00001790199,0.0021104044,0.000046349825,0.000059259863,0.00031887402,0.0000075445832,0.00008398688,0.00019493606],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99770063,0.00019997903,0.0006655182,0.0004844671,0.00044637677,0.00050304685],"domain_scores_gemma":[0.99843353,0.00037391725,0.00010125577,0.0005751347,0.0003407629,0.00017542749],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00051176065,0.00036520924,0.0005141286,0.00012632164,0.00039050507,0.0002020779,0.00018711115,0.00031797687,0.000036578425],"category_scores_gemma":[0.000027269996,0.0003533528,0.0002833122,0.00029745893,0.000043775704,0.0001821717,0.0000017504511,0.0004551118,0.00003677748],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000455993,0.00006778241,0.000019154917,0.00030383043,0.00032668555,0.000012185211,0.00068513467,0.9941238,0.0011280125,0.0028741537,0.00037470527,0.000038928258],"study_design_scores_gemma":[0.0017949498,0.0002381607,0.000082181396,0.0044607352,0.0003049492,0.0004155483,0.011362945,0.9474237,0.006989701,0.00024733157,0.02527905,0.0014007458],"about_ca_topic_score_codex":0.0001096434,"about_ca_topic_score_gemma":0.00003185452,"teacher_disagreement_score":0.9753238,"about_ca_system_score_codex":0.00072088203,"about_ca_system_score_gemma":0.000158121,"threshold_uncertainty_score":0.9998918},"labels":[],"label_agreement":null},{"id":"W3145621925","doi":"","title":"Probabilistic Reliability Planning at British Columbia Transmission Corporation: Method and Project Case","year":2008,"lang":"en","type":"article","venue":"Proceedings of the 10th International Conference on Probablistic Methods Applied to Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Probabilistic logic; Corporation; Computer science; Operations research; Reliability engineering; Engineering; Business; Artificial intelligence; Finance","score_opus":0.04560159232388095,"score_gpt":0.30194290937641727,"score_spread":0.2563413170525363,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3145621925","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28447855,0.0002963633,0.53387016,0.00033487295,0.0051944195,0.008333273,0.00027319958,0.0006712755,0.16654791],"genre_scores_gemma":[0.93632346,0.000015897343,0.06101299,0.00004162814,0.00005689677,0.0005718047,0.0000045673864,0.000043173084,0.0019295882],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99735516,0.000091525304,0.0009374197,0.0006869739,0.0005753873,0.00035351582],"domain_scores_gemma":[0.9980041,0.00027319213,0.00032947573,0.00027878673,0.0009341431,0.00018031675],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0021946747,0.00029251637,0.0006010882,0.00010805031,0.0003112856,0.000352112,0.00056764076,0.00018603788,0.00006124312],"category_scores_gemma":[0.0008959517,0.00029612915,0.00009383866,0.0003877034,0.0001919066,0.00018522228,0.00018908094,0.00032697394,0.000004395375],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0025538697,0.0016346825,0.01202289,0.023893781,0.0016109132,0.0005579027,0.034888465,0.07827153,0.13637228,0.4920108,0.18437529,0.031807598],"study_design_scores_gemma":[0.007200891,0.0021355145,0.00963085,0.0135246515,0.00057519827,0.0375473,0.0056125815,0.64803004,0.0136516,0.07243174,0.18347308,0.00618657],"about_ca_topic_score_codex":0.00089738803,"about_ca_topic_score_gemma":0.00005926591,"teacher_disagreement_score":0.6518449,"about_ca_system_score_codex":0.00032079493,"about_ca_system_score_gemma":0.000090271555,"threshold_uncertainty_score":0.9999491},"labels":[],"label_agreement":null},{"id":"W3155016304","doi":"10.1109/tpwrs.2021.3072341","title":"Incorporating Multi-Year Asset Replacement Time Into Calculation of Asset's Expected Annual Unavailability Due to End-of-Life Failure","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Manitoba; Manitoba Hydro","funders":"","keywords":"Unavailability; Reliability engineering; Asset (computer security); Investment (military); Probabilistic logic; Risk analysis (engineering); Asset management; Engineering; Computer science; Actuarial science; Economics; Business; Finance","score_opus":0.00944572469184722,"score_gpt":0.22866685733561082,"score_spread":0.2192211326437636,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3155016304","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2115715,0.00010630186,0.7849719,0.0000715284,0.0016817542,0.0006967528,0.00036532246,0.00022284585,0.0003120891],"genre_scores_gemma":[0.9963235,0.0000021244562,0.003190003,0.000012772041,0.000015301133,0.00011279539,0.000023027016,0.000043085525,0.0002773442],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9974583,0.00027544537,0.0010811612,0.00044999333,0.00045396827,0.0002811735],"domain_scores_gemma":[0.99810946,0.0001761875,0.00018824957,0.0008042345,0.0005279029,0.00019396534],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006663831,0.00027723968,0.00064666325,0.0001809003,0.00008018825,0.00003217507,0.00017820425,0.00021584585,0.0001168295],"category_scores_gemma":[0.000094890536,0.00029030463,0.0001767061,0.00065293873,0.00005634513,0.00023273921,0.0000048166958,0.00025007653,0.00007909782],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000317919,0.0011097693,0.0010257928,0.0030397873,0.000761636,0.000035312925,0.011134739,0.7802779,0.1966058,0.00029343183,0.005048493,0.00034938293],"study_design_scores_gemma":[0.008975322,0.002195524,0.007381132,0.005553685,0.00042390323,0.00021788783,0.02357293,0.32500657,0.6002089,0.00006015355,0.022576736,0.0038272636],"about_ca_topic_score_codex":0.00031052894,"about_ca_topic_score_gemma":0.00039458432,"teacher_disagreement_score":0.7847521,"about_ca_system_score_codex":0.00031738356,"about_ca_system_score_gemma":0.00017259285,"threshold_uncertainty_score":0.99995494},"labels":[],"label_agreement":null},{"id":"W3157636745","doi":"10.36001/phmconf.2013.v5i1.2301","title":"A New Prognostic Approach for Hydro-generator Stator Windings","year":2013,"lang":"en","type":"article","venue":"Annual Conference of the PHM Society","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Condition-based maintenance; Reliability engineering; Identification (biology); Stator; Condition monitoring; Root cause; Computer science; Context (archaeology); Generator (circuit theory); Root cause analysis; Failure mode and effects analysis; Prognostics; Engineering; Data mining; Power (physics); Mechanical engineering","score_opus":0.014135470617960541,"score_gpt":0.20136747781857633,"score_spread":0.18723200720061578,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3157636745","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7044821,0.00038464178,0.2865575,0.0009442387,0.0009828518,0.002942781,0.00027358683,0.0003336802,0.0030986366],"genre_scores_gemma":[0.9891744,0.000013275503,0.0094952425,0.00008427554,0.0000846225,0.00014349673,0.000006303743,0.000020967735,0.0009774124],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991325,0.000018109877,0.00022683114,0.00017503095,0.0001495068,0.00029801734],"domain_scores_gemma":[0.99926734,0.00006002938,0.000061272054,0.000291383,0.00022390946,0.00009605274],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016528588,0.00015100063,0.00021564456,0.000008313927,0.00006930853,0.000047471178,0.00038934432,0.000097599186,0.00003108174],"category_scores_gemma":[0.00008578865,0.00010716295,0.0002259807,0.00011595424,0.00007501058,0.00022727616,0.00006391634,0.00012753799,0.0000104794835],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022632763,0.00021678461,0.0043387976,0.0028027939,0.0007013629,2.7932015e-7,0.07692641,0.003132741,0.04461268,0.0095008565,0.8494044,0.00834026],"study_design_scores_gemma":[0.004445456,0.0006602068,0.012126017,0.0008886027,0.00040097543,0.000028297292,0.029266197,0.74335057,0.09825881,0.017212223,0.09069052,0.0026721566],"about_ca_topic_score_codex":0.00010101329,"about_ca_topic_score_gemma":0.0000025194304,"teacher_disagreement_score":0.7587139,"about_ca_system_score_codex":0.00004273515,"about_ca_system_score_gemma":0.00010473564,"threshold_uncertainty_score":0.43699783},"labels":[],"label_agreement":null},{"id":"W3176312524","doi":"","title":"Spare Assessment of Distribution Power Transformers using Two Markov Models","year":2019,"lang":"en","type":"article","venue":"IEEE Conference Proceedings","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan; Hydro One (Canada)","funders":"","keywords":"Spare part; Reliability engineering; Transformer; Probabilistic logic; Markov chain; Computer science; Engineering; Operations research; Operations management; Artificial intelligence; Machine learning; Electrical engineering","score_opus":0.017919376195396828,"score_gpt":0.2498109714830862,"score_spread":0.23189159528768938,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3176312524","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7912485,0.000035324338,0.18867232,0.000026016109,0.00053502223,0.00035181423,0.000055029006,0.00011306498,0.018962886],"genre_scores_gemma":[0.99905,0.000027254013,0.00079713785,0.000009100371,0.000016290678,0.00001573209,0.0000071514596,0.000018844261,0.000058442536],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989158,0.0000043016503,0.00031650657,0.00022130703,0.00023451255,0.00030757973],"domain_scores_gemma":[0.9994895,0.000013165268,0.00006566475,0.00009832503,0.00025931877,0.00007401417],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022706801,0.0001765034,0.00029048856,0.0000444746,0.000026527208,0.000038869526,0.0001690898,0.000085772765,0.0000674188],"category_scores_gemma":[0.0000065889894,0.00017099,0.00009376655,0.0001553339,0.00004526092,0.00050370366,0.0000124735225,0.00016374882,0.000007271802],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016391954,0.00031624595,0.037438877,0.007912094,0.000513671,0.0000057245616,0.00814408,0.08477504,0.736115,0.11636508,0.0022059528,0.006044336],"study_design_scores_gemma":[0.00064466905,0.00008762776,0.0012816589,0.0005902755,0.000034982837,0.000011652416,0.000858444,0.9777756,0.01623982,0.0013792401,0.00071664026,0.0003793911],"about_ca_topic_score_codex":0.000030423202,"about_ca_topic_score_gemma":0.0000028409868,"teacher_disagreement_score":0.89300054,"about_ca_system_score_codex":0.00017296875,"about_ca_system_score_gemma":0.00006725202,"threshold_uncertainty_score":0.697277},"labels":[],"label_agreement":null},{"id":"W3184201173","doi":"10.18280/ijdne.160301","title":"A Voltage Stability-Based Approach to Determining the Maximum Size of Wind Farms in Power Systems","year":2021,"lang":"en","type":"article","venue":"International Journal of Design & Nature and Ecodynamics","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Wind power; Installation; Electric power system; Wind speed; Voltage; Power optimizer; Power (physics); Electrical engineering; Engineering; Control theory (sociology); Automotive engineering; Environmental science; Marine engineering; Computer science; Meteorology; Maximum power point tracking; Geography; Mechanical engineering","score_opus":0.009502060792620655,"score_gpt":0.21803564906922546,"score_spread":0.20853358827660481,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3184201173","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6359076,0.001180857,0.35941705,0.00026998983,0.0019799026,0.00023693776,0.00004192827,0.0000134429865,0.00095233053],"genre_scores_gemma":[0.99710363,0.00003353554,0.0026664487,0.0001227924,0.000042330204,0.0000028817858,0.0000023808475,0.000013834822,0.000012190054],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99881023,0.00007407244,0.00052418985,0.00012264393,0.00032228415,0.0001465774],"domain_scores_gemma":[0.99884826,0.0003715419,0.00013727928,0.00014453131,0.0004385519,0.000059852966],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00079486327,0.00012246182,0.00026387282,0.00011468107,0.000016956737,0.000061548715,0.00031837652,0.00014078539,0.0000035357234],"category_scores_gemma":[0.00040963606,0.000090789596,0.0000851045,0.00016732067,0.000026455768,0.0001277427,0.000034682194,0.00046417964,4.8953865e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005185491,0.0005850692,0.030921645,0.0005695393,0.000551814,0.00025459504,0.0035654106,0.9445101,0.013555758,0.0024319452,0.00043905058,0.0020965112],"study_design_scores_gemma":[0.0064122127,0.0006447822,0.07792769,0.0025596193,0.000140855,0.0011311492,0.0065909615,0.8838538,0.00658336,0.0038998171,0.0091051115,0.0011506412],"about_ca_topic_score_codex":0.0000034093648,"about_ca_topic_score_gemma":0.000012928832,"teacher_disagreement_score":0.36119604,"about_ca_system_score_codex":0.00014389516,"about_ca_system_score_gemma":0.00009118601,"threshold_uncertainty_score":0.37022924},"labels":[],"label_agreement":null},{"id":"W3193758524","doi":"10.3390/su13169091","title":"Global Methodology for Electrical Utilities Maintenance Assessment Based on Risk-Informed Decision Making","year":2021,"lang":"en","type":"article","venue":"Sustainability","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal; Université du Québec à Trois-Rivières; Hydro-Québec","funders":"","keywords":"Risk analysis (engineering); Asset (computer security); Electric power system; Reliability (semiconductor); Asset management; Context (archaeology); Grid; Computer science; Resilience (materials science); Risk management; Electric power; Service (business); Reliability engineering; Power (physics); Business; Engineering; Computer security; Finance","score_opus":0.018082769215349785,"score_gpt":0.33910777822579496,"score_spread":0.3210250090104452,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3193758524","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07239361,0.00017787305,0.9215884,0.00039009232,0.00088737207,0.0009081351,0.00012107578,0.0003379594,0.0031954544],"genre_scores_gemma":[0.9361921,0.000015998254,0.063192636,0.00017479307,0.0000553679,0.00025486853,0.0000122519405,0.000020933578,0.00008104986],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973787,0.0003898009,0.0005670212,0.00054040336,0.00029023783,0.0008338153],"domain_scores_gemma":[0.99442565,0.0036006363,0.00008448629,0.00081437733,0.0009573877,0.00011747857],"candidate_categories":["metaresearch","metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0021019906,0.00028011756,0.0005044998,0.00006357397,0.00016421977,0.000056381996,0.0002508057,0.0002167726,0.000041527866],"category_scores_gemma":[0.01597827,0.00025762207,0.0002890786,0.00047483563,0.00011628325,0.000120170575,0.00006536656,0.00027855334,0.0000029833557],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022544332,0.0007532672,0.11758819,0.0057880916,0.00022520161,0.00015311805,0.0006174873,0.2730626,0.00003389291,0.1790325,0.016808517,0.4036827],"study_design_scores_gemma":[0.0019032283,0.00044652532,0.16305253,0.00020061819,0.00006400457,0.000023154995,0.0013013686,0.49375933,0.0003178292,0.2916602,0.046606094,0.00066510256],"about_ca_topic_score_codex":0.00003142295,"about_ca_topic_score_gemma":0.00017599348,"teacher_disagreement_score":0.8637985,"about_ca_system_score_codex":0.0047046514,"about_ca_system_score_gemma":0.0012307797,"threshold_uncertainty_score":0.9999876},"labels":[],"label_agreement":null},{"id":"W3193915105","doi":"10.3390/en14164987","title":"Optimal Decision Making in Electrical Systems Using an Asset Risk Management Framework","year":2021,"lang":"en","type":"article","venue":"Energies","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Ministère des relations internationales et de la Francophonie","keywords":"Risk analysis (engineering); Asset management; Asset (computer security); Risk management; Computer science; Business; Finance; Computer security","score_opus":0.010319420719680233,"score_gpt":0.2530279913425396,"score_spread":0.2427085706228594,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3193915105","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.72949934,0.002796257,0.26560542,0.0000027173169,0.00087555876,0.000072987,0.0000040928057,0.00014784366,0.0009957841],"genre_scores_gemma":[0.9437439,0.0002984196,0.055801388,0.0000093453245,0.00007960711,0.000015629694,0.0000025023242,0.000022375545,0.000026850228],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99892414,0.000085469255,0.00027118155,0.0002361714,0.00018294615,0.00030009256],"domain_scores_gemma":[0.9994259,0.0001373648,0.000029342982,0.0003394006,0.000027597713,0.000040427458],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002862129,0.0001303697,0.00020843268,0.00009903065,0.000049453127,0.00009951545,0.00013830712,0.000111012465,0.000009782145],"category_scores_gemma":[0.00008532625,0.00013104599,0.000044121534,0.00036761098,0.000012191317,0.00015523932,0.000059637303,0.00021334198,0.00000798271],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000071735194,0.000024992753,0.0009517555,0.00007036526,0.000020802432,0.00012140887,0.00015510981,0.98989654,0.000110427194,0.005287444,0.00011598693,0.0032380065],"study_design_scores_gemma":[0.00022788355,0.000024022387,0.004176479,0.0010379854,0.000023928642,0.00004439442,0.0007512904,0.98479486,0.00060246506,0.0014985322,0.0064865826,0.00033160162],"about_ca_topic_score_codex":0.000035003963,"about_ca_topic_score_gemma":0.000026053956,"teacher_disagreement_score":0.21424456,"about_ca_system_score_codex":0.00018026467,"about_ca_system_score_gemma":0.000013552077,"threshold_uncertainty_score":0.53439003},"labels":[],"label_agreement":null},{"id":"W3194204426","doi":"10.1016/j.ress.2021.107960","title":"Risk-averse maintenance scheduling of generation units in combined heat and power systems with demand response","year":2021,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; Okanagan University College; University of British Columbia","funders":"FortisBC; Mitacs","keywords":"Demand response; Scheduling (production processes); Reliability engineering; Operations research; Computer science; Mathematical optimization; Engineering; Operations management; Mathematics; Electrical engineering; Electricity","score_opus":0.00499516119004559,"score_gpt":0.17129916963495798,"score_spread":0.1663040084449124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3194204426","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8712042,0.0014338177,0.12526539,0.000035393732,0.0008059372,0.0006319723,0.00007879284,0.00032154744,0.00022295817],"genre_scores_gemma":[0.9982502,0.00015566667,0.0013783603,0.0000033027236,0.000027401757,0.000058200123,0.000013457128,0.000060661227,0.000052752788],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973145,0.0003770952,0.0009943836,0.0005226425,0.0003115412,0.00047984027],"domain_scores_gemma":[0.9980816,0.00045418317,0.00009913284,0.0007980301,0.00040105564,0.00016598178],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0025483505,0.00036767192,0.00078546436,0.00015349647,0.000066488916,0.000046267556,0.00014858767,0.0002196172,0.0000030386614],"category_scores_gemma":[0.00081044144,0.00034110085,0.00006679723,0.0007916586,0.00006487445,0.00022472005,0.000045999022,0.0003716702,0.0000039238166],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032095518,0.00003107587,0.0061884574,0.0024561258,0.000057783996,0.00004698101,0.00049759116,0.9788916,0.010683541,0.0007894059,0.000018174063,0.000018303015],"study_design_scores_gemma":[0.0017929107,0.00014533509,0.025202578,0.002705793,0.00004357913,0.00016171501,0.0009919496,0.96391577,0.003467889,0.00000234084,0.001066288,0.0005038351],"about_ca_topic_score_codex":0.00011706984,"about_ca_topic_score_gemma":0.000045456873,"teacher_disagreement_score":0.127046,"about_ca_system_score_codex":0.00062279025,"about_ca_system_score_gemma":0.00012987935,"threshold_uncertainty_score":0.9999041},"labels":[],"label_agreement":null},{"id":"W3199657620","doi":"10.1016/j.ress.2021.108075","title":"Optimal placement of fuses and switches in active distribution networks using value-based MINLP","year":2021,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Solver; Mathematical optimization; Reliability engineering; Reliability (semiconductor); Computer science; Contingency; Flexibility (engineering); Electricity; Parametric statistics; Interconnection; Distributed generation; Renewable energy; Engineering; Power (physics); Mathematics; Electrical engineering; Telecommunications","score_opus":0.00516941576272968,"score_gpt":0.18720721380522454,"score_spread":0.18203779804249487,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3199657620","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.61150616,0.00080716977,0.38650218,0.000018272454,0.00049279205,0.00033774468,0.000092628805,0.00018768226,0.00005537645],"genre_scores_gemma":[0.99720013,0.00004252346,0.0025927443,0.0000026554903,0.00004702389,0.000032366992,0.00004389216,0.00003506173,0.0000035763337],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980514,0.00008725682,0.00079206645,0.00040743558,0.00022984936,0.0004319722],"domain_scores_gemma":[0.99888265,0.00029552015,0.00008266292,0.0004928073,0.00013073538,0.00011565136],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00081103423,0.00029640214,0.0006104755,0.00006604249,0.000041729287,0.000022557942,0.00011816926,0.0001999429,0.0000038390294],"category_scores_gemma":[0.00021574547,0.0003149425,0.00011839045,0.00041417693,0.00004779518,0.00014031357,0.000049412905,0.00025693935,9.4374064e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006821416,0.00004410286,0.0017703441,0.0026029772,0.00003622442,0.0000085872,0.00012744639,0.9916651,0.0031918779,0.00035384082,0.0000061242554,0.00012511197],"study_design_scores_gemma":[0.00062542263,0.000029203164,0.012152778,0.0013948936,0.000035289326,0.000021498863,0.00033540087,0.97161615,0.013120919,0.0000022173353,0.0003738028,0.00029243407],"about_ca_topic_score_codex":0.00009495369,"about_ca_topic_score_gemma":0.000012075816,"teacher_disagreement_score":0.385694,"about_ca_system_score_codex":0.0010468039,"about_ca_system_score_gemma":0.000090032845,"threshold_uncertainty_score":0.99993026},"labels":[],"label_agreement":null},{"id":"W3208255100","doi":"10.32920/ryerson.14655681.v1","title":"Probabilistic power transmission system reliability evaluation","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Probabilistic logic; Upgrade; Reliability engineering; Transmission system; Transmission (telecommunications); Reliability (semiconductor); Electric power system; Power transmission; Plan (archaeology); Fault (geology); Business system planning; Computer science; Asset (computer security); Engineering; Power (physics); Telecommunications; Systems engineering; Computer security","score_opus":0.013747496533170431,"score_gpt":0.23135250306179606,"score_spread":0.21760500652862563,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3208255100","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31131303,0.006242279,0.48004717,0.00030371954,0.012532799,0.006272211,0.000071412964,0.0044457302,0.17877164],"genre_scores_gemma":[0.99682295,0.00003743742,0.0021919217,0.000013013128,0.00006945543,0.00050238875,0.000101873564,0.000060440634,0.00020050649],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9969732,0.00030988618,0.0008164849,0.0008028178,0.00070855167,0.00038904822],"domain_scores_gemma":[0.99767447,0.00009641033,0.000081007944,0.0014060227,0.00057074806,0.00017132459],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0020404523,0.0004449034,0.0006511122,0.00007557125,0.000056371748,0.00013549914,0.0003546949,0.0006260644,0.0004155142],"category_scores_gemma":[0.0002182273,0.00039531145,0.0003097437,0.00016319232,0.00004849213,0.00011723512,0.00016198476,0.00070498075,0.00004987546],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028644397,0.0001797187,0.00008462809,0.02757362,0.0001833332,0.000025074778,0.0019330853,0.95483434,0.0010412349,0.0015206155,0.003874298,0.008721422],"study_design_scores_gemma":[0.00044337535,0.000033354285,0.0011119655,0.00352484,0.00021075616,0.000026867689,0.0007060418,0.98381585,0.0014083199,0.0009944147,0.0068377224,0.00088650896],"about_ca_topic_score_codex":0.000074780066,"about_ca_topic_score_gemma":0.00001556431,"teacher_disagreement_score":0.6855099,"about_ca_system_score_codex":0.00131925,"about_ca_system_score_gemma":0.000313677,"threshold_uncertainty_score":0.99984986},"labels":[],"label_agreement":null},{"id":"W3214768147","doi":"10.1109/mper.2002.4312392","title":"Determination of the Optimum Routine Test and Self-Checking Intervals in Protective Relaying Using a Reliability Model","year":2002,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":55,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Dependability; Reliability engineering; Relay; Reliability (semiconductor); Computer science; Model checking; Protective relay; Markov model; Markov chain; Engineering; Power (physics); Algorithm","score_opus":0.015495119330420843,"score_gpt":0.2242735162283714,"score_spread":0.20877839689795058,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3214768147","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.61128145,0.066432394,0.3159563,0.00024952824,0.0011036198,0.0036589191,0.000022137885,0.0006196897,0.00067597785],"genre_scores_gemma":[0.99010414,0.0024937533,0.0072534527,0.000023797575,0.0000116135025,0.00006905517,1.5623245e-7,0.000035570778,0.000008447393],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998707,0.00004312344,0.00059235387,0.00024060428,0.00015642437,0.00026048068],"domain_scores_gemma":[0.999249,0.00012526702,0.00009596057,0.00041504425,0.000068685265,0.000046087884],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00077584543,0.00021971324,0.0004375948,0.00007144639,0.00002689243,0.000014087429,0.00018733913,0.00008757048,0.0000048595434],"category_scores_gemma":[0.000623533,0.00018034677,0.00010390945,0.0003716669,0.000026701828,0.00020529515,0.000052599375,0.00030497834,0.000001613293],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000029918963,0.00022386071,0.0027040313,0.033057615,0.000044997472,0.000008338981,0.0033870982,0.941068,0.015542178,0.00008240599,0.000081559694,0.0037969113],"study_design_scores_gemma":[0.00014781844,0.000015926538,0.00049725425,0.009947732,0.000029518504,0.000024729825,0.0000064594383,0.9876997,0.001238986,0.000024800682,0.00017352118,0.00019357412],"about_ca_topic_score_codex":0.0000101391015,"about_ca_topic_score_gemma":0.0000021135409,"teacher_disagreement_score":0.3788227,"about_ca_system_score_codex":0.00024087577,"about_ca_system_score_gemma":0.000009648504,"threshold_uncertainty_score":0.7354328},"labels":[],"label_agreement":null},{"id":"W3216264770","doi":"10.1109/epec52095.2021.9621481","title":"Framework for a Real-Time Autonomous Cascading Failure Prediction Model","year":2021,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"SaskPower","keywords":"Cascading failure; Robustness (evolution); Computer science; Cascade; Grid; Reliability engineering; Power-system protection; Data modeling; Artificial intelligence; Electric power system; Engineering","score_opus":0.010152782947855528,"score_gpt":0.22180661152077633,"score_spread":0.2116538285729208,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3216264770","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010661116,0.0000744408,0.97205335,0.00025658935,0.00038529388,0.00020369113,0.0000497599,0.00079639396,0.015519352],"genre_scores_gemma":[0.80317926,0.000042866846,0.19137669,0.000060473336,0.00015056803,0.00011681844,0.000022638353,0.000041206553,0.0050095003],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993327,0.0000084791145,0.00018257764,0.00017982768,0.00006751026,0.00022890739],"domain_scores_gemma":[0.999537,0.000078561534,0.000013725841,0.00024590266,0.000062253464,0.00006258593],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011976615,0.00010150212,0.00015280324,0.000023305,0.000047546913,0.000031457064,0.00006561248,0.00014571306,0.000057693844],"category_scores_gemma":[0.00008588314,0.0001004036,0.00007962195,0.00009154953,0.000009354644,0.00011045949,0.000016945945,0.000098073084,0.000037009526],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015127748,0.000052557338,0.00007141624,0.0007413725,0.00013917076,0.000013638772,0.0014545665,0.757413,0.040442176,0.1424678,0.055299148,0.0018900246],"study_design_scores_gemma":[0.00011824116,0.000012217249,0.000017704282,0.00008348577,0.000012759622,0.000015871114,0.000077485645,0.9772268,0.004943078,0.0093143955,0.008060687,0.0001172884],"about_ca_topic_score_codex":0.000007456883,"about_ca_topic_score_gemma":0.000015351025,"teacher_disagreement_score":0.79251814,"about_ca_system_score_codex":0.00011144392,"about_ca_system_score_gemma":0.000038917948,"threshold_uncertainty_score":0.409434},"labels":[],"label_agreement":null},{"id":"W4200312378","doi":"10.18280/mmep.080604","title":"Modelling and Analysis of Solar and Wind System Adequacy Assessment and Cost Optimization","year":2021,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Wind speed; Engineering; Meteorology; Computer science; Environmental science","score_opus":0.018417347643803105,"score_gpt":0.21280407902095147,"score_spread":0.19438673137714838,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200312378","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09784164,0.0019696127,0.89971423,0.000017857563,0.000036786143,0.00016376912,0.000010491026,0.000108993845,0.00013660904],"genre_scores_gemma":[0.8982275,0.0007588201,0.10094289,0.0000018567514,0.000009008384,0.000015179074,0.0000076425695,0.000024805204,0.000012276336],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99898213,0.000016873037,0.00040150457,0.00025779975,0.00012881693,0.00021287512],"domain_scores_gemma":[0.99947524,0.0001389851,0.000037945596,0.00016756673,0.000055625813,0.00012462423],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003525898,0.0001858893,0.000495537,0.00012385906,0.000050617182,0.00008194517,0.00003647604,0.000103547354,0.000002054712],"category_scores_gemma":[0.000012742343,0.00017813299,0.00003935916,0.0002222452,0.00003414799,0.00011831129,0.000043104654,0.0001413962,1.7061022e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000012195178,0.0000125303495,0.000046322155,0.0036402205,0.00020473704,0.0000021642702,0.0005356915,0.98993593,0.00011496725,0.0053812405,6.151162e-7,0.00012433634],"study_design_scores_gemma":[0.00017739242,0.000013205876,0.000012495346,0.0006796815,0.0002951736,0.000022151029,0.00011832462,0.9980531,0.000069889385,0.000356325,0.000023470793,0.00017878677],"about_ca_topic_score_codex":0.000009335235,"about_ca_topic_score_gemma":4.5479962e-7,"teacher_disagreement_score":0.8003859,"about_ca_system_score_codex":0.00003226038,"about_ca_system_score_gemma":0.000008420626,"threshold_uncertainty_score":0.7264052},"labels":[],"label_agreement":null},{"id":"W4200337012","doi":"10.2172/1836418","title":"NERC MISOPS","year":2021,"lang":"en","type":"report","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Reliability (semiconductor); Relay; TRIPS architecture; Electricity; Engineering; Electric power system; Reliability engineering; Telecommunications; Transport engineering; Power (physics); Electrical engineering; Geography","score_opus":0.022706916963496,"score_gpt":0.23545908084873865,"score_spread":0.21275216388524265,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200337012","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00008094637,0.008628374,0.004542592,0.000038728587,0.006868117,0.00011258987,0.000022341912,0.000567582,0.97913873],"genre_scores_gemma":[0.097556986,0.017348345,0.0018870406,0.00015003253,0.002348564,0.00012987274,0.00028484757,0.000275974,0.88001835],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99888396,0.000012065538,0.00029959925,0.00022465369,0.00033880834,0.00024089383],"domain_scores_gemma":[0.9991607,0.000028387796,0.000024945059,0.00051683653,0.00019618079,0.00007295848],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026304246,0.00020499388,0.00039222566,0.000040805153,0.000015014118,0.000032345866,0.00014671344,0.0003232759,0.0007954696],"category_scores_gemma":[0.00012078332,0.00018327135,0.00016332685,0.00009714935,0.000014451287,0.000032427448,0.00003798711,0.00029722706,0.00019301884],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[3.2158468e-7,0.000008296259,0.00002539326,0.0016116987,0.00009279704,0.00007844329,0.000027452104,0.00030606735,0.00006387252,0.00013549633,0.99337864,0.004271507],"study_design_scores_gemma":[0.000034694403,0.0000034766147,0.00006449571,0.00027068172,0.000016856007,0.000090779184,0.000020101692,0.00026800224,0.00023988214,0.00002900196,0.99873596,0.00022605747],"about_ca_topic_score_codex":0.00014228588,"about_ca_topic_score_gemma":0.00015303183,"teacher_disagreement_score":0.09912039,"about_ca_system_score_codex":0.00027255248,"about_ca_system_score_gemma":0.00029581782,"threshold_uncertainty_score":0.8709835},"labels":[],"label_agreement":null},{"id":"W4205539682","doi":"10.11159/eecss21","title":"Proceedings of the 7th World Congress on Electrical Engineering and Computer Systems and Science","year":2021,"lang":"en","type":"paratext","venue":"Proceedings of the World Congress on Electrical Engineering and Computer Systems and Science","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Instituto de Ciencias del Mar y Limnología, Universidad Nacional Autónoma de México; Purdue University; Microsoft Research; Massachusetts General Hospital; Nvidia; National Science Foundation","keywords":"Computer science; Engineering physics; Software engineering; Engineering; Engineering ethics","score_opus":0.006297230081841046,"score_gpt":0.1965340628138662,"score_spread":0.19023683273202516,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4205539682","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9078802,0.027822109,0.0015534302,0.00043639116,0.050874714,0.004702165,0.00009198626,0.00060129707,0.0060377484],"genre_scores_gemma":[0.9952049,0.00043886347,0.0002029792,0.00003904454,0.0006208319,0.000078977704,5.625895e-7,0.000065839944,0.0033479868],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9957114,0.000013700231,0.00089603366,0.0011886666,0.0011687016,0.0010214901],"domain_scores_gemma":[0.99794227,0.0003041284,0.00038684925,0.00031402847,0.00066534214,0.00038738287],"candidate_categories":["metaepi_narrow","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.0012452606,0.00074087916,0.0012628324,0.00095399073,0.00039835853,0.0010650817,0.00128927,0.000207606,9.1335755e-7],"category_scores_gemma":[0.00013798548,0.00050983386,0.000120897384,0.0033486849,0.0008465767,0.0004082258,0.0006542952,0.0011009868,0.0000012018738],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037924093,0.00075501966,0.008240662,0.05984009,0.0014639578,0.000032524436,0.002318975,0.31082737,0.09480446,0.38116375,0.12595284,0.014221123],"study_design_scores_gemma":[0.00044767064,0.00023827891,0.0015752852,0.0067495555,0.000054255088,0.00019029326,0.000018004896,0.97214484,0.004462776,0.0000056909207,0.013432464,0.0006808862],"about_ca_topic_score_codex":0.00003598189,"about_ca_topic_score_gemma":0.0000018029567,"teacher_disagreement_score":0.66131747,"about_ca_system_score_codex":0.00023475636,"about_ca_system_score_gemma":0.00013259678,"threshold_uncertainty_score":0.9999719},"labels":[],"label_agreement":null},{"id":"W4205834436","doi":"10.2139/ssrn.3963603","title":"Maximizing the Utilization of Existing Grids for Renewable Energy Integration","year":2021,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Renewable energy; Grid; Environmental economics; Computer science; Environmental science; Natural resource economics; Economics; Engineering; Geology; Electrical engineering","score_opus":0.02581160187566076,"score_gpt":0.24618263801413376,"score_spread":0.220371036138473,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4205834436","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0041919653,0.0056106537,0.98656803,0.0001377488,0.00045984166,0.000054680408,0.0000021205658,0.00003406824,0.002940912],"genre_scores_gemma":[0.9959304,0.002224922,0.00048364676,0.000019294655,0.00015020564,0.000010355836,0.0000072166094,0.000016314889,0.0011576954],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9988999,0.000041411335,0.00025838616,0.00008010017,0.00009774911,0.00062247744],"domain_scores_gemma":[0.99954945,0.00007070546,0.00007071484,0.00012285233,0.0001668969,0.00001935558],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00090434507,0.00007586233,0.00011709628,0.000030099829,0.00010618347,0.000026832688,0.00010935932,0.00004450536,0.0000043104806],"category_scores_gemma":[0.00018023551,0.000057145266,0.00007924827,0.0001527461,0.0000149996695,0.000106614236,0.0000104455285,0.00027209043,3.7815957e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005101229,0.000048238246,0.00012390724,0.00017536673,0.00025994965,0.0000020002963,0.00073483464,0.10483967,0.045161087,0.7349777,0.0014142381,0.112211965],"study_design_scores_gemma":[0.0011106358,0.00024465172,0.00007904472,0.00044688123,0.00010257135,0.0007298126,0.008240409,0.20198533,0.16493659,0.5474977,0.0742343,0.0003920623],"about_ca_topic_score_codex":0.000072464165,"about_ca_topic_score_gemma":0.0021286628,"teacher_disagreement_score":0.9917384,"about_ca_system_score_codex":0.0003239614,"about_ca_system_score_gemma":0.0003857984,"threshold_uncertainty_score":0.23303163},"labels":[],"label_agreement":null},{"id":"W4210528826","doi":"10.1002/9780470496251.ch1","title":"Introduction","year":2009,"lang":"en","type":"other","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kinectrics (Canada); Université du Québec à Chicoutimi","funders":"","keywords":"Computer science","score_opus":0.0024333326182212345,"score_gpt":0.16569480558247102,"score_spread":0.16326147296424978,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210528826","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[2.0462467e-7,0.0007474969,0.009551825,0.00012946341,0.0016349321,0.00007399845,0.000002284497,0.0015209845,0.9863388],"genre_scores_gemma":[0.0001188731,0.00015600858,0.00048428355,0.000023098673,0.0016131056,0.000003508132,0.000006041092,0.00013657057,0.9974585],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997233,0.0000031929076,0.000058961803,0.0000885219,0.000040114875,0.0000858946],"domain_scores_gemma":[0.9997759,0.0000012783927,0.000008057752,0.00019306847,0.000003173399,0.00001852571],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000026289363,0.00008369192,0.00010404057,0.00004822966,0.00000276232,0.0000055041583,0.00004990337,0.00011480334,0.0040296316],"category_scores_gemma":[0.0000037713398,0.00007278088,0.000024037226,0.000036537043,0.00000605159,0.0000098835335,0.000002639061,0.00006385515,0.0011486722],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[1.1841046e-7,0.0000017718938,1.4427218e-7,0.00005246631,0.0000073841497,4.1846891e-7,0.0000025785273,0.00003674229,0.000011617014,0.00083200855,0.99592924,0.0031255065],"study_design_scores_gemma":[0.000022278244,0.000003742076,0.000003119326,0.000026735166,0.000002701677,0.0000024515093,0.000001489014,0.00009952911,0.000040600014,0.000045931887,0.9996654,0.00008602409],"about_ca_topic_score_codex":0.00001372856,"about_ca_topic_score_gemma":0.00004064484,"teacher_disagreement_score":0.0111197,"about_ca_system_score_codex":0.000022491382,"about_ca_system_score_gemma":0.0000022508964,"threshold_uncertainty_score":0.999629},"labels":[],"label_agreement":null},{"id":"W4223893641","doi":"10.1061/(asce)ey.1943-7897.0000836","title":"Rapidity Prediction of Power Infrastructure Forced Outages: Data-Driven Approach for Resilience Planning","year":2022,"lang":"en","type":"article","venue":"Journal of Energy Engineering","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University; Bayer (Canada)","funders":"","keywords":"Resilience (materials science); Critical infrastructure; Computer science; Identification (biology); Reliability engineering; Key (lock); Rapidity; Risk analysis (engineering); Engineering; Business; Computer security","score_opus":0.013394851771907378,"score_gpt":0.20839397577985108,"score_spread":0.1949991240079437,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4223893641","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04375686,0.00075952354,0.95352185,0.000008366587,0.0013937185,0.00008365018,0.00016310741,0.000061488936,0.00025146327],"genre_scores_gemma":[0.98616123,0.00002498316,0.0135747725,0.0000064868286,0.00014133408,0.000013684462,0.000031046566,0.000028032267,0.000018434584],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988393,0.000021172504,0.00052465993,0.00013563187,0.000270238,0.00020900196],"domain_scores_gemma":[0.9992751,0.000084765205,0.00017712264,0.0003166538,0.00007769852,0.00006869086],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048754772,0.00013555743,0.00030810537,0.00017100212,0.000058044967,0.000012111094,0.000504223,0.00005586273,0.000008225527],"category_scores_gemma":[0.00013114768,0.0001315038,0.0000980092,0.00017980947,0.000015178609,0.00029161706,0.000109615365,0.00027221243,2.9375025e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028446817,0.0000129608525,0.0001526758,0.00015023196,0.00007595434,0.000003633454,0.0001843604,0.98760647,0.00950139,0.00027566447,0.0018626571,0.0001455698],"study_design_scores_gemma":[0.0004455492,0.00016371997,0.00066046976,0.00007429251,0.000027288303,0.000107534106,0.00033558917,0.97474676,0.0014504126,0.000030043393,0.021835687,0.00012263702],"about_ca_topic_score_codex":0.0000024429396,"about_ca_topic_score_gemma":1.6600522e-7,"teacher_disagreement_score":0.9424044,"about_ca_system_score_codex":0.00013112092,"about_ca_system_score_gemma":0.000039911323,"threshold_uncertainty_score":0.5362569},"labels":[],"label_agreement":null},{"id":"W4224980557","doi":"10.1016/j.epsr.2022.107890","title":"Development of a simple reliability model for reliability evaluation of redundant customer delivery systems","year":2022,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Simple (philosophy); Computer science; Set (abstract data type); Component (thermodynamics); Network model; Engineering; Power (physics); Data mining","score_opus":0.07064322349355238,"score_gpt":0.3305926871047083,"score_spread":0.2599494636111559,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4224980557","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93286616,0.0054591,0.05043184,0.00002104836,0.001377325,0.0066538854,0.00022296039,0.00018080678,0.0027868608],"genre_scores_gemma":[0.9954207,0.000025839361,0.00043765013,0.0000016465872,0.000027183325,0.0036531675,0.000031070766,0.00006211754,0.0003406045],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99168384,0.0014381733,0.0018148245,0.0006855316,0.003364614,0.0010129993],"domain_scores_gemma":[0.99458206,0.0007269265,0.00026719156,0.0012320776,0.0030213206,0.00017041076],"candidate_categories":["metaresearch","metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.03157713,0.00028369666,0.0008122443,0.0006471207,0.0004015018,0.000037431495,0.0007699035,0.00016529884,0.000029699586],"category_scores_gemma":[0.0012166176,0.00028110386,0.00019358909,0.0016737941,0.00010652945,0.00018049547,0.00023555383,0.00062922854,0.000009634271],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002497191,0.00034867873,0.00017297559,0.0031910099,0.00013329873,9.3546373e-7,0.0029784844,0.9602252,0.022040758,0.0008091991,0.008996222,0.0008534804],"study_design_scores_gemma":[0.00078955217,0.00019168846,0.00014735897,0.000105166895,0.00003148069,0.000009390106,0.0011884035,0.9754427,0.0029303173,0.00020358677,0.018686844,0.00027349574],"about_ca_topic_score_codex":0.00037157154,"about_ca_topic_score_gemma":0.00001648298,"teacher_disagreement_score":0.062554546,"about_ca_system_score_codex":0.0030989095,"about_ca_system_score_gemma":0.0018054075,"threshold_uncertainty_score":0.9999641},"labels":[],"label_agreement":null},{"id":"W4230011546","doi":"10.1109/ias.2004.1348776","title":"System reliability worth assessment using the customer survey approach","year":2004,"lang":"en","type":"article","venue":"Conference Record of the 2004 IEEE Industry Applications Conference, 2004. 39th IAS Annual Meeting.","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Backup; Reliability (semiconductor); Customer satisfaction; Work (physics); Business; Customer service; Service (business); Operations management; Computer science; Marketing; Power (physics); Engineering","score_opus":0.032365752665542244,"score_gpt":0.26733038401996295,"score_spread":0.2349646313544207,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4230011546","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6749136,0.00034334091,0.25067854,0.000541676,0.0024892252,0.00534193,0.000943939,0.0007869599,0.063960835],"genre_scores_gemma":[0.9947239,0.000026362628,0.0038620078,0.000033435685,0.0001735086,0.0006099909,0.000025258332,0.00006191167,0.00048363442],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99594337,0.0004145992,0.0013577016,0.0007837488,0.00067111227,0.000829443],"domain_scores_gemma":[0.995457,0.00024374266,0.000607958,0.002169947,0.0012660341,0.000255309],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0022590472,0.00060276437,0.00079352333,0.00013474813,0.00053220463,0.00015545035,0.001943046,0.0007397046,0.000045769666],"category_scores_gemma":[0.00016734423,0.0004239397,0.00025329672,0.0013253388,0.00063155714,0.00029959748,0.00016117263,0.0017996908,0.000034549554],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002995703,0.0022888908,0.0809863,0.005060252,0.0010798569,0.000009122844,0.0045826193,0.7622729,0.0070573958,0.0971034,0.008803003,0.030456698],"study_design_scores_gemma":[0.011866285,0.00088597345,0.29069108,0.014874653,0.0023414576,0.00071847026,0.063538685,0.36076188,0.033670094,0.01203389,0.19532317,0.013294361],"about_ca_topic_score_codex":0.0014342252,"about_ca_topic_score_gemma":0.00036960276,"teacher_disagreement_score":0.401511,"about_ca_system_score_codex":0.00081369455,"about_ca_system_score_gemma":0.0012518116,"threshold_uncertainty_score":0.99982125},"labels":[],"label_agreement":null},{"id":"W4231486697","doi":"10.1002/9781118849972.ch1","title":"Introduction","year":2014,"lang":"en","type":"other","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Risk assessment; Computer science; Reliability engineering; Probabilistic risk assessment; Risk analysis (engineering); Probabilistic logic; Electric power system; Risk management; Power (physics); Engineering; Artificial intelligence; Business","score_opus":0.0021804967248311917,"score_gpt":0.1595103519801496,"score_spread":0.1573298552553184,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4231486697","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[2.5013426e-7,0.000285382,0.04960129,0.000075915574,0.0028644672,0.000062286425,0.0000019327822,0.0013061323,0.94580233],"genre_scores_gemma":[0.00032245836,0.000060390314,0.0003498729,0.00001707926,0.0022641707,0.000007317099,0.0000059368263,0.00020918365,0.9967636],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.999726,0.0000048518273,0.000059849077,0.00008934733,0.000038462138,0.00008149229],"domain_scores_gemma":[0.99974704,0.0000025331733,0.000009336775,0.00021882981,0.0000033887964,0.000018865372],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00004132256,0.000080668564,0.0001104249,0.000042713564,0.0000027866126,0.000005137087,0.00005261918,0.00011313481,0.0060201404],"category_scores_gemma":[0.0000065653667,0.000068710695,0.000023092554,0.000026184109,0.000008649711,0.0000068074633,0.0000047924445,0.000058513513,0.00312701],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[8.791242e-8,8.9055925e-7,4.1472046e-7,0.00013182657,0.000009415512,1.10301414e-7,0.0000019323254,0.000043807304,0.0000109702005,0.0013650247,0.9976893,0.000746226],"study_design_scores_gemma":[0.000022746626,0.0000024803364,0.0000014030352,0.000026413445,0.0000027773779,0.0000016505725,0.0000011209703,0.0003660989,0.000033498363,0.000024198464,0.9994336,0.00008401017],"about_ca_topic_score_codex":0.000016363007,"about_ca_topic_score_gemma":0.0000464939,"teacher_disagreement_score":0.050961245,"about_ca_system_score_codex":0.000016540771,"about_ca_system_score_gemma":0.0000016567332,"threshold_uncertainty_score":0.9976492},"labels":[],"label_agreement":null},{"id":"W4232642629","doi":"10.1109/pesw.2002.984936","title":"Capacity expansion of small isolated power systems using PV and wind energy","year":2003,"lang":"en","type":"article","venue":"2002 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.02CH37309)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Renewable energy; Wind power; Reliability engineering; Offset (computer science); Electric power system; Intermittent energy source; Reliability (semiconductor); Photovoltaics; Photovoltaic system; Computer science; Energy source; Environmental science; Distributed generation; Power (physics); Engineering; Electrical engineering","score_opus":0.013403139775878434,"score_gpt":0.18224303460679664,"score_spread":0.1688398948309182,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4232642629","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90253603,0.00043257172,0.08910585,0.00002372713,0.002679648,0.00047482274,0.000033746644,0.0006827885,0.004030786],"genre_scores_gemma":[0.98473597,0.00020192086,0.014413135,0.000046432087,0.000084985055,0.000036512185,0.0000030701854,0.00016414345,0.00031380853],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99648523,0.000034532655,0.0010856363,0.0008265821,0.00045566427,0.0011123793],"domain_scores_gemma":[0.99799114,0.0001105482,0.00029154425,0.00040681683,0.00083897053,0.00036096136],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008371564,0.00083779654,0.0009902667,0.00017408858,0.00013630804,0.00022421998,0.0004649539,0.00057074724,0.00005342723],"category_scores_gemma":[0.00024423897,0.00087238004,0.00033953987,0.0004838506,0.00019410938,0.00050188636,0.000092192284,0.00046964767,0.000017066555],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038227456,0.000103336,0.0010103068,0.00271748,0.0004544288,0.000005708652,0.010149738,0.01909034,0.9622103,0.001626838,0.0025472955,0.000045992438],"study_design_scores_gemma":[0.0008619512,0.00020723284,0.0001933066,0.002807837,0.000099913275,0.0001358934,0.0017425665,0.95170444,0.0363965,0.00003069449,0.0045144656,0.00130521],"about_ca_topic_score_codex":0.00012772452,"about_ca_topic_score_gemma":0.0000029289956,"teacher_disagreement_score":0.9326141,"about_ca_system_score_codex":0.0003311606,"about_ca_system_score_gemma":0.00008770493,"threshold_uncertainty_score":0.9993727},"labels":[],"label_agreement":null},{"id":"W4233520516","doi":"10.11159/eecss17","title":"Proceedings of the 3rd World Congress on Electrical Engineering and Computer Systems and Science","year":2017,"lang":"en","type":"paratext","venue":"Proceedings of the World Congress on Electrical Engineering and Computer Systems and Science","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Engineering ethics; Engineering; Engineering physics; Systems engineering","score_opus":0.007446390013814997,"score_gpt":0.20558159755461022,"score_spread":0.19813520754079522,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4233520516","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89796567,0.020943373,0.0012551536,0.00051083,0.062469255,0.0060300436,0.00010834572,0.000688233,0.010029092],"genre_scores_gemma":[0.99460137,0.0003698952,0.00015643754,0.000027352795,0.0006599675,0.000079927944,3.6884433e-7,0.00006360941,0.0040410957],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99579626,0.0000110983465,0.0008553413,0.0011549317,0.0011360605,0.0010463346],"domain_scores_gemma":[0.99783146,0.00026768012,0.0005187929,0.00039698745,0.0005882425,0.0003968456],"candidate_categories":["metaepi_narrow","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.0013970501,0.00075987715,0.0012655086,0.00097454066,0.0005950569,0.0013417556,0.0017840156,0.00021800576,6.2104783e-7],"category_scores_gemma":[0.00016128946,0.0005129014,0.000118919306,0.0018626101,0.001118895,0.0005136955,0.0006889738,0.001094661,0.0000017187915],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005607425,0.00074070424,0.011378808,0.06381106,0.0015481382,0.00002774156,0.0023744302,0.21060395,0.08071891,0.43141654,0.1746798,0.02213918],"study_design_scores_gemma":[0.00048899767,0.00026978174,0.002301702,0.006804083,0.000054459913,0.00015717758,0.000009649278,0.9677539,0.0031407813,0.000008596772,0.018302727,0.0007081641],"about_ca_topic_score_codex":0.00004652028,"about_ca_topic_score_gemma":0.0000019199188,"teacher_disagreement_score":0.75714993,"about_ca_system_score_codex":0.00021942059,"about_ca_system_score_gemma":0.00011258465,"threshold_uncertainty_score":0.99973226},"labels":[],"label_agreement":null},{"id":"W4237602079","doi":"10.1049/ip-gtd:20030068","title":"Reliability evaluation of small stand-alone wind energy conversion systems using a time series simulation model","year":2003,"lang":"en","type":"article","venue":"IEE Proceedings - Generation Transmission and Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":72,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Reliability (semiconductor); Turbine; Reliability engineering; Wind speed; Small wind turbine; Margin (machine learning); Battery (electricity); Series (stratigraphy); Electric power system; Environmental science; Electricity; Automotive engineering; Computer science; Power (physics); Marine engineering; Simulation; Engineering; Meteorology; Electrical engineering; Aerospace engineering","score_opus":0.02865673324261425,"score_gpt":0.23443546976698987,"score_spread":0.20577873652437562,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4237602079","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47386715,0.0007753205,0.5245154,0.000012577277,0.00014570887,0.00032029668,0.000049523376,0.00008030856,0.00023373344],"genre_scores_gemma":[0.9986739,0.00013519167,0.00091879006,0.00000438857,0.000036380956,0.000016378799,0.00013791908,0.000016455426,0.000060552327],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985407,0.000066608336,0.00050415966,0.0002955269,0.0004006202,0.00019238588],"domain_scores_gemma":[0.9988462,0.000018823714,0.00012186431,0.0001009923,0.0007988404,0.00011328706],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011796915,0.00019663069,0.00025643862,0.00006179461,0.00016215193,0.0000649474,0.000047436642,0.0001979369,0.000015594724],"category_scores_gemma":[0.000109180924,0.00018803356,0.000055049826,0.00020815832,0.00005189052,0.00051198836,0.000005655144,0.000077855286,9.576567e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042031235,0.000033820324,0.000050385057,0.00035601942,0.000010647826,7.165185e-8,0.00019215081,0.8022803,0.19495007,0.0013763359,0.0001413931,0.00056677766],"study_design_scores_gemma":[0.0006866347,0.000044605,0.000056011773,0.00013000176,0.00008015017,0.000005972305,0.00007679358,0.9140007,0.082683235,0.00036306848,0.0016906986,0.00018216863],"about_ca_topic_score_codex":0.000016463988,"about_ca_topic_score_gemma":6.5008913e-7,"teacher_disagreement_score":0.5248068,"about_ca_system_score_codex":0.00027116,"about_ca_system_score_gemma":0.00009433531,"threshold_uncertainty_score":0.7667786},"labels":[],"label_agreement":null},{"id":"W4237619818","doi":"10.1109/icps.2004.1314989","title":"Impact of manual versus automatic transfer switching on the reliability levels of an industrial plant","year":2004,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Reliability (semiconductor); Circuit breaker; Duration (music); Reliability engineering; Transfer (computing); Maximum power transfer theorem; Computer science; Power (physics); Point (geometry); Failure rate; State (computer science); Engineering; Electric power system; Automotive engineering; Electrical engineering; Mathematics","score_opus":0.039341390733394724,"score_gpt":0.26538452916159866,"score_spread":0.22604313842820395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4237619818","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9938302,0.0000059425633,0.003565838,0.0000494024,0.00039217828,0.00029867108,0.000095528565,0.000107904816,0.001654312],"genre_scores_gemma":[0.9998284,0.0000012844134,0.000108532506,0.0000047624703,0.000032308733,0.0000065095965,0.0000018172922,0.0000119107835,0.0000044717817],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99903697,0.000055499706,0.0003869135,0.00012958139,0.0001961578,0.00019487948],"domain_scores_gemma":[0.99924386,0.00023328353,0.000025160456,0.0004136509,0.000027505883,0.0000565718],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005707841,0.00013800808,0.00026162562,0.000039262082,0.000024521989,0.000008044446,0.0002017605,0.00010665271,0.00009138454],"category_scores_gemma":[0.0001289287,0.00008118609,0.00013946272,0.00011379382,0.000041046416,0.000112720365,0.000009669349,0.00020202392,0.000005356165],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016123032,0.0010588326,0.0011227936,0.0009043619,0.00072400295,0.0000142325125,0.0105345,0.90356314,0.03906536,0.025710408,0.00040734585,0.01528272],"study_design_scores_gemma":[0.033050686,0.013556503,0.24395722,0.003170133,0.00038401256,0.000063857886,0.004095954,0.22406557,0.46510354,0.009606277,0.00037789124,0.0025683572],"about_ca_topic_score_codex":0.00044420542,"about_ca_topic_score_gemma":0.00007509662,"teacher_disagreement_score":0.67949754,"about_ca_system_score_codex":0.00015725155,"about_ca_system_score_gemma":0.000069736336,"threshold_uncertainty_score":0.33106726},"labels":[],"label_agreement":null},{"id":"W4239606557","doi":"10.1109/pes.2004.1372917","title":"Status and future directions of power system harmonic analysis","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Harmonic analysis; Harmonic; Power (physics); Computer science; Electronic engineering; Electrical engineering; Physics; Engineering; Acoustics","score_opus":0.0036767974575966813,"score_gpt":0.18914912488034177,"score_spread":0.18547232742274508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4239606557","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9307158,0.018091293,0.044586036,0.000100831596,0.0037419607,0.0003284076,0.00009134063,0.0012083318,0.0011359896],"genre_scores_gemma":[0.9928522,0.00087719876,0.0058322246,0.000020602905,0.00022297511,0.000035525587,0.0000073492647,0.00006885229,0.000083039275],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99818605,0.000022487515,0.000514131,0.00036952208,0.0002744956,0.000633338],"domain_scores_gemma":[0.999118,0.0000363362,0.00008922035,0.00043027644,0.00010821796,0.00021799435],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003584296,0.00036061154,0.0005585462,0.0001459775,0.00008672947,0.00004295001,0.00016670137,0.00023042684,0.000012742759],"category_scores_gemma":[0.000019614086,0.00036673204,0.00047295718,0.0009270585,0.00005133494,0.0001422171,0.000028076396,0.00029796432,0.000006964633],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005951073,0.00005075968,0.00074278377,0.00064982363,0.0017842571,0.0000059938925,0.004347086,0.9639757,0.0256385,0.0011366607,0.0015426157,0.00011982554],"study_design_scores_gemma":[0.0075875875,0.0006579408,0.048700705,0.0028304895,0.004193772,0.0002082767,0.008875078,0.39206523,0.13065976,0.00014947294,0.39694402,0.007127675],"about_ca_topic_score_codex":0.00018193675,"about_ca_topic_score_gemma":0.000021315742,"teacher_disagreement_score":0.5719105,"about_ca_system_score_codex":0.00042397506,"about_ca_system_score_gemma":0.000039591494,"threshold_uncertainty_score":0.99987847},"labels":[],"label_agreement":null},{"id":"W4242408575","doi":"10.1002/9781119547273.app7","title":"Appendix G: Special Case","year":2019,"lang":"en","type":"other","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Circuit breaker; Session (web analytics); Electrical engineering; Generator (circuit theory); Switchgear; Computer science; Telecommunications; Operations research; Library science; Power (physics); Engineering; Physics; World Wide Web","score_opus":0.005721105333156493,"score_gpt":0.19287663269633085,"score_spread":0.18715552736317437,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4242408575","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000002691798,0.00037614116,0.0024703594,0.000007489956,0.0050987396,0.00025064405,0.000046019097,0.0007419147,0.991006],"genre_scores_gemma":[0.0004811577,0.000048232978,0.00019313049,0.00001907783,0.0020879768,0.000006893767,0.000010400479,0.000320249,0.9968329],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994944,0.000006617344,0.00010696191,0.00014604138,0.00006858931,0.00017742625],"domain_scores_gemma":[0.99957335,0.000009276597,0.00001679307,0.0003538108,0.000004172326,0.000042569936],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000041882533,0.0001609878,0.00022105749,0.00006873908,0.0000057821317,0.000012929824,0.000098989236,0.00021509375,0.015491592],"category_scores_gemma":[0.0000041812805,0.00013983938,0.00006037725,0.000039320883,0.000013088433,0.000014593694,0.000018405399,0.00011900693,0.027920898],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[3.6810252e-7,0.0000029313248,0.0000014107262,0.0002728176,0.000025016929,0.00030366448,0.00001580291,0.000022740498,0.0000012968012,0.0014684147,0.99710655,0.0007789814],"study_design_scores_gemma":[0.00008753789,0.00000458887,2.2992887e-7,0.00008701254,0.000006271812,0.00035733744,0.000020173224,0.00018189359,0.000008905696,0.0000125863,0.9990498,0.0001837051],"about_ca_topic_score_codex":0.00017508084,"about_ca_topic_score_gemma":0.00070259435,"teacher_disagreement_score":0.012429306,"about_ca_system_score_codex":0.00003702104,"about_ca_system_score_gemma":0.000008971707,"threshold_uncertainty_score":0.98540837},"labels":[],"label_agreement":null},{"id":"W4242887701","doi":"10.1002/awwa.1334","title":"Issue Information","year":2019,"lang":"en","type":"paratext","venue":"American Water Works Association","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Citation; Computer science; Information retrieval; World Wide Web; Library science","score_opus":0.0020322802863355256,"score_gpt":0.1843303201796519,"score_spread":0.18229803989331636,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4242887701","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008397219,0.0012602534,0.04354654,0.002166137,0.08073205,0.0021768028,0.0005140151,0.0012164849,0.8599905],"genre_scores_gemma":[0.5850847,0.0021234704,0.00023054589,0.0011344178,0.0015834614,0.00018953298,0.0040137796,0.00014355878,0.40549654],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99851286,0.00006215435,0.00045222134,0.00016540328,0.00031787957,0.0004894661],"domain_scores_gemma":[0.9991744,0.000062912455,0.00025212998,0.00032609154,0.00012975132,0.000054688397],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0003002695,0.00027826065,0.00050980475,0.00014511394,0.000042115036,0.00017705429,0.00020649846,0.0003409288,0.00074713555],"category_scores_gemma":[0.000034001027,0.00023276077,0.0001239994,0.00020575873,0.000021506394,0.00057568145,0.000038884,0.0004645961,0.11529506],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000043659506,0.000005507191,0.00007025503,0.00019102336,0.00012283861,1.4194764e-7,0.00083601696,0.015800515,0.000037291513,0.0000018965069,0.96997386,0.012956266],"study_design_scores_gemma":[0.00013326903,0.00002524842,0.0000744974,0.00017121418,0.000021792688,4.3025398e-7,0.00013604457,0.0022152753,0.00039896643,0.000005668634,0.99647886,0.00033876617],"about_ca_topic_score_codex":0.00019965216,"about_ca_topic_score_gemma":0.0000098085,"teacher_disagreement_score":0.57668746,"about_ca_system_score_codex":0.0012008352,"about_ca_system_score_gemma":0.000023999448,"threshold_uncertainty_score":0.9491709},"labels":[],"label_agreement":null},{"id":"W4243437427","doi":"10.1109/icps.2004.1314988","title":"Impact of circuit breaker failure modes on the reliability of the gold book standard network","year":2004,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Circuit breaker; Reliability (semiconductor); Reliability engineering; Power (physics); Failure mode and effects analysis; Engineering; Point (geometry); Computer science; Failure rate; Electrical engineering; Power network; Electric power system; Electronic engineering; Mathematics; Physics","score_opus":0.007054004821819028,"score_gpt":0.20023577470853082,"score_spread":0.1931817698867118,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4243437427","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94464064,0.0003122365,0.013944516,0.0011630298,0.00032446912,0.0008255408,0.00009618804,0.00015765858,0.0385357],"genre_scores_gemma":[0.99959874,0.000016559594,0.000062556006,0.00009608529,0.000034441746,0.000012231486,5.25586e-7,0.000015650781,0.0001632277],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99901325,0.000049234866,0.00031716368,0.0001392259,0.00023338177,0.0002477669],"domain_scores_gemma":[0.9988313,0.00014137017,0.00005976638,0.0008178922,0.000110266636,0.000039438757],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004713365,0.00014803397,0.00025595273,0.000012438694,0.000034133045,0.000009605527,0.00031178645,0.00008375436,0.000095357565],"category_scores_gemma":[0.00010560554,0.00006857867,0.0002399508,0.00022760528,0.00011333328,0.000074929536,0.000038224392,0.00018628026,0.000007266481],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032023778,0.00003453195,0.0018775009,0.00011629287,0.00006320201,2.718192e-7,0.00035289404,0.9576642,0.000997742,0.020585945,0.018169863,0.000105539984],"study_design_scores_gemma":[0.009557665,0.0033690836,0.38583377,0.008084456,0.0004896378,0.0000951637,0.002285624,0.04726764,0.13766026,0.2881006,0.11338919,0.0038668928],"about_ca_topic_score_codex":0.00025560366,"about_ca_topic_score_gemma":0.0001379806,"teacher_disagreement_score":0.9103966,"about_ca_system_score_codex":0.00021039987,"about_ca_system_score_gemma":0.000078887235,"threshold_uncertainty_score":0.27965572},"labels":[],"label_agreement":null},{"id":"W4243870676","doi":"10.1109/28.903149","title":"Deregulated transmission system reliability planning criteria based on historical equipment performance data","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Planner; Rule of thumb; Reliability engineering; Reliability (semiconductor); Electric power system; Contingency; Computer science; Electric power industry; Business system planning; Probabilistic logic; Operations research; Transmission system; Engineering; Risk analysis (engineering); Transmission (telecommunications); Systems engineering; Electricity; Power (physics); Artificial intelligence; Telecommunications","score_opus":0.037194640841177476,"score_gpt":0.2655199125863425,"score_spread":0.22832527174516504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4243870676","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015815368,0.00005048488,0.97695017,0.00044347096,0.00059173774,0.0007873068,0.00011519878,0.00094694033,0.004299353],"genre_scores_gemma":[0.99752116,0.000020418722,0.0012391262,0.000054800454,0.00007056843,0.00066275237,0.000041422238,0.00004256733,0.0003471988],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981861,0.00006362182,0.00051616493,0.0005612146,0.0003020263,0.00037084313],"domain_scores_gemma":[0.9979711,0.00012082318,0.00005273112,0.0015707659,0.00006475693,0.00021981081],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003555063,0.0002761127,0.00026472792,0.00014221156,0.00035942625,0.00003696953,0.0005291167,0.00045477675,0.00015111323],"category_scores_gemma":[0.000003303877,0.00027458285,0.00007326235,0.00052469043,0.000045953646,0.00021897326,0.0000023367666,0.0008940105,0.000076557946],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000115907584,0.00045399478,0.000067703244,0.0005270679,0.00003336229,0.00000570594,0.00010298122,0.9684296,0.0015169155,0.000024818359,0.0039061466,0.024815774],"study_design_scores_gemma":[0.0004679335,0.00009046237,0.00035642396,0.00049601245,0.000052228577,0.00002572847,0.00007211408,0.88561314,0.0040265378,0.000006337544,0.10844542,0.00034765463],"about_ca_topic_score_codex":0.000024986799,"about_ca_topic_score_gemma":0.0000015629313,"teacher_disagreement_score":0.9817058,"about_ca_system_score_codex":0.0011795559,"about_ca_system_score_gemma":0.000066278124,"threshold_uncertainty_score":0.9999706},"labels":[],"label_agreement":null},{"id":"W4243939837","doi":"10.1109/tdc.1991.169488","title":"Separable insulated connector loadbreak testing. II. Providing reliability assurances","year":2002,"lang":"en","type":"article","venue":"Proceedings of the 1991 IEEE Power Engineering Society Transmission and Distribution Conference","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Computer science; Confidence interval; Test (biology); Engineering; Mathematics; Statistics","score_opus":0.012019268571920523,"score_gpt":0.17963880014673156,"score_spread":0.16761953157481105,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4243939837","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9782109,0.0010831312,0.016497483,0.0006122334,0.00063664996,0.0005747483,0.00012939284,0.000731331,0.001524091],"genre_scores_gemma":[0.9986781,0.00022800617,0.0008667139,0.000018233744,0.00002171746,0.000029286744,0.0000052516943,0.000021811173,0.00013087667],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985654,0.000006539478,0.00044097062,0.00032735514,0.00027813623,0.00038163486],"domain_scores_gemma":[0.9991782,0.00009146167,0.00009673877,0.00014882477,0.00033216577,0.00015261525],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034930167,0.00028882298,0.00033751084,0.000019587738,0.00022208133,0.00006601959,0.00028918864,0.00018770059,0.000028605808],"category_scores_gemma":[0.0001941013,0.00022464409,0.00016859702,0.00046161097,0.00012636652,0.0003139617,0.000038182956,0.00033778945,0.0000019007075],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006415007,0.00045880233,0.004734098,0.0077066906,0.00028342995,0.0000010982274,0.007497974,0.030579148,0.907511,0.004611932,0.031045599,0.0055061006],"study_design_scores_gemma":[0.0008350393,0.000114797556,0.004145991,0.0013639795,0.00006261481,0.00002383522,0.00021472001,0.8736848,0.082143635,0.00022832744,0.036553737,0.0006284767],"about_ca_topic_score_codex":0.000018710765,"about_ca_topic_score_gemma":1.6824593e-7,"teacher_disagreement_score":0.8431057,"about_ca_system_score_codex":0.000097773656,"about_ca_system_score_gemma":0.0000149209,"threshold_uncertainty_score":0.916072},"labels":[],"label_agreement":null},{"id":"W4246247914","doi":"10.1109/60.969477","title":"Reliability/cost implications of PV and wind energy utilization in small isolated power systems","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Conversion","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":240,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Reliability engineering; Renewable energy; Reliability (semiconductor); Electric power system; Energy source; Electricity generation; Environmental science; Photovoltaics; Computer science; Photovoltaic system; Environmental economics; Engineering; Automotive engineering; Power (physics); Electrical engineering","score_opus":0.013210439430668021,"score_gpt":0.20113500425808098,"score_spread":0.18792456482741296,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4246247914","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14165345,0.00025077528,0.8556591,0.00006963398,0.00076700974,0.00015694583,0.000023429204,0.0001437634,0.0012758651],"genre_scores_gemma":[0.99843276,0.0011015557,0.00003599151,0.000033119337,0.0000067175697,0.000034550954,0.000008159144,0.000024054076,0.00032311116],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99896544,0.00007040866,0.0003856006,0.0002694089,0.000089359615,0.00021978504],"domain_scores_gemma":[0.99931383,0.00009906708,0.000052118165,0.00035059822,0.000097725235,0.00008666386],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013578575,0.00016992819,0.00023667945,0.0002463349,0.000064994296,0.00001437676,0.00010728027,0.00018372617,0.000033227796],"category_scores_gemma":[0.000005259162,0.00017608174,0.000060855382,0.0004722119,0.00006089937,0.00016201087,0.0000016322243,0.00011489606,0.0000035746107],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019744218,0.00033785726,0.0004965317,0.00023020955,0.0000650414,0.000006698978,0.00042061807,0.96785986,0.020429814,0.0022484604,0.00022289675,0.007484591],"study_design_scores_gemma":[0.003327974,0.0005661322,0.0059235916,0.00082580064,0.000105689316,0.00012015536,0.0006964386,0.85316736,0.056264978,0.00045251736,0.07745888,0.0010905075],"about_ca_topic_score_codex":0.0008843391,"about_ca_topic_score_gemma":0.00038759483,"teacher_disagreement_score":0.8567793,"about_ca_system_score_codex":0.00016319576,"about_ca_system_score_gemma":0.000024285317,"threshold_uncertainty_score":0.7180405},"labels":[],"label_agreement":null},{"id":"W4246432733","doi":"10.1109/repcon.1990.68525","title":"Rural power quality","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Power (physics); Quality (philosophy); Computer science; Reliability engineering; Electrical engineering; Database; Engineering","score_opus":0.014087003965421525,"score_gpt":0.21322215228621152,"score_spread":0.19913514832079,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4246432733","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19161828,0.0005279883,0.010686142,0.00026229935,0.0009099286,0.00009106403,0.0000036799902,0.0008246685,0.79507595],"genre_scores_gemma":[0.9949492,0.000018896024,0.00015878356,0.00008751485,0.000017701675,0.0000044034637,2.9758522e-7,0.0000068178983,0.004756359],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99959815,0.000010595414,0.00012580969,0.000053883497,0.00006564222,0.0001459023],"domain_scores_gemma":[0.9997383,0.000018894856,0.0000055603987,0.00018286666,0.000012150882,0.000042260275],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00009208671,0.00005801524,0.00008237334,0.000012125781,0.000013941658,0.000010685407,0.00006930204,0.000033380067,0.0017718716],"category_scores_gemma":[0.000018062266,0.000047946287,0.00003706884,0.000051104427,0.000013595625,0.000069614325,0.000008579646,0.00005145296,0.0009729662],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011205621,0.00022414683,0.007920863,0.00052234955,0.00015265975,0.000021016886,0.004173817,0.0036308498,0.013255691,0.14572604,0.8032531,0.02110823],"study_design_scores_gemma":[0.0009104196,0.00006794885,0.025774188,0.000079475634,0.000008457457,0.000032908232,0.00093313993,0.03620693,0.0051838965,0.0016096308,0.9282168,0.0009761886],"about_ca_topic_score_codex":0.000016735768,"about_ca_topic_score_gemma":0.000009132813,"teacher_disagreement_score":0.80333096,"about_ca_system_score_codex":0.000024057977,"about_ca_system_score_gemma":6.412426e-7,"threshold_uncertainty_score":0.9998049},"labels":[],"label_agreement":null},{"id":"W4246666722","doi":"10.1109/28.845068","title":"Development of transmission system reliability performance benchmarks","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Electricity market; Electricity; Transmission system; Electric utility; Transmission (telecommunications); Competition (biology); Risk analysis (engineering); Computer science; Electric power industry; Service (business); Engineering; Business; Telecommunications; Marketing","score_opus":0.008011220972866776,"score_gpt":0.20291269820058597,"score_spread":0.1949014772277192,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4246666722","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30301428,0.0000314209,0.6788094,0.000034987166,0.00014381437,0.00064504903,0.000041652947,0.0003455137,0.016933873],"genre_scores_gemma":[0.9936392,0.00003689789,0.0050850576,0.0000067523233,0.000020349606,0.00075399573,0.000007039904,0.00001946181,0.00043125422],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99880016,0.000021224268,0.0005293442,0.0002416434,0.00018560201,0.00022200192],"domain_scores_gemma":[0.99926525,0.0000387611,0.00003474306,0.0004892418,0.00005277007,0.00011923275],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020313612,0.0001715347,0.00020054438,0.00007012616,0.00021182204,0.000009232696,0.00020712274,0.00032635973,0.00056122005],"category_scores_gemma":[4.2219617e-7,0.00016987814,0.00007417241,0.0003715448,0.0000620402,0.000118116106,3.8690516e-7,0.0005292073,0.000096476026],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038988856,0.0003241701,0.000021782462,0.0011399775,0.00005585327,3.6619838e-7,0.00081751077,0.44034615,0.0040533696,0.00010451526,0.00024054539,0.55285674],"study_design_scores_gemma":[0.0009832253,0.00010042966,0.0015440149,0.0010971408,0.00010506036,0.0000407632,0.00079972687,0.10972335,0.41045192,0.000030430294,0.47415698,0.0009669494],"about_ca_topic_score_codex":0.000005945748,"about_ca_topic_score_gemma":0.0000026656037,"teacher_disagreement_score":0.6906249,"about_ca_system_score_codex":0.00019868504,"about_ca_system_score_gemma":0.00007039535,"threshold_uncertainty_score":0.69274294},"labels":[],"label_agreement":null},{"id":"W4247981495","doi":"10.1109/59.962402","title":"Bibliography on the application of probability methods in power system reliability evaluation 1996-1999","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":168,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Probabilistic logic; Reliability (semiconductor); Reliability engineering; Electric power system; Activity-based costing; Computer science; Bibliography; Power (physics); Engineering; Library science; Artificial intelligence","score_opus":0.022472755493910503,"score_gpt":0.28326492865065267,"score_spread":0.2607921731567422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4247981495","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.073832214,0.0003830159,0.9101333,0.0001053201,0.0029377025,0.0034767936,0.000055680197,0.00037739507,0.008698553],"genre_scores_gemma":[0.9976056,0.00009976269,0.0005417358,0.000018041272,0.000010986789,0.0016597752,0.000002550447,0.0000427274,0.000018789626],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9960447,0.0011397955,0.0011417392,0.00057300745,0.0006951451,0.00040560187],"domain_scores_gemma":[0.9971797,0.0006835435,0.0001865834,0.0015353111,0.0003147618,0.00010012686],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0061203884,0.00034544384,0.0005464436,0.00211064,0.00011791912,0.000047201338,0.00039312913,0.0002656719,0.000031764677],"category_scores_gemma":[0.000043549462,0.00026339525,0.0002930624,0.0065620835,0.0001263184,0.0002092711,0.0000021049855,0.0004574944,0.000044686007],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030612497,0.0009928399,0.001974864,0.0015670727,0.00021404213,0.0000029681803,0.0012874898,0.9806383,0.0057118786,0.0032861098,0.0014995689,0.0025187035],"study_design_scores_gemma":[0.003108952,0.0011117555,0.019327471,0.002727198,0.00029972923,0.00010806662,0.004010136,0.9092693,0.023854677,0.0013108229,0.033021398,0.0018505099],"about_ca_topic_score_codex":0.00077711896,"about_ca_topic_score_gemma":0.00012727377,"teacher_disagreement_score":0.9237734,"about_ca_system_score_codex":0.0003759013,"about_ca_system_score_gemma":0.000040516763,"threshold_uncertainty_score":0.9999818},"labels":[],"label_agreement":null},{"id":"W4248908001","doi":"10.1088/1755-1315/645/1/011001","title":"Preface","year":2021,"lang":"en","type":"article","venue":"IOP Conference Series Earth and Environmental Science","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Library science; Energy (signal processing); Engineering; Political science; Computer science","score_opus":0.0073418338843581725,"score_gpt":0.17337564838196295,"score_spread":0.1660338144976048,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4248908001","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98450613,0.0004936945,0.00037034813,0.00009836034,0.00026023222,0.00005870297,0.00001692443,0.000068094196,0.014127498],"genre_scores_gemma":[0.99762774,0.000634175,0.00047846994,0.00004212869,0.0000125887545,0.0000050965405,0.000003189846,0.0000046079517,0.0011920197],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992182,0.000009174491,0.00009899938,0.0002313353,0.00017095529,0.00027131912],"domain_scores_gemma":[0.99964136,0.000007707992,0.000010475789,0.00019072989,0.000007456115,0.00014225983],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001034801,0.00009532612,0.00009483878,0.000017013237,0.0001309331,0.00008630131,0.00012109464,0.000028655697,0.00021368076],"category_scores_gemma":[0.000015754147,0.000090153604,0.000015429086,0.000111155015,0.0006021103,0.00047182752,0.000087998305,0.000072546325,0.000047690184],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000057994102,0.000020748408,0.0010048405,0.000052997435,0.000005982439,0.000024147206,0.00081068935,0.0004315687,0.9742616,0.0027737399,0.00006422275,0.020543711],"study_design_scores_gemma":[0.00018089206,0.00005831894,0.06312256,0.000043705684,0.0000048050288,0.00016004141,0.001633128,0.0026701707,0.8724919,0.0003005111,0.05901719,0.00031680168],"about_ca_topic_score_codex":0.000005675064,"about_ca_topic_score_gemma":0.000031572254,"teacher_disagreement_score":0.101769686,"about_ca_system_score_codex":0.000021967422,"about_ca_system_score_gemma":0.000035346628,"threshold_uncertainty_score":0.36763573},"labels":[],"label_agreement":null},{"id":"W4250112698","doi":"10.32920/ryerson.14655681","title":"Probabilistic power transmission system reliability evaluation","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Probabilistic logic; Upgrade; Reliability engineering; Transmission system; Transmission (telecommunications); Reliability (semiconductor); Electric power system; Power transmission; Plan (archaeology); Business system planning; Computer science; Fault (geology); Asset (computer security); Engineering; Power (physics); Telecommunications; Systems engineering; Computer security","score_opus":0.013747496533170431,"score_gpt":0.23135250306179606,"score_spread":0.21760500652862563,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4250112698","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31131303,0.006242279,0.48004717,0.00030371954,0.012532799,0.006272211,0.000071412964,0.0044457302,0.17877164],"genre_scores_gemma":[0.99682295,0.00003743742,0.0021919217,0.000013013128,0.00006945543,0.00050238875,0.000101873564,0.000060440634,0.00020050649],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9969732,0.00030988618,0.0008164849,0.0008028178,0.00070855167,0.00038904822],"domain_scores_gemma":[0.99767447,0.00009641033,0.000081007944,0.0014060227,0.00057074806,0.00017132459],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0020404523,0.0004449034,0.0006511122,0.00007557125,0.000056371748,0.00013549914,0.0003546949,0.0006260644,0.0004155142],"category_scores_gemma":[0.0002182273,0.00039531145,0.0003097437,0.00016319232,0.00004849213,0.00011723512,0.00016198476,0.00070498075,0.00004987546],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028644397,0.0001797187,0.00008462809,0.02757362,0.0001833332,0.000025074778,0.0019330853,0.95483434,0.0010412349,0.0015206155,0.003874298,0.008721422],"study_design_scores_gemma":[0.00044337535,0.000033354285,0.0011119655,0.00352484,0.00021075616,0.000026867689,0.0007060418,0.98381585,0.0014083199,0.0009944147,0.0068377224,0.00088650896],"about_ca_topic_score_codex":0.000074780066,"about_ca_topic_score_gemma":0.00001556431,"teacher_disagreement_score":0.6855099,"about_ca_system_score_codex":0.00131925,"about_ca_system_score_gemma":0.000313677,"threshold_uncertainty_score":0.99984986},"labels":[],"label_agreement":null},{"id":"W4255251875","doi":"10.1109/59.962442","title":"Capacity expansion of small isolated power systems using PV and wind energy","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":87,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Renewable energy; Wind power; Reliability engineering; Electric power system; Offset (computer science); Intermittent energy source; Photovoltaic system; Reliability (semiconductor); Photovoltaics; Energy source; Electricity generation; Variable renewable energy; Environmental science; Engineering; Computer science; Distributed generation; Power (physics); Electrical engineering","score_opus":0.01745417003444114,"score_gpt":0.19615982023662756,"score_spread":0.17870565020218643,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4255251875","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30496883,0.0009790997,0.68781877,0.0000077048435,0.004588805,0.00031054733,0.00005761776,0.00022791135,0.0010406967],"genre_scores_gemma":[0.99927145,0.00013653847,0.00007475861,0.000011887223,0.000014605636,0.000027454107,0.0000013741225,0.000067005414,0.00039493624],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99795234,0.00014915464,0.0007646192,0.0003934496,0.0002867637,0.00045365852],"domain_scores_gemma":[0.9988389,0.000097068776,0.00012843721,0.0005833683,0.00016063052,0.00019159463],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00034030972,0.0003639521,0.0006118352,0.00026621576,0.00013332642,0.00006939049,0.00017737717,0.00031704613,0.00002130311],"category_scores_gemma":[0.00000492904,0.00034884067,0.0001407643,0.00038858192,0.00009375665,0.00023492394,0.000002056916,0.00025955573,0.000011960873],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016132214,0.00021063104,0.00012711073,0.0009828935,0.0003990475,0.000045717974,0.0020496906,0.9251889,0.06996557,0.00046227156,0.00023775068,0.00016907846],"study_design_scores_gemma":[0.0021997693,0.00075422134,0.0002528011,0.003317233,0.00020888835,0.0015330707,0.0021903366,0.9481852,0.01679273,0.000024748759,0.022938231,0.0016027789],"about_ca_topic_score_codex":0.0016419912,"about_ca_topic_score_gemma":0.00007470751,"teacher_disagreement_score":0.6943026,"about_ca_system_score_codex":0.00019646557,"about_ca_system_score_gemma":0.000035255143,"threshold_uncertainty_score":0.99989635},"labels":[],"label_agreement":null},{"id":"W4255543907","doi":"10.1002/9781118849972.index","title":"Index","year":2014,"lang":"en","type":"paratext","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Index (typography); China; Library science; Geography; Computer science; World Wide Web; Archaeology","score_opus":0.005106069747378903,"score_gpt":0.19555487421076143,"score_spread":0.19044880446338253,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4255543907","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000017627892,0.00087737327,0.11691768,0.000019502495,0.007269432,0.00009922124,0.000014048611,0.00020528548,0.87457985],"genre_scores_gemma":[0.12941997,0.00027634433,0.00008544083,0.00012423824,0.00054069166,0.000031969634,0.000038245915,0.0000571431,0.86942595],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.999358,0.000011990134,0.0001799937,0.00014699643,0.000090435286,0.0002125877],"domain_scores_gemma":[0.9995284,0.000024724892,0.000016819164,0.0003522108,0.000021968386,0.00005587311],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00008408816,0.00017903431,0.0002784399,0.00004760733,0.00001244853,0.00002198736,0.00018856459,0.00029733052,0.004443445],"category_scores_gemma":[0.000008064272,0.00015244674,0.00007272329,0.000051836505,0.000016945114,0.000024736979,0.000021984915,0.00023898335,0.055961777],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[4.630726e-7,0.0000016859792,0.0000013349146,0.000377117,0.000017781062,3.8995825e-7,0.000008648194,0.0036497917,0.0000075461267,0.0001590101,0.9951598,0.0006164172],"study_design_scores_gemma":[0.00005474518,0.000005501252,0.000007982857,0.00009267237,0.0000031002373,0.0000027100025,0.0000027095648,0.0048809815,0.00008662262,0.000030145942,0.9946361,0.00019673722],"about_ca_topic_score_codex":0.000026237209,"about_ca_topic_score_gemma":0.000017317567,"teacher_disagreement_score":0.12940234,"about_ca_system_score_codex":0.000053864027,"about_ca_system_score_gemma":0.00001416999,"threshold_uncertainty_score":0.99646664},"labels":[],"label_agreement":null},{"id":"W4255598268","doi":"10.1002/9781118849972.furread","title":"Further Reading","year":2014,"lang":"en","type":"other","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Reliability (semiconductor); Citation; Reading (process); Computer science; Test (biology); Library science; Power (physics); Physics; Political science; Law","score_opus":0.0036698714460633767,"score_gpt":0.17661540677341858,"score_spread":0.1729455353273552,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4255598268","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[9.3655757e-7,0.00040791946,0.02472789,0.00001764787,0.0011583292,0.000089860456,0.0000041476146,0.0015195851,0.9720737],"genre_scores_gemma":[0.00368096,0.00006724619,0.00051685557,0.00004613153,0.00029857803,0.000010786708,0.0000031599868,0.00042669298,0.9949496],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99958354,0.00000766745,0.00008906676,0.00011197489,0.000057253983,0.00015051007],"domain_scores_gemma":[0.9996478,0.000009907436,0.000014961719,0.0002871835,0.0000038088215,0.000036345362],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000064500586,0.00013266549,0.00018191557,0.000057862428,0.000003919673,0.000009199736,0.00010563508,0.00017644162,0.004246905],"category_scores_gemma":[0.000007083698,0.00011010356,0.000042317544,0.000032957803,0.000011990076,0.000008531579,0.000010187854,0.00008297306,0.0030788046],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[1.2670334e-7,0.0000011203101,0.0000037062202,0.00018518636,0.000020057223,7.946775e-7,0.00001596072,0.000022176875,0.000027333343,0.0009173044,0.998166,0.0006401979],"study_design_scores_gemma":[0.000039491177,0.0000026812031,0.0000030791068,0.00018267678,0.0000042698957,0.0000018590471,0.0000053213516,0.0005243965,0.00002664067,0.00003366346,0.9990287,0.00014721499],"about_ca_topic_score_codex":0.00004276481,"about_ca_topic_score_gemma":0.00007437582,"teacher_disagreement_score":0.024211034,"about_ca_system_score_codex":0.00002117918,"about_ca_system_score_gemma":0.0000028640363,"threshold_uncertainty_score":0.9976974},"labels":[],"label_agreement":null},{"id":"W4280555159","doi":"10.36227/techrxiv.19738768.v1","title":"Bayesian Analysis of Power Outages in Reliability and Resilience Domains","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact","funders":"","keywords":"Reliability (semiconductor); Resilience (materials science); Reliability engineering; Computer science; Rare events; Bayesian probability; Bayesian network; Outage probability; Grid; Power grid; Power (physics); Work (physics); Node (physics); Psychological resilience; Econometrics; Statistics; Engineering; Mathematics; Telecommunications; Psychology; Artificial intelligence","score_opus":0.005320981373897756,"score_gpt":0.22962893449367583,"score_spread":0.22430795311977808,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4280555159","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9353748,0.0009867833,0.03526818,0.00014063221,0.0006452664,0.00057079986,0.00021120124,0.0002192989,0.026583025],"genre_scores_gemma":[0.997942,0.00022373786,0.0014588049,0.000017493496,0.0000049126247,0.000066356064,0.000016470058,0.00001704722,0.0002532022],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9981325,0.00012198316,0.00066838507,0.00055195007,0.00026103327,0.0002641218],"domain_scores_gemma":[0.9985893,0.00017914732,0.00008812798,0.0010284648,0.000040542527,0.000074455565],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010354578,0.00024178329,0.0008074421,0.0004819136,0.000024732813,0.000020309975,0.00036402096,0.00019485471,0.00042336778],"category_scores_gemma":[0.00017426623,0.00023334374,0.0002062678,0.0007416733,0.00011642097,0.000059638198,0.0005636203,0.00054845784,9.4493186e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021537986,0.00007902104,0.10354355,0.001047606,0.0004056442,0.000014517838,0.00189279,0.891088,0.00013531838,0.0011798338,0.00027245446,0.00031970558],"study_design_scores_gemma":[0.0004942121,0.00009064863,0.660564,0.00029188563,0.0006638575,0.000002963024,0.0021237005,0.3221229,0.00032970303,0.0044651395,0.0076634097,0.0011876088],"about_ca_topic_score_codex":0.00068998587,"about_ca_topic_score_gemma":0.0010335156,"teacher_disagreement_score":0.56896514,"about_ca_system_score_codex":0.0002123829,"about_ca_system_score_gemma":0.00004149645,"threshold_uncertainty_score":0.95154816},"labels":[],"label_agreement":null},{"id":"W4283312561","doi":"10.36227/techrxiv.19738768.v2","title":"Bayesian Analysis of Power Outages in Reliability and Resilience Domains","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact","funders":"","keywords":"Reliability (semiconductor); Resilience (materials science); Reliability engineering; Computer science; Bayesian probability; Power (physics); Outage probability; Rare events; Bayesian network; Grid; Power grid; Work (physics); Econometrics; Statistics; Engineering; Mathematics; Telecommunications; Artificial intelligence","score_opus":0.005320981373897756,"score_gpt":0.22962893449367583,"score_spread":0.22430795311977808,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283312561","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9353748,0.0009867833,0.03526818,0.00014063221,0.0006452664,0.00057079986,0.00021120124,0.0002192989,0.026583025],"genre_scores_gemma":[0.997942,0.00022373786,0.0014588049,0.000017493496,0.0000049126247,0.000066356064,0.000016470058,0.00001704722,0.0002532022],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9981325,0.00012198316,0.00066838507,0.00055195007,0.00026103327,0.0002641218],"domain_scores_gemma":[0.9985893,0.00017914732,0.00008812798,0.0010284648,0.000040542527,0.000074455565],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010354578,0.00024178329,0.0008074421,0.0004819136,0.000024732813,0.000020309975,0.00036402096,0.00019485471,0.00042336778],"category_scores_gemma":[0.00017426623,0.00023334374,0.0002062678,0.0007416733,0.00011642097,0.000059638198,0.0005636203,0.00054845784,9.4493186e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021537986,0.00007902104,0.10354355,0.001047606,0.0004056442,0.000014517838,0.00189279,0.891088,0.00013531838,0.0011798338,0.00027245446,0.00031970558],"study_design_scores_gemma":[0.0004942121,0.00009064863,0.660564,0.00029188563,0.0006638575,0.000002963024,0.0021237005,0.3221229,0.00032970303,0.0044651395,0.0076634097,0.0011876088],"about_ca_topic_score_codex":0.00068998587,"about_ca_topic_score_gemma":0.0010335156,"teacher_disagreement_score":0.56896514,"about_ca_system_score_codex":0.0002123829,"about_ca_system_score_gemma":0.00004149645,"threshold_uncertainty_score":0.95154816},"labels":[],"label_agreement":null},{"id":"W4283808560","doi":"10.1109/pmaps53380.2022.9810617","title":"A Scenario Based Reliability Assessment Methodology for Evaluating the Benefit of Power System Enhancements","year":2022,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Manitoba Hydro","funders":"","keywords":"Reliability engineering; Probabilistic logic; Reliability (semiconductor); Electric power system; Computer science; Risk analysis (engineering); Stakeholder; Scrutiny; Transformer; Power (physics); Engineering; Business; Economics","score_opus":0.059305491180914556,"score_gpt":0.3399026259062919,"score_spread":0.28059713472537734,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283808560","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2278074,0.00014346246,0.76015365,0.00029726131,0.0019342751,0.0018717892,0.0000847059,0.00022958174,0.007477858],"genre_scores_gemma":[0.9582889,6.697022e-7,0.040288888,0.000079414924,0.000012319129,0.0010476403,0.000007774237,0.000019990805,0.0002543985],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981699,0.00037900434,0.00054819713,0.00026169774,0.00034646437,0.00029472902],"domain_scores_gemma":[0.99805856,0.0010503859,0.00011102065,0.00059949805,0.00014418253,0.00003636674],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0062260656,0.00014011125,0.00033004026,0.000043923537,0.00019214509,0.000010450061,0.00033881312,0.000041928775,0.00022747497],"category_scores_gemma":[0.0002011331,0.00010319604,0.00014872356,0.00017359544,0.000038054925,0.000042839783,0.000104439074,0.00017358093,0.0000018689831],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024878382,0.00022109425,0.0015125214,0.0025327087,0.00021245086,0.0000012212877,0.0011217442,0.9142495,0.035410274,0.039561365,0.0017799728,0.003148389],"study_design_scores_gemma":[0.0012371032,0.0009837465,0.0018728232,0.0000883088,0.00007467565,0.000006304257,0.002600147,0.97639453,0.0076654195,0.0008606246,0.007933688,0.00028262753],"about_ca_topic_score_codex":0.00008340633,"about_ca_topic_score_gemma":0.000015363066,"teacher_disagreement_score":0.7304815,"about_ca_system_score_codex":0.00051521073,"about_ca_system_score_gemma":0.00009258151,"threshold_uncertainty_score":0.42082125},"labels":[],"label_agreement":null},{"id":"W4285092140","doi":"10.3390/en15145073","title":"A Framework for Reliability Assessment in Expansion Planning of Power Distribution Systems","year":2022,"lang":"en","type":"article","venue":"Energies","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"Agência Nacional de Energia Elétrica; Conselho Nacional de Desenvolvimento Científico e Tecnológico; Coordenação de Aperfeiçoamento de Pessoal de Nível Superior","keywords":"Reliability (semiconductor); Reliability engineering; Automation; Interconnection; Estimation; Process (computing); Engineering; Power (physics); Computer science; Systems engineering","score_opus":0.011564352451776384,"score_gpt":0.2621501556489787,"score_spread":0.2505858031972023,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285092140","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87205577,0.00079453486,0.124806084,0.000041827112,0.0014473437,0.00030283802,0.00014246693,0.000114426286,0.00029473798],"genre_scores_gemma":[0.9983122,0.000007927294,0.0011843921,0.000004315304,0.000017935005,0.00039834145,0.000039421735,0.000011698714,0.000023777373],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991525,0.00006108889,0.00030384693,0.0001456449,0.0001594069,0.00017751029],"domain_scores_gemma":[0.99945134,0.00021056198,0.000048435028,0.00023852588,0.000030401394,0.000020710766],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000569586,0.00008721627,0.000205105,0.000039213155,0.00005641999,0.000009934266,0.0001148246,0.00004896942,0.000009287296],"category_scores_gemma":[0.00010088718,0.000087663764,0.00005327047,0.000154555,0.00001957335,0.00006588456,0.000051520557,0.00017096697,2.6697438e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020231493,0.00003651855,0.0020301708,0.00024568636,0.000007030057,0.0000013540409,0.0005364423,0.97011954,0.00063710246,0.025546977,0.00076578115,0.000053195774],"study_design_scores_gemma":[0.0028890555,0.0011308332,0.10317245,0.0023802542,0.000056707257,0.000027732734,0.03492398,0.60642964,0.010394823,0.026368152,0.21051607,0.0017103357],"about_ca_topic_score_codex":0.000058643087,"about_ca_topic_score_gemma":0.0000022581544,"teacher_disagreement_score":0.3636899,"about_ca_system_score_codex":0.0002862808,"about_ca_system_score_gemma":0.000028406745,"threshold_uncertainty_score":0.35748246},"labels":[],"label_agreement":null},{"id":"W4285265494","doi":"10.1109/mias.2022.3161000","title":"Centralized Protection and Control System: Are We Ready for Deployment in the Chemical, Oil, and Gas Industry?","year":2022,"lang":"en","type":"article","venue":"IEEE Industry Applications Magazine","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"ABB (Canada)","funders":"ABB","keywords":"Software deployment; Engineering; IEC 61850; Control (management); Systems engineering; Reliability engineering; Computer security; Computer science; Automation; Software engineering","score_opus":0.024836751710607074,"score_gpt":0.24194863690557092,"score_spread":0.21711188519496386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285265494","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8685851,0.0028056735,0.07634577,0.033636972,0.0009078406,0.011652998,0.001741005,0.0012628793,0.0030617246],"genre_scores_gemma":[0.9874171,0.000043001346,0.000080243815,0.00009619066,0.00010887517,0.012047801,0.0000112195685,0.00002270232,0.00017287665],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.99897146,0.00007368454,0.00030649596,0.00025958195,0.00013890116,0.000249878],"domain_scores_gemma":[0.9994109,0.00008531606,0.00008267126,0.00031800286,0.000035769728,0.00006731357],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044610925,0.00015059121,0.00020470118,0.000056462217,0.00016687969,0.00004099481,0.00016792609,0.0002487216,0.0000067258134],"category_scores_gemma":[0.00001669844,0.00013310797,0.000024611341,0.0002719661,0.00005351889,0.0000632855,0.00002003872,0.00084709405,0.0000031815805],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015432009,0.0033161903,0.0136117125,0.020894667,0.0010613678,0.000087155015,0.005366117,0.1567552,0.42634177,0.028027015,0.17733327,0.16566235],"study_design_scores_gemma":[0.0062233997,0.00014536998,0.0013281008,0.00035268412,0.0001688052,0.00047065326,0.003372536,0.056835856,0.0032561754,0.0005718694,0.92653096,0.0007436077],"about_ca_topic_score_codex":0.00002323926,"about_ca_topic_score_gemma":0.0000088998995,"teacher_disagreement_score":0.74919766,"about_ca_system_score_codex":0.00019202866,"about_ca_system_score_gemma":0.000020465453,"threshold_uncertainty_score":0.5427985},"labels":[],"label_agreement":null},{"id":"W4293101252","doi":"10.3390/en15062275","title":"Expansion Planning of Power Distribution Systems Considering Reliability: A Comprehensive Review","year":2022,"lang":"en","type":"review","venue":"Energies","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Context (archaeology); Quality (philosophy); Plan (archaeology); Computer science; Resource (disambiguation); Power (physics); Operations research; Engineering","score_opus":0.04489174026248697,"score_gpt":0.2869035798265288,"score_spread":0.24201183956404185,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293101252","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000043677097,0.9950805,0.00027090256,0.0000046626315,0.0022231038,0.00090555573,0.0003089807,0.0003450824,0.0008175903],"genre_scores_gemma":[0.00045693197,0.9985099,0.000040266335,0.000010119088,0.000044097644,0.00044020417,0.0003657901,0.00006949356,0.0000632022],"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","domain_scores_codex":[0.9973034,0.00032087477,0.0012664836,0.00040780564,0.0003562109,0.00034519512],"domain_scores_gemma":[0.99804384,0.0006058275,0.00035911854,0.00083244446,0.00008807998,0.00007068023],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00048878946,0.00048753785,0.0025435784,0.00009458662,0.00008218939,0.000024625278,0.00032756847,0.00020014418,0.00006760088],"category_scores_gemma":[0.00024929646,0.00042699222,0.0005030452,0.00038750313,0.00008350231,0.00011116603,0.0001867428,0.00047187688,0.000009417367],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004344754,0.000037348567,0.0000015757067,0.8460824,0.00030956353,0.000055817014,0.0001797357,0.059654858,0.0000056173067,0.00091784063,0.023877127,0.06887378],"study_design_scores_gemma":[0.00005172557,0.000028710763,6.5409654e-7,0.10706695,0.00023011654,0.00007211522,0.00013378313,0.000096958596,0.0000022302295,0.000005062095,0.89197284,0.00033884967],"about_ca_topic_score_codex":0.0000353736,"about_ca_topic_score_gemma":3.3550754e-7,"teacher_disagreement_score":0.8680957,"about_ca_system_score_codex":0.00037824048,"about_ca_system_score_gemma":0.00014254532,"threshold_uncertainty_score":0.9998182},"labels":[],"label_agreement":null},{"id":"W4308744807","doi":"10.1007/s40998-022-00566-6","title":"Reliability Assessment of Cyber-Physical Generation System","year":2022,"lang":"en","type":"article","venue":"Iranian Journal of Science and Technology Transactions of Electrical Engineering","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Cyber-physical system; Computer science; Probabilistic logic; Monte Carlo method; Vulnerability assessment; Electric power system; Nonlinear system; Component (thermodynamics); Vulnerability (computing); Wind power; Bayesian probability; Random variable; Power (physics); Engineering; Computer security; Artificial intelligence; Statistics; Mathematics","score_opus":0.004784235975320972,"score_gpt":0.2077376710888875,"score_spread":0.20295343511356653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4308744807","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.73857254,0.00022070942,0.26064318,0.00007178139,0.00029168834,0.0000799345,0.000004766146,0.000053765434,0.00006160783],"genre_scores_gemma":[0.9969015,0.000021505171,0.0030432502,0.0000011626879,0.000015685253,0.000008050585,8.688067e-8,0.000006846327,0.0000019037251],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988932,0.0000143325415,0.00041882932,0.0001151386,0.00037382863,0.00018468937],"domain_scores_gemma":[0.9993783,0.000045111683,0.00009678175,0.00015200714,0.00027009466,0.000057676058],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00079546013,0.00008506141,0.00028368266,0.00063465594,0.00011384366,0.000006419431,0.00027467313,0.000044711887,0.0000028225047],"category_scores_gemma":[0.00006364662,0.00008008746,0.000060475835,0.0017699809,0.00024407107,0.00019540921,0.000010768575,0.00042767465,6.7377734e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007281612,0.00010586636,0.00012709104,0.00015986475,0.00003409418,0.000006079863,0.00015523242,0.410777,0.5768082,0.005216307,0.000008109835,0.0065948544],"study_design_scores_gemma":[0.0003302856,0.0006814308,0.0006782475,0.0000513579,0.00004267646,0.0003551612,0.00027000965,0.9241217,0.07302655,0.00008314298,0.00023908926,0.000120355086],"about_ca_topic_score_codex":0.000002734392,"about_ca_topic_score_gemma":2.7005655e-7,"teacher_disagreement_score":0.51334465,"about_ca_system_score_codex":0.00026782553,"about_ca_system_score_gemma":0.00013407334,"threshold_uncertainty_score":0.3265872},"labels":[],"label_agreement":null},{"id":"W4311858744","doi":"10.3390/en15249292","title":"Financial Hazard Prediction Due to Power Outages Associated with Severe Weather-Related Natural Disaster Categories","year":2022,"lang":"en","type":"article","venue":"Energies","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Moncton","funders":"","keywords":"Revenue; Natural disaster; Electric power; Extreme weather; Natural hazard; Population; Business; Electricity; Finance; Environmental economics; Power (physics); Economics; Engineering; Climate change; Meteorology; Geography","score_opus":0.0030266350863254582,"score_gpt":0.16661082816138498,"score_spread":0.16358419307505953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4311858744","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99285585,0.0003811711,0.00031996102,0.00022055395,0.0024906406,0.00019149018,0.00014039628,0.0006452064,0.0027547537],"genre_scores_gemma":[0.9934283,0.0000036832728,0.00004925352,0.0000751497,0.00003917661,0.00012831448,0.00004800729,0.000035964622,0.006192188],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99892426,0.00005448787,0.00021414248,0.00022289845,0.00027856443,0.0003056773],"domain_scores_gemma":[0.99958915,0.00005806702,0.000036345224,0.00022140327,0.00005110016,0.000043941887],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018244667,0.00018680896,0.00022874416,0.00007058386,0.0001889081,0.000040779654,0.00017137217,0.000071820614,0.00010934309],"category_scores_gemma":[0.00009571408,0.00016049528,0.00005815136,0.00029325427,0.000038420978,0.00017012283,0.000088836125,0.00030226784,0.000015476768],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014887638,0.00008521094,0.0030116905,0.00006723803,0.00024759647,0.00010943793,0.01808716,0.93916863,0.0016378752,0.004476787,0.032290917,0.0006685977],"study_design_scores_gemma":[0.007945458,0.003955591,0.35415557,0.0010735134,0.00038993976,0.0009674201,0.031893957,0.022157568,0.008962412,0.007448998,0.5552119,0.0058376538],"about_ca_topic_score_codex":0.00003454735,"about_ca_topic_score_gemma":0.00026409436,"teacher_disagreement_score":0.917011,"about_ca_system_score_codex":0.00023011523,"about_ca_system_score_gemma":0.000038324055,"threshold_uncertainty_score":0.65448076},"labels":[],"label_agreement":null},{"id":"W4312781026","doi":"10.1109/tpwrd.2022.3215964","title":"A Multi-Period Regulation Methodology for Reliability as Service Quality Considering Reward-Penalty Scheme","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université Laval","funders":"","keywords":"Reliability (semiconductor); Natural monopoly; Reliability engineering; Monopoly; Quality (philosophy); Service quality; Computer science; IT service continuity; Risk analysis (engineering); Investment (military); Service (business); Engineering; Economics; Business; Power (physics); Microeconomics","score_opus":0.0653077608912047,"score_gpt":0.2981039984125811,"score_spread":0.2327962375213764,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312781026","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2787985,0.00011415183,0.71627146,0.0004858558,0.0024843009,0.0008136554,0.0002554907,0.00053943315,0.00023713557],"genre_scores_gemma":[0.9622127,0.000017088132,0.03615882,0.00051841076,0.00001987447,0.0006727224,0.0000122545,0.0000585218,0.00032960283],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974967,0.00047748548,0.0006852824,0.00057350594,0.00030666133,0.0004603511],"domain_scores_gemma":[0.9981106,0.00066885137,0.000099879595,0.0007562908,0.00023261069,0.00013174793],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001853305,0.00029319213,0.00046538425,0.00016097471,0.0004978693,0.00003079341,0.00026758653,0.00015591683,0.00051336834],"category_scores_gemma":[0.0000865841,0.00033720242,0.0002821751,0.0003838723,0.0000688292,0.00025251202,0.0000076046035,0.0005368345,0.00005574198],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012061583,0.0006160778,0.00007523673,0.0009414137,0.0003434474,0.000013025788,0.0054963846,0.88111633,0.10652194,0.0003765863,0.0012101871,0.0020832089],"study_design_scores_gemma":[0.014541632,0.0021092303,0.0053429217,0.0004349253,0.0005230153,0.0007440325,0.013857322,0.57310337,0.19355206,0.0046628444,0.1860007,0.0051279315],"about_ca_topic_score_codex":0.0003321735,"about_ca_topic_score_gemma":0.00019169203,"teacher_disagreement_score":0.6834142,"about_ca_system_score_codex":0.0005428212,"about_ca_system_score_gemma":0.0001117229,"threshold_uncertainty_score":0.99990803},"labels":[],"label_agreement":null},{"id":"W4313159003","doi":"10.1016/j.ifacol.2022.09.660","title":"Multi-criteria prioritization of asset management investments in the power industry","year":2022,"lang":"en","type":"article","venue":"IFAC-PapersOnLine","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"","keywords":"Prioritization; Electric power industry; Investment (military); Business; Risk analysis (engineering); Asset (computer security); Asset management; Balance (ability); Resource allocation; Computer science; Finance; Process management; Engineering; Electricity","score_opus":0.01362258302023279,"score_gpt":0.24793824027038858,"score_spread":0.2343156572501558,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313159003","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99164546,0.00043306238,0.0010034085,0.0005460021,0.0009490485,0.00074953353,0.00019775624,0.00010850611,0.00436725],"genre_scores_gemma":[0.9828513,0.000025392921,0.016288714,0.00035454816,0.000020654254,0.00009620689,0.000056498982,0.000017665594,0.00028896867],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9990519,0.00009533186,0.0002714919,0.0001523881,0.00023713267,0.00019172592],"domain_scores_gemma":[0.9996146,0.000025177464,0.000039947805,0.00027679335,0.000015953392,0.000027530594],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039915115,0.00011475715,0.00014725962,0.00007933987,0.000048476475,0.000012611332,0.00026841083,0.00006379347,0.00013437326],"category_scores_gemma":[0.000019617324,0.00009885743,0.000040069088,0.00031244176,0.0000248197,0.00007798419,0.000078077785,0.00031055562,0.0000055312485],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00071735185,0.01389531,0.18380606,0.010773806,0.0023590706,0.0020174903,0.12324469,0.39317337,0.19143833,0.027856939,0.013224787,0.03749278],"study_design_scores_gemma":[0.010713201,0.00065642205,0.5946007,0.0007901457,0.000169309,0.00016285038,0.043844588,0.2119826,0.002266024,0.0006803546,0.13210148,0.0020323754],"about_ca_topic_score_codex":0.000025837295,"about_ca_topic_score_gemma":0.00001966315,"teacher_disagreement_score":0.41079462,"about_ca_system_score_codex":0.00011467608,"about_ca_system_score_gemma":0.00001111666,"threshold_uncertainty_score":0.40312892},"labels":[],"label_agreement":null},{"id":"W4320005515","doi":"10.1109/tpwrs.2023.3242450","title":"Reliability Assessment of Distribution Stations Considering Spare Transformer Sharing","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Spare part; Reliability engineering; Transformer; Probabilistic logic; Markov chain; Reliability (semiconductor); Distribution transformer; Engineering; Computer science; Markov process; Markov model; Mathematics; Statistics; Operations management; Electrical engineering; Voltage","score_opus":0.017153304476168797,"score_gpt":0.25683318032154173,"score_spread":0.23967987584537293,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4320005515","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09315962,0.00004585547,0.8993758,0.000043298194,0.0032959806,0.000611055,0.00078024046,0.000762012,0.0019261213],"genre_scores_gemma":[0.9992947,0.000059148606,0.00008976581,0.000004558612,0.00000780167,0.00022508629,0.000031617987,0.000037487094,0.00024984704],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982091,0.000055666384,0.0006916762,0.00032460777,0.00033900046,0.00037993593],"domain_scores_gemma":[0.9989987,0.00016541951,0.00006390994,0.000527964,0.0001326099,0.000111371664],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005723697,0.00022289829,0.00037210606,0.00015370872,0.0001406891,0.000043047625,0.00016871846,0.00012970397,0.00004483414],"category_scores_gemma":[0.00001076739,0.0002234164,0.00016965934,0.0005974417,0.00006668276,0.00025257719,9.957862e-7,0.0002703181,0.00005753113],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010491284,0.00008073799,0.00020048571,0.0008059231,0.00009903675,0.0000050693166,0.00065354625,0.9922202,0.0042918213,0.00073585083,0.0007508489,0.00014597287],"study_design_scores_gemma":[0.0020072248,0.0004268265,0.013286251,0.0019465995,0.00019399513,0.000061151,0.0044292407,0.91543525,0.031391095,0.00031916477,0.02906519,0.0014379784],"about_ca_topic_score_codex":0.00011424188,"about_ca_topic_score_gemma":0.00004785318,"teacher_disagreement_score":0.9061351,"about_ca_system_score_codex":0.00030774105,"about_ca_system_score_gemma":0.00005118856,"threshold_uncertainty_score":0.91106564},"labels":[],"label_agreement":null},{"id":"W4322208384","doi":"10.22215/jphm.v3i1.4154","title":"An Enhanced Joint Indicator for Starter Failure Diagnostics in Auxiliary Power Unit","year":2023,"lang":"en","type":"article","venue":"Journal of Prognostics and Health Management","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada; Life Prediction Technologies (Canada); Carleton University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Reliability engineering; Starter; Reliability (semiconductor); Performance indicator; Power (physics); Engineering; Computer science; Automotive engineering","score_opus":0.02651593665485657,"score_gpt":0.28916413190286755,"score_spread":0.262648195248011,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4322208384","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8013189,0.003685855,0.17369828,0.012462192,0.003508177,0.004250288,0.00012400975,0.00027593217,0.00067640864],"genre_scores_gemma":[0.99186975,0.0033397127,0.004321957,0.00029856013,0.00007496123,0.00004162582,0.000007167406,0.000022672542,0.000023622106],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.9986931,0.000029325636,0.00062405784,0.00012215659,0.00018170183,0.00034962787],"domain_scores_gemma":[0.99936634,0.000088624845,0.00014998254,0.00014061773,0.0000660262,0.00018841805],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012571493,0.00012197172,0.00029973232,0.0002971547,0.000051930132,0.000037786103,0.000121238314,0.000053311593,0.0000058332444],"category_scores_gemma":[0.000054936885,0.00010768978,0.00004413087,0.00019536387,0.000021650814,0.000108734384,0.00003209136,0.00018033205,0.0000052755045],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004975957,0.0026752804,0.07412146,0.045580678,0.0014750436,0.0012524151,0.02871436,0.051959917,0.00088353234,0.0742917,0.5061066,0.21244137],"study_design_scores_gemma":[0.0063609956,0.0047394955,0.61829937,0.0037864323,0.00013844403,0.00003826365,0.00859413,0.028334042,0.0004161457,0.011192318,0.31708947,0.0010109186],"about_ca_topic_score_codex":0.0000034939014,"about_ca_topic_score_gemma":0.00004115892,"teacher_disagreement_score":0.5441779,"about_ca_system_score_codex":0.00008238989,"about_ca_system_score_gemma":0.000042869975,"threshold_uncertainty_score":0.4391462},"labels":[],"label_agreement":null},{"id":"W4328007353","doi":"10.1109/tpwrs.2023.3259242","title":"A Comprehensive Reliability Strategy for Managing Assets of Redundant Customer Delivery Systems","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Computer science; Remedial action; Engineering; Power (physics)","score_opus":0.025254768440019254,"score_gpt":0.24941934848628244,"score_spread":0.2241645800462632,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4328007353","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.098889105,0.0009335638,0.87787026,0.000047051646,0.014457574,0.0026591502,0.00079211243,0.0014364922,0.0029147135],"genre_scores_gemma":[0.9982525,0.00014009207,0.000044901175,0.0000072669436,0.000021502643,0.00056926155,0.000010501728,0.00008147341,0.0008724923],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997487,0.00013990774,0.00092468224,0.00047418202,0.00039002547,0.00058420585],"domain_scores_gemma":[0.99816704,0.00042572196,0.00013129614,0.00077577424,0.00034856345,0.00015159213],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00060466793,0.00035565288,0.00070310617,0.0003688428,0.0001498973,0.00007521871,0.00029278803,0.00022241074,0.000009276325],"category_scores_gemma":[0.00000837009,0.00034567463,0.00029643532,0.0006487102,0.0000933211,0.00023338526,0.000002444351,0.0002741731,0.00016515142],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007523542,0.000075796765,0.000009477671,0.0032534855,0.00021008783,0.000010643742,0.00039018344,0.986977,0.003940212,0.00034646227,0.004523516,0.00018794193],"study_design_scores_gemma":[0.0025470161,0.00076750806,0.00044986603,0.0027772582,0.0002416364,0.00012620127,0.007361846,0.89143395,0.008586862,0.00012644763,0.08400458,0.0015768345],"about_ca_topic_score_codex":0.00032812322,"about_ca_topic_score_gemma":0.000014626626,"teacher_disagreement_score":0.8993634,"about_ca_system_score_codex":0.00025465825,"about_ca_system_score_gemma":0.00005877872,"threshold_uncertainty_score":0.9998995},"labels":[],"label_agreement":null},{"id":"W4361761737","doi":"10.1109/tpwrs.2023.3262421","title":"A Rapid Method for Impact Analysis of Grid-Edge Technologies on Power Distribution Networks","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"Institut de Valorisation des Données; Eaton Corporation","keywords":"Monte Carlo method; Probability density function; Grid; Computer science; Electric power system; Stochastic process; Mathematical optimization; Probability distribution; Enhanced Data Rates for GSM Evolution; Cumulative distribution function; Power grid; Power (physics); Mathematics; Telecommunications; Physics; Statistics","score_opus":0.013762920392573019,"score_gpt":0.26562247334792444,"score_spread":0.2518595529553514,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4361761737","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0076288357,0.00037451668,0.9832773,0.00006045426,0.004249045,0.00082292256,0.0018917347,0.0014629978,0.00023219215],"genre_scores_gemma":[0.9990943,0.00011548154,0.000107420725,0.0000059778567,0.0000109294315,0.0004034268,0.00007192641,0.000043549833,0.00014698414],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99814224,0.00009733264,0.00062238297,0.00038124403,0.0002532638,0.0005035524],"domain_scores_gemma":[0.9984339,0.0005008735,0.00011399674,0.0007379915,0.00013638602,0.00007685199],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00082660443,0.00031365207,0.0007378654,0.0006609564,0.00011535444,0.00004348727,0.00026809893,0.00032893923,0.000021067068],"category_scores_gemma":[0.000027106811,0.00026669554,0.0007058157,0.0024670118,0.000054146283,0.00011751397,0.0000018379403,0.0002766923,0.000028736227],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008865003,0.00007799659,0.000013126528,0.00014661546,0.001603374,0.000002665965,0.00022245858,0.9902373,0.0005899092,0.00021298452,0.00564121,0.0011636969],"study_design_scores_gemma":[0.000638968,0.0006397655,0.00056639593,0.00029630994,0.0006760397,0.000008547005,0.00096669357,0.97453916,0.005830379,0.000028434411,0.0153019745,0.00050731626],"about_ca_topic_score_codex":0.000073302734,"about_ca_topic_score_gemma":0.000026453876,"teacher_disagreement_score":0.99146545,"about_ca_system_score_codex":0.00029839508,"about_ca_system_score_gemma":0.000023295808,"threshold_uncertainty_score":0.99997854},"labels":[],"label_agreement":null},{"id":"W4362653183","doi":"10.2139/ssrn.4397958","title":"The Dark Side of Circuit Breakers","year":2023,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Quest University Canada","funders":"","keywords":"Circuit breaker; Physics; Electrical engineering; Engineering","score_opus":0.005661430677742853,"score_gpt":0.19542323415155052,"score_spread":0.18976180347380767,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4362653183","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8682967,0.020258278,0.042407606,0.0019035118,0.004833284,0.00053035276,0.000015844189,0.0009373622,0.06081708],"genre_scores_gemma":[0.99328613,0.0054363883,0.0000024118533,0.000008426048,0.00008395495,0.0000042328547,6.643954e-7,0.000018276593,0.0011595028],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9981018,0.00003355967,0.00024696332,0.00007102294,0.00017023733,0.0013764654],"domain_scores_gemma":[0.9995799,0.000104562016,0.00004718855,0.0001855691,0.00004072005,0.000042029762],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017381022,0.00008403725,0.00012051266,0.00004832233,0.00012005162,0.000021778129,0.000270185,0.000040883016,0.0000023782218],"category_scores_gemma":[0.00007950285,0.00005925878,0.00009449903,0.00026230005,0.000044438748,0.000068186244,0.000016175807,0.0007424796,0.000057676436],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000065446526,0.000040177656,0.0017830818,0.00020989981,0.0011979993,0.000026264523,0.0015101322,0.021883424,0.01475096,0.7403583,0.017910091,0.20026423],"study_design_scores_gemma":[0.000885526,0.00023650393,0.003600154,0.00014977448,0.00005050369,0.0008894591,0.0055542286,0.0029786297,0.001823204,0.90412146,0.07929621,0.00041436366],"about_ca_topic_score_codex":0.000017843407,"about_ca_topic_score_gemma":0.0003301551,"teacher_disagreement_score":0.19984987,"about_ca_system_score_codex":0.00033778214,"about_ca_system_score_gemma":0.00034411703,"threshold_uncertainty_score":0.32257456},"labels":[],"label_agreement":null},{"id":"W4368246870","doi":"10.1007/978-3-031-29962-9","title":"Intelligent Reliability and Maintainability of Energy Infrastructure Assets","year":2023,"lang":"en","type":"book","venue":"Studies in systems, decision and control","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Maintainability; Reliability (semiconductor); Reliability engineering; Computer science; Energy (signal processing); Engineering; Physics","score_opus":0.013200954154505956,"score_gpt":0.2629170103093821,"score_spread":0.24971605615487613,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4368246870","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.061896652,0.723799,0.09215483,0.0004206136,0.039573167,0.010876085,0.0021659909,0.0018464648,0.067267224],"genre_scores_gemma":[0.964711,0.01871029,0.00006142774,0.000030175672,0.00016520362,0.00021946487,0.000010893414,0.000077069584,0.01601448],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99691534,0.00019146965,0.0014522795,0.00064594415,0.00041350452,0.00038145497],"domain_scores_gemma":[0.996615,0.0019968087,0.00022565546,0.00070921204,0.00033595556,0.000117353426],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0018058437,0.0005005143,0.0018192845,0.00024496473,0.00006218885,0.000031514573,0.00023521842,0.00048496135,0.000004347694],"category_scores_gemma":[0.0011720093,0.00040466464,0.00013246774,0.00015605635,0.00045806743,0.00006690827,0.00024153903,0.00039798123,0.0000040492305],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021550464,0.00027981744,0.020765191,0.08286652,0.0053929207,0.0006145565,0.011002145,0.0623857,0.000098130826,0.07648886,0.45883948,0.27911162],"study_design_scores_gemma":[0.0046522343,0.0005463994,0.00969959,0.014034596,0.00034296865,0.000121050776,0.0063993707,0.01903655,0.000017781778,0.19936903,0.7436767,0.002103684],"about_ca_topic_score_codex":0.00004985866,"about_ca_topic_score_gemma":0.00015194001,"teacher_disagreement_score":0.9028143,"about_ca_system_score_codex":0.00061703555,"about_ca_system_score_gemma":0.00009148776,"threshold_uncertainty_score":0.9998405},"labels":[],"label_agreement":null},{"id":"W4368246949","doi":"10.1007/978-3-031-29962-9_1","title":"Advances in Intelligent Reliability and Maintainability of Energy Infrastructure Assets","year":2023,"lang":"en","type":"book-chapter","venue":"Studies in systems, decision and control","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Maintainability; Reliability (semiconductor); Point (geometry); Reliability engineering; Computer science; Engineering; Systems engineering; Risk analysis (engineering); Business","score_opus":0.012364831512259223,"score_gpt":0.2636354125186801,"score_spread":0.2512705810064209,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4368246949","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023997452,0.84973574,0.027287057,0.00021271549,0.014442892,0.0055310247,0.0006867393,0.00058648974,0.077519916],"genre_scores_gemma":[0.9243558,0.073530875,0.00004111351,0.00001442503,0.000058863006,0.00011419996,0.0000034876475,0.000044312128,0.0018369333],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9972344,0.00010170802,0.0014103486,0.00059516076,0.00033885497,0.00031953532],"domain_scores_gemma":[0.99749804,0.001479887,0.00020235823,0.0005230117,0.00021501852,0.00008166141],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0014656396,0.00044713513,0.0016147386,0.00028802498,0.000038208746,0.000019657815,0.00018413822,0.00037750188,0.0000045715487],"category_scores_gemma":[0.00074766146,0.00036656813,0.00009735248,0.000102898375,0.00037444299,0.000107732274,0.00017481521,0.00036425996,0.0000023015293],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017360412,0.00013367007,0.027847322,0.03471644,0.0010075117,0.00045910888,0.00549254,0.0726098,0.000036128124,0.29451355,0.005609908,0.555838],"study_design_scores_gemma":[0.004778925,0.0004790898,0.009678405,0.017814007,0.00014584111,0.000075564436,0.0060945996,0.013782983,0.000012759255,0.4362823,0.508942,0.0019135142],"about_ca_topic_score_codex":0.000053044718,"about_ca_topic_score_gemma":0.00061462785,"teacher_disagreement_score":0.9003583,"about_ca_system_score_codex":0.00035545783,"about_ca_system_score_gemma":0.000032861895,"threshold_uncertainty_score":0.99987864},"labels":[],"label_agreement":null},{"id":"W4378965596","doi":"10.18280/jesa.560218","title":"Condition Monitoring of Wind Turbines: A Case Study of the Gibara II Wind Farm","year":2023,"lang":"fr","type":"article","venue":"Journal Européen des Systèmes Automatisés","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Wind power; Meteorology; Environmental science; Marine engineering; Engineering; Geography; Electrical engineering","score_opus":0.022370206712142234,"score_gpt":0.26496021107432133,"score_spread":0.2425900043621791,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4378965596","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98621744,0.004278305,0.0002459532,0.00016271925,0.007633079,0.00077139674,0.00007591947,0.00016865393,0.00044651478],"genre_scores_gemma":[0.9966008,0.00028408674,0.00025844597,0.0000043081145,0.0004889652,0.0000075369203,9.397788e-7,0.00008225271,0.002272647],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99603814,0.0006937022,0.0016544663,0.00028274654,0.0007242978,0.00060666],"domain_scores_gemma":[0.99759007,0.00030092013,0.0008441405,0.0006492728,0.00042989396,0.00018569833],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0014182067,0.00039743015,0.00080959353,0.00030128343,0.0005326847,0.00010313489,0.00052772625,0.0001824627,0.000052113795],"category_scores_gemma":[0.0004421489,0.00031455024,0.0003412438,0.001299456,0.00025565,0.00039119358,0.00027126598,0.00067660044,0.000038854403],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010446051,0.0025850798,0.15922324,0.018095685,0.003478162,0.017801685,0.17455488,0.43135774,0.02244387,0.001163407,0.004488311,0.16470349],"study_design_scores_gemma":[0.002704126,0.0014569394,0.87930393,0.0099969525,0.00062910235,0.030295486,0.045123294,0.024734395,0.0024748244,0.0010618013,0.0015831544,0.0006359885],"about_ca_topic_score_codex":0.00096591306,"about_ca_topic_score_gemma":0.00011094165,"teacher_disagreement_score":0.7200807,"about_ca_system_score_codex":0.0004222578,"about_ca_system_score_gemma":0.00015153488,"threshold_uncertainty_score":0.9999307},"labels":[],"label_agreement":null},{"id":"W4382318486","doi":"10.1609/aaai.v37i13.26941","title":"Robust Training for AC-OPF (Student Abstract)","year":2023,"lang":"en","type":"article","venue":"Proceedings of the AAAI Conference on Artificial Intelligence","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Univariate; Artificial neural network; Power flow; Training (meteorology); Training set; Machine learning; Multivariate statistics; Test data; Electric power system; Artificial intelligence; Mathematical optimization; Power (physics); Mathematics","score_opus":0.16946928669712757,"score_gpt":0.30517435312790936,"score_spread":0.13570506643078178,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382318486","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9260998,0.00006982168,0.009575498,0.0028921142,0.0036506294,0.0020859868,0.000074972646,0.0011658949,0.054385297],"genre_scores_gemma":[0.99894327,0.000057400935,0.0003008287,0.000043456286,0.00011197014,0.00012826349,0.0000013835866,0.000029295355,0.00038415633],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9984187,0.000003522998,0.0005307621,0.00029720497,0.00030218874,0.00044760513],"domain_scores_gemma":[0.9991803,0.00013251015,0.00012736932,0.0001839161,0.00029840268,0.00007745707],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00065314316,0.00020808286,0.00028197217,0.00010331841,0.00012794942,0.00009971273,0.0007805742,0.00010418638,0.00004650045],"category_scores_gemma":[0.00035984296,0.0001645824,0.00015410822,0.00044729337,0.00013929662,0.00016111248,0.000083387364,0.00022404782,0.00013931892],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000177534,0.00017295273,0.00026091235,0.001247466,0.00013221231,0.0000015624444,0.0142153585,0.027158374,0.16068257,0.6902166,0.007189352,0.09854513],"study_design_scores_gemma":[0.00013053499,0.00029400855,0.0024430952,0.0015263244,0.00005663614,0.000006891934,0.014504885,0.2191856,0.6480647,0.10716773,0.0057353596,0.0008842529],"about_ca_topic_score_codex":0.000009626319,"about_ca_topic_score_gemma":0.000013723967,"teacher_disagreement_score":0.5830489,"about_ca_system_score_codex":0.000058769743,"about_ca_system_score_gemma":0.000038682567,"threshold_uncertainty_score":0.6711475},"labels":[],"label_agreement":null},{"id":"W4383163895","doi":"10.2139/ssrn.4500893","title":"A New Method to Assess Uncertainty in Electric Power Distribution Systems","year":2023,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Distribution (mathematics); Electric power; Power (physics); Computer science; Environmental science; Mathematics; Physics; Mathematical analysis; Thermodynamics","score_opus":0.017757892596886014,"score_gpt":0.2828008288400813,"score_spread":0.26504293624319525,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383163895","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014414007,0.0057265474,0.97392505,0.00042174783,0.0039003259,0.0008286258,0.000050079147,0.0004311757,0.00030241493],"genre_scores_gemma":[0.9945207,0.0024343752,0.00047122786,0.000019407526,0.00052399875,0.00012194295,0.000058231577,0.00012598142,0.0017240964],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99410325,0.0003564479,0.0009320065,0.0005528602,0.00050088955,0.0035545148],"domain_scores_gemma":[0.99866724,0.00016782827,0.00018587461,0.00053642364,0.00015003938,0.00029261285],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0057873023,0.00049802393,0.000805975,0.00042405387,0.00007484067,0.00022237471,0.00079053175,0.0005112545,0.0000073590454],"category_scores_gemma":[0.00025516935,0.00048711174,0.00027034685,0.00086141826,0.000007720294,0.00011881449,0.00019640227,0.006204896,0.00011210274],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005778072,0.000030851497,0.00016462166,0.00028401124,0.00035456495,0.000031255106,0.00022522609,0.9567486,0.00044449582,0.03087678,0.005496588,0.005285216],"study_design_scores_gemma":[0.0036706824,0.0012451735,0.0044583534,0.0059244297,0.00040813198,0.0026642904,0.0040382156,0.3717458,0.00047199542,0.51152694,0.088607594,0.0052384087],"about_ca_topic_score_codex":0.0016204248,"about_ca_topic_score_gemma":0.0018303958,"teacher_disagreement_score":0.9801067,"about_ca_system_score_codex":0.009818898,"about_ca_system_score_gemma":0.0036694526,"threshold_uncertainty_score":0.99975806},"labels":[],"label_agreement":null},{"id":"W4385770932","doi":"10.23977/jeeem.2023.060404","title":"Evaluation of Insulation Aging Maintenance Technology for High-voltage Equipment Based on the Internet of Things","year":2023,"lang":"en","type":"article","venue":"Journal of Electrotechnology Electrical Engineering and Management","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"High voltage; Electrical engineering; Reliability engineering; Internet of Things; Power grid; Voltage; Partial discharge; Power (physics); Power transmission; Engineering; Computer science; Telecommunications; Automotive engineering; Embedded system","score_opus":0.008486804391397876,"score_gpt":0.21436058205492695,"score_spread":0.20587377766352907,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385770932","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29836586,0.0007475736,0.69772124,0.0017575143,0.0002644785,0.0008126868,0.0000014402661,0.00021592448,0.00011330952],"genre_scores_gemma":[0.99810946,0.0002685167,0.0014774512,0.000021796199,0.00001217562,0.00007666997,8.563798e-7,0.000017390912,0.000015702732],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998769,0.000023158593,0.00048045142,0.00012234761,0.0003263142,0.0002787215],"domain_scores_gemma":[0.9992357,0.00015512528,0.00018272654,0.0001849963,0.00022033727,0.00002111269],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020352942,0.00013098257,0.00029511363,0.00084891566,0.000021748509,0.0000061197366,0.00023510138,0.000114968956,0.0000014860431],"category_scores_gemma":[0.00042184864,0.000099555946,0.00006617123,0.00087006064,0.000040096613,0.000052357085,0.000033176704,0.00029306387,4.7395753e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012046275,0.00011644785,0.000049646835,0.0009786161,0.00066707644,0.000012150856,0.00011022068,0.5064733,0.11108841,0.27530187,0.0011557892,0.10392602],"study_design_scores_gemma":[0.0007728498,0.0005917612,0.00028919222,0.00029060218,0.0001136761,0.0000098223145,0.000025172736,0.9306574,0.058155265,0.008131431,0.0008641554,0.00009867642],"about_ca_topic_score_codex":0.0000020820314,"about_ca_topic_score_gemma":2.4353145e-7,"teacher_disagreement_score":0.69974357,"about_ca_system_score_codex":0.00018133022,"about_ca_system_score_gemma":0.000020289166,"threshold_uncertainty_score":0.40597737},"labels":[],"label_agreement":null},{"id":"W4387491037","doi":"10.1109/sege59172.2023.10274544","title":"Fast Contingency Filtering Using Machine Learning for Power System Planning","year":2023,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Hydro-Québec","keywords":"Computer science; Reliability (semiconductor); Contingency; Electric power system; Computation; Power (physics); Term (time); Artificial intelligence; Reliability engineering; Real-time computing; Machine learning; Engineering; Algorithm","score_opus":0.02156401628946642,"score_gpt":0.2399412361212015,"score_spread":0.21837721983173508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387491037","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45079425,0.000567185,0.5253674,0.000023626348,0.0025059448,0.00056369737,0.000023086888,0.00445623,0.015698621],"genre_scores_gemma":[0.99702364,0.000004557076,0.0018833751,0.0000075568973,0.000079786354,0.00003769837,0.000011571928,0.00005498664,0.00089680083],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998929,0.000019203633,0.00029811455,0.00020223041,0.00010547677,0.00044596934],"domain_scores_gemma":[0.9995915,0.000100105455,0.000036876903,0.00016464609,0.00004083016,0.0000660258],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004033551,0.00016378096,0.00024166629,0.000111480316,0.0001428991,0.00005007147,0.00012627755,0.000072652576,0.000017762892],"category_scores_gemma":[0.0000690487,0.00015633581,0.00008858656,0.00022416632,0.00001174944,0.00012419667,0.00004817438,0.00013363866,0.000053314958],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023629294,0.00000853607,0.0054440373,0.0025556327,0.00012367412,0.00004297168,0.0021769968,0.9169037,0.06863907,0.0018617926,0.001382726,0.0008372295],"study_design_scores_gemma":[0.0002620249,0.000025514057,0.00026345262,0.00039696746,0.000010028953,0.00002092918,0.0013260227,0.982211,0.0024556883,0.000010481299,0.012787495,0.00023041696],"about_ca_topic_score_codex":0.000036388134,"about_ca_topic_score_gemma":0.0000055569153,"teacher_disagreement_score":0.5462294,"about_ca_system_score_codex":0.00009865763,"about_ca_system_score_gemma":0.000008058145,"threshold_uncertainty_score":0.6375189},"labels":[],"label_agreement":null},{"id":"W4388806758","doi":"10.20906/cba2022/3546","title":"Ferramenta Computacional para o Planejamento da Expansão de Redes de Distribuição Considerando Confiabilidade","year":2022,"lang":"pt","type":"article","venue":"Congresso Brasileiro de Automática","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Automation; Reliability (semiconductor); Reliability engineering; Software; Computer science; Plan (archaeology); Software quality; Process (computing); Work (physics); Engineering; Power (physics); Software development","score_opus":0.032641141337279383,"score_gpt":0.2801859977909132,"score_spread":0.2475448564536338,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388806758","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9463061,0.0060271025,0.031283956,0.0034010445,0.0034906797,0.0020726915,0.0035786987,0.0012551658,0.002584552],"genre_scores_gemma":[0.9953324,0.00013047055,0.0008281929,0.0012512597,0.00022900611,0.0005349237,0.00027914293,0.0001533915,0.0012611904],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99339026,0.0011310647,0.0012658006,0.00107802,0.00087741204,0.0022574272],"domain_scores_gemma":[0.9960432,0.0014423998,0.00032793355,0.001175286,0.00011834759,0.0008928472],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0018985337,0.00087139575,0.0012270215,0.00021531217,0.0008974939,0.0005571836,0.0011501554,0.0004093643,0.0029903827],"category_scores_gemma":[0.00060398644,0.001032436,0.00044034922,0.00044902955,0.0005441608,0.00022623292,0.00062860234,0.0016091998,0.00012378601],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0034937419,0.0048508537,0.2228361,0.007432222,0.005106687,0.008231708,0.046706446,0.27136844,0.046046168,0.04495751,0.33103305,0.00793705],"study_design_scores_gemma":[0.016039133,0.0014433594,0.11358856,0.002118876,0.001166726,0.006450032,0.01280313,0.55325145,0.00938088,0.0050173355,0.27358913,0.005151393],"about_ca_topic_score_codex":0.00037065707,"about_ca_topic_score_gemma":0.00004030879,"teacher_disagreement_score":0.281883,"about_ca_system_score_codex":0.003130303,"about_ca_system_score_gemma":0.0011103497,"threshold_uncertainty_score":0.9992126},"labels":[],"label_agreement":null},{"id":"W4390635899","doi":"10.1002/ente.202301294","title":"Enhancing Photovoltaic Farm Capacity Estimation: A Comprehensive Analysis with a Novel Approach","year":2024,"lang":"en","type":"article","venue":"Energy Technology","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Metric (unit); Photovoltaic system; Computer science; Grid; Reliability engineering; Novelty; Nameplate capacity; Performance metric; Value (mathematics); Environmental economics; Power (physics); Engineering; Electricity generation; Operations management; Mathematics; Business; Machine learning; Economics","score_opus":0.007937684038781258,"score_gpt":0.19304300600564175,"score_spread":0.1851053219668605,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390635899","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0666555,0.0010637677,0.9276277,0.00005471815,0.00017934947,0.00007337683,0.0000145539625,0.0019210697,0.0024099676],"genre_scores_gemma":[0.9720861,0.00001985464,0.027517341,0.000024218176,0.000020270698,0.00013580846,0.000014052858,0.000025828313,0.00015655451],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99904686,0.000009304907,0.00021450302,0.0003328752,0.00011150048,0.00028496617],"domain_scores_gemma":[0.99947745,0.000039854593,0.000021885839,0.00036546378,0.00005591923,0.000039436327],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006510144,0.00018789375,0.00032958126,0.00059631513,0.00004786842,0.000032805812,0.00017713671,0.00020496115,0.0000098837245],"category_scores_gemma":[0.00001388704,0.00015892579,0.000082641774,0.0021281312,0.0001288521,0.00006575812,0.00003697807,0.00023042357,0.0000073700894],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015833883,0.000113293776,0.00018939828,0.0009295613,0.0032783037,0.00007022332,0.00075235777,0.6731984,0.13235411,0.17922656,0.00022050913,0.00965141],"study_design_scores_gemma":[0.00016695386,0.000047826517,0.00006355986,0.000097528195,0.00021282575,0.00013116123,0.00021822787,0.9202218,0.05276795,0.000760737,0.025019964,0.00029144893],"about_ca_topic_score_codex":0.0001846635,"about_ca_topic_score_gemma":0.00040386643,"teacher_disagreement_score":0.90543056,"about_ca_system_score_codex":0.00012266003,"about_ca_system_score_gemma":0.000023360386,"threshold_uncertainty_score":0.6480806},"labels":[],"label_agreement":null},{"id":"W4390663692","doi":"10.3390/en17020292","title":"N − k Static Security Assessment for Power Transmission System Planning Using Machine Learning","year":2024,"lang":"en","type":"article","venue":"Energies","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec à Trois-Rivières; Hydro-Québec","funders":"Hydro-Québec","keywords":"Computer science; Transmission (telecommunications); Metric (unit); Electric power system; Perceptron; Reliability (semiconductor); Probabilistic logic; Reliability engineering; Power (physics); Mathematical optimization; Artificial neural network; Simulation; Engineering; Machine learning; Artificial intelligence; Mathematics","score_opus":0.010105689098706861,"score_gpt":0.26111755147986127,"score_spread":0.2510118623811544,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390663692","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41608566,0.00956739,0.56660336,0.00006899514,0.0021048305,0.00032239128,0.00003780336,0.0018681817,0.0033413954],"genre_scores_gemma":[0.99465907,0.000027379238,0.005048965,0.0000060413436,0.00005466677,0.000034879868,0.000012333257,0.000041869822,0.00011482302],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991752,0.000037456986,0.00022674332,0.0001841904,0.00012845479,0.00024796595],"domain_scores_gemma":[0.9996674,0.00013370275,0.00001662391,0.00010984265,0.000021240463,0.00005115513],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003193039,0.0001508214,0.00019586648,0.00007595645,0.000094992756,0.00009426733,0.00007940308,0.000061461185,0.000012078669],"category_scores_gemma":[0.000010855065,0.00012983529,0.0000839839,0.00010449527,0.000014430668,0.00015415304,0.000013910112,0.00017781838,0.0000030222961],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008440547,0.000007070445,0.0000836818,0.003778208,0.00007197094,0.000027321486,0.0029753426,0.9780362,0.008990497,0.004846314,0.00037434653,0.00080055336],"study_design_scores_gemma":[0.000121952115,0.00003397018,0.000019526446,0.0011925353,0.00002327037,0.00001663755,0.0009997023,0.9271247,0.0023151077,0.00014758148,0.06784306,0.00016199486],"about_ca_topic_score_codex":0.00003251673,"about_ca_topic_score_gemma":0.0000018232998,"teacher_disagreement_score":0.5785734,"about_ca_system_score_codex":0.00019207044,"about_ca_system_score_gemma":0.0000307011,"threshold_uncertainty_score":0.5294529},"labels":[],"label_agreement":null},{"id":"W4392429810","doi":"10.2139/ssrn.4747158","title":"A Machine Learning Approach to Uncertainty Analysis in Power System Planning: Insights and Pathways for Decarbonization","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Power (physics); Computer science; Physics","score_opus":0.008039809706151738,"score_gpt":0.21163104485203582,"score_spread":0.2035912351458841,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392429810","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32668263,0.05075419,0.61634153,0.00006948799,0.00098546,0.0011697991,0.000040238217,0.0004223735,0.0035342993],"genre_scores_gemma":[0.9985557,0.0006840446,0.00028282846,0.000007736384,0.000115321665,0.00012171051,0.000058830596,0.00006648763,0.00010731868],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972016,0.00011264246,0.0006014289,0.0004952678,0.00022547143,0.0013635899],"domain_scores_gemma":[0.9993576,0.00006262871,0.00011813656,0.00023894511,0.0000928772,0.00012980368],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0017761902,0.00036518768,0.00068228994,0.00086144527,0.00009072083,0.00017491284,0.0002681345,0.0003044142,5.0027506e-7],"category_scores_gemma":[0.000080759,0.00032513813,0.0002358408,0.00067164324,0.00001529303,0.0000509006,0.00017820491,0.0033519515,0.0000021050585],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000395848,0.000018366602,0.0004907673,0.0008388997,0.000998374,0.0000060825587,0.0025406466,0.9484902,0.000040343744,0.046112698,0.000010917404,0.0004131303],"study_design_scores_gemma":[0.00037695232,0.00012035821,0.00013073557,0.0006922409,0.00042908665,0.00011094045,0.0024514769,0.96377814,0.000010168593,0.030698394,0.00074177986,0.0004597362],"about_ca_topic_score_codex":0.00011400533,"about_ca_topic_score_gemma":0.0005417229,"teacher_disagreement_score":0.6718731,"about_ca_system_score_codex":0.002718737,"about_ca_system_score_gemma":0.00056436064,"threshold_uncertainty_score":0.99992007},"labels":[],"label_agreement":null},{"id":"W4393145448","doi":"10.1109/icpc2t60072.2024.10475112","title":"Protection Coordination Impact on Reliability of Distribution Systems With Distributed Energy Resources","year":2024,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Distributed generation; Computer science; Reliability (semiconductor); Reliability engineering; Energy resources; Distributed computing; Environmental science; Renewable energy; Engineering; Electrical engineering; Environmental protection; Physics","score_opus":0.004807829301861383,"score_gpt":0.1960735068500555,"score_spread":0.19126567754819412,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393145448","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3895369,0.00027018934,0.60684747,0.00009280691,0.00047952012,0.000360201,0.00035608097,0.00073147804,0.0013253891],"genre_scores_gemma":[0.9995614,0.000008487752,0.000010233395,0.0000010435494,0.000043649838,0.000082683306,0.000118311786,0.000015307753,0.0001588616],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991261,0.0000533766,0.00026035466,0.00020061199,0.00019340629,0.00016615569],"domain_scores_gemma":[0.9995085,0.00006421642,0.000030908206,0.00024228496,0.00010592138,0.000048197042],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030035523,0.00014548084,0.00018794337,0.00005266278,0.000030779396,0.000051998213,0.00006681744,0.000089442154,0.000009604146],"category_scores_gemma":[0.00004542002,0.0000923207,0.00006659256,0.00039541753,0.000040483814,0.00015537339,0.000007973862,0.00010634699,0.000006349209],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004342123,0.00019131777,0.00096592074,0.004044045,0.00024667027,0.000012490692,0.0003139294,0.9448826,0.0056128525,0.025194708,0.012982172,0.005119089],"study_design_scores_gemma":[0.0002931411,0.00075359305,0.0072187567,0.0011127432,0.000036902402,0.00002987169,0.00013785074,0.93303883,0.010281818,0.00029340814,0.046480175,0.00032290074],"about_ca_topic_score_codex":0.00068480626,"about_ca_topic_score_gemma":0.000020400736,"teacher_disagreement_score":0.6100245,"about_ca_system_score_codex":0.00040245015,"about_ca_system_score_gemma":0.000019918833,"threshold_uncertainty_score":0.37647286},"labels":[],"label_agreement":null},{"id":"W4394995349","doi":"10.1109/infoteh60418.2024.10496031","title":"Constant-Parameter VBR Synchronous Machine Model for Studies of Unbalanced Faults in PSCAD","year":2024,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Constant (computer programming); Computer science; Control theory (sociology); Synchronous motor; Engineering; Electrical engineering; Artificial intelligence","score_opus":0.023199124622031598,"score_gpt":0.2791045648904081,"score_spread":0.25590544026837647,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394995349","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18939354,0.023844553,0.77592576,0.00029687322,0.0014309821,0.0010354551,0.0002449417,0.00062789395,0.0071999864],"genre_scores_gemma":[0.9954337,0.00028310658,0.00361589,0.000023888528,0.000013422666,0.00007703068,0.0000028853703,0.000017550976,0.0005325556],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99925154,0.000007872225,0.00030570777,0.00016472375,0.00006652106,0.0002036041],"domain_scores_gemma":[0.9995294,0.00023655586,0.000012080206,0.0001594323,0.000037947288,0.00002458979],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018932116,0.00012050097,0.00029742735,0.00006851385,0.000009573809,0.0000072549255,0.00008133053,0.000053093692,0.00000531474],"category_scores_gemma":[0.00008288099,0.000093405535,0.000068680696,0.000112231646,0.000050358525,0.0000802128,0.00002028385,0.00007744457,0.000006718701],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015177255,0.00013453946,0.0006138315,0.015189433,0.00077330763,0.000031668664,0.007480061,0.8817139,0.012467314,0.050682582,0.01422171,0.016539866],"study_design_scores_gemma":[0.00028017932,0.00003016491,0.000016117423,0.00033465965,0.000010883345,0.000003295203,0.00013236798,0.9939757,0.0015926077,0.0028217973,0.00068678573,0.00011542138],"about_ca_topic_score_codex":0.000018351391,"about_ca_topic_score_gemma":0.00017696904,"teacher_disagreement_score":0.8060401,"about_ca_system_score_codex":0.000089306566,"about_ca_system_score_gemma":0.000021290203,"threshold_uncertainty_score":0.38089672},"labels":[],"label_agreement":null},{"id":"W4398205649","doi":"10.1115/1.887738_ch6","title":"Combining Asset Integrity Management and Resilience in Coping with Extreme Climate Events in Electrical Power Grids","year":2024,"lang":"en","type":"book-chapter","venue":"ASME eBooks","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Polytechnique Montréal; Hydro-Québec","funders":"","keywords":"Integrity management; Resilience (materials science); Coping (psychology); Psychology; Engineering; Materials science; Mechanical engineering","score_opus":0.013118906921432685,"score_gpt":0.21443271013692575,"score_spread":0.20131380321549305,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4398205649","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01320747,0.0015642168,0.00056619383,0.000053204545,0.0006302911,0.00094421266,0.00002192509,0.00027925358,0.98273325],"genre_scores_gemma":[0.9475789,0.00026714572,0.0002916646,0.000065716515,0.0000246208,0.00007618738,0.000008950418,0.00009787581,0.051588938],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983026,0.000020435618,0.0004668018,0.0004979527,0.00025195073,0.0004602585],"domain_scores_gemma":[0.99947083,0.00006653392,0.000050200164,0.00031916276,0.000019441439,0.000073836825],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00044433147,0.00036300713,0.00047336763,0.00031781202,0.000026723548,0.000033863314,0.00019744162,0.00025017036,0.00000929996],"category_scores_gemma":[0.000007643332,0.0003312751,0.00004996938,0.000051044535,0.000061446975,0.000060631377,0.00014758948,0.0010682391,0.000032050873],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021941242,0.000056418467,0.008652869,0.0045286333,0.00033198114,0.0021533717,0.0021069204,0.00053202774,0.00010049711,0.97509784,0.0015506742,0.004669379],"study_design_scores_gemma":[0.0117289275,0.0024398149,0.0526132,0.11846267,0.000666623,0.00090835284,0.0010134532,0.024831755,0.00053358846,0.23319949,0.541893,0.011709124],"about_ca_topic_score_codex":0.000025534622,"about_ca_topic_score_gemma":0.00033230457,"teacher_disagreement_score":0.9343714,"about_ca_system_score_codex":0.00031235864,"about_ca_system_score_gemma":0.000023932114,"threshold_uncertainty_score":0.99991393},"labels":[],"label_agreement":null},{"id":"W4399058518","doi":"10.1007/978-3-031-60597-0_3","title":"Acquiring Constraints for a Non-linear Transmission Maintenance Scheduling Problem","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Polytechnique Montréal","funders":"","keywords":"Computer science; Scheduling (production processes); Mathematical optimization; Linear programming; Distributed computing; Operations research; Algorithm; Mathematics","score_opus":0.011692792838895273,"score_gpt":0.23198650169496624,"score_spread":0.22029370885607097,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399058518","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00006022063,0.0009658494,0.9889223,0.00023128728,0.0022861948,0.0009560694,0.000025671494,0.00032789505,0.006224497],"genre_scores_gemma":[0.39479893,0.00016617778,0.6025348,0.0002700251,0.00077000394,0.000084119085,0.000010902759,0.00016747783,0.00119755],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973654,0.0000051766233,0.000565997,0.00095750776,0.0003765973,0.000729317],"domain_scores_gemma":[0.9989026,0.00023448549,0.000071866525,0.0004893872,0.00014654778,0.00015507886],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00077739096,0.00050386204,0.00054794305,0.00035500716,0.000116760246,0.0001597687,0.00077372463,0.00035697006,0.00001541172],"category_scores_gemma":[0.000037070273,0.00044060755,0.00019623163,0.00024402584,0.00061414833,0.00019439946,0.00013743526,0.00070862955,0.00003784496],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015170704,0.000011257574,0.0000028418672,0.002696754,0.00003575745,0.000061570754,0.0009370213,0.60743004,0.001996324,0.006175209,0.000047134556,0.38059092],"study_design_scores_gemma":[0.00026806875,0.00007061959,0.000001568046,0.0061357142,0.000016746159,0.000060115606,5.836836e-7,0.9267366,0.002216388,0.053512085,0.010424109,0.0005574212],"about_ca_topic_score_codex":0.0000030993206,"about_ca_topic_score_gemma":0.000011979375,"teacher_disagreement_score":0.39473873,"about_ca_system_score_codex":0.00035185725,"about_ca_system_score_gemma":0.00021123383,"threshold_uncertainty_score":0.99980456},"labels":[],"label_agreement":null},{"id":"W4400312677","doi":"10.1016/j.compeleceng.2024.109441","title":"Multi-objective optimization model of Ultra-High Voltage Direct Current system considering low carbon and equipment safety based on Im-NSGA-II and ResNet-LSTM","year":2024,"lang":"en","type":"article","venue":"Computers & Electrical Engineering","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"National Natural Science Foundation of China","keywords":"Current (fluid); Low voltage; Voltage; Computer science; Multi-objective optimization; Reliability engineering; Engineering; Materials science; Electrical engineering; Machine learning","score_opus":0.006448735807789838,"score_gpt":0.18986104875493262,"score_spread":0.18341231294714277,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400312677","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021491932,0.0038052718,0.97271425,0.000012673101,0.00080392347,0.00039829925,0.000018807623,0.0006518513,0.00010298823],"genre_scores_gemma":[0.9908379,0.00017841467,0.008840091,0.000006315875,0.000042370506,0.00003161544,0.000006577088,0.000052123847,0.0000046495225],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99858063,0.000027327666,0.0004071619,0.00041520648,0.00019273903,0.00037693323],"domain_scores_gemma":[0.9992937,0.00030688476,0.000032895532,0.00020327201,0.00004254575,0.00012074331],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002563513,0.00030409635,0.0004438532,0.0002567507,0.00005507046,0.000048784797,0.00009392803,0.000101081,4.0056233e-7],"category_scores_gemma":[0.00005871191,0.0003014013,0.00006476183,0.000323675,0.000029226692,0.00008892514,0.000043598637,0.00030667987,3.1507724e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018867664,0.00002393969,0.000008754154,0.001671991,0.00004960833,0.000008825559,0.00022933513,0.98935753,0.005785391,0.0004066449,0.000012036201,0.0024270786],"study_design_scores_gemma":[0.00043720874,0.000099013756,0.00005337213,0.0016757481,0.00003111513,0.000009081916,0.0000057845523,0.99365103,0.0036823188,0.0000034002721,0.00006394944,0.00028797635],"about_ca_topic_score_codex":0.00001670469,"about_ca_topic_score_gemma":7.812878e-7,"teacher_disagreement_score":0.9693459,"about_ca_system_score_codex":0.00038505482,"about_ca_system_score_gemma":0.00003561608,"threshold_uncertainty_score":0.9999438},"labels":[],"label_agreement":null},{"id":"W4401206158","doi":"10.2316/j.2024.203-0536","title":"CHAIN FAULT IDENTIFICATION AND POWER GRID PLANNING OPTIMISATION IN POWER SYSTEMS CONSIDERING MULTIPLE SCENARIOS, 1-14.","year":2024,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Electric power system; Power grid; Identification (biology); Fault (geology); Chain (unit); Grid; Computer science; Reliability engineering; Power (physics); Engineering; Mathematics; Geology; Physics","score_opus":0.008986925992803279,"score_gpt":0.22654981734271196,"score_spread":0.21756289134990867,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401206158","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83945364,0.05366695,0.06319128,0.00044728795,0.040543616,0.00024139334,0.00008784505,0.00020314136,0.0021648332],"genre_scores_gemma":[0.9991257,0.00035162678,0.000042733136,0.000019761232,0.00021660524,0.00001411695,0.000008888797,0.000022105594,0.00019846248],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982386,0.00007329514,0.00087402307,0.00021114641,0.00039976847,0.00020314976],"domain_scores_gemma":[0.9992059,0.00020174196,0.00015627604,0.00010088407,0.00022920947,0.0001059963],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000799754,0.0001925967,0.0003047996,0.00036141186,0.000034762765,0.00043852397,0.00016871588,0.00012864545,0.000007247825],"category_scores_gemma":[0.00009890752,0.00016100312,0.000066605025,0.00011444404,0.000037300444,0.00055159716,0.000036653466,0.00022160258,0.000002666977],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017617688,0.00010038846,0.009782227,0.00077392336,0.0010260032,0.0011220059,0.011007729,0.9295568,0.027729906,0.009999686,0.0069252555,0.0017998946],"study_design_scores_gemma":[0.0018346657,0.00019027726,0.00890738,0.008142101,0.00005002752,0.0048289513,0.0065441555,0.7273392,0.00077388104,0.00016447419,0.24036454,0.0008603225],"about_ca_topic_score_codex":0.00021947129,"about_ca_topic_score_gemma":0.000022548154,"teacher_disagreement_score":0.23343928,"about_ca_system_score_codex":0.00021588031,"about_ca_system_score_gemma":0.00003351455,"threshold_uncertainty_score":0.65655166},"labels":[],"label_agreement":null},{"id":"W4401877989","doi":"10.2139/ssrn.4917976","title":"Quantifying Renewables Reliability Risk in Modern and Future Electricity Grids","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Renewable energy; Reliability (semiconductor); Electricity; Reliability engineering; Grid; Risk analysis (engineering); Business; Computer science; Environmental science; Engineering; Geography; Electrical engineering; Power (physics); Physics","score_opus":0.007408027376016108,"score_gpt":0.22360378634128955,"score_spread":0.21619575896527343,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401877989","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82555485,0.15290831,0.016223634,0.0005223584,0.0030695922,0.00048484327,0.000052630094,0.00036078822,0.00082302035],"genre_scores_gemma":[0.8609706,0.13774815,0.00016955216,0.000009961369,0.0008604839,0.000030493002,0.000007752806,0.00008043699,0.00012256199],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99522036,0.00024458993,0.0008303233,0.0006894258,0.0003419857,0.0026733296],"domain_scores_gemma":[0.9989414,0.00009953624,0.0001689655,0.0005601029,0.00008915259,0.00014079605],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.004714191,0.0005412857,0.00073045684,0.0003595179,0.0001250412,0.00020325427,0.00046122464,0.0006527145,0.000005352366],"category_scores_gemma":[0.00014011496,0.00048951386,0.00025730388,0.0003462912,0.000059739516,0.00013070456,0.00032447395,0.010735063,0.000006534368],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005624907,0.00042798146,0.03701553,0.012369008,0.002657485,0.00021162925,0.0064889556,0.44663957,0.0016616181,0.07536885,0.002866421,0.41373047],"study_design_scores_gemma":[0.0004347964,0.00009541388,0.0010208471,0.0006358812,0.00013650252,0.00037712939,0.0007398509,0.099586695,0.00010979689,0.89250815,0.0036125435,0.0007423829],"about_ca_topic_score_codex":0.000701843,"about_ca_topic_score_gemma":0.012099215,"teacher_disagreement_score":0.8171393,"about_ca_system_score_codex":0.00309682,"about_ca_system_score_gemma":0.0015276689,"threshold_uncertainty_score":0.9997557},"labels":[],"label_agreement":null},{"id":"W4402058370","doi":"10.1061/9780784485583.012","title":"Maintaining Service Despite Wire Breaks: Condition Assessment of a Low Pressure PCCP System","year":2024,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Stantec (Canada)","funders":"","keywords":"Service (business); Computer science; Reliability engineering; Engineering; Business","score_opus":0.004885899474889818,"score_gpt":0.23078591696348394,"score_spread":0.22590001748859412,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402058370","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17224255,0.004696196,0.551389,0.0004872151,0.005194747,0.0017529506,0.00036730885,0.0056550805,0.25821495],"genre_scores_gemma":[0.99877214,0.000013007351,0.0007035586,0.000035560384,0.00007184381,0.000054403317,0.000015456008,0.000029224373,0.00030478326],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990379,0.000038815953,0.00032220024,0.00019816084,0.00018360847,0.00021930702],"domain_scores_gemma":[0.9995047,0.000079172074,0.000026606907,0.00025695266,0.00007134521,0.0000612424],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035295522,0.00014696567,0.00023153842,0.00007276121,0.000027194745,0.000055453158,0.00013276574,0.00009530964,0.000081222206],"category_scores_gemma":[0.000006654789,0.00012894937,0.0000687734,0.00023635628,0.000015495305,0.00021318643,0.000031587213,0.00014853328,0.000046177407],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024562192,0.00010951252,0.0012069992,0.112619676,0.0014200625,0.00019546621,0.0036475575,0.31346095,0.03443063,0.5155705,0.013838706,0.0034753792],"study_design_scores_gemma":[0.0002300961,0.00003771863,0.0014884743,0.0042195846,0.00007753657,0.000068062116,0.0017865398,0.9761143,0.0023806852,0.00013198583,0.013211521,0.00025349332],"about_ca_topic_score_codex":0.00007600086,"about_ca_topic_score_gemma":0.000050939634,"teacher_disagreement_score":0.8265296,"about_ca_system_score_codex":0.00012517403,"about_ca_system_score_gemma":0.00004668815,"threshold_uncertainty_score":0.5258403},"labels":[],"label_agreement":null},{"id":"W4402856261","doi":"10.3390/app14198651","title":"Interruption Cost Estimation for Value-Based Reliability Investment in Emerging Smart Grid Resources","year":2024,"lang":"en","type":"article","venue":"Applied Sciences","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Investment value; Reliability (semiconductor); Estimation; Business; Reliability engineering; Computer science; Engineering; Finance; Systems engineering","score_opus":0.022434084901474607,"score_gpt":0.27559884235136367,"score_spread":0.2531647574498891,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402856261","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6645089,0.00063369906,0.31300956,0.0011356929,0.0027594364,0.0018647762,0.000024875493,0.00081257155,0.015250534],"genre_scores_gemma":[0.99326086,0.000004944386,0.006153476,0.00010798086,0.00004615786,0.00039330535,0.000007240347,0.000009409656,0.000016624535],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989412,0.000020578067,0.0002785125,0.0003206866,0.00018716227,0.00025185174],"domain_scores_gemma":[0.9995748,0.00019868794,0.000020584524,0.00014951498,0.000013709611,0.00004270295],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015101488,0.00011353311,0.00013003658,0.00014947017,0.00008691535,0.00011282655,0.00017553124,0.000048469752,0.0000067903143],"category_scores_gemma":[0.00007172732,0.00009702411,0.000042553336,0.0004481145,0.00014756195,0.00016518266,0.000018217746,0.00009167562,0.000019070165],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018102517,0.00003199442,0.00033396995,0.0008454255,0.000007000071,0.000001060869,0.0018577003,0.95592415,0.0037720825,0.023840053,0.0015826393,0.011785839],"study_design_scores_gemma":[0.0001407548,0.000034133856,0.00060096575,0.00021625661,0.0000055751116,5.540062e-7,0.00024666003,0.9672582,0.0033333024,0.005209209,0.02281417,0.00014021376],"about_ca_topic_score_codex":0.000042120682,"about_ca_topic_score_gemma":0.000055166587,"teacher_disagreement_score":0.328752,"about_ca_system_score_codex":0.0001922967,"about_ca_system_score_gemma":0.00004113261,"threshold_uncertainty_score":0.39565283},"labels":[],"label_agreement":null},{"id":"W4403026433","doi":"10.1016/b978-0-443-19021-6.00007-7","title":"Novel system protection scheme for power transformers in utility grid to mitigate renewable power evacuation constraints and improve grid stability","year":2024,"lang":"en","type":"book-chapter","venue":"Elsevier eBooks","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Innovaderm (Canada)","funders":"","keywords":"Grid; Power grid; Renewable energy; Transformer; Electric power system; Computer science; Scheme (mathematics); Stability (learning theory); Engineering; Environmental economics; Electrical engineering; Power (physics); Economics; Mathematics; Voltage","score_opus":0.014458180164729844,"score_gpt":0.20936122883621355,"score_spread":0.1949030486714837,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403026433","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0032743574,0.0010177435,0.010051272,0.00012464637,0.0058075436,0.011454484,0.0026154553,0.0006438124,0.9650107],"genre_scores_gemma":[0.8489006,0.00003271441,0.0011971875,0.0000711717,0.00035287163,0.0025491917,0.00008981309,0.0003339533,0.14647248],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9971746,0.000022818484,0.0010032206,0.00092276704,0.000313746,0.0005628242],"domain_scores_gemma":[0.99888986,0.00006842162,0.000107714404,0.00050618267,0.00019808052,0.00022971885],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0013041766,0.00062896305,0.0008291242,0.00023126656,0.00007780813,0.00008905981,0.00016730903,0.00057666894,0.000038734735],"category_scores_gemma":[0.000059000555,0.0006220588,0.00026308483,0.00004896147,0.00018163964,0.00013629878,0.000049216178,0.00056735624,0.000029887413],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001095053,0.00013197232,0.00002728378,0.057966962,0.0012925053,0.00004718869,0.007991905,0.0003617515,0.07627691,0.01341132,0.0005431502,0.840854],"study_design_scores_gemma":[0.0021641979,0.0005464005,0.00008687648,0.008772893,0.00023261695,0.00008523871,0.0006598816,0.0076914183,0.0076517644,0.0032571175,0.96671236,0.0021392277],"about_ca_topic_score_codex":0.000017502782,"about_ca_topic_score_gemma":0.0003779369,"teacher_disagreement_score":0.96616924,"about_ca_system_score_codex":0.00080301473,"about_ca_system_score_gemma":0.00014225904,"threshold_uncertainty_score":0.99962306},"labels":[],"label_agreement":null},{"id":"W4403304187","doi":"10.3390/en17205023","title":"An Open-Source Tool for Composite Power System Reliability Assessment in Julia™","year":2024,"lang":"en","type":"article","venue":"Energies","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Energie NB Power (Canada); University of New Brunswick","funders":"Alliance de recherche numérique du Canada; Atlantic Canada Opportunities Agency; Mitacs","keywords":"Reliability engineering; Reliability (semiconductor); Composite number; Open source; Computer science; Power (physics); Engineering; Physics; Algorithm; Operating system; Thermodynamics; Software","score_opus":0.0071087190863845665,"score_gpt":0.25814621508101393,"score_spread":0.2510374959946294,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403304187","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93160576,0.0010787481,0.05130816,0.00020502644,0.002877558,0.0009704729,0.000072156865,0.00153034,0.010351764],"genre_scores_gemma":[0.99549603,0.00001306794,0.003525302,0.00002537096,0.00006110661,0.00033414827,0.000015776272,0.000046017984,0.00048320176],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99877983,0.00006680116,0.00036929085,0.00035492567,0.00013058125,0.00029854945],"domain_scores_gemma":[0.99922174,0.00016157438,0.000017409524,0.00050603267,0.000038546532,0.000054675987],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007874826,0.00017974086,0.00029427398,0.00007378161,0.00004961539,0.00029701067,0.00041023735,0.00009159654,0.000011241381],"category_scores_gemma":[0.00001964731,0.00016069454,0.000063291445,0.00017775552,0.000030876185,0.0004552123,0.00008044267,0.00016166776,0.000017649149],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005114465,0.00012831597,0.0014645755,0.0038165438,0.00007484525,0.000032895245,0.0016722432,0.91322404,0.014350041,0.05305617,0.009538973,0.002590212],"study_design_scores_gemma":[0.0008197676,0.00027351375,0.009539929,0.0016523715,0.000032163643,0.000025052594,0.001397085,0.5226897,0.0064681903,0.0006802679,0.45560667,0.00081531727],"about_ca_topic_score_codex":0.00010485453,"about_ca_topic_score_gemma":0.00004277102,"teacher_disagreement_score":0.4460677,"about_ca_system_score_codex":0.0003836776,"about_ca_system_score_gemma":0.00004904396,"threshold_uncertainty_score":0.65529335},"labels":[],"label_agreement":null},{"id":"W4403737640","doi":"10.2139/ssrn.4997869","title":"Hierarchical-Decentralized Short-Term Voltage Instability Prediction and Localization Scheme","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Term (time); Instability; Scheme (mathematics); Computer science; Mathematics; Physics; Mechanics; Mathematical analysis","score_opus":0.007394554383812428,"score_gpt":0.22377597975622468,"score_spread":0.21638142537241226,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403737640","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.63003093,0.02986223,0.3340426,0.00016267621,0.0035572543,0.00077020144,0.00008734335,0.00074869953,0.000738054],"genre_scores_gemma":[0.97487956,0.024385888,0.0000746051,0.000013263182,0.00032507998,0.000037297857,0.000048921982,0.00006846774,0.00016689778],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9967103,0.00009672396,0.0006864072,0.00047880728,0.00032889686,0.0016988368],"domain_scores_gemma":[0.9992416,0.0000351932,0.00006849086,0.00037931188,0.00009958184,0.00017582995],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0017423355,0.00038467412,0.00044139868,0.0001613357,0.00011572949,0.00019702138,0.0002656467,0.0004477089,0.000015321584],"category_scores_gemma":[0.00008915417,0.00035643412,0.00018867433,0.00015844735,0.00010337294,0.00012977187,0.000262597,0.0057868045,0.000011392064],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010329323,0.0009865854,0.103887364,0.029211015,0.009069249,0.00022178132,0.009193628,0.088540226,0.017767044,0.455913,0.0037139254,0.28046325],"study_design_scores_gemma":[0.000842987,0.00019676356,0.002336825,0.0014888429,0.00027144808,0.0007929648,0.00037120175,0.20709413,0.0003202457,0.77749354,0.007861775,0.0009293115],"about_ca_topic_score_codex":0.000021863376,"about_ca_topic_score_gemma":0.0002484597,"teacher_disagreement_score":0.34484863,"about_ca_system_score_codex":0.00219736,"about_ca_system_score_gemma":0.00094975455,"threshold_uncertainty_score":0.9998888},"labels":[],"label_agreement":null},{"id":"W4404180312","doi":"10.1109/ceege62093.2024.10744134","title":"Modeling Emerging Uncertainties in Bulk Power System Reliability Assessment","year":2024,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Computer science; Electric power system; Power (physics); Engineering; Physics","score_opus":0.007540778628370295,"score_gpt":0.23719428413900637,"score_spread":0.22965350551063607,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404180312","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42122254,0.0024694593,0.45860103,0.00038786422,0.004864812,0.00052975916,0.000011142814,0.0031767273,0.10873668],"genre_scores_gemma":[0.9983601,0.000036748832,0.0011241407,0.00001272196,0.000040367926,0.00006373988,0.0000022590984,0.00003299044,0.0003269338],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99856824,0.000040329345,0.00047676984,0.00033390304,0.00020863165,0.0003721216],"domain_scores_gemma":[0.99945796,0.00006354344,0.0000075516773,0.00036538017,0.00004214032,0.00006341842],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008623845,0.00019054965,0.00025975346,0.00014304894,0.00003328518,0.0000965702,0.00015630301,0.00009400458,0.00005630732],"category_scores_gemma":[0.000024129335,0.00016253648,0.000093431925,0.00030826675,0.000019699239,0.00025247654,0.000044741326,0.00028346645,0.000060716764],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000025213126,0.000011404455,0.0002072313,0.0016335968,0.000021248748,0.000025494206,0.00058881694,0.97072256,0.00022266878,0.025742948,0.00042397683,0.0003975361],"study_design_scores_gemma":[0.00007772152,0.000011175249,0.00007532018,0.0006731247,0.0000056497997,0.000008101544,0.0014787664,0.9931223,0.00006792812,0.00035917648,0.0039231977,0.00019758363],"about_ca_topic_score_codex":0.00034607764,"about_ca_topic_score_gemma":0.000088766,"teacher_disagreement_score":0.57713753,"about_ca_system_score_codex":0.0007354456,"about_ca_system_score_gemma":0.000051389576,"threshold_uncertainty_score":0.66280454},"labels":[],"label_agreement":null},{"id":"W4405092799","doi":"10.1109/tsg.2024.3512456","title":"Power Distribution Network Topology Detection Using Dual-Graph Structure Graph Neural Network Model","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Concordia University","funders":"","keywords":"Topology (electrical circuits); Computer science; Dual (grammatical number); Network topology; Power graph analysis; Graph; Topological graph theory; Voltage graph; Mathematics; Theoretical computer science; Computer network; Line graph; Combinatorics","score_opus":0.008895301259256345,"score_gpt":0.2139354556320936,"score_spread":0.20504015437283726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405092799","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15537226,0.0005267717,0.8247634,0.0000629425,0.017908758,0.0002468149,0.00026970514,0.00074531813,0.00010402145],"genre_scores_gemma":[0.99877435,0.000073386225,0.00039252214,0.00005887296,0.0005406747,0.00003271828,0.000021818336,0.000053547763,0.000052097486],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984047,0.00007047079,0.00036797134,0.00038754515,0.00017863043,0.0005906944],"domain_scores_gemma":[0.9993978,0.00007183798,0.000028222239,0.00033847318,0.000048323178,0.000115339586],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00017954543,0.00030277585,0.00027454333,0.00010522681,0.00030027007,0.0000796182,0.00010433063,0.00027689707,0.000056709378],"category_scores_gemma":[0.0000024522785,0.0002964333,0.00025153856,0.00074014114,0.00008529063,0.0002634467,0.0000017696095,0.00064448535,0.000016946435],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034245528,0.000012953733,0.000007794569,0.00007267877,0.00009087997,0.000010556665,0.00007447397,0.99494576,0.0019395502,0.00015501017,0.0016075685,0.0010485187],"study_design_scores_gemma":[0.00017278818,0.000078410485,0.00010339313,0.0001247258,0.000088937166,0.00013849944,0.000020669318,0.9902659,0.002748901,0.0019513353,0.0039558033,0.00035061073],"about_ca_topic_score_codex":0.000045594694,"about_ca_topic_score_gemma":0.00028654112,"teacher_disagreement_score":0.8434021,"about_ca_system_score_codex":0.00020034213,"about_ca_system_score_gemma":0.000027842452,"threshold_uncertainty_score":0.9999488},"labels":[],"label_agreement":null},{"id":"W4405907834","doi":"10.1109/wcnps65035.2024.10814194","title":"Metaheuristic Approach Hybridizing Variable Neighborhood Search and Genetic Algorithm to Size Hybrid Backup Systems for Power Outages","year":2024,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Backup; Metaheuristic; Genetic algorithm; Variable neighborhood search; Computer science; Variable (mathematics); Power (physics); Algorithm; Mathematical optimization; Mathematics; Machine learning; Operating system","score_opus":0.008945939568697776,"score_gpt":0.2158076937003205,"score_spread":0.20686175413162272,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405907834","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029921634,0.009546747,0.975973,0.00006849527,0.0016790215,0.001201221,0.00016826252,0.0006468934,0.007724167],"genre_scores_gemma":[0.86817676,0.00013690686,0.12806545,0.000053508367,0.00019814321,0.00034602397,0.000008691632,0.00010264664,0.0029118787],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982158,0.00004656664,0.00038989526,0.000539076,0.00022023323,0.0005884053],"domain_scores_gemma":[0.9988652,0.0004350731,0.0000101710375,0.00037069534,0.00008407768,0.00023481197],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005604193,0.0002785391,0.00040911834,0.00010801679,0.000075904274,0.00037575734,0.00019955917,0.000065917,0.000030203546],"category_scores_gemma":[0.00012741004,0.00024030486,0.00008191574,0.00024386906,0.000029117948,0.00014890372,0.000079306876,0.00017173862,0.000059762213],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011191289,0.00045210007,0.00021618293,0.04977139,0.0037162045,0.0005489651,0.0045170365,0.62400717,0.018767916,0.09371575,0.13232562,0.07184978],"study_design_scores_gemma":[0.00024701547,0.000100169826,0.00007213347,0.00023605625,0.000070873146,0.0002327178,0.0002737458,0.9459307,0.00043399434,0.00032157803,0.051655404,0.0004256065],"about_ca_topic_score_codex":0.00007589998,"about_ca_topic_score_gemma":7.1629887e-7,"teacher_disagreement_score":0.8651846,"about_ca_system_score_codex":0.00010425519,"about_ca_system_score_gemma":0.000046606725,"threshold_uncertainty_score":0.97993475},"labels":[],"label_agreement":null},{"id":"W4406237252","doi":"10.1007/978-3-031-73978-1_3","title":"Resilience of Transmission Systems","year":2025,"lang":"en","type":"book-chapter","venue":"Power electronics and power systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Resilience (materials science); Computer science; Geography; Physics","score_opus":0.003983860520113571,"score_gpt":0.18621545689429764,"score_spread":0.18223159637418407,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406237252","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000109739354,0.2808131,0.017840736,0.000031126914,0.0036803805,0.0010584107,0.00015093727,0.00026165604,0.6960539],"genre_scores_gemma":[0.67364985,0.012199875,0.000024744644,0.000015852587,0.000056840512,0.00005593019,0.000025365904,0.00013365978,0.3138379],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99718857,0.00004588497,0.0010847175,0.0005900218,0.00045681046,0.0006340269],"domain_scores_gemma":[0.99841255,0.00014147813,0.00024341518,0.0008161447,0.00020242113,0.00018397324],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00058026967,0.00063767406,0.001199552,0.0002685147,0.000078020516,0.00008907413,0.00041964414,0.00071777357,0.000038077425],"category_scores_gemma":[0.00001552714,0.0005895229,0.00022296254,0.000095759424,0.00011215547,0.00010311157,0.000054032396,0.00066754676,0.000019924528],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007956111,0.000038051,0.000020460935,0.008694252,0.00066995784,0.000031682994,0.0006375335,0.0029229573,0.0009786842,0.942163,0.0425581,0.0012057886],"study_design_scores_gemma":[0.00027113993,0.00021493809,0.0000045125694,0.0034731464,0.00008153008,0.000056512436,0.000040970983,0.004174522,0.00009871239,0.00053465535,0.99045736,0.00059198914],"about_ca_topic_score_codex":0.0000469788,"about_ca_topic_score_gemma":0.000007860909,"teacher_disagreement_score":0.9478993,"about_ca_system_score_codex":0.00023969948,"about_ca_system_score_gemma":0.00021020327,"threshold_uncertainty_score":0.9996556},"labels":[],"label_agreement":null},{"id":"W4406254453","doi":"10.3390/app15020610","title":"Bulk System Reliability Assessment Incorporating Nodal Correlations in Supply–Demand Variabilities and Uncertainties Created with Net-Zero Emission Targets","year":2025,"lang":"en","type":"article","venue":"Applied Sciences","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Net (polyhedron); Zero (linguistics); Reliability (semiconductor); Reliability engineering; Environmental science; Computer science; Mathematics; Physics; Engineering; Thermodynamics","score_opus":0.00525740328554198,"score_gpt":0.2155713209136725,"score_spread":0.21031391762813054,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406254453","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87205297,0.00038902133,0.060866363,0.000333312,0.00051546877,0.0010241813,0.000016113005,0.00041691813,0.06438567],"genre_scores_gemma":[0.99582577,0.000010408242,0.0038278536,0.000017503517,0.000012275942,0.0001393367,0.000005885577,0.000007783551,0.000153211],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984896,0.000066844375,0.0004353482,0.00043842598,0.00025155695,0.00031822323],"domain_scores_gemma":[0.9991601,0.0003954982,0.00006964198,0.00024773454,0.000060312363,0.00006668684],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014561327,0.00020149398,0.00032230836,0.0001519657,0.00032239992,0.0001224708,0.00020108343,0.00009998507,0.0000047502986],"category_scores_gemma":[0.00006912555,0.00015202643,0.000021107517,0.00071315194,0.00066086947,0.00021542734,0.00007282644,0.0002060128,0.0000013652941],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006094257,0.00009035242,0.25169256,0.0019356346,0.000040144565,0.0000064947676,0.002476769,0.4733511,0.0034627116,0.26543045,0.00076797634,0.00068487343],"study_design_scores_gemma":[0.0017225636,0.00023782162,0.08734968,0.002258097,0.00006387393,0.00001878749,0.021632904,0.85734653,0.0031499967,0.024037123,0.0011982677,0.0009843413],"about_ca_topic_score_codex":0.00038593577,"about_ca_topic_score_gemma":0.00012800649,"teacher_disagreement_score":0.38399547,"about_ca_system_score_codex":0.0002452737,"about_ca_system_score_gemma":0.00018010492,"threshold_uncertainty_score":0.6199458},"labels":[],"label_agreement":null},{"id":"W4408358637","doi":"10.1109/access.2025.3550097","title":"Convolutional Variational Autoencoder for Anomaly Detection in On-Load Tap Changers","year":2025,"lang":"en","type":"article","venue":"IEEE Access","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec; Université du Québec à Chicoutimi","funders":"Natural Sciences and Engineering Research Council of Canada; Hydro-Québec","keywords":"Autoencoder; Computer science; Anomaly detection; Convolutional code; Pattern recognition (psychology); Artificial intelligence; Convolutional neural network; Anomaly (physics); Algorithm; Decoding methods; Deep learning; Physics","score_opus":0.01568750961618474,"score_gpt":0.2708188849191246,"score_spread":0.25513137530293983,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408358637","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0845343,0.00016454556,0.9005296,0.0003293449,0.0055462196,0.0007462848,0.00005618078,0.00022175508,0.007871744],"genre_scores_gemma":[0.9986829,0.000006513383,0.00025435525,0.00017985026,0.000102775186,0.00045821746,0.000004732326,0.000007983789,0.0003026518],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999378,0.000013543576,0.00017149637,0.00015695443,0.00010611006,0.00017389453],"domain_scores_gemma":[0.9996548,0.000116052266,0.00002002419,0.00011605767,0.00007128158,0.000021727921],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020034572,0.00008661844,0.00011059152,0.0001138493,0.000041666895,0.000033520784,0.00015102772,0.00007868726,0.000016167167],"category_scores_gemma":[0.00006606187,0.00009073008,0.000041102336,0.00021307058,0.000016499767,0.0001877285,0.000010476144,0.00008236095,0.000011400659],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036124475,0.00033457813,0.008013665,0.001414761,0.00025272986,0.00000995221,0.000555577,0.9048204,0.0103768855,0.030209266,0.026663296,0.016987639],"study_design_scores_gemma":[0.0013296448,0.00004053487,0.08799509,0.00019455912,0.000015409873,0.0000026202592,0.000017536391,0.86859226,0.00960516,0.0048586824,0.027075939,0.00027252865],"about_ca_topic_score_codex":0.00007790354,"about_ca_topic_score_gemma":0.00034387037,"teacher_disagreement_score":0.9141486,"about_ca_system_score_codex":0.00035100448,"about_ca_system_score_gemma":0.00006654753,"threshold_uncertainty_score":0.3699865},"labels":[],"label_agreement":null},{"id":"W4408755560","doi":"10.1016/j.ijepes.2025.110627","title":"Extreme outage prediction in power systems using a new deep generative Informer model","year":2025,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"Qatar National Library; Qatar University","keywords":"Electric power system; Computer science; Generative grammar; Power (physics); Reliability engineering; Artificial intelligence; Machine learning; Engineering; Physics","score_opus":0.013275324107928579,"score_gpt":0.23313139668358,"score_spread":0.2198560725756514,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408755560","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02295182,0.007001155,0.9491743,0.000103631166,0.009293828,0.00017942447,0.000015332342,0.000070004935,0.011210545],"genre_scores_gemma":[0.99780595,0.00010908471,0.00028001587,0.00009721793,0.0002452759,0.000011677026,0.0000038277744,0.000026958169,0.0014200085],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9971969,0.000097373755,0.0014245672,0.00020891946,0.00069374364,0.00037845873],"domain_scores_gemma":[0.99867576,0.00010630542,0.00030118716,0.00018961422,0.0005682962,0.00015885296],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004921155,0.00026704455,0.00052055164,0.0008309198,0.000035034882,0.00017237522,0.00051652314,0.00022271038,0.000012113976],"category_scores_gemma":[0.0001545171,0.00023672836,0.00019126538,0.00047517288,0.000027517,0.0005666595,0.000042231844,0.00039285078,0.000004605825],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010237325,0.000066995366,0.000505301,0.000021465406,0.0003495682,0.000059605652,0.0002789609,0.9664356,0.004068959,0.023707379,0.0041036084,0.00030014233],"study_design_scores_gemma":[0.00092792884,0.0000802966,0.00013655196,0.00051426195,0.00002361422,0.0002261157,0.00011160654,0.9789795,0.00029449115,0.0004893934,0.018017089,0.00019912433],"about_ca_topic_score_codex":0.00034972827,"about_ca_topic_score_gemma":0.00003541576,"teacher_disagreement_score":0.9748541,"about_ca_system_score_codex":0.0013294978,"about_ca_system_score_gemma":0.00032686308,"threshold_uncertainty_score":0.9653502},"labels":[],"label_agreement":null},{"id":"W4411443222","doi":"10.1088/1402-4896/ade644","title":"A hybrid machine learning approach for real-time reliability evaluation of power systems","year":2025,"lang":"en","type":"article","venue":"Physica Scripta","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Electric power system; Reliability engineering; Reliability (semiconductor); Benchmark (surveying); Artificial neural network; Transformer; Scalability; Machine learning; Power (physics); Engineering","score_opus":0.013587057419295574,"score_gpt":0.23971331839191357,"score_spread":0.22612626097261798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411443222","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40497035,0.0038108523,0.35193968,0.00022327605,0.0052871173,0.007237989,0.00042444517,0.0015404881,0.22456579],"genre_scores_gemma":[0.99766994,0.000014097289,0.00066412956,0.0000057642956,0.000028130782,0.0003064041,0.00005673047,0.000022643802,0.0012321761],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986597,0.00014926307,0.00037333905,0.0002905968,0.00028635486,0.00024077075],"domain_scores_gemma":[0.99899817,0.00006243297,0.0000744978,0.00048352938,0.0003424973,0.000038869814],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014782709,0.00016372897,0.000383597,0.00006533067,0.000057765716,0.000023522127,0.00019476823,0.000047701382,0.00000767033],"category_scores_gemma":[0.0002960776,0.0001550494,0.00013568124,0.00017833088,0.000045358192,0.00012682372,0.000035604622,0.00012987386,0.000008501464],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002401898,0.00081407616,0.00079693034,0.008048799,0.00059985986,6.315696e-7,0.0013111462,0.73282593,0.13222824,0.016987167,0.10250164,0.003645403],"study_design_scores_gemma":[0.00049977086,0.00004373467,0.00033188073,0.000119392185,0.00009011161,6.6884496e-7,0.00005311928,0.98482126,0.0023463068,0.0007154654,0.010837551,0.00014072862],"about_ca_topic_score_codex":0.00013088582,"about_ca_topic_score_gemma":6.74083e-7,"teacher_disagreement_score":0.5926996,"about_ca_system_score_codex":0.00017962564,"about_ca_system_score_gemma":0.000053563555,"threshold_uncertainty_score":0.63227314},"labels":[],"label_agreement":null},{"id":"W4412055222","doi":"10.12794/metadc103339","title":"Risk Management And Market Efficiency On The Midwest Independent System Operator Electricity Exchange.","year":2011,"lang":"en","type":"dissertation","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity market; Operator (biology); Electricity; Electricity system; Business; Environmental economics; Economics; Engineering; Electrical engineering; Electricity generation; Chemistry; Physics; Power (physics)","score_opus":0.00526785690137657,"score_gpt":0.18247554509137456,"score_spread":0.177207688189998,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412055222","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16678977,0.0034052043,0.001667188,0.000008601689,0.002579079,0.0018868574,0.000046381912,0.00051728566,0.8230996],"genre_scores_gemma":[0.9682123,0.001586633,0.00004703937,0.000026709959,0.00005933586,0.00030946193,0.000022964496,0.000053962285,0.029681563],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.998563,0.00010779821,0.00032878714,0.00037985411,0.0002828216,0.00033774765],"domain_scores_gemma":[0.99921864,0.000077844634,0.00008500113,0.00048955565,0.00005227175,0.000076697186],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00067150407,0.00034478767,0.0003093095,0.00012549061,0.00014745464,0.00007053981,0.00032701573,0.00023022413,0.00017045335],"category_scores_gemma":[0.0000239663,0.00022543545,0.00007722279,0.0001752779,0.000015932721,0.000046032488,0.000029296258,0.0003957055,0.000099522775],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019306153,0.0015748946,0.0033185184,0.108781695,0.005930705,0.0005608311,0.02063316,0.002086108,0.0004920595,0.3230688,0.43195507,0.099667534],"study_design_scores_gemma":[0.008987846,0.0029956454,0.2866592,0.025548102,0.0043084547,0.00025199857,0.06696377,0.17115113,0.038414277,0.0018970385,0.37653267,0.01628987],"about_ca_topic_score_codex":0.00017691281,"about_ca_topic_score_gemma":0.0004198834,"teacher_disagreement_score":0.80142254,"about_ca_system_score_codex":0.00017988634,"about_ca_system_score_gemma":0.000012739874,"threshold_uncertainty_score":0.91929907},"labels":[],"label_agreement":null},{"id":"W4412069135","doi":"10.3390/aerospace12070607","title":"Enhancing Fault Detection and Isolation in All-Electric Auxiliary Power Unit (APU) Gas Generator by Utilizing Starter/Generator Signal","year":2025,"lang":"en","type":"article","venue":"Aerospace","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"China Scholarship Council","keywords":"Starter; Generator (circuit theory); Fault detection and isolation; Electric generator; Isolation (microbiology); Auxiliary power unit; Electric power; SIGNAL (programming language); Power (physics); Signal generator; Electrical engineering; Computer science; Automotive engineering; Engineering; Physics; Voltage; Biology","score_opus":0.006857694186395966,"score_gpt":0.21450775984901976,"score_spread":0.20765006566262378,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412069135","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9239703,0.002608644,0.071737744,0.00013303504,0.0004856934,0.00027826437,0.0000066760226,0.00022293416,0.00055672915],"genre_scores_gemma":[0.9989912,0.00015786644,0.00031872504,0.0001455658,0.000032582513,0.000040563096,0.000005711075,0.000025016981,0.00028277954],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9988253,0.00007082515,0.00030012734,0.00030724844,0.00012342434,0.00037304655],"domain_scores_gemma":[0.99956405,0.000069001486,0.000038410726,0.00020033664,0.000053613414,0.00007460579],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031151136,0.00020626483,0.00022300034,0.00014200098,0.00008261227,0.00006757708,0.000086852946,0.0001594176,0.000014355927],"category_scores_gemma":[0.000047131824,0.00022336935,0.000036065987,0.0004998839,0.000018947001,0.0002474513,0.000028697232,0.00024812625,0.000009777042],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019153718,0.000019344807,0.0010403574,0.00010314755,0.000029842091,0.0000038885505,0.00049238483,0.0013431718,0.9940603,0.00010341919,0.0013615412,0.0014234894],"study_design_scores_gemma":[0.0008885829,0.00011964739,0.0024236995,0.00023183977,0.000030397456,0.000010873997,0.0005911729,0.16388616,0.81676364,0.000118171905,0.014433335,0.0005025063],"about_ca_topic_score_codex":0.00013722149,"about_ca_topic_score_gemma":0.00087736495,"teacher_disagreement_score":0.17729665,"about_ca_system_score_codex":0.0002232056,"about_ca_system_score_gemma":0.000037801827,"threshold_uncertainty_score":0.9108738},"labels":[],"label_agreement":null},{"id":"W4412218230","doi":"","title":"The Impact of Electricity Market Interventions by System Operators during Emergency Situations","year":2024,"lang":"en","type":"report","venue":"VBN Forskningsportal (Aalborg Universitet)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator","funders":"","keywords":"Electricity; Psychological intervention; Electricity market; Electricity system; Business; Operations management; Engineering; Electricity generation; Electrical engineering; Medicine; Physics; Nursing","score_opus":0.00810544861552506,"score_gpt":0.24344126318506817,"score_spread":0.2353358145695431,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412218230","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5657522,0.02818117,0.002913103,0.00005827996,0.008147718,0.002031313,0.0033391062,0.001836314,0.3877408],"genre_scores_gemma":[0.95605457,0.0027057955,0.000018802935,3.7339856e-7,0.00010820555,0.000017736666,0.00019552385,0.00011256626,0.0407864],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99721247,0.000056632925,0.0010534215,0.00045792767,0.0006198496,0.000599671],"domain_scores_gemma":[0.9981867,0.00006802116,0.0003930326,0.0006538589,0.0005110193,0.00018735221],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007185605,0.00053148676,0.0006972393,0.0004073233,0.00029735288,0.00006521483,0.0006158869,0.00037759222,0.00036548704],"category_scores_gemma":[0.00012141174,0.0004281035,0.0013574958,0.0010581047,0.00008872098,0.0002564809,0.0001435156,0.0007063037,0.00005992214],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050600975,0.00010440778,0.0025549342,0.009552104,0.0034121142,0.0002020086,0.0007099958,0.0027239956,0.0016263732,0.001498897,0.9771785,0.0003860533],"study_design_scores_gemma":[0.004775523,0.0019792584,0.042833794,0.05275969,0.010733246,0.0020191176,0.024970789,0.046104945,0.011264093,0.0012122098,0.7877514,0.013595971],"about_ca_topic_score_codex":0.0014039255,"about_ca_topic_score_gemma":0.00020712311,"teacher_disagreement_score":0.3903024,"about_ca_system_score_codex":0.0021775488,"about_ca_system_score_gemma":0.0004723064,"threshold_uncertainty_score":0.9998171},"labels":[],"label_agreement":null},{"id":"W4413349509","doi":"10.1109/tsc.2025.3601051","title":"Understanding AWS Provider Dependency Updates in Infrastructure-As-Code: Empirical Study, Taxonomy, and Insights","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Services Computing","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Taxonomy (biology); Theoretical computer science; Database; Data science","score_opus":0.029600660419781363,"score_gpt":0.2608214432214027,"score_spread":0.23122078280162134,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413349509","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6291295,0.00010873945,0.36832017,0.00009518709,0.0006697146,0.0004988427,0.0000029738778,0.00021613322,0.00095870974],"genre_scores_gemma":[0.99922353,0.000018050776,0.0004789831,0.0001943163,0.000014595796,0.000033267457,8.1009983e-7,0.000018284905,0.00001819076],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987395,0.000072736344,0.00040523152,0.00036099856,0.00013866302,0.00028289322],"domain_scores_gemma":[0.99944556,0.00018439154,0.00003800167,0.00024218144,0.00002810724,0.000061756735],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017948828,0.00022861945,0.0002855671,0.00029339205,0.0001878786,0.000102750426,0.00019020253,0.00012023601,0.000008199689],"category_scores_gemma":[0.0000019102265,0.00022143587,0.000044392556,0.0004948125,0.000029790122,0.00023081529,0.0000070284564,0.00041705457,0.000006965572],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010904262,0.0004386389,0.02422769,0.0023004815,0.00034407608,0.000052417105,0.017845865,0.94352543,0.00045439115,0.0008147449,0.00011531617,0.009771881],"study_design_scores_gemma":[0.0027077876,0.00022467862,0.013453917,0.0014669631,0.00010311883,0.000030511555,0.026957626,0.9437409,0.0023220829,0.0061925696,0.001937995,0.0008618509],"about_ca_topic_score_codex":0.00012744214,"about_ca_topic_score_gemma":0.0036923862,"teacher_disagreement_score":0.37009397,"about_ca_system_score_codex":0.00026562746,"about_ca_system_score_gemma":0.000038178325,"threshold_uncertainty_score":0.90298927},"labels":[],"label_agreement":null},{"id":"W4414000769","doi":"10.18280/jesa.580707","title":"Reliability Model and State Probabilities of Electrical System, Subject to Multiple Competing Failure Processes","year":2025,"lang":"en","type":"article","venue":"Journal Européen des Systèmes Automatisés","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Subject (documents); State (computer science); Computer science; Engineering; Algorithm; Physics; Thermodynamics; Power (physics)","score_opus":0.008176717835581425,"score_gpt":0.21578190718361484,"score_spread":0.2076051893480334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414000769","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91888803,0.0016218752,0.07648839,0.00006503144,0.00025895628,0.0006743891,0.00003827687,0.0005297801,0.0014352443],"genre_scores_gemma":[0.98755395,0.00008566351,0.012046925,0.000017113853,0.000029677185,0.000041325948,9.4534886e-7,0.000036570913,0.00018780964],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99760664,0.00021802244,0.0010586176,0.00030515133,0.00032047063,0.0004911282],"domain_scores_gemma":[0.9982556,0.00048211918,0.00017752002,0.0003340501,0.00056623935,0.00018443516],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0011175144,0.0002965655,0.0006736413,0.00026020742,0.0001987386,0.00015074194,0.00031321586,0.00009182058,0.000002368561],"category_scores_gemma":[0.0017246369,0.00024857785,0.00010104438,0.00068919343,0.00013333706,0.00030730333,0.00009897755,0.0003407949,0.0000052009536],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002245214,0.00023140556,0.03009254,0.066227466,0.0004207108,0.000051386516,0.011247028,0.83600575,0.015932307,0.0039014025,0.00270583,0.03295967],"study_design_scores_gemma":[0.0008652174,0.00023797245,0.062963255,0.0060562547,0.00008254189,0.00036270302,0.001304631,0.9195718,0.0035875363,0.0036484245,0.0007620117,0.0005576076],"about_ca_topic_score_codex":0.000039040227,"about_ca_topic_score_gemma":0.00009983982,"teacher_disagreement_score":0.08356611,"about_ca_system_score_codex":0.00044584656,"about_ca_system_score_gemma":0.00024759196,"threshold_uncertainty_score":0.99999666},"labels":[],"label_agreement":null},{"id":"W4416341587","doi":"10.1109/epec65543.2025.11230420","title":"Reliability Assessment of Network Planning Options Used in Distribution Stations","year":2025,"lang":"","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Reliability (semiconductor); Markov model; Probabilistic logic; Markov chain; Spare part; Markov process; Network planning and design","score_opus":0.011983262091379504,"score_gpt":0.29640035596309056,"score_spread":0.28441709387171105,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416341587","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09253865,0.0006924968,0.886896,0.00039308215,0.0019064259,0.0008924459,0.00022232512,0.000114160415,0.016344408],"genre_scores_gemma":[0.9943482,0.000115097166,0.004790802,0.00001560291,0.000033039225,0.00009903866,0.00011192755,0.000010896293,0.00047537754],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9974088,0.0002307385,0.001246584,0.00039160732,0.0002095523,0.0005127109],"domain_scores_gemma":[0.9984084,0.00057325535,0.00012415554,0.00062968384,0.00018993224,0.000074579286],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00154648,0.00023731714,0.0005259971,0.00011341659,0.00011671619,0.000039991406,0.00021477573,0.00021144268,0.000088209505],"category_scores_gemma":[0.0002865828,0.00025524062,0.00014375136,0.0013051945,0.00011335254,0.00024270972,0.00009352124,0.00042275173,0.0000043072023],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010176488,0.00013854569,0.06299866,0.0006594664,0.000045487446,0.0000013474373,0.00022455095,0.7913292,0.00013046424,0.14264016,0.0016115154,0.00021044258],"study_design_scores_gemma":[0.00068316614,0.000051899046,0.4943765,0.0016915865,0.00005658641,5.2243115e-7,0.0007811425,0.4887029,0.00012545436,0.0073677944,0.005912658,0.00024978077],"about_ca_topic_score_codex":0.00035428753,"about_ca_topic_score_gemma":0.00027845282,"teacher_disagreement_score":0.9018096,"about_ca_system_score_codex":0.00089134433,"about_ca_system_score_gemma":0.0004248582,"threshold_uncertainty_score":0.99999},"labels":[],"label_agreement":null},{"id":"W4416342014","doi":"10.1109/epec65543.2025.11230447","title":"Consideration of Nodal Cross-Correlation in Reliability Assessment of Bulk Electric Systems with Net-zero Emission Targets","year":2025,"lang":"","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Electrification; Renewable energy; Electric power system; Investment (military); Power (physics); Electric power; Electricity; Business system planning","score_opus":0.005128987525518981,"score_gpt":0.2576241205440486,"score_spread":0.2524951330185296,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416342014","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5062708,0.0014657474,0.47531325,0.000097996955,0.0014269474,0.0016588536,0.000015201931,0.00006820141,0.013682992],"genre_scores_gemma":[0.9973269,0.00011746455,0.001268522,0.000009856493,0.000019041589,0.00006276342,0.000014526515,0.000022747177,0.0011581616],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9960452,0.00027064813,0.0021258276,0.0006016431,0.00049009774,0.00046660716],"domain_scores_gemma":[0.9974163,0.00054554135,0.00047248567,0.00074581924,0.00073237595,0.00008746403],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0019436533,0.00038141702,0.00097470236,0.00039552726,0.00008324964,0.000068147834,0.00019444652,0.00042044677,0.000036282363],"category_scores_gemma":[0.0004972727,0.00033356,0.00012242547,0.0011966573,0.00014249285,0.00043057333,0.00006127231,0.00047503383,0.0000019962074],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020146932,0.00036062737,0.2042791,0.0054906444,0.00008027842,0.000003372668,0.0003230214,0.76705647,0.012712091,0.008910085,0.0003209401,0.0002619069],"study_design_scores_gemma":[0.0016335744,0.00033539426,0.13387918,0.0023728043,0.000057743953,0.0000056834533,0.00012070736,0.846402,0.013972993,0.0007366173,0.00018539642,0.0002979145],"about_ca_topic_score_codex":0.0013762503,"about_ca_topic_score_gemma":0.00006759222,"teacher_disagreement_score":0.4910561,"about_ca_system_score_codex":0.0009370349,"about_ca_system_score_gemma":0.00081738667,"threshold_uncertainty_score":0.99991167},"labels":[],"label_agreement":null},{"id":"W4416342200","doi":"10.1109/epec65543.2025.11230399","title":"Reliability Assessment of Deregulated Power Systems Considering Demand Response and Energy Storage","year":2025,"lang":"","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Reliability (semiconductor); Electric power system; Demand response; Energy storage; Energy (signal processing); Power (physics)","score_opus":0.005795351854148393,"score_gpt":0.23272055384578705,"score_spread":0.22692520199163865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416342200","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5953585,0.009842563,0.37159553,0.00027808637,0.0031561377,0.0005918999,0.00004980149,0.00024333342,0.018884137],"genre_scores_gemma":[0.99408996,0.000328858,0.0009506387,0.000049032224,0.000010267103,0.00004814847,0.0000024848293,0.00003786383,0.004482736],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.995676,0.0009329367,0.0016092093,0.000795581,0.0003484132,0.0006378747],"domain_scores_gemma":[0.996447,0.0014714084,0.00022355796,0.0012444963,0.00039276984,0.00022075868],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0033302368,0.000526682,0.0011852783,0.00032169302,0.0001488265,0.00012633747,0.00026107972,0.00046416934,0.00009223716],"category_scores_gemma":[0.00063322386,0.0005112951,0.0001722402,0.00056489074,0.00037374068,0.00026718187,0.00028369972,0.00032556913,0.0000018323183],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0025093444,0.0009237049,0.017473629,0.022754187,0.002410864,0.0001585611,0.0022409533,0.58260816,0.11512855,0.24622376,0.006678795,0.000889505],"study_design_scores_gemma":[0.0031933319,0.00048414778,0.133479,0.0058913706,0.00032418992,0.00007571664,0.002429848,0.79536974,0.00696424,0.00094685284,0.049545653,0.0012958912],"about_ca_topic_score_codex":0.00063489727,"about_ca_topic_score_gemma":0.00004746216,"teacher_disagreement_score":0.39873144,"about_ca_system_score_codex":0.00053072226,"about_ca_system_score_gemma":0.0004501846,"threshold_uncertainty_score":0.99973387},"labels":[],"label_agreement":null},{"id":"W6892498416","doi":"10.5281/zenodo.10931644","title":"Federal University of Technology Minna 2024/2025 (Post Utme) Admission Form,Direct Entry Screening Form Is Out Call_091–6299–3014 Or +23491–6299–3014 For More Details–Apply For Admission If You Wish To Study At The University,It's Time To Apply For The Screening Exercise 2024/2025 Session Which Now On Sale Call 091–6299–30–14.See More Details Below Or Call Office Of The Admin On How To Apply And Register Online Call 091–6299–3014 Dr.Mrs. Judith .A. A.The University Invites Applications From Suitably Qualified Applicants For Admission Into The Full-Time Undergraduate Programme Such As Ijmb,Jupeb,Pre-Degree,Sandwich,Transfer Form,Change Of Institution Form,Diploma And Part Time Programme In The 2024/2025 Academic Session.In This Post, We Break Down The Process To Successfully Register Or Apply For University Screening.This Includes, How To Apply For The University Post Utme, Admission Portal, Registration Fees, Cut Off Mark, Requirements And Deadline,For More Details Call 091–6299–30–14 Office Of The Admin.University Admission General Entry Requirement.1.Minimum Qualification For The First Degree Programs: 5 Credits At The Gce/Ssce/Neco Examinations Or Their Equivalent (At Not More Than 2 Sittings);2. Candidates Below 15 Years Of Age Are Advised Not To Apply.3. Candidates Awaiting 2024 Waec/Neco Ssce Results Will Be Required To Present Acceptable Qualifications Before Matriculation.4. All Candidates Who Apply Directly To The University Are Required To Sit For The Current Jamb Examination (For 100 Level) Or Apply For Jamb Direct Entry Admissions (For Direct Entry).5. Candidates Who Apply For Transfer Admissions Need To Present A Jamb Admission Letter Or Transcript From Previous University And Attestation Letters,For More Information And Admission Assistance Contact Us Through 091–6299–30–14 Or Whatsapp (+234)91–6299–30–14 For More Details.","year":2024,"lang":"en","type":"other","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Session (web analytics); Wish; Institution; Full-time; Entrance exam; Register (sociolinguistics)","score_opus":0.047399646468089265,"score_gpt":0.2769613948904055,"score_spread":0.22956174842231625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6892498416","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18136987,0.00053837104,0.32439044,0.2047151,0.0003850522,0.19126804,0.09687735,0.00039168439,0.000064071595],"genre_scores_gemma":[0.78996694,0.0020855707,0.02211004,0.0047561796,0.0010536081,0.0056604682,0.024902135,0.0018511026,0.14761397],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9939698,0.0004678019,0.0013179117,0.0019125254,0.0010638105,0.0012681655],"domain_scores_gemma":[0.9894166,0.004748452,0.0012789646,0.0014646885,0.0022735111,0.0008177729],"candidate_categories":["metaepi_narrow","sts"],"consensus_categories":[],"category_scores_codex":[0.0028686293,0.0011370002,0.0013122688,0.00066440116,0.005120744,0.00039504093,0.0025917534,0.0005683274,0.00005954992],"category_scores_gemma":[0.0034765077,0.0006335778,0.0004633787,0.0019649493,0.00042702115,0.0008278267,0.0011001854,0.0004900958,0.000002081023],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.18497284,0.0011316926,0.00049506925,0.007373939,0.0015438289,0.0000070346596,0.058902163,0.0028778694,0.007404952,0.00009653485,0.62516266,0.11003141],"study_design_scores_gemma":[0.008941822,0.003907852,0.002478632,0.0048645074,0.002225256,0.00000812919,0.033637498,0.032332867,0.0026709635,0.000012578659,0.9078742,0.0010456521],"about_ca_topic_score_codex":0.001291205,"about_ca_topic_score_gemma":0.016566284,"teacher_disagreement_score":0.60859704,"about_ca_system_score_codex":0.001200131,"about_ca_system_score_gemma":0.0006527501,"threshold_uncertainty_score":0.99961156},"labels":[],"label_agreement":null},{"id":"W6905790469","doi":"10.15468/dl.nfbtjf","title":"Occurrence Download","year":2023,"lang":"en","type":"dataset","venue":"Global Biodiversity Information Facility","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Download; Matching (statistics); Range (aeronautics); Alien; The Internet","score_opus":0.0105376643774963,"score_gpt":0.19399672888694208,"score_spread":0.18345906450944577,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6905790469","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00011205618,0.000030229161,0.00002525494,0.000041907304,0.0025418315,0.00030345662,0.9960473,0.00072005246,0.00017788757],"genre_scores_gemma":[0.000016546906,0.00017068033,5.952441e-7,0.00009148211,0.0000018619859,0.000007813846,0.9997108,2.7541406e-8,1.946214e-7],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99865615,0.00003015535,0.00041453072,0.00017532901,0.00036499253,0.00035882965],"domain_scores_gemma":[0.9990376,0.000023022403,0.000097376294,0.00055253,0.00014185136,0.00014758053],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00027486903,0.00029225112,0.000308109,0.00008459273,0.00012596427,0.00010203601,0.00050248374,0.0003854498,0.00018896112],"category_scores_gemma":[0.00012882423,0.00030914258,0.00014990615,0.0003852691,0.00010106053,0.00067183934,0.00018246993,0.00030168833,0.6021805],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008537983,0.0000074039845,0.00006953883,0.0006939393,0.000033623845,0.0000025505117,0.000025933548,0.00033520584,2.7952156e-8,6.220646e-8,0.9984281,0.00039506902],"study_design_scores_gemma":[0.00016896409,0.000012819385,0.00004827571,0.0000085266865,0.000025495296,0.0000033898723,0.000071301954,0.0000030553683,0.0000016439179,9.593666e-7,0.99935555,0.0003000104],"about_ca_topic_score_codex":0.0004015295,"about_ca_topic_score_gemma":0.00003909977,"teacher_disagreement_score":0.60199153,"about_ca_system_score_codex":0.00044107417,"about_ca_system_score_gemma":0.000058203976,"threshold_uncertainty_score":0.99993604},"labels":[],"label_agreement":null},{"id":"W6911506450","doi":"10.5281/zenodo.11096821","title":"A Review on Combining Modified Weibull Distribution Method For Power System Reliability Forecast","year":2024,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Weibull distribution; Reliability (semiconductor); Asset (computer security); Electric power system; Asset management; Weibull fading; Failure rate","score_opus":0.025432771773362756,"score_gpt":0.2550077474349596,"score_spread":0.22957497566159682,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6911506450","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0007572043,0.0062432243,0.9211154,0.0010707775,0.0011371801,0.002421958,0.0015934503,0.0055049993,0.060155835],"genre_scores_gemma":[0.9927109,0.0010093355,0.0013928629,0.00017076748,0.00013956078,0.0000021441697,0.0025684068,0.0016157554,0.00039026226],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982209,0.00027515183,0.00040753538,0.0004616975,0.0002397422,0.0003949691],"domain_scores_gemma":[0.998806,0.00011502428,0.000045297445,0.0005383472,0.0003541556,0.00014115298],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.002175347,0.00019355824,0.00027638476,0.00008715407,0.0006288344,0.00038200372,0.0004868368,0.00008663712,0.00039482416],"category_scores_gemma":[0.000775202,0.00018297588,0.000132197,0.0004619181,0.000051963103,0.0001862701,0.0001997031,0.00028761226,0.0015728286],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010011595,0.00009366897,1.9858706e-7,0.019979887,0.00011663351,0.0000138327305,0.00056858564,0.0030664515,0.0008307904,0.097375125,0.81972635,0.05812839],"study_design_scores_gemma":[0.00022014411,0.00018565025,0.000008281058,0.002729315,0.000028642722,0.00006997985,0.00007429442,0.09062785,0.00016496249,0.00020556859,0.9055002,0.00018516197],"about_ca_topic_score_codex":0.000005590011,"about_ca_topic_score_gemma":8.670263e-8,"teacher_disagreement_score":0.9919537,"about_ca_system_score_codex":0.0005596767,"about_ca_system_score_gemma":0.0000042280744,"threshold_uncertainty_score":0.9992046},"labels":[],"label_agreement":null},{"id":"W6921047722","doi":"10.6084/m9.figshare.27345648","title":"Code and Data for BNNMSO Model","year":2024,"lang":"en","type":"article","venue":"Figshare","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Code (set theory); Power (physics); Data modeling; Data model (GIS); Source code; Scheme (mathematics)","score_opus":0.08111402362153683,"score_gpt":0.29103226866624426,"score_spread":0.20991824504470744,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6921047722","genre_codex":"dataset","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00005683532,0.0056201154,0.005560751,0.00012878087,0.00017812652,0.00024358745,0.9844274,0.0005114844,0.003272941],"genre_scores_gemma":[0.7802037,0.000056252196,0.0026413372,0.00015212873,0.00032537273,0.00054799905,0.21274717,0.000105881416,0.0032201721],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996419,0.0000017358678,0.000064773725,0.00015192709,0.00003356619,0.00010611351],"domain_scores_gemma":[0.99961954,0.000045519293,0.0000029531218,0.00028905732,0.000011777369,0.00003117701],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000035872534,0.000056135515,0.00006156136,0.000013962045,0.000014888251,0.000049923015,0.00015140763,0.0000367177,0.0012718427],"category_scores_gemma":[0.00014589845,0.000050912207,0.000013885921,0.00003137897,0.0000017024026,0.00014364558,0.00007092641,0.0000468998,0.00017985364],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[6.0810606e-7,9.910201e-7,1.4199273e-7,0.0015015394,0.000008235786,0.0000015791276,0.00004095904,0.0025597138,0.00003511915,0.0001271127,0.9941735,0.0015505007],"study_design_scores_gemma":[0.000020471101,0.0000019716274,0.0000023368411,0.00051195914,0.0000018797891,0.0000021247479,0.000002425406,0.54525256,0.0000387453,0.00013860072,0.45398772,0.000039177547],"about_ca_topic_score_codex":4.7217284e-7,"about_ca_topic_score_gemma":0.00000797557,"teacher_disagreement_score":0.78014684,"about_ca_system_score_codex":0.000012303838,"about_ca_system_score_gemma":0.00001361427,"threshold_uncertainty_score":0.9996411},"labels":[],"label_agreement":null},{"id":"W6925137892","doi":"10.17611/dp/1466617","title":"Magnetotelluric Transfer Functions","year":2013,"lang":"en","type":"other","venue":"NSF Seismological Facility for the Advancement of Geoscience (SAGE)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Magnetotellurics; Transfer function; Field (mathematics); Transfer (computing); Interpretation (philosophy)","score_opus":0.014595062965468994,"score_gpt":0.21577690369809352,"score_spread":0.20118184073262452,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6925137892","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00025123818,0.0031325386,0.98913634,0.00044850327,0.001803849,0.0018566157,0.0012461602,0.00036085327,0.0017638968],"genre_scores_gemma":[0.008109862,0.0018960171,0.000904432,0.00021671265,0.00007445413,0.00053243135,0.00004472149,0.00006207102,0.9881593],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9979159,0.000047598514,0.0005011599,0.0005347329,0.0003911289,0.0006094301],"domain_scores_gemma":[0.99879676,0.00022396496,0.00006596288,0.0007497459,0.00004879924,0.000114770555],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0004632553,0.00039493412,0.0005299961,0.0000864137,0.00013261869,0.000028449052,0.0006735909,0.0002829436,0.001883795],"category_scores_gemma":[0.000084152154,0.00025432964,0.00028097513,0.00029841124,0.0005886162,0.000113482034,0.0000684903,0.00025737434,0.00020221701],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017921206,0.00011279031,0.000021971247,0.00058124756,0.000055164077,0.0000011943642,0.000048103597,0.003232323,0.0003004143,0.00068940036,0.00050114054,0.99443835],"study_design_scores_gemma":[0.00026498447,0.0002051373,0.00014080017,0.00010465469,0.00004758233,0.0000027392452,0.00006525077,0.0029499193,0.00010976287,0.00016646292,0.99564284,0.00029987827],"about_ca_topic_score_codex":0.0002055531,"about_ca_topic_score_gemma":0.000024219582,"teacher_disagreement_score":0.9951417,"about_ca_system_score_codex":0.000091110654,"about_ca_system_score_gemma":0.000028570275,"threshold_uncertainty_score":0.9999909},"labels":[],"label_agreement":null},{"id":"W6931430035","doi":"10.5281/zenodo.5168863","title":"tardis-sn/tardis: TARDIS v2021.8.8.0","year":2021,"lang":"en","type":"other","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Sequence (biology); Documentation; Set (abstract data type); Component (thermodynamics); Process (computing)","score_opus":0.016712951552822347,"score_gpt":0.20636061558962868,"score_spread":0.18964766403680633,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6931430035","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000037348163,0.0023974124,0.0063448567,0.00015121394,0.0009664949,0.0005456438,0.00081243267,0.003452417,0.9852922],"genre_scores_gemma":[0.029070778,0.0031783932,0.0011034094,0.00028425356,0.002243023,7.506693e-7,0.012527839,0.040498354,0.9110932],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9976366,0.0002644947,0.00037150126,0.00064206787,0.00047572397,0.00060957886],"domain_scores_gemma":[0.9983069,0.00001714253,0.00009952987,0.0010730972,0.00024609055,0.00025724413],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00046907214,0.00038101917,0.00047846782,0.00030385258,0.0005342859,0.0005372136,0.0011444204,0.0002922004,0.10531924],"category_scores_gemma":[0.0003040285,0.00041758368,0.00018944511,0.0005421882,0.00014615293,0.00009782993,0.0008712572,0.0005428332,0.014184663],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000072118537,0.000041924883,5.410976e-7,0.0007245963,0.00020185983,0.000050021692,0.00030760435,0.00018425773,0.00030559045,0.00070137944,0.98604536,0.011429639],"study_design_scores_gemma":[0.00029819802,0.000042854714,0.000032159347,0.0004242004,0.00003271404,0.00009090341,0.0001499434,0.0002776287,0.000090378075,0.000041524163,0.99807996,0.0004395696],"about_ca_topic_score_codex":0.000060829116,"about_ca_topic_score_gemma":0.000005742775,"teacher_disagreement_score":0.09113458,"about_ca_system_score_codex":0.0002794489,"about_ca_system_score_gemma":0.000006471772,"threshold_uncertainty_score":0.9998276},"labels":[],"label_agreement":null},{"id":"W6977351549","doi":"10.6084/m9.figshare.27345648.v1","title":"Code and Data for BNNMSO Model","year":2024,"lang":"en","type":"article","venue":"Figshare","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Code (set theory); Power (physics); Data modeling; Data model (GIS); Source code; Scheme (mathematics)","score_opus":0.08111402362153683,"score_gpt":0.29103226866624426,"score_spread":0.20991824504470744,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6977351549","genre_codex":"dataset","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00005683532,0.0056201154,0.005560751,0.00012878087,0.00017812652,0.00024358745,0.9844274,0.0005114844,0.003272941],"genre_scores_gemma":[0.7802037,0.000056252196,0.0026413372,0.00015212873,0.00032537273,0.00054799905,0.21274717,0.000105881416,0.0032201721],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996419,0.0000017358678,0.000064773725,0.00015192709,0.00003356619,0.00010611351],"domain_scores_gemma":[0.99961954,0.000045519293,0.0000029531218,0.00028905732,0.000011777369,0.00003117701],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000035872534,0.000056135515,0.00006156136,0.000013962045,0.000014888251,0.000049923015,0.00015140763,0.0000367177,0.0012718427],"category_scores_gemma":[0.00014589845,0.000050912207,0.000013885921,0.00003137897,0.0000017024026,0.00014364558,0.00007092641,0.0000468998,0.00017985364],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[6.0810606e-7,9.910201e-7,1.4199273e-7,0.0015015394,0.000008235786,0.0000015791276,0.00004095904,0.0025597138,0.00003511915,0.0001271127,0.9941735,0.0015505007],"study_design_scores_gemma":[0.000020471101,0.0000019716274,0.0000023368411,0.00051195914,0.0000018797891,0.0000021247479,0.000002425406,0.54525256,0.0000387453,0.00013860072,0.45398772,0.000039177547],"about_ca_topic_score_codex":4.7217284e-7,"about_ca_topic_score_gemma":0.00000797557,"teacher_disagreement_score":0.78014684,"about_ca_system_score_codex":0.000012303838,"about_ca_system_score_gemma":0.00001361427,"threshold_uncertainty_score":0.9996411},"labels":[],"label_agreement":null},{"id":"W6977550468","doi":"10.6084/m9.figshare.19759730.v1","title":"Additional file 4 of Galbase: a comprehensive repository for integrating chicken multi-omics data","year":2022,"lang":"en","type":"article","venue":"Figshare","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Data file; File format; Key (lock); File system; Set (abstract data type)","score_opus":0.04980496598364709,"score_gpt":0.24023304480828458,"score_spread":0.1904280788246375,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6977550468","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000005822507,0.000110895824,0.00006249841,0.000004818528,0.000107400854,0.000261723,0.99841905,0.000091748174,0.0009360676],"genre_scores_gemma":[0.0019206097,1.9649359e-7,0.004242107,0.000033060922,0.00006609276,0.0020295435,0.99129575,0.000020335012,0.0003922945],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993603,0.000022269522,0.00020221178,0.00017645366,0.000107594766,0.00013113726],"domain_scores_gemma":[0.99837345,0.001027829,0.000074905525,0.0004034587,0.00008893003,0.000031443196],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000022990289,0.000087419496,0.00013865458,0.000027540027,0.00010107653,0.000010774884,0.0003691325,0.000030446054,0.82335085],"category_scores_gemma":[0.0013288154,0.00009468845,0.00005380106,0.00007496378,0.0000056830336,0.00008694473,0.00024798664,0.00014786862,0.000054866032],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004140915,0.000015409547,1.944782e-7,0.00033989124,0.00001786164,0.0000026605544,0.000057241858,0.0012512918,0.00006960544,0.0000026202144,0.99803567,0.000203418],"study_design_scores_gemma":[0.00011086522,0.000019489931,0.00005930539,0.0006145515,0.000002376491,0.000015488165,0.00018349384,0.13377538,0.000098800345,0.0000032548244,0.8650273,0.00008971661],"about_ca_topic_score_codex":0.00000401811,"about_ca_topic_score_gemma":0.000007210247,"teacher_disagreement_score":0.823296,"about_ca_system_score_codex":0.0000626444,"about_ca_system_score_gemma":0.000060328526,"threshold_uncertainty_score":0.38612828},"labels":[],"label_agreement":null},{"id":"W6980661188","doi":"","title":"Comparative Study of Maintenance Strategies&#13;\\nfor Wind Turbine Systems","year":2010,"lang":"en","type":"dissertation","venue":"Spectrum Research Repository (Concordia University)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Concordia University","keywords":"Wind power; Turbine; Renewable energy; Electricity generation; Electric power system; Power (physics)","score_opus":0.021475453116975098,"score_gpt":0.26969375345703833,"score_spread":0.24821830034006323,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6980661188","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8025985,0.00029061,0.00004093008,0.0000084892845,0.0033670673,0.0016790425,0.00003634603,0.00019000102,0.19178902],"genre_scores_gemma":[0.96650296,0.000075938784,0.000003993968,3.9055362e-7,0.00025292096,0.000014230103,0.0000615718,0.000066347005,0.033021662],"study_design_codex":"bench_or_experimental","study_design_gemma":"qualitative","domain_scores_codex":[0.99619025,0.00047849622,0.0006674855,0.0007453611,0.0009928435,0.000925575],"domain_scores_gemma":[0.9972521,0.0002786323,0.00028273236,0.0011229842,0.00075428776,0.00030924033],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0007219086,0.00051471236,0.001154414,0.0010550369,0.00036204985,0.00019052975,0.001214003,0.0005843354,0.000024389958],"category_scores_gemma":[0.000046099187,0.00054007804,0.00021232695,0.0012092658,0.00028508232,0.000485584,0.00010702348,0.0023984478,0.000033304306],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.018019024,0.011492668,0.06390546,0.05142079,0.018344475,0.018114377,0.16316837,0.13002236,0.38968122,0.0636266,0.0711987,0.0010059495],"study_design_scores_gemma":[0.008124941,0.0063635935,0.17579041,0.003764539,0.0006391002,0.00015620142,0.6399073,0.010373656,0.0426946,0.0005391422,0.10773382,0.003912707],"about_ca_topic_score_codex":0.021956408,"about_ca_topic_score_gemma":0.07686135,"teacher_disagreement_score":0.4767389,"about_ca_system_score_codex":0.0006923826,"about_ca_system_score_gemma":0.0007824687,"threshold_uncertainty_score":0.9999031},"labels":[],"label_agreement":null},{"id":"W6997476467","doi":"","title":"WindESCo Partners with Capital Power to Identify Tuning and Maintenance Opportunities on Canadian Wind Facilities","year":2020,"lang":"en","type":"other","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Capital (architecture); Power (physics); Government (linguistics); Wind power; Investment (military); Productivity","score_opus":0.022138525314262712,"score_gpt":0.22787551506926365,"score_spread":0.20573698975500093,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6997476467","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0015960241,0.00043087333,0.00093133404,0.0006942954,0.00057281536,0.0005660211,0.00050278386,0.0005795554,0.9941263],"genre_scores_gemma":[0.39932173,0.0001053676,0.00020340829,0.00076299557,0.00008459655,0.000030837695,0.000025445943,0.00035520195,0.5991104],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99850285,0.000023470713,0.00022291696,0.00042496252,0.00022921237,0.00059656164],"domain_scores_gemma":[0.9988541,0.000027671591,0.000036309666,0.00036477848,0.000027420721,0.000689713],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00009918702,0.0004554761,0.0004741047,0.0002980981,0.0000521562,0.0001133681,0.00021185323,0.00022068359,0.0012119336],"category_scores_gemma":[0.00003070312,0.0003832492,0.000048612077,0.00010549226,0.00012922063,0.000082690254,0.000034203167,0.00028518785,0.00017267451],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018153767,0.0000051628604,0.00009464628,0.0005046418,0.00019106697,0.00027813468,0.0030966129,0.00026183564,0.000021032027,0.004315569,0.99081784,0.0003953232],"study_design_scores_gemma":[0.00018832822,0.00012451058,0.000212062,0.0009891306,0.000014080793,0.000023132487,0.006065858,0.000056196233,0.00001741092,0.00002037062,0.99168956,0.00059936906],"about_ca_topic_score_codex":0.035355188,"about_ca_topic_score_gemma":0.17654967,"teacher_disagreement_score":0.3977257,"about_ca_system_score_codex":0.00018454895,"about_ca_system_score_gemma":0.0001633776,"threshold_uncertainty_score":0.99986196},"labels":[],"label_agreement":null},{"id":"W7000630071","doi":"","title":"First quarter global power and utilities transaction activity up 50% compared to Q1 2015","year":2016,"lang":"en","type":"other","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Database transaction; Power (physics); Quarter (Canadian coin); Production (economics); Payment","score_opus":0.007441409373469271,"score_gpt":0.2251372170635305,"score_spread":0.21769580769006122,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7000630071","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00044484387,0.0005272401,0.15061349,0.00043205978,0.0031113764,0.00055511796,0.00038089984,0.00090083154,0.84303415],"genre_scores_gemma":[0.5213395,0.00008929582,0.00019055246,0.000047008714,0.00012240837,0.000052281604,0.000003476829,0.00014603093,0.47800946],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99912465,0.000021595333,0.00015110489,0.00027980283,0.00013688313,0.0002859771],"domain_scores_gemma":[0.9994756,0.000025253838,0.000025940573,0.00031984117,0.000017442368,0.00013593341],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000078341574,0.00028202083,0.00037032916,0.000059046826,0.000024720806,0.000033035543,0.000109096036,0.00024365373,0.0028186422],"category_scores_gemma":[0.000004539768,0.00021942673,0.00007100891,0.000043691874,0.000045354118,0.000083743886,0.000011832432,0.00008803735,0.0004841237],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050118222,0.000013852058,0.00003401826,0.0003468322,0.000078234974,8.3743197e-7,0.00017815146,0.0000158535,0.000025573896,0.00016289305,0.9985218,0.00057180645],"study_design_scores_gemma":[0.00040497,0.000026515083,0.0004700365,0.0003162092,0.000013610175,0.0000068992663,0.00009789358,0.00016777973,0.00003781298,0.000043557626,0.9980943,0.00032039385],"about_ca_topic_score_codex":0.0005719081,"about_ca_topic_score_gemma":0.003632532,"teacher_disagreement_score":0.52089465,"about_ca_system_score_codex":0.00014854061,"about_ca_system_score_gemma":0.000013184829,"threshold_uncertainty_score":0.9980929},"labels":[],"label_agreement":null},{"id":"W7009968315","doi":"","title":"Formal Probabilistic Risk Assessment using Theorem Proving with Applications in Power Systems","year":2021,"lang":"en","type":"dissertation","venue":"Spectrum Research Repository (Concordia University)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Probabilistic logic; Reliability (semiconductor); Fault tree analysis; Electric power system; Block (permutation group theory); Probabilistic risk assessment; Power transmission; Block diagram; Event (particle physics); Formal verification","score_opus":0.012259728091307443,"score_gpt":0.25197387983639713,"score_spread":0.2397141517450897,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7009968315","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8458004,0.000532745,0.0052669807,0.000007810991,0.00081002136,0.0023961063,0.000035417594,0.00021863387,0.14493188],"genre_scores_gemma":[0.9942098,0.000087683635,0.000094757226,3.8393918e-7,0.00007838326,0.00006323644,0.00009577891,0.00007846697,0.005291466],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9966965,0.0005574905,0.00041428205,0.0007029596,0.0007004556,0.0009283599],"domain_scores_gemma":[0.9981399,0.0002627899,0.00017251908,0.00080685015,0.00040244218,0.00021548007],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008955403,0.00037451557,0.0005588312,0.0008584392,0.00051603187,0.00026187743,0.00056742074,0.00035076603,0.000010063791],"category_scores_gemma":[0.000051801217,0.00037493402,0.00013293701,0.0014367192,0.00015568982,0.0004875684,0.00009555754,0.0016488824,0.00000410593],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021367797,0.0019395823,0.39210114,0.03444961,0.00341793,0.008902602,0.011770248,0.26555625,0.025210984,0.25295454,0.0005793174,0.0009809816],"study_design_scores_gemma":[0.007545081,0.0024340036,0.48445475,0.017700218,0.0012885928,0.00059326494,0.20777513,0.18703823,0.0121181365,0.0025682491,0.06828202,0.008202329],"about_ca_topic_score_codex":0.0076241395,"about_ca_topic_score_gemma":0.01745499,"teacher_disagreement_score":0.2503863,"about_ca_system_score_codex":0.0028087639,"about_ca_system_score_gemma":0.0014155455,"threshold_uncertainty_score":0.99987024},"labels":[],"label_agreement":null},{"id":"W7016061426","doi":"","title":"Wind energy contributes to improvement of Ontario's electricity grid stability and reliability | Electric Power News","year":2014,"lang":"en","type":"other","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Wind power; Stability (learning theory); Electricity; Grid; Electric energy; Renewable energy","score_opus":0.0031644677512985054,"score_gpt":0.17131693707358214,"score_spread":0.16815246932228364,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7016061426","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07666009,0.0034794528,0.10401963,0.000254447,0.0034877008,0.003519866,0.0002723448,0.0014794786,0.806827],"genre_scores_gemma":[0.88844484,0.00022601911,0.0006055829,0.00037667074,0.00016540725,0.00011817277,0.000031615553,0.00041596926,0.109615706],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99750894,0.000066825894,0.0007735779,0.00072050147,0.0002885974,0.00064155686],"domain_scores_gemma":[0.998308,0.00013608871,0.00015937092,0.001038859,0.00013354949,0.00022411876],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0006061533,0.000538114,0.0011260032,0.00027391844,0.000028895643,0.00003043996,0.00031873837,0.0004858488,0.0011105092],"category_scores_gemma":[0.0001880024,0.00046916603,0.00015750012,0.00037338474,0.00006640715,0.000047413076,0.000104839746,0.00032535574,0.000015197413],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019975024,0.00044969746,0.0076407543,0.0023161354,0.0005881821,0.0000033605636,0.00035703043,0.0003343211,0.016827112,0.0028041597,0.96352583,0.004953672],"study_design_scores_gemma":[0.00052921876,0.0004122992,0.0016803404,0.00014726436,0.000057019726,0.0000015890131,0.000012347043,0.00021823322,0.016357558,0.00034823237,0.9796551,0.00058079895],"about_ca_topic_score_codex":0.092621766,"about_ca_topic_score_gemma":0.11309346,"teacher_disagreement_score":0.81178474,"about_ca_system_score_codex":0.0010214734,"about_ca_system_score_gemma":0.00023497286,"threshold_uncertainty_score":0.9998026},"labels":[],"label_agreement":null},{"id":"W7017009890","doi":"","title":"ADEQUACY ASSESSMENT OF COMPOSITE POWER SYSTEMS INCORPORATING FACTS","year":2003,"lang":"en","type":"dissertation","venue":"University Library (University of Saskatchewan)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Reliability (semiconductor); Electric power system; Power transmission; Contingency; Transmission system; Transmission (telecommunications); Electric power transmission; Range (aeronautics)","score_opus":0.005051378787395759,"score_gpt":0.17118934987617757,"score_spread":0.1661379710887818,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7017009890","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86619914,0.00051668007,0.005435182,0.000037016132,0.0016461121,0.0007256883,0.00065205793,0.00043675274,0.124351405],"genre_scores_gemma":[0.96947306,0.00011311961,0.0028761104,0.0000048220895,0.00000973242,8.2557e-8,0.0005808497,0.00004622805,0.026896],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9984878,0.00014520327,0.00031970954,0.00038211668,0.0003624926,0.000302716],"domain_scores_gemma":[0.9986203,0.0000868369,0.0004871162,0.0004912336,0.00013831288,0.00017621697],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001262397,0.0003725223,0.0008489235,0.00044494236,0.0001541279,0.00002269097,0.00070956134,0.0004914473,0.00020445422],"category_scores_gemma":[0.000004064726,0.00052595336,0.00029953744,0.0005237271,0.00013400342,0.001206628,0.00009641986,0.00047145155,0.000014140161],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0035503607,0.0038849104,0.12522903,0.102317594,0.01404371,0.0043349112,0.3922661,0.160791,0.07887955,0.04100186,0.06998646,0.0037145026],"study_design_scores_gemma":[0.003439069,0.00044974702,0.023741184,0.004862935,0.0007387599,0.000019203218,0.9169398,0.0073138243,0.0045018382,0.00028162566,0.03523525,0.0024767965],"about_ca_topic_score_codex":0.0005911045,"about_ca_topic_score_gemma":0.00034995674,"teacher_disagreement_score":0.52467364,"about_ca_system_score_codex":0.00018917331,"about_ca_system_score_gemma":0.0004514975,"threshold_uncertainty_score":0.9997192},"labels":[],"label_agreement":null},{"id":"W7027396716","doi":"","title":"Canadian Infrastructure Technology Assessment Centre - proving product performance","year":2002,"lang":"en","type":"article","venue":"NPARC","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Product (mathematics); Value (mathematics); Technology assessment; Value for money","score_opus":0.0032691609540924874,"score_gpt":0.16575018648286402,"score_spread":0.16248102552877153,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7027396716","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.74656403,0.0003421219,0.00044790976,0.004488242,0.0013647521,0.0006066533,0.000020834757,0.00078409177,0.24538134],"genre_scores_gemma":[0.9969103,0.00004469726,0.0020205013,0.000037945425,0.000061019156,0.000018385852,0.0000019726365,0.000017347713,0.00088786153],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991945,0.000008017288,0.00013865888,0.00017274918,0.00009109308,0.00039495062],"domain_scores_gemma":[0.9995315,0.0000047752164,0.00001598574,0.00030803133,0.000036272304,0.00010345581],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000068809175,0.00011810841,0.00012344644,0.00012155589,0.00007110323,0.00002002937,0.00017786492,0.00008172435,0.000538007],"category_scores_gemma":[0.000021658241,0.00011080487,0.000020061636,0.00022464193,0.000028804066,0.00010528521,0.000018884124,0.00024113781,0.00007589218],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000044275757,0.00007247633,0.16384645,0.0020045484,0.00016085485,0.000099460136,0.0023069682,0.019869076,0.037915494,0.011732669,0.25979155,0.502196],"study_design_scores_gemma":[0.00042703832,0.000062117855,0.022274759,0.0002589872,0.000018824425,0.00011520749,0.0003168053,0.2393449,0.00760873,0.001215478,0.7276349,0.00072224345],"about_ca_topic_score_codex":0.00025742594,"about_ca_topic_score_gemma":0.0034835024,"teacher_disagreement_score":0.5014738,"about_ca_system_score_codex":0.00039761903,"about_ca_system_score_gemma":0.00004463714,"threshold_uncertainty_score":0.58908},"labels":[],"label_agreement":null},{"id":"W7027699105","doi":"","title":"Contribution a l’évaluation de la fiabilité d’un réseau électrique","year":2012,"lang":"en","type":"dissertation","venue":"University of Biskra Theses Repository (University of Biskra)","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Electric power system; Transmission system; Power transmission; Electric power transmission; Power (physics); Transmission (telecommunications); Range (aeronautics); Electric power industry","score_opus":0.003694385888666916,"score_gpt":0.17329988423399525,"score_spread":0.16960549834532834,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7027699105","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94650733,0.0014092281,0.008544526,0.000034095494,0.00071898144,0.0005974787,0.0000880986,0.00029683055,0.041803427],"genre_scores_gemma":[0.9958152,0.00070334174,0.0007615296,0.000002115349,0.000049605464,2.6945136e-7,0.00015707049,0.000031657455,0.0024791798],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99803776,0.0004895929,0.0002732646,0.00036885557,0.00042052424,0.00041000685],"domain_scores_gemma":[0.99797153,0.0003812792,0.0004477591,0.00054583355,0.0004763153,0.0001772935],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007659009,0.00033504178,0.0006823983,0.0003045594,0.00033562677,0.000016435904,0.0006004568,0.0008292575,0.0001468572],"category_scores_gemma":[0.00010975805,0.00047052593,0.00044693297,0.00034919527,0.00031373216,0.00040653843,0.000063594234,0.00048283566,0.000014726009],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.006368577,0.0027369126,0.028291475,0.014248315,0.0063151084,0.00065116753,0.15004484,0.010835083,0.71427673,0.012839814,0.007733568,0.04565838],"study_design_scores_gemma":[0.008459734,0.0012083775,0.53377014,0.0050590625,0.0053282273,0.0002633748,0.09027988,0.031467386,0.19833235,0.00274825,0.11847409,0.004609133],"about_ca_topic_score_codex":0.0020628723,"about_ca_topic_score_gemma":0.00048764748,"teacher_disagreement_score":0.5159444,"about_ca_system_score_codex":0.0006579383,"about_ca_system_score_gemma":0.00028734517,"threshold_uncertainty_score":0.99977463},"labels":[],"label_agreement":null},{"id":"W7095264850","doi":"","title":"Comparison of Two Methods for Evaluating the Effects","year":2004,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Failure rate; Electric power system; Index (typography); Power (physics); Maintenance engineering","score_opus":0.05249161690320265,"score_gpt":0.45191330960148784,"score_spread":0.3994216926982852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7095264850","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05401253,0.0005948599,0.941035,0.00005179612,0.00052620796,0.00040719588,6.1356536e-7,0.00008534389,0.0032864518],"genre_scores_gemma":[0.82615936,0.0000014022041,0.17369933,0.00001806177,0.000016115484,0.00005263109,3.4952643e-7,0.0000071046043,0.000045625733],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995519,0.00004443711,0.00017031086,0.00006355443,0.000053654807,0.00011614689],"domain_scores_gemma":[0.9991252,0.0006338576,0.00002216941,0.00016795385,0.000034392415,0.000016455197],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00086085976,0.000056777833,0.00015387662,0.000011365555,0.000027362828,0.000005713485,0.000099371035,0.000021383288,0.0000034755344],"category_scores_gemma":[0.0003093492,0.000035174042,0.000054556847,0.00005970906,0.000018916979,0.000026272744,0.000011478568,0.000047569487,0.0000031013951],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025545554,0.00007952963,0.0005681394,0.0024914797,0.00013246945,1.5734273e-7,0.0036584255,0.41507673,0.33063883,0.08077041,0.00094319676,0.16561508],"study_design_scores_gemma":[0.0012773972,0.00036411767,0.0003875286,0.00018367209,0.000044673296,0.0000019158165,0.00019729228,0.43057224,0.5478031,0.016449952,0.0025683972,0.00014969253],"about_ca_topic_score_codex":0.000024308336,"about_ca_topic_score_gemma":0.000011670277,"teacher_disagreement_score":0.7721468,"about_ca_system_score_codex":0.000030715077,"about_ca_system_score_gemma":0.000009848035,"threshold_uncertainty_score":0.14343558},"labels":[],"label_agreement":null},{"id":"W7096882971","doi":"","title":"Wide-Area Trans-Regional Northeast Reliability Assessment","year":2007,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Contingency; Grid; Point (geometry); Transmission (telecommunications); Power grid; Contingency plan","score_opus":0.010804454779534753,"score_gpt":0.2291550541087706,"score_spread":0.21835059932923584,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096882971","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15838228,0.00008887851,0.72319484,0.00063628354,0.00069152424,0.00028070246,0.0000079470365,0.00064209336,0.11607548],"genre_scores_gemma":[0.9962552,0.000018605686,0.0029762627,0.00015998082,0.000035282854,0.000013718003,0.000006634233,0.000018755356,0.000515528],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.99879307,0.000016877233,0.00035172683,0.00022174137,0.00023638747,0.00038018118],"domain_scores_gemma":[0.9992438,0.00015371974,0.000016731328,0.00037112378,0.0000668426,0.00014778388],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008089632,0.00015873247,0.00019502894,0.000043946344,0.000048663598,0.000016399774,0.0001593556,0.00009035188,0.0002317324],"category_scores_gemma":[0.000022178438,0.00013483904,0.000107679974,0.00014738154,0.000059655147,0.00013014286,0.000011912246,0.00017863685,0.00004335556],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033431995,0.0017350668,0.61924434,0.0029954268,0.0005646109,0.00020140235,0.0039670733,0.08547168,0.011489188,0.06692535,0.15385608,0.053215455],"study_design_scores_gemma":[0.0010045457,0.00011171865,0.41777068,0.00012860492,0.00002866909,0.000046070352,0.00045463225,0.02566619,0.0014825823,0.0021103024,0.5503515,0.0008445357],"about_ca_topic_score_codex":0.00006636301,"about_ca_topic_score_gemma":0.00035884796,"teacher_disagreement_score":0.8378729,"about_ca_system_score_codex":0.00017233245,"about_ca_system_score_gemma":0.000029885727,"threshold_uncertainty_score":0.5498576},"labels":[],"label_agreement":null},{"id":"W7097123134","doi":"","title":"Respectfully submitted,","year":2009,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Notice; Reliability (semiconductor); Table (database); Quarter (Canadian coin); National standard","score_opus":0.003059137399383849,"score_gpt":0.1699912044921433,"score_spread":0.16693206709275946,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097123134","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.111481264,0.00042268055,0.030000534,0.00077723846,0.0005369968,0.00012301668,0.000001501819,0.0014175558,0.8552392],"genre_scores_gemma":[0.9972354,0.000014010664,0.00036711222,0.00019325652,0.000040727256,0.0000015858022,3.958287e-7,0.0000043250157,0.002143177],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99965537,0.000004222152,0.00008500535,0.00006582798,0.000054264456,0.000135314],"domain_scores_gemma":[0.9997828,0.000008337638,0.0000035592968,0.00015641315,0.000011827001,0.00003709176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006568242,0.00005223207,0.00006415242,0.000019670973,0.000011757869,0.000011363104,0.0000724631,0.00002870664,0.0000834821],"category_scores_gemma":[0.000012597738,0.000044109423,0.00002522525,0.000071243805,0.0000059823046,0.000050862596,0.000002908249,0.00004874014,0.00024404691],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042507065,0.00012460581,0.0010072973,0.00015448609,0.0000597534,0.000105977524,0.00090962835,0.010920533,0.049477696,0.23975833,0.6079534,0.08948575],"study_design_scores_gemma":[0.0006676265,0.00016267,0.038656425,0.00006863066,0.0000091849215,0.00006458682,0.00011548301,0.021408055,0.022901116,0.013797084,0.9015052,0.000643982],"about_ca_topic_score_codex":0.0000040544483,"about_ca_topic_score_gemma":0.000007708968,"teacher_disagreement_score":0.88575417,"about_ca_system_score_codex":0.000024570696,"about_ca_system_score_gemma":0.0000031601148,"threshold_uncertainty_score":0.31368107},"labels":[],"label_agreement":null},{"id":"W7097308923","doi":"","title":"Please contact the undersigned if you have any questions. Respectfully submitted,","year":2009,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Quarter (Canadian coin); Table (database); Transmission (telecommunications)","score_opus":0.007993508892500691,"score_gpt":0.20966543323834205,"score_spread":0.20167192434584136,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097308923","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26927108,0.0036556292,0.19203082,0.021638133,0.0023490912,0.0021811721,0.00005446246,0.0039326334,0.504887],"genre_scores_gemma":[0.99697864,0.00004528644,0.0001258361,0.000551934,0.00007670908,0.000010218543,0.0000024003355,0.000012348054,0.002196605],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991214,0.000049216935,0.00021759591,0.00016818052,0.00014569727,0.00029786144],"domain_scores_gemma":[0.9993083,0.000089859794,0.000021736014,0.00043588204,0.00005017375,0.0000940696],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028585084,0.00014557234,0.00015473136,0.000043608157,0.00009211021,0.00005685409,0.00021791081,0.00007619677,0.00008661674],"category_scores_gemma":[0.000089136556,0.00009960467,0.00008200623,0.00013263393,0.000030965697,0.00012023018,0.00001157825,0.00016277813,0.00013662595],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047598072,0.00046719098,0.005745476,0.00032810585,0.00045053646,0.00032782138,0.005082593,0.028282521,0.0286436,0.5072473,0.40604764,0.01690119],"study_design_scores_gemma":[0.0066104266,0.0014155025,0.30222654,0.00072500046,0.00027345304,0.00038388156,0.007076369,0.1009202,0.01759216,0.056023907,0.5034184,0.0033341735],"about_ca_topic_score_codex":0.00013117163,"about_ca_topic_score_gemma":0.0001326745,"teacher_disagreement_score":0.72770756,"about_ca_system_score_codex":0.0001304001,"about_ca_system_score_gemma":0.000027327418,"threshold_uncertainty_score":0.40617606},"labels":[],"label_agreement":null},{"id":"W7097361548","doi":"","title":"Special Report: Potential Reliability Impacts of Emerging Flexible Resources","year":2011,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Electricity; Electric power industry; Electric power system; Table (database); Corporation; Commission; Electric power","score_opus":0.01018273567812358,"score_gpt":0.20526336600357792,"score_spread":0.19508063032545434,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097361548","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6973379,0.000088862966,0.0053960667,0.000027753094,0.0022973425,0.00017759684,0.000006292592,0.00038794187,0.2942802],"genre_scores_gemma":[0.996769,0.000017706489,0.0016745712,0.000008549557,0.00060426176,0.0000051786806,0.0000017304731,0.000018549998,0.0009004546],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987481,0.00002596541,0.0005321875,0.00021016337,0.00018991358,0.0002936244],"domain_scores_gemma":[0.9991972,0.000018225406,0.00007647309,0.0005263589,0.000081526836,0.00010022936],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005287811,0.00013740045,0.00025362545,0.00006612773,0.000033355216,0.000009390518,0.00017715358,0.00008756567,0.00077076873],"category_scores_gemma":[0.0001378307,0.00011889578,0.0001217725,0.00016264003,0.00007502723,0.00016631189,0.000048658792,0.000114639246,0.000036428704],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018896264,0.0024758002,0.15171504,0.011477489,0.0014390456,0.00275179,0.09415035,0.037404515,0.16588369,0.02574379,0.4718007,0.033268157],"study_design_scores_gemma":[0.002102317,0.0005102701,0.32164115,0.00061789504,0.00017388008,0.000812213,0.0034761266,0.009904852,0.26264167,0.009291603,0.38671634,0.0021116831],"about_ca_topic_score_codex":0.0003780644,"about_ca_topic_score_gemma":0.000053814252,"teacher_disagreement_score":0.29943106,"about_ca_system_score_codex":0.000046835543,"about_ca_system_score_gemma":0.000019163575,"threshold_uncertainty_score":0.8439377},"labels":[],"label_agreement":null},{"id":"W7097557054","doi":"","title":"Reliability Compliance","year":2013,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Disclaimer; Reliability (semiconductor); Web site; Compliance (psychology); Subject (documents); Web application; The Internet; Web page","score_opus":0.012840844900561456,"score_gpt":0.20290248239166342,"score_spread":0.19006163749110197,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097557054","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30901945,0.00025332734,0.0815504,0.00044960828,0.0013544312,0.0006142177,0.0000036919737,0.0019388193,0.6048161],"genre_scores_gemma":[0.99614435,0.000008717444,0.0019026326,0.000094967414,0.0000223762,0.000046578916,6.20797e-7,0.000008376818,0.0017713889],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995246,0.000008110424,0.00013169319,0.0001031641,0.00005926803,0.00017316264],"domain_scores_gemma":[0.9995746,0.000027173428,0.000005830373,0.00028866564,0.000045198274,0.000058559726],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000076231976,0.000069835565,0.000092594455,0.0000105768895,0.000017966031,0.000019256813,0.00010873743,0.000034295204,0.0007657888],"category_scores_gemma":[0.000026380007,0.000056227986,0.000030373985,0.00006563629,0.000028213773,0.00015700777,0.000013810541,0.000064228785,0.0027850566],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006585395,0.00016646898,0.010365717,0.0017740265,0.00006791624,0.000005247872,0.0006216323,0.022642616,0.03676566,0.026645714,0.85274804,0.048190366],"study_design_scores_gemma":[0.00058611424,0.000057364137,0.18999453,0.00016230888,0.000007704196,0.00002168993,0.00021675063,0.32900032,0.010043001,0.020531682,0.44843075,0.00094777346],"about_ca_topic_score_codex":0.00008109189,"about_ca_topic_score_gemma":0.0000064492474,"teacher_disagreement_score":0.6871249,"about_ca_system_score_codex":0.000035737947,"about_ca_system_score_gemma":0.0000032141445,"threshold_uncertainty_score":0.9979914},"labels":[],"label_agreement":null},{"id":"W7097740954","doi":"","title":"STANDARD EOP-008-1 AND RETIREMENT OF ONE EXISTING RELIABILITY STANDARD EOP-008-0","year":2011,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Notice; Reliability (semiconductor); Control (management); Quarter (Canadian coin); Table (database)","score_opus":0.038675962033833784,"score_gpt":0.22250276439651795,"score_spread":0.18382680236268417,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097740954","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75093114,0.0009110915,0.059686687,0.00011962449,0.000867781,0.0009156502,0.00019846429,0.00071086007,0.18565872],"genre_scores_gemma":[0.98623836,0.00016887173,0.013101844,0.00002402742,0.000036748956,0.000023820272,0.000003493512,0.00003428568,0.00036852807],"study_design_codex":"observational","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9979883,0.00007453268,0.00071159826,0.00038652538,0.0004065061,0.00043255006],"domain_scores_gemma":[0.9987607,0.00009291719,0.000095569594,0.00065001834,0.00023148695,0.00016932249],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001436573,0.00025237026,0.0005525175,0.0000649581,0.00007204427,0.000023579545,0.00019945025,0.0001342304,0.0003472333],"category_scores_gemma":[0.00027214226,0.00023033921,0.0000891877,0.00016523876,0.0001854526,0.00019853273,0.0001082484,0.00020779345,0.000012954129],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0077629224,0.0022847776,0.38520288,0.047568478,0.0024606297,0.00019897739,0.0785414,0.0036540048,0.06536859,0.23760124,0.059361316,0.10999477],"study_design_scores_gemma":[0.012489463,0.0061716065,0.13687293,0.005953789,0.0006207283,0.00007663911,0.007974586,0.013051304,0.5457113,0.04759742,0.21756929,0.0059109568],"about_ca_topic_score_codex":0.00024253743,"about_ca_topic_score_gemma":0.00013651869,"teacher_disagreement_score":0.4803427,"about_ca_system_score_codex":0.00020761703,"about_ca_system_score_gemma":0.000048575963,"threshold_uncertainty_score":0.93929607},"labels":[],"label_agreement":null},{"id":"W7097828457","doi":"","title":"Respectfully submitted,","year":2009,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Notice; Reliability (semiconductor); Table (database); Quarter (Canadian coin); National standard","score_opus":0.003059137399383849,"score_gpt":0.1699912044921433,"score_spread":0.16693206709275946,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097828457","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.111481264,0.00042268055,0.030000534,0.00077723846,0.0005369968,0.00012301668,0.000001501819,0.0014175558,0.8552392],"genre_scores_gemma":[0.9972354,0.000014010664,0.00036711222,0.00019325652,0.000040727256,0.0000015858022,3.958287e-7,0.0000043250157,0.002143177],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99965537,0.000004222152,0.00008500535,0.00006582798,0.000054264456,0.000135314],"domain_scores_gemma":[0.9997828,0.000008337638,0.0000035592968,0.00015641315,0.000011827001,0.00003709176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006568242,0.00005223207,0.00006415242,0.000019670973,0.000011757869,0.000011363104,0.0000724631,0.00002870664,0.0000834821],"category_scores_gemma":[0.000012597738,0.000044109423,0.00002522525,0.000071243805,0.0000059823046,0.000050862596,0.000002908249,0.00004874014,0.00024404691],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042507065,0.00012460581,0.0010072973,0.00015448609,0.0000597534,0.000105977524,0.00090962835,0.010920533,0.049477696,0.23975833,0.6079534,0.08948575],"study_design_scores_gemma":[0.0006676265,0.00016267,0.038656425,0.00006863066,0.0000091849215,0.00006458682,0.00011548301,0.021408055,0.022901116,0.013797084,0.9015052,0.000643982],"about_ca_topic_score_codex":0.0000040544483,"about_ca_topic_score_gemma":0.000007708968,"teacher_disagreement_score":0.88575417,"about_ca_system_score_codex":0.000024570696,"about_ca_system_score_gemma":0.0000031601148,"threshold_uncertainty_score":0.31368107},"labels":[],"label_agreement":null},{"id":"W7097873619","doi":"","title":"Terms of Reference SE-93 Compliance Auditing of Reliability Standards for Ontario Market Participants","year":2012,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Audit; Reliability (semiconductor); Corporation; Compliance (psychology); Electric power industry; Conformity assessment; Electricity; Generally Accepted Auditing Standards","score_opus":0.07362159561734058,"score_gpt":0.3022213032898274,"score_spread":0.2285997076724868,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097873619","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88970155,0.00017734105,0.020844884,0.000030774314,0.0006205285,0.0005600312,0.00035132637,0.00012913416,0.08758442],"genre_scores_gemma":[0.99509233,0.000012434504,0.003706309,0.000008936994,0.000025811665,0.000045855177,0.0000033706438,0.000014292235,0.001090634],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9985946,0.000023184071,0.00054639357,0.00015304782,0.00021840383,0.00046438197],"domain_scores_gemma":[0.9990425,0.00017618376,0.000110701956,0.00035577908,0.00020780349,0.00010700699],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014418144,0.00013781112,0.0003856065,0.000024866786,0.000027313576,0.0000057708035,0.0001659484,0.00007822505,0.00028644418],"category_scores_gemma":[0.00029062587,0.00011847033,0.00008096322,0.00007593167,0.00008050188,0.0002025965,0.000037551417,0.00010363919,0.000002926623],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007585228,0.0007480942,0.85580814,0.016208759,0.00035298907,0.0000010991215,0.009399057,0.0035508021,0.018876586,0.01241,0.0696903,0.012195633],"study_design_scores_gemma":[0.001773464,0.0003222668,0.57376575,0.0017879866,0.00011000072,0.000007143371,0.0005307566,0.020428099,0.080167845,0.001916324,0.31830722,0.00088317145],"about_ca_topic_score_codex":0.000872122,"about_ca_topic_score_gemma":0.0029447048,"teacher_disagreement_score":0.2820424,"about_ca_system_score_codex":0.00025972305,"about_ca_system_score_gemma":0.00005702189,"threshold_uncertainty_score":0.48310798},"labels":[],"label_agreement":null},{"id":"W7097922326","doi":"","title":"STANDARD EOP-008-1 AND RETIREMENT OF ONE EXISTING RELIABILITY STANDARD EOP-008-0","year":2011,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Notice; Reliability (semiconductor); Control (management); Quarter (Canadian coin); Table (database)","score_opus":0.038675962033833784,"score_gpt":0.22250276439651795,"score_spread":0.18382680236268417,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097922326","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75093114,0.0009110915,0.059686687,0.00011962449,0.000867781,0.0009156502,0.00019846429,0.00071086007,0.18565872],"genre_scores_gemma":[0.98623836,0.00016887173,0.013101844,0.00002402742,0.000036748956,0.000023820272,0.000003493512,0.00003428568,0.00036852807],"study_design_codex":"observational","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9979883,0.00007453268,0.00071159826,0.00038652538,0.0004065061,0.00043255006],"domain_scores_gemma":[0.9987607,0.00009291719,0.000095569594,0.00065001834,0.00023148695,0.00016932249],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001436573,0.00025237026,0.0005525175,0.0000649581,0.00007204427,0.000023579545,0.00019945025,0.0001342304,0.0003472333],"category_scores_gemma":[0.00027214226,0.00023033921,0.0000891877,0.00016523876,0.0001854526,0.00019853273,0.0001082484,0.00020779345,0.000012954129],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0077629224,0.0022847776,0.38520288,0.047568478,0.0024606297,0.00019897739,0.0785414,0.0036540048,0.06536859,0.23760124,0.059361316,0.10999477],"study_design_scores_gemma":[0.012489463,0.0061716065,0.13687293,0.005953789,0.0006207283,0.00007663911,0.007974586,0.013051304,0.5457113,0.04759742,0.21756929,0.0059109568],"about_ca_topic_score_codex":0.00024253743,"about_ca_topic_score_gemma":0.00013651869,"teacher_disagreement_score":0.4803427,"about_ca_system_score_codex":0.00020761703,"about_ca_system_score_gemma":0.000048575963,"threshold_uncertainty_score":0.93929607},"labels":[],"label_agreement":null},{"id":"W7097935112","doi":"","title":"The North American Electric Reliability Corporation (“NERC”) hereby submits","year":2011,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Notice; Reliability (semiconductor); Corporation; Control (management); Quarter (Canadian coin)","score_opus":0.010734711622618534,"score_gpt":0.17604214968722554,"score_spread":0.16530743806460702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097935112","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9289828,0.00012029684,0.012972063,0.0000708891,0.0005571785,0.00033144894,0.000002750152,0.00059089815,0.0563717],"genre_scores_gemma":[0.998904,0.000084295905,0.0004096452,0.00004152894,0.000034229346,0.0000404582,0.0000021645064,0.000016840184,0.00046684794],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99907064,0.000052116528,0.0002642633,0.00017936893,0.00012779454,0.00030582034],"domain_scores_gemma":[0.999237,0.00007732318,0.000049678423,0.00047809628,0.00008295908,0.00007496537],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003279452,0.00012905285,0.00014577639,0.000025038735,0.00010245863,0.000026576607,0.00021421681,0.000030423265,0.000019065326],"category_scores_gemma":[0.000090743706,0.000084256375,0.00005480764,0.00045152297,0.00008261325,0.00013246034,0.000018717672,0.00014434532,0.00013578414],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000255167,0.00038267643,0.7237242,0.00038032624,0.00023318361,0.00002141824,0.003091734,0.0031788053,0.002921547,0.03519749,0.061378706,0.16923475],"study_design_scores_gemma":[0.0001884325,0.0001766171,0.93395704,0.000008993665,0.000017199212,0.000010292281,0.00015859045,0.016228974,0.0039665494,0.001141893,0.043736015,0.00040941645],"about_ca_topic_score_codex":0.0005275915,"about_ca_topic_score_gemma":0.0026933553,"teacher_disagreement_score":0.21023282,"about_ca_system_score_codex":0.000091409944,"about_ca_system_score_gemma":0.000022018441,"threshold_uncertainty_score":0.34358752},"labels":[],"label_agreement":null},{"id":"W7097967532","doi":"","title":"Reference Resource Scenario","year":2002,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Mains electricity; Electricity; Reliability (semiconductor); Resource (disambiguation); Transmission (telecommunications); Work (physics)","score_opus":0.019561091522286838,"score_gpt":0.1734020505581481,"score_spread":0.15384095903586129,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097967532","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011185061,0.00046700911,0.004896508,0.00017174048,0.00016081134,0.00006357921,0.0000015997736,0.00062980194,0.9824239],"genre_scores_gemma":[0.9853466,0.000034554,0.00033839032,0.00009605037,0.000024733134,0.0000050933595,5.712787e-7,0.000008596557,0.014145413],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995904,0.000007236972,0.00009675496,0.0000858463,0.00006424699,0.00015552835],"domain_scores_gemma":[0.9997083,0.00001688445,0.0000050385092,0.00021292397,0.00001017321,0.00004671129],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00005801448,0.000060827962,0.00007112181,0.000018006514,0.000019760204,0.000013218894,0.00010003923,0.00004091113,0.00074444496],"category_scores_gemma":[0.000014505421,0.000051395276,0.00001857561,0.000068273,0.000014850138,0.000050650222,0.000012129124,0.00008107284,0.0010578603],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004273217,0.000060192517,0.0006563443,0.00025058375,0.00003669072,0.00002238139,0.0011456728,0.0063464027,0.002216077,0.025248196,0.93359745,0.030415738],"study_design_scores_gemma":[0.00007654107,0.00000930067,0.0002194765,0.000019912766,0.0000014768801,0.0000074912427,0.000032881577,0.026393907,0.0005469196,0.00007590833,0.97251433,0.00010185704],"about_ca_topic_score_codex":0.000011436469,"about_ca_topic_score_gemma":0.000017031482,"teacher_disagreement_score":0.97416157,"about_ca_system_score_codex":0.000027757045,"about_ca_system_score_gemma":9.356479e-7,"threshold_uncertainty_score":0.9997199},"labels":[],"label_agreement":null},{"id":"W7098087254","doi":"","title":"Please contact the undersigned if you have any questions. Respectfully submitted,","year":2009,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Notice; Reliability (semiconductor); Table (database); Quarter (Canadian coin); National standard","score_opus":0.007993508892500691,"score_gpt":0.20966543323834205,"score_spread":0.20167192434584136,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7098087254","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26927108,0.0036556292,0.19203082,0.021638133,0.0023490912,0.0021811721,0.00005446246,0.0039326334,0.504887],"genre_scores_gemma":[0.99697864,0.00004528644,0.0001258361,0.000551934,0.00007670908,0.000010218543,0.0000024003355,0.000012348054,0.002196605],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991214,0.000049216935,0.00021759591,0.00016818052,0.00014569727,0.00029786144],"domain_scores_gemma":[0.9993083,0.000089859794,0.000021736014,0.00043588204,0.00005017375,0.0000940696],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028585084,0.00014557234,0.00015473136,0.000043608157,0.00009211021,0.00005685409,0.00021791081,0.00007619677,0.00008661674],"category_scores_gemma":[0.000089136556,0.00009960467,0.00008200623,0.00013263393,0.000030965697,0.00012023018,0.00001157825,0.00016277813,0.00013662595],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047598072,0.00046719098,0.005745476,0.00032810585,0.00045053646,0.00032782138,0.005082593,0.028282521,0.0286436,0.5072473,0.40604764,0.01690119],"study_design_scores_gemma":[0.0066104266,0.0014155025,0.30222654,0.00072500046,0.00027345304,0.00038388156,0.007076369,0.1009202,0.01759216,0.056023907,0.5034184,0.0033341735],"about_ca_topic_score_codex":0.00013117163,"about_ca_topic_score_gemma":0.0001326745,"teacher_disagreement_score":0.72770756,"about_ca_system_score_codex":0.0001304001,"about_ca_system_score_gemma":0.000027327418,"threshold_uncertainty_score":0.40617606},"labels":[],"label_agreement":null},{"id":"W7099393401","doi":"","title":"Respectfully submitted,","year":2009,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Quarter (Canadian coin); Table (database); Transmission (telecommunications)","score_opus":0.003059137399383849,"score_gpt":0.1699912044921433,"score_spread":0.16693206709275946,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7099393401","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.111481264,0.00042268055,0.030000534,0.00077723846,0.0005369968,0.00012301668,0.000001501819,0.0014175558,0.8552392],"genre_scores_gemma":[0.9972354,0.000014010664,0.00036711222,0.00019325652,0.000040727256,0.0000015858022,3.958287e-7,0.0000043250157,0.002143177],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99965537,0.000004222152,0.00008500535,0.00006582798,0.000054264456,0.000135314],"domain_scores_gemma":[0.9997828,0.000008337638,0.0000035592968,0.00015641315,0.000011827001,0.00003709176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006568242,0.00005223207,0.00006415242,0.000019670973,0.000011757869,0.000011363104,0.0000724631,0.00002870664,0.0000834821],"category_scores_gemma":[0.000012597738,0.000044109423,0.00002522525,0.000071243805,0.0000059823046,0.000050862596,0.000002908249,0.00004874014,0.00024404691],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042507065,0.00012460581,0.0010072973,0.00015448609,0.0000597534,0.000105977524,0.00090962835,0.010920533,0.049477696,0.23975833,0.6079534,0.08948575],"study_design_scores_gemma":[0.0006676265,0.00016267,0.038656425,0.00006863066,0.0000091849215,0.00006458682,0.00011548301,0.021408055,0.022901116,0.013797084,0.9015052,0.000643982],"about_ca_topic_score_codex":0.0000040544483,"about_ca_topic_score_gemma":0.000007708968,"teacher_disagreement_score":0.88575417,"about_ca_system_score_codex":0.000024570696,"about_ca_system_score_gemma":0.0000031601148,"threshold_uncertainty_score":0.31368107},"labels":[],"label_agreement":null},{"id":"W7100193686","doi":"","title":"REGARDING AUTOMATIC TIME ERROR CORRECTION AND THREE","year":2008,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Quarter (Canadian coin); Error detection and correction; Electricity; Section (typography)","score_opus":0.009615388729842127,"score_gpt":0.18391935784867275,"score_spread":0.17430396911883062,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7100193686","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8560343,0.00025365647,0.048446182,0.00006881374,0.0013301894,0.00018444736,8.459776e-7,0.001323838,0.092357725],"genre_scores_gemma":[0.9962168,0.000013276201,0.0006447203,0.000015909276,0.000025339867,0.000006701582,4.784482e-7,0.000009160948,0.0030676401],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99966204,0.0000056978943,0.00009687494,0.00007696494,0.00005114716,0.0001072761],"domain_scores_gemma":[0.9998128,0.00002802623,0.000007965582,0.00010583616,0.0000113066835,0.000034074994],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007448123,0.000060270766,0.00009545428,0.00002482557,0.000045678633,0.0000071742297,0.000031228392,0.0000346807,0.000068628804],"category_scores_gemma":[0.000027386612,0.000051542578,0.000018973706,0.000055280227,0.000021090638,0.00009278477,0.000009921774,0.00004839913,0.00015643188],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038393013,0.00014177586,0.03376694,0.0018937212,0.00039535103,0.00015870587,0.006191155,0.028722964,0.026996946,0.0025405388,0.7902785,0.10887504],"study_design_scores_gemma":[0.00016734448,0.000019393343,0.010788305,0.000061211256,0.0000054075467,0.00021985396,0.00002785779,0.98151624,0.0008234986,0.000107992484,0.0061284597,0.00013442141],"about_ca_topic_score_codex":0.000016960108,"about_ca_topic_score_gemma":0.000020624115,"teacher_disagreement_score":0.9527933,"about_ca_system_score_codex":0.000029974899,"about_ca_system_score_gemma":0.0000041656613,"threshold_uncertainty_score":0.21018454},"labels":[],"label_agreement":null},{"id":"W7100742306","doi":"","title":"Respectfully submitted,","year":2011,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Quarter (Canadian coin); Control (management); Table (database); On board","score_opus":0.019035271096389396,"score_gpt":0.15223334978277545,"score_spread":0.13319807868638606,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7100742306","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.075965084,0.0001347715,0.01883999,0.000017606733,0.00052311743,0.00006828528,0.0000011174847,0.00070818776,0.90374184],"genre_scores_gemma":[0.9968047,0.000010351397,0.0009156484,0.000037209604,0.000021861042,0.000006345046,2.1790744e-7,0.000008953315,0.002194712],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996736,0.0000049099517,0.00008459844,0.000065114305,0.00004249438,0.00012925461],"domain_scores_gemma":[0.99976766,0.0000065955373,0.000004005714,0.00017082736,0.000013021757,0.000037885857],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000070978625,0.00005066506,0.00005862236,0.00001936355,0.000010010486,0.000004377321,0.00008411023,0.000029029512,0.00048812962],"category_scores_gemma":[0.000010137679,0.00004217538,0.000024090354,0.00005634202,0.000012725689,0.00005194645,0.000008998967,0.00004426676,0.0005282583],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011792183,0.0002625417,0.02150546,0.0007893088,0.00029824566,0.0002508365,0.011933228,0.00070814625,0.020322107,0.49105245,0.42479,0.027969753],"study_design_scores_gemma":[0.0010768996,0.00017782487,0.08562864,0.00011618552,0.00002636218,0.000119914446,0.00077942724,0.012483661,0.110520884,0.01678506,0.7710017,0.0012834332],"about_ca_topic_score_codex":0.000042586224,"about_ca_topic_score_gemma":0.000039261322,"teacher_disagreement_score":0.9208396,"about_ca_system_score_codex":0.000016900944,"about_ca_system_score_gemma":0.0000031925872,"threshold_uncertainty_score":0.6789868},"labels":[],"label_agreement":null},{"id":"W7100918737","doi":"","title":"Midwest Reliability Organization","year":2012,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Electricity; Corporation; Commission; Electric power industry; Electric power system","score_opus":0.00418139912273815,"score_gpt":0.17090539280114578,"score_spread":0.16672399367840762,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7100918737","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.759685,0.00029705363,0.1248635,0.00017520475,0.0024683,0.0002118606,0.0000036889408,0.0015233143,0.11077212],"genre_scores_gemma":[0.99867505,0.000011163281,0.00072075904,0.000041242358,0.000082949875,0.0000036155905,0.0000034016377,0.000012681287,0.00044913968],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995838,0.000010757672,0.00010937026,0.000057541176,0.000055996574,0.00018255334],"domain_scores_gemma":[0.9996749,0.000020419795,0.000006359162,0.00019205593,0.000038394468,0.00006785437],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017897594,0.000059149468,0.00006635718,0.000013465198,0.000021363414,0.000007903919,0.000057586032,0.000044839755,0.00032082427],"category_scores_gemma":[0.000095628464,0.00005054021,0.000014658315,0.0001517753,0.000013368133,0.0002117347,0.000012120727,0.000046521815,0.00049598777],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008797068,0.0004442222,0.7187406,0.0012529702,0.000074627664,0.0000018656397,0.004018443,0.013417242,0.024828736,0.06832209,0.16254056,0.006349874],"study_design_scores_gemma":[0.00053639355,0.000032241387,0.38780734,0.000060018643,0.000028689814,0.000042756714,0.00034722386,0.0071381354,0.10216234,0.0007541916,0.5001797,0.0009109727],"about_ca_topic_score_codex":0.000009663864,"about_ca_topic_score_gemma":0.0000028329086,"teacher_disagreement_score":0.33763912,"about_ca_system_score_codex":0.000053327854,"about_ca_system_score_gemma":0.0000036556503,"threshold_uncertainty_score":0.63750845},"labels":[],"label_agreement":null},{"id":"W7100921358","doi":"","title":"Comparison of Two Methods for Evaluating the Effects of Maintenance on Component and System Reliability","year":2015,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Component (thermodynamics); Failure rate; Electric power system; Index (typography); Power (physics)","score_opus":0.055700354682277006,"score_gpt":0.40242300658515484,"score_spread":0.3467226519028778,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7100921358","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49156827,0.00088521454,0.502829,0.000057213416,0.0009797175,0.0013133622,0.0000059988943,0.00010697311,0.0022542512],"genre_scores_gemma":[0.9605442,0.0000031344894,0.039295528,0.0000088824245,0.00001469941,0.0000858942,7.805419e-7,0.000012403082,0.00003444257],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987266,0.0002817723,0.00048462395,0.00016724657,0.00016088117,0.00017889019],"domain_scores_gemma":[0.9971624,0.0020537095,0.00011543651,0.00040678395,0.00019990822,0.00006177707],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032804506,0.00012598305,0.00046675946,0.000025524445,0.000028243956,0.0000066585985,0.00015172796,0.00004506467,4.8173666e-7],"category_scores_gemma":[0.0011123569,0.00007756765,0.00006970007,0.000083222214,0.00008951912,0.000035931487,0.000038180282,0.00008970805,8.5777714e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001482856,0.000832241,0.016804468,0.07761207,0.00060371147,0.0000016493385,0.016468624,0.30709794,0.24877946,0.21635368,0.009888604,0.104074694],"study_design_scores_gemma":[0.0013772446,0.0008375688,0.0011388124,0.0008537,0.000052097093,0.0000031300463,0.00092029123,0.9100934,0.0830271,0.0008780807,0.0006791141,0.00013940249],"about_ca_topic_score_codex":0.00007152085,"about_ca_topic_score_gemma":0.0000055877413,"teacher_disagreement_score":0.6029955,"about_ca_system_score_codex":0.00010279705,"about_ca_system_score_gemma":0.00001871696,"threshold_uncertainty_score":0.31631172},"labels":[],"label_agreement":null},{"id":"W7100940644","doi":"","title":"STANDARD EOP-008-1 AND RETIREMENT OF ONE EXISTING RELIABILITY STANDARD EOP-008-0","year":2011,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Notice; Reliability (semiconductor); Control (management); Quarter (Canadian coin); On board","score_opus":0.038675962033833784,"score_gpt":0.22250276439651795,"score_spread":0.18382680236268417,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7100940644","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75093114,0.0009110915,0.059686687,0.00011962449,0.000867781,0.0009156502,0.00019846429,0.00071086007,0.18565872],"genre_scores_gemma":[0.98623836,0.00016887173,0.013101844,0.00002402742,0.000036748956,0.000023820272,0.000003493512,0.00003428568,0.00036852807],"study_design_codex":"observational","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9979883,0.00007453268,0.00071159826,0.00038652538,0.0004065061,0.00043255006],"domain_scores_gemma":[0.9987607,0.00009291719,0.000095569594,0.00065001834,0.00023148695,0.00016932249],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001436573,0.00025237026,0.0005525175,0.0000649581,0.00007204427,0.000023579545,0.00019945025,0.0001342304,0.0003472333],"category_scores_gemma":[0.00027214226,0.00023033921,0.0000891877,0.00016523876,0.0001854526,0.00019853273,0.0001082484,0.00020779345,0.000012954129],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0077629224,0.0022847776,0.38520288,0.047568478,0.0024606297,0.00019897739,0.0785414,0.0036540048,0.06536859,0.23760124,0.059361316,0.10999477],"study_design_scores_gemma":[0.012489463,0.0061716065,0.13687293,0.005953789,0.0006207283,0.00007663911,0.007974586,0.013051304,0.5457113,0.04759742,0.21756929,0.0059109568],"about_ca_topic_score_codex":0.00024253743,"about_ca_topic_score_gemma":0.00013651869,"teacher_disagreement_score":0.4803427,"about_ca_system_score_codex":0.00020761703,"about_ca_system_score_gemma":0.000048575963,"threshold_uncertainty_score":0.93929607},"labels":[],"label_agreement":null},{"id":"W7101047424","doi":"","title":"Respectfully submitted,","year":2009,"lang":"en","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Notice; Reliability (semiconductor); Table (database); Quarter (Canadian coin); National standard","score_opus":0.003059137399383849,"score_gpt":0.1699912044921433,"score_spread":0.16693206709275946,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7101047424","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.111481264,0.00042268055,0.030000534,0.00077723846,0.0005369968,0.00012301668,0.000001501819,0.0014175558,0.8552392],"genre_scores_gemma":[0.9972354,0.000014010664,0.00036711222,0.00019325652,0.000040727256,0.0000015858022,3.958287e-7,0.0000043250157,0.002143177],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99965537,0.000004222152,0.00008500535,0.00006582798,0.000054264456,0.000135314],"domain_scores_gemma":[0.9997828,0.000008337638,0.0000035592968,0.00015641315,0.000011827001,0.00003709176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006568242,0.00005223207,0.00006415242,0.000019670973,0.000011757869,0.000011363104,0.0000724631,0.00002870664,0.0000834821],"category_scores_gemma":[0.000012597738,0.000044109423,0.00002522525,0.000071243805,0.0000059823046,0.000050862596,0.000002908249,0.00004874014,0.00024404691],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042507065,0.00012460581,0.0010072973,0.00015448609,0.0000597534,0.000105977524,0.00090962835,0.010920533,0.049477696,0.23975833,0.6079534,0.08948575],"study_design_scores_gemma":[0.0006676265,0.00016267,0.038656425,0.00006863066,0.0000091849215,0.00006458682,0.00011548301,0.021408055,0.022901116,0.013797084,0.9015052,0.000643982],"about_ca_topic_score_codex":0.0000040544483,"about_ca_topic_score_gemma":0.000007708968,"teacher_disagreement_score":0.88575417,"about_ca_system_score_codex":0.000024570696,"about_ca_system_score_gemma":0.0000031601148,"threshold_uncertainty_score":0.31368107},"labels":[],"label_agreement":null},{"id":"W7108336811","doi":"10.1115/imece-india2025-161226","title":"Analysis of the Effects of Online and Offline Washing on Degradation and Life Cycle Costs in Gas Turbine Combined Cycle Power Plants: A Comparative Study","year":2025,"lang":"","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Siemens (Canada)","funders":"","keywords":"Combined cycle; Cost of electricity by source; Gas compressor; Gas turbines; Power station; Electricity generation; Turbine; Electricity","score_opus":0.006990493163649884,"score_gpt":0.2477287721477838,"score_spread":0.2407382789841339,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7108336811","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99555475,0.0010466251,0.0005489444,0.00021284018,0.00032849444,0.0015465423,0.00008348983,0.000023306065,0.00065503485],"genre_scores_gemma":[0.99958295,0.0001723841,0.00004973325,0.000066015135,0.000005083999,0.000018459627,0.00001526881,0.000010710959,0.000079418285],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99767524,0.00037744918,0.000992796,0.00042237443,0.00027334844,0.00025876763],"domain_scores_gemma":[0.9977486,0.0013009647,0.0002418722,0.0005123152,0.000113115435,0.00008309502],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006051018,0.000316947,0.0012505387,0.0005218404,0.00006349831,0.000028698727,0.00020930679,0.00011718625,0.00000808477],"category_scores_gemma":[0.00057500554,0.00023526279,0.00011438344,0.0014872167,0.00013612617,0.00014316263,0.0001765279,0.0002962155,3.4007363e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0041054743,0.017406363,0.6605006,0.007124939,0.017167797,0.000022997192,0.04657784,0.21845917,0.01698975,0.005840129,0.00043156758,0.005373379],"study_design_scores_gemma":[0.0041809804,0.0007693294,0.6740004,0.0017031789,0.00079028594,4.426564e-7,0.005144266,0.30951005,0.003625339,0.00005615746,0.000009055269,0.00021048904],"about_ca_topic_score_codex":0.0011664889,"about_ca_topic_score_gemma":0.005536167,"teacher_disagreement_score":0.09105089,"about_ca_system_score_codex":0.00013026384,"about_ca_system_score_gemma":0.000051842773,"threshold_uncertainty_score":0.95937383},"labels":[],"label_agreement":null},{"id":"W7117144372","doi":"10.18280/jesa.581111","title":"Machine Learning Based Weather Prediction for Smart Battery Switching of PV System to Enhanced Reliability Optimization","year":2025,"lang":"","type":"article","venue":"Journal Européen des Systèmes Automatisés","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Photovoltaic system; Battery (electricity); Support vector machine; Artificial neural network","score_opus":0.0078034931506942755,"score_gpt":0.22470716084571768,"score_spread":0.2169036676950234,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7117144372","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04293698,0.0016733209,0.9453184,0.00027768116,0.0048240665,0.001964987,0.0001220687,0.00057717337,0.002305333],"genre_scores_gemma":[0.96079004,0.00014832386,0.037672043,0.00006332469,0.00023709757,0.00013515582,0.000014355711,0.00013911039,0.0008005602],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99374866,0.0010201063,0.002972342,0.00072629674,0.0006428876,0.0008896911],"domain_scores_gemma":[0.99596983,0.0008148918,0.0010110807,0.0007645422,0.0010975196,0.0003421183],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.004128713,0.0006973821,0.0013906233,0.0007613375,0.0007302443,0.00035581872,0.00060186326,0.0003688747,0.00007326529],"category_scores_gemma":[0.0021712899,0.0006800566,0.0006060818,0.0010700909,0.000073451025,0.0006345142,0.00013703809,0.00087023224,0.000020036296],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028040344,0.00013268978,0.0017909786,0.013321306,0.00031019037,0.000007712,0.0010379847,0.9562658,0.006962277,0.00024960338,0.00031938512,0.01932168],"study_design_scores_gemma":[0.001666607,0.00056101376,0.011301331,0.015197771,0.0003477551,0.000072742485,0.0004194365,0.9651017,0.0033764518,0.00012780973,0.0013662552,0.00046111573],"about_ca_topic_score_codex":0.00008845016,"about_ca_topic_score_gemma":0.0000133096,"teacher_disagreement_score":0.91785306,"about_ca_system_score_codex":0.0019936408,"about_ca_system_score_gemma":0.00037989157,"threshold_uncertainty_score":0.99956506},"labels":[],"label_agreement":null},{"id":"W7124831022","doi":"10.22215/etd/2025-16751","title":"The Impact of Industrial Sector Electrification on Power System Cost and Performance: A Case Study of New Brunswick","year":2025,"lang":"","type":"dissertation","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electrification; Electric power system; Secondary sector of the economy; Electricity; Electric power industry; Power (physics)","score_opus":0.0224277003222609,"score_gpt":0.27019487732506453,"score_spread":0.24776717700280362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7124831022","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.990093,0.00062684814,0.00014311227,0.0000082435845,0.0014924704,0.004508203,0.000024525089,0.000046427253,0.0030571548],"genre_scores_gemma":[0.9974389,0.00019298847,0.0000034476104,7.9150317e-7,0.00007282841,0.000061088416,0.00002387155,0.000036424844,0.002169649],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9968461,0.00022268451,0.0016004377,0.00049598585,0.000394085,0.00044071273],"domain_scores_gemma":[0.9972632,0.0005988997,0.0007027411,0.0008683407,0.00040673703,0.00016010736],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00094770733,0.00055743207,0.0009856944,0.0003076293,0.00023114371,0.000075516204,0.00031095056,0.00057593884,0.000027194721],"category_scores_gemma":[0.00027141112,0.0003829075,0.00023360313,0.0007636869,0.00003547271,0.00013746042,0.000018408999,0.00070334,0.0000036667623],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.055576146,0.011380125,0.22852376,0.056374535,0.026109392,0.00048836507,0.26388952,0.12043097,0.011902895,0.018058851,0.014853623,0.19241183],"study_design_scores_gemma":[0.04159699,0.05911001,0.1740866,0.03358358,0.0035980942,0.0016229764,0.4266806,0.22282447,0.03130236,0.000029658184,0.0006150112,0.0049496614],"about_ca_topic_score_codex":0.035051856,"about_ca_topic_score_gemma":0.005187018,"teacher_disagreement_score":0.18746217,"about_ca_system_score_codex":0.00062391866,"about_ca_system_score_gemma":0.0018582917,"threshold_uncertainty_score":0.9998623},"labels":[],"label_agreement":null},{"id":"W7127304815","doi":"10.1109/ccece64018.2025.11364488","title":"Towards a Digital Twin of Medium-Voltage Circuit Breakers Using Quantum Algorithms and Deep Learning","year":2025,"lang":"","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Deep learning; Circuit breaker; Quantum computer; Virtual reality; Task (project management); Digital electronics","score_opus":0.0117253211133228,"score_gpt":0.23059225874835226,"score_spread":0.21886693763502946,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7127304815","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12746821,0.0065548723,0.82990247,0.000112423,0.0021550565,0.00056530273,0.00003723984,0.00024674524,0.032957688],"genre_scores_gemma":[0.99770075,0.0004013797,0.00059911143,0.000033326312,0.000070328555,0.000008732044,0.000005277685,0.00004696586,0.0011341526],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9971779,0.00006519523,0.0010355836,0.00061252684,0.00036835455,0.00074041536],"domain_scores_gemma":[0.99875265,0.00024394678,0.0001584963,0.00044358705,0.00018470876,0.00021658083],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006704502,0.0004739937,0.0008792919,0.000296631,0.00014342416,0.00021422905,0.0003040584,0.00033749227,0.00009759948],"category_scores_gemma":[0.0005314313,0.00048639215,0.00022726075,0.00069090317,0.00031195828,0.0005864689,0.00026833997,0.00054464256,0.000010059808],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031804838,0.00091053615,0.05590866,0.02858411,0.004257712,0.00030246837,0.026188763,0.09121941,0.0353518,0.07160168,0.0005740357,0.68478274],"study_design_scores_gemma":[0.001867726,0.00023051402,0.0069876797,0.002700732,0.00026533857,0.0000943151,0.0067386325,0.9600341,0.004256239,0.0026784134,0.0131070325,0.0010393164],"about_ca_topic_score_codex":0.00069239904,"about_ca_topic_score_gemma":0.000030584415,"teacher_disagreement_score":0.8702325,"about_ca_system_score_codex":0.00026371048,"about_ca_system_score_gemma":0.00021925599,"threshold_uncertainty_score":0.9997588},"labels":[],"label_agreement":null},{"id":"W7127961354","doi":"10.57041/ijeet.v1i2.795","title":"Modern Trends in Manufacturing of Medium Voltage Switchgears","year":2022,"lang":"","type":"article","venue":"International Journal of Emerging Engineering and Technology","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Switchgear; Preventive maintenance; Electrical equipment; Shut down; Production (economics); Trouble shooting; Maintenance engineering; Voltage","score_opus":0.004838093495666291,"score_gpt":0.21596621128990606,"score_spread":0.21112811779423976,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7127961354","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9653072,0.0063474695,0.01972725,0.0019885742,0.0062308167,0.00007181282,0.00003817126,0.00008114525,0.0002075681],"genre_scores_gemma":[0.99870247,0.00043853177,0.0006054532,0.000008396847,0.00011133687,0.00000786844,0.0000020971038,0.000036575708,0.00008727188],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979357,0.00002021657,0.0010260512,0.00020069773,0.0004945805,0.00032277132],"domain_scores_gemma":[0.99918866,0.00007109417,0.00034536453,0.00018842459,0.00014114911,0.000065296284],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006365087,0.00022758065,0.00051027164,0.0030153978,0.000035762565,0.000017212216,0.00072191225,0.00013940365,0.00008219245],"category_scores_gemma":[0.00010651524,0.00025926688,0.00012817292,0.00047539797,0.00005893803,0.00016305016,0.0003305671,0.0010487007,4.2154767e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010299676,0.0001759917,0.0021917787,0.00024575644,0.0006867488,0.0006665365,0.0021160895,0.8642613,0.04411345,0.0025229407,0.0002164154,0.08269995],"study_design_scores_gemma":[0.008626979,0.0014901782,0.011525308,0.0031143995,0.0002427669,0.0065047676,0.0047223466,0.7511232,0.09960222,0.0075403615,0.10356758,0.0019399035],"about_ca_topic_score_codex":0.000034513432,"about_ca_topic_score_gemma":0.0000074992304,"teacher_disagreement_score":0.11313816,"about_ca_system_score_codex":0.00032289815,"about_ca_system_score_gemma":0.000043656204,"threshold_uncertainty_score":0.99998593},"labels":[],"label_agreement":null},{"id":"W7131211529","doi":"10.1109/mmeat65787.2025.11398999","title":"Based on thermal and solid coupling topology reliability sensitivity analysis of wind turbine transmission system","year":2025,"lang":"","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"123 Certification (Canada)","funders":"","keywords":"Turbine; Reliability (semiconductor); Transmission (telecommunications); Transmission system; Thermal; Wind power; Coupling (piping); Sensitivity (control systems)","score_opus":0.0051810862235173345,"score_gpt":0.2265584445042113,"score_spread":0.22137735828069396,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7131211529","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7180325,0.0005210824,0.2715164,0.00062094984,0.0007141745,0.0006257455,0.00008536947,0.00016515469,0.0077186213],"genre_scores_gemma":[0.99911624,0.000044533,0.0004891674,0.000075034186,0.000025774807,0.000006848552,0.000012180672,0.000020117432,0.00021011061],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9968691,0.0003266872,0.001161055,0.0008209281,0.00028595043,0.0005362973],"domain_scores_gemma":[0.9972224,0.001222527,0.00015979404,0.000986545,0.00023771427,0.0001710133],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0025408266,0.0004567095,0.0016096004,0.0005791113,0.00015071144,0.0000324872,0.00015207674,0.0004769358,0.0000899458],"category_scores_gemma":[0.00018516307,0.00039837908,0.00046663763,0.0013667026,0.000281825,0.0001002617,0.000059144477,0.00041102341,0.0000028707893],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036725923,0.00020331013,0.00593095,0.0044098846,0.0009574046,0.000016596721,0.0002588992,0.9704761,0.014114368,0.0018997934,0.000022799975,0.0013426634],"study_design_scores_gemma":[0.0007647486,0.00014052124,0.031149182,0.0010902225,0.0016878931,0.0000017319586,0.0003097577,0.95040095,0.013921558,0.000011858358,0.00022857814,0.00029297368],"about_ca_topic_score_codex":0.0006453726,"about_ca_topic_score_gemma":0.00008164258,"teacher_disagreement_score":0.28108373,"about_ca_system_score_codex":0.00032894767,"about_ca_system_score_gemma":0.00013426648,"threshold_uncertainty_score":0.9998468},"labels":[],"label_agreement":null},{"id":"W7134176809","doi":"10.63125/qm2kzn75","title":"A Conceptual Model Development for Evaluating AI-Driven Predictive Maintenance in SCADA-Integrated Smart Grid Systems","year":2025,"lang":"","type":"article","venue":"","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Benchmarking; SCADA; Conceptual model; Smart grid; Grid; Data modeling; Resilience (materials science)","score_opus":0.02393385683587419,"score_gpt":0.2750881664531466,"score_spread":0.2511543096172724,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7134176809","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024502747,0.0021578546,0.95047307,0.00037749799,0.0056387996,0.0058550253,0.00031459332,0.0003947461,0.010285648],"genre_scores_gemma":[0.9705679,0.00008461292,0.0149438875,0.00027814455,0.000091026275,0.0026252978,0.00006425223,0.00008271917,0.011262163],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99390304,0.00026895208,0.0023847057,0.0012789529,0.000561326,0.0016030391],"domain_scores_gemma":[0.9971088,0.00056957075,0.00024788777,0.0007184382,0.0011194398,0.00023582764],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0024805886,0.0008627836,0.0013915551,0.00043649806,0.0002673977,0.00018806483,0.00071075466,0.0005749141,0.000026630476],"category_scores_gemma":[0.0010455988,0.0008132189,0.00025927112,0.00095889095,0.0002770486,0.0004648441,0.00022461577,0.000805378,0.000034571538],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046988373,0.00017758828,0.0009569679,0.0018844391,0.00041552278,0.0000070220985,0.004722123,0.9424205,0.0006403988,0.036624998,0.010503836,0.0011767386],"study_design_scores_gemma":[0.0033408431,0.00020527578,0.00035178594,0.007378943,0.00008825958,0.0000061200553,0.0058312714,0.96489006,0.0009506283,0.00031931375,0.015875021,0.000762456],"about_ca_topic_score_codex":0.000495756,"about_ca_topic_score_gemma":0.00071220996,"teacher_disagreement_score":0.9460651,"about_ca_system_score_codex":0.0031460624,"about_ca_system_score_gemma":0.002394184,"threshold_uncertainty_score":0.99943185},"labels":[],"label_agreement":null},{"id":"W808441817","doi":"10.1049/iet-gtd.2015.0581","title":"Power system reliability evaluation using a state space classification technique and particle swarm optimisation search method","year":2015,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Particle swarm optimization; Weighting; Computer science; Reliability (semiconductor); Electric power system; State space; Monte Carlo method; Mathematical optimization; Power (physics); Algorithm; Mathematics","score_opus":0.062278877971819725,"score_gpt":0.31051351338947475,"score_spread":0.24823463541765503,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W808441817","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28438944,0.00022822313,0.7134766,0.00023267166,0.00027273165,0.0009750207,0.00005408145,0.00026558648,0.00010563569],"genre_scores_gemma":[0.98211795,0.00003469046,0.017191375,0.0000074397367,0.00005865483,0.00019291262,0.0003530513,0.000024145436,0.000019755202],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975612,0.00060732523,0.00053610816,0.0004232686,0.0005868913,0.00028518774],"domain_scores_gemma":[0.9986301,0.000042606127,0.0000837558,0.00033918742,0.0006520116,0.00025232232],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0040077004,0.00021224405,0.000219281,0.00005209546,0.00017553568,0.000108229564,0.0000823537,0.00018767781,0.000012230507],"category_scores_gemma":[0.00011148214,0.00020535702,0.000057858015,0.00034844427,0.00003980184,0.00048784926,0.000012916575,0.00017536258,0.000008543158],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007457311,0.00006953337,0.00016120379,0.00025102633,0.000018689689,0.0000010439635,0.0011277945,0.52687645,0.46049967,0.0012612487,0.0007099642,0.00894879],"study_design_scores_gemma":[0.00047936157,0.00005173037,0.00046842825,0.000073666786,0.00003329459,0.000013759075,0.0003181445,0.789083,0.20746341,0.000140359,0.0016932157,0.00018162158],"about_ca_topic_score_codex":0.000056940993,"about_ca_topic_score_gemma":0.0000038226367,"teacher_disagreement_score":0.6977285,"about_ca_system_score_codex":0.0011200929,"about_ca_system_score_gemma":0.00016375561,"threshold_uncertainty_score":0.8374216},"labels":[],"label_agreement":null},{"id":"W84273743","doi":"10.1049/iet-gtd.2010.0312","title":"Incorporating superconducting fault current limiters in the probabilistic evaluation of transient recovery voltage","year":2010,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Circuit breaker; Transient recovery voltage; Emtp; Transient (computer programming); Context (archaeology); Limiter; Fault (geology); Electric power transmission; Monte Carlo method; Electric power system; Voltage; Probabilistic logic; Control theory (sociology); Fault current limiter; Engineering; Power (physics); Electrical engineering; Reliability engineering; Computer science; Physics; Power factor; Mathematics; Statistics","score_opus":0.03461532239015791,"score_gpt":0.2626340911105275,"score_spread":0.22801876872036958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W84273743","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8122678,0.00025062275,0.18539704,0.00018852043,0.0010079725,0.0006794743,0.000068440946,0.000050743925,0.00008939781],"genre_scores_gemma":[0.99876946,0.00003268921,0.00025204115,0.000010457334,0.000114331844,0.00013069862,0.00067747524,0.000011144107,0.0000017011517],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982697,0.00020855118,0.0005920094,0.00022938705,0.00050459977,0.00019579649],"domain_scores_gemma":[0.99926007,0.0000631695,0.00007722186,0.00024744272,0.00030330705,0.00004876632],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026014962,0.00015726718,0.00016659444,0.00005553735,0.00009762523,0.00004345362,0.00013991394,0.00011725529,0.000026780926],"category_scores_gemma":[0.00023750108,0.00012304379,0.00007786928,0.000379672,0.00004706771,0.00030679395,0.0000039362226,0.0003436034,0.0000026251225],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014203649,0.00015017086,0.00019727282,0.00031393647,0.00000937845,4.805812e-7,0.0016450476,0.13398318,0.7196325,0.0008202834,0.0008096478,0.14242388],"study_design_scores_gemma":[0.0008052644,0.00006888507,0.0027783897,0.00021523116,0.000070900605,0.0000064234623,0.00033971595,0.9296945,0.059419405,0.0007538037,0.005582661,0.00026483886],"about_ca_topic_score_codex":0.000016703194,"about_ca_topic_score_gemma":0.00012063394,"teacher_disagreement_score":0.7957113,"about_ca_system_score_codex":0.0001285985,"about_ca_system_score_gemma":0.00009484404,"threshold_uncertainty_score":0.50175804},"labels":[],"label_agreement":null}]}